Environmental Business Council April 8, 2013
![Page 2: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/2.jpg)
“Dam removal projects can contribute to the restoration of aquatic habitats upstream and downstream by restoring the natural movement of water and sediment, and by reestablishing more natural temperatures and oxygen levels. Dam removal projects can also improve flood management, storm damage prevention, and prevention of pollution in cases where the dam is otherwise in disrepair and represents a hazard. Since these projects can serve to improve the natural capacity of a river to protect the many interests of the WPA, they may be (and have been) permitted under 310 CMR 10.53(4).” MassDEP Dam Removal Guidance -2007
![Page 3: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/3.jpg)
General permitting for ecological
restoration projects. For example: dam removal, stream
daylighting, shellfish habitat restoration, fish passage, removing tidal restrictions (WPA)
![Page 4: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/4.jpg)
•Provides incentives to undertake restoration
•Improves speed and predictability of Orders of Conditions
•Identifies key issues for review and information development
•Projects eligible for General Permits are exempt from MEPA
•Order of conditions serves as the Water Quality Certification
![Page 5: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/5.jpg)
Eligibility Criteria for all Restoration Projects
Project will benefit at least one of the interests of the Act
Avoid and minimize adverse impacts
Utilize erosion control BMPs
No significant effect on flood impacts to the built environment
No impacts to vernal pools or ORWs
No armoring of barrier beaches or dunes
![Page 6: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/6.jpg)
•Written notification in the
Environmental Monitor
•Contact Mass Natural Heritage for
Rare Species Determination
•Time of Year (TOY) Restrictions
•TOYs for Coastal Waters
•Diadromous Fish
•Silt producing in-water work
![Page 7: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/7.jpg)
•Submit a Sediment Management Plan to DEP
•Managed in accordance with physical and chemical analytical requirements
•Address quantity and quality of mobilized sediments
•Turbidity BMPs
•Construction sequence in accordance with TOY
•Complies with Waterways dredge permit requirements
![Page 8: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/8.jpg)
•Project restoration goals
•Typical NOI information
•Pre-application documentation
•Invasive species control plan
•Eligibility criteria certification
•Combined Application Info (if applicable) documenting potential to affect structures authorized under Chapter 91
•Wildlife Habitat evaluations not required
![Page 9: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/9.jpg)
•Dam not constructed or managed for flood control purposes •Will not adversely affect PWS or permitted water withdrawals or private water supply •Complete removal of vertical extent so no remnant remains at or below the streambed •Removal of horizontal extent so will not impound the 500 year flood •Will not affect a hydroelectric facility or require FERC approval •Not subject to DCR Dam Safety regulations, or permit issued by DCR •No adverse affect on navigation or on piers or boat ramps
![Page 10: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/10.jpg)
Please comment on draft regulations!
Public notice versions of draft regulatory changes have been approved by EOEEA and Governor’s office
Notice to State Agencies and Legislature (approval is required for promulgation) provided recently.
Public Comment: March 1, 2013 to May 10, 2013.
Final promulgation completed by end of the year
![Page 11: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/11.jpg)
March 22, 2013
MassDEP - Central Regional Office 627 Main Street
Worcester, MA 01608
April 1, 2013 MassDEP – Southeast Regional Office
20 Riverside Drive, Lakeville, MA 02347
April 11, 2013 MassDEP – Western Regional Office
436 Dwight Street Springfield, MA 01103
March 28, 2013
MassDEP - Northeast Regional Office
205B Lowell Street Wilmington, MA 01887
April 3, 2013 Cape Cod Community College -
Theatre 2240 Iyannough Rd
West Barnstable, MA 02668
April 16, 2013 MassDEP - Boston
2nd Floor Conference Rooms One Winter Street Boston, MA 02108
![Page 12: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/12.jpg)
Proposed regulations: www.mass.gov/dep/water/approvals/2012_rr.htm
Comment period closes: May 10, 2013
Mail Comment:
MassDEP-Bureau of Resource Protection Regulatory Comment Box
One Winter Street, Fifth Floor Boston, MA 02108
Electronic Comment: [email protected]
![Page 13: Environmental Business Council April 8, 2013s3.amazonaws.com/.../Langley_Dam_Removal_Restoration_Projects.… · restoration of aquatic habitats upstream and downstream by restoring](https://reader033.vdocuments.site/reader033/viewer/2022050416/5f8c89cd7327f303e161f10f/html5/thumbnails/13.jpg)
Thank you! Lealdon Langley, Director
Wetlands and Waterways Program
Bureau of Resource Protection
(617) 574-6882