entry point monitoring schedule · 2020. 12. 18. · distribution monitoring schedule ** reminder:...

142
ANDOVER VILLAGE PWS OH0400012 ENTRY POINT MONITORING SCHEDULE 2021 ENTRY POINT SCHEDULE Community System Type: Operating Period: to 1/1 12/31 Sampling Location Facility ID: SMP ID: 452810 EP001 Facility Name: ANDOVER WTP Effective Date: 01/01/2021 THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM. Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Also, monitoring schedules may be revised during the year based on sampling results. For water emergencies that occur after hours, please call 800-282-9378 ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements Facility Class: CLASS 1 Facility Source: Ground Water EP001 EP001 Not Required INORGANICS Not Required NITRITE - 1041 Sample(s) Required between NITRATE - 1040 1 1/1/2021 and 5/31/2021 Not Required RADIOLOGICALS Not Required SYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 Not Required VOLATILE ORGANIC CHEMICALS (VOC)

Upload: others

Post on 22-Jan-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ANDOVER VILLAGE PWSOH0400012

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452810EP001

Facility Name: ANDOVER WTP

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 2: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ANDOVER VILLAGE PWSOH0400012

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20212TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and

Sample(s) Required between 1/31/20212TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2021at: DS201DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 3: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ANDOVER VILLAGE PWSOH0400012

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2021at: DS202DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202110LEAD - 1030 AND COPPER - 1022 6/1/2021 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 4: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BAYSHORE CAMPGROUND PWS

2021 MONITORING SCHEDULE

OH0400112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: BAYSHORE CAMPGROUND DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 5: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BAYSHORE CAMPGROUND PWS

2021 MONITORING SCHEDULE

OH0400112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/15/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BAYSHORE CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/15/2021 and 4/30/2021

Sample(s) Required between1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/15/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 6: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BAYSHORE CAMPGROUND PWS

2021 MONITORING SCHEDULE

OH0400112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BAYSHORE CAMPGROUNDGround Water Facility Class: CLASS A

452811

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 7: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ANDOVER-CAMPLANDS WATEROH0400212

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452812EP001

Facility Name: ANDOVER-CAMPLANDS WATER WTP

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 8: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ANDOVER-CAMPLANDS WATEROH0400212

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER CAMPLANDS DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20217TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20217 2/1/2021 andSample(s) Required between 3/31/20217 3/1/2021 andSample(s) Required between 4/30/20217 4/1/2021 andSample(s) Required between 5/31/20217 5/1/2021 andSample(s) Required between 6/30/20217 6/1/2021 andSample(s) Required between 7/31/20217 7/1/2021 andSample(s) Required between 8/31/20217 8/1/2021 andSample(s) Required between 9/30/20217 9/1/2021 andSample(s) Required between 10/31/20217 10/1/2021 andSample(s) Required between 11/30/20217 11/1/2021 andSample(s) Required between 12/31/20217 12/1/2021 and

Sample(s) Required between 1/31/20217TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20217 2/1/2021 andSample(s) Required between 3/31/20217 3/1/2021 andSample(s) Required between 4/30/20217 4/1/2021 andSample(s) Required between 5/31/20217 5/1/2021 andSample(s) Required between 6/30/20217 6/1/2021 andSample(s) Required between 7/31/20217 7/1/2021 andSample(s) Required between 8/31/20217 8/1/2021 andSample(s) Required between 9/30/20217 9/1/2021 andSample(s) Required between 10/31/20217 10/1/2021 andSample(s) Required between 11/30/20217 11/1/2021 andSample(s) Required between 12/31/20217 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER CAMPLANDS DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2021at: DS201DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 9: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ANDOVER-CAMPLANDS WATEROH0400212

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER CAMPLANDS DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2021at: DS202DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER CAMPLANDS DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202120LEAD - 1030 AND COPPER - 1022 6/1/2021 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANDOVER CAMPLANDS DISTRIBUTION Facility Class: CLASS 1SUP01

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative beforethe system may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements.If your start date is different from last year, please contact your Ohio EPA District Representative.***

Page 10: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CONNEAUTOH0400411

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452814EP001

Facility Name: CONNEAUT WATER DEPARTMENT CONNEAUT WTP

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

EP001

EP001

Sample(s) Required betweenINORGANICS 1 1/1/2021 and 5/31/2021 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 1/31/2021Sample(s) Required between1 2/1/2021 and 2/28/2021Sample(s) Required between1 3/1/2021 and 3/31/2021Sample(s) Required between1 4/1/2021 and 4/30/2021Sample(s) Required between1 5/1/2021 and 5/31/2021Sample(s) Required between1 6/1/2021 and 6/30/2021Sample(s) Required between1 7/1/2021 and 7/31/2021Sample(s) Required between1 8/1/2021 and 8/31/2021Sample(s) Required between1 9/1/2021 and 9/30/2021Sample(s) Required between1 10/1/2021 and 10/31/2021Sample(s) Required between1 11/1/2021 and 11/30/2021Sample(s) Required between1 12/1/2021 and 12/31/2021

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2021 and 6/30/2021 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2021 and 5/31/2021

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2021 and 1/31/2021Paired Sample Set Required between1 2/1/2021 and 2/28/2021Paired Sample Set Required between1 3/1/2021 and 3/31/2021Paired Sample Set Required between1 4/1/2021 and 4/30/2021Paired Sample Set Required between1 5/1/2021 and 5/31/2021Paired Sample Set Required between1 6/1/2021 and 6/30/2021Paired Sample Set Required between1 7/1/2021 and 7/31/2021Paired Sample Set Required between1 8/1/2021 and 8/31/2021Paired Sample Set Required between1 9/1/2021 and 9/30/2021Paired Sample Set Required between1 10/1/2021 and 10/31/2021Paired Sample Set Required between1 11/1/2021 and 11/30/2021Paired Sample Set Required between1 12/1/2021 and 12/31/2021

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.

Page 11: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CONNEAUTOH0400411

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452814EP001/LT2001

Facility Name: CONNEAUT WATER DEPARTMENT CONNEAUT WTP

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

EP001

LT2001

Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.

*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.

Page 12: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CONNEAUTOH0400411

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452814LT2001

Facility Name: CONNEAUT WATER DEPARTMENT CONNEAUT WTP

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/27/2020 and 1/2/2021Sample(s) Required between1 1/10/2021 and 1/16/2021Sample(s) Required between1 1/24/2021 and 1/30/2021Sample(s) Required between1 2/7/2021 and 2/13/2021Sample(s) Required between1 2/21/2021 and 2/27/2021Sample(s) Required between1 3/7/2021 and 3/13/2021Sample(s) Required between1 3/21/2021 and 3/27/2021Sample(s) Required between1 4/4/2021 and 4/10/2021Sample(s) Required between1 4/18/2021 and 4/24/2021Sample(s) Required between1 5/2/2021 and 5/8/2021Sample(s) Required between1 5/16/2021 and 5/22/2021Sample(s) Required between1 5/30/2021 and 6/5/2021Sample(s) Required between1 6/13/2021 and 6/19/2021Sample(s) Required between1 6/27/2021 and 7/3/2021Sample(s) Required between1 7/11/2021 and 7/17/2021Sample(s) Required between1 7/25/2021 and 7/31/2021Sample(s) Required between1 8/8/2021 and 8/14/2021Sample(s) Required between1 8/22/2021 and 8/28/2021Sample(s) Required between1 9/5/2021 and 9/11/2021Sample(s) Required between1 9/19/2021 and 9/25/2021Sample(s) Required between1 10/3/2021 and 10/9/2021Sample(s) Required between1 10/17/2021 and 10/23/2021Sample(s) Required between1 10/31/2021 and 11/6/2021Sample(s) Required between1 11/14/2021 and 11/20/2021Sample(s) Required between1 11/28/2021 and 12/4/2021Sample(s) Required between1 12/12/2021 and 12/18/2021

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.

Page 13: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CONNEAUTOH0400411

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONNEAUT, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202110TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/202110 2/1/2021 andSample(s) Required between 3/31/202110 3/1/2021 andSample(s) Required between 4/30/202110 4/1/2021 andSample(s) Required between 5/31/202110 5/1/2021 andSample(s) Required between 6/30/202110 6/1/2021 andSample(s) Required between 7/31/202110 7/1/2021 andSample(s) Required between 8/31/202110 8/1/2021 andSample(s) Required between 9/30/202110 9/1/2021 andSample(s) Required between 10/31/202110 10/1/2021 andSample(s) Required between 11/30/202110 11/1/2021 andSample(s) Required between 12/31/202110 12/1/2021 and

Sample(s) Required between 1/31/202110TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/202110 2/1/2021 andSample(s) Required between 3/31/202110 3/1/2021 andSample(s) Required between 4/30/202110 4/1/2021 andSample(s) Required between 5/31/202110 5/1/2021 andSample(s) Required between 6/30/202110 6/1/2021 andSample(s) Required between 7/31/202110 7/1/2021 andSample(s) Required between 8/31/202110 8/1/2021 andSample(s) Required between 9/30/202110 9/1/2021 andSample(s) Required between 10/31/202110 10/1/2021 andSample(s) Required between 11/30/202110 11/1/2021 andSample(s) Required between 12/31/202110 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONNEAUT, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 207 PARRISH ROAD

Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 and

Page 14: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CONNEAUTOH0400411

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONNEAUT, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 207 PARRISH ROAD

Dual Sample Required between 11/14/2021at: DS201DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONNEAUT, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 ROUTE 90 REST AREA

Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONNEAUT, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

Page 15: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DFC MOBILE HOME PARKOH0400512

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452815EP001

Facility Name: DFC MHP

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 3/31/2021

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 16: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DFC MOBILE HOME PARKOH0400512

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DFC MOBILE HOME PARK DISTRIBUTIONDS000

Sample(s) Required between 1/31/20211TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and

Sample(s) Required between 1/31/20211TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DFC MOBILE HOME PARK DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2021at: DS201DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 17: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DFC MOBILE HOME PARKOH0400512

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DFC MOBILE HOME PARK DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20215LEAD - 1030 AND COPPER - 1022 6/1/2021 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 18: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ROAMING SHORES VILLAGE PWSOH0400611

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROAMING SHORES, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20212TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and

Sample(s) Required between 1/31/20212TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROAMING SHORES, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 955 ROME ROCK CREEK ROAD

Dual Sample Required between 2/7/2021at: DS201DISINFECTION BYPRODUCTS 2/1/2021 andDual Sample Required between 5/7/2021at: DS2015/1/2021 andDual Sample Required between 8/7/2021at: DS2018/1/2021 and

Page 19: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ROAMING SHORES VILLAGE PWSOH0400611

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROAMING SHORES, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 955 ROME ROCK CREEK ROAD

Dual Sample Required between 11/7/2021at: DS201DISINFECTION BYPRODUCTS 11/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROAMING SHORES, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 2079 SOUTH PARK LANE

Dual Sample Required between 2/7/2021at: DS202DISINFECTION BYPRODUCTS 2/1/2021 andDual Sample Required between 5/7/2021at: DS2025/1/2021 andDual Sample Required between 8/7/2021at: DS2028/1/2021 andDual Sample Required between 11/7/2021at: DS20211/1/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROAMING SHORES, VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202110LEAD - 1030 AND COPPER - 1022 6/1/2021 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 20: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - ASHTABULAOH0400711

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452817EP001

Facility Name: AQUA OHIO - ASHTABULA WATER

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

EP001

Sample(s) Required betweenINORGANICS 1 1/1/2021 and 5/31/2021 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 1/31/2021Sample(s) Required between1 2/1/2021 and 2/28/2021Sample(s) Required between1 3/1/2021 and 3/31/2021Sample(s) Required between1 4/1/2021 and 4/30/2021Sample(s) Required between1 5/1/2021 and 5/31/2021Sample(s) Required between1 6/1/2021 and 6/30/2021Sample(s) Required between1 7/1/2021 and 7/31/2021Sample(s) Required between1 8/1/2021 and 8/31/2021Sample(s) Required between1 9/1/2021 and 9/30/2021Sample(s) Required between1 10/1/2021 and 10/31/2021Sample(s) Required between1 11/1/2021 and 11/30/2021Sample(s) Required between1 12/1/2021 and 12/31/2021

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2021 and 6/30/2021 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2021 and 5/31/2021

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2021 and 1/31/2021Paired Sample Set Required between1 2/1/2021 and 2/28/2021Paired Sample Set Required between1 3/1/2021 and 3/31/2021Paired Sample Set Required between1 4/1/2021 and 4/30/2021Paired Sample Set Required between1 5/1/2021 and 5/31/2021Paired Sample Set Required between1 6/1/2021 and 6/30/2021Paired Sample Set Required between1 7/1/2021 and 7/31/2021Paired Sample Set Required between1 8/1/2021 and 8/31/2021Paired Sample Set Required between1 9/1/2021 and 9/30/2021Paired Sample Set Required between1 10/1/2021 and 10/31/2021Paired Sample Set Required between1 11/1/2021 and 11/30/2021Paired Sample Set Required between1 12/1/2021 and 12/31/2021

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.

Page 21: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - ASHTABULAOH0400711

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452817EP001/LT2001

Facility Name: AQUA OHIO - ASHTABULA WATER

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

LT2001

Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.

*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.

Page 22: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - ASHTABULAOH0400711

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452817LT2001

Facility Name: AQUA OHIO - ASHTABULA WATER

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/27/2020 and 1/2/2021Sample(s) Required between1 1/10/2021 and 1/16/2021Sample(s) Required between1 1/24/2021 and 1/30/2021Sample(s) Required between1 2/7/2021 and 2/13/2021Sample(s) Required between1 2/21/2021 and 2/27/2021Sample(s) Required between1 3/7/2021 and 3/13/2021Sample(s) Required between1 3/21/2021 and 3/27/2021Sample(s) Required between1 4/4/2021 and 4/10/2021Sample(s) Required between1 4/18/2021 and 4/24/2021Sample(s) Required between1 5/2/2021 and 5/8/2021Sample(s) Required between1 5/16/2021 and 5/22/2021Sample(s) Required between1 5/30/2021 and 6/5/2021Sample(s) Required between1 6/13/2021 and 6/19/2021Sample(s) Required between1 6/27/2021 and 7/3/2021Sample(s) Required between1 7/11/2021 and 7/17/2021Sample(s) Required between1 7/25/2021 and 7/31/2021Sample(s) Required between1 8/8/2021 and 8/14/2021Sample(s) Required between1 8/22/2021 and 8/28/2021Sample(s) Required between1 9/5/2021 and 9/11/2021Sample(s) Required between1 9/19/2021 and 9/25/2021Sample(s) Required between1 10/3/2021 and 10/9/2021Sample(s) Required between1 10/17/2021 and 10/23/2021Sample(s) Required between1 10/31/2021 and 11/6/2021Sample(s) Required between1 11/14/2021 and 11/20/2021Sample(s) Required between1 11/28/2021 and 12/4/2021Sample(s) Required between1 12/12/2021 and 12/18/2021

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.

Page 23: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - ASHTABULAOH0400711

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202140TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/202140 2/1/2021 andSample(s) Required between 3/31/202140 3/1/2021 andSample(s) Required between 4/30/202140 4/1/2021 andSample(s) Required between 5/31/202140 5/1/2021 andSample(s) Required between 6/30/202140 6/1/2021 andSample(s) Required between 7/31/202140 7/1/2021 andSample(s) Required between 8/31/202140 8/1/2021 andSample(s) Required between 9/30/202140 9/1/2021 andSample(s) Required between 10/31/202140 10/1/2021 andSample(s) Required between 11/30/202140 11/1/2021 andSample(s) Required between 12/31/202140 12/1/2021 and

Sample(s) Required between 1/31/202140TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/202140 2/1/2021 andSample(s) Required between 3/31/202140 3/1/2021 andSample(s) Required between 4/30/202140 4/1/2021 andSample(s) Required between 5/31/202140 5/1/2021 andSample(s) Required between 6/30/202140 6/1/2021 andSample(s) Required between 7/31/202140 7/1/2021 andSample(s) Required between 8/31/202140 8/1/2021 andSample(s) Required between 9/30/202140 9/1/2021 andSample(s) Required between 10/31/202140 10/1/2021 andSample(s) Required between 11/30/202140 11/1/2021 andSample(s) Required between 12/31/202140 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2DS201 6600 SANBORN ROAD ASHTABULA

Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 and

Page 24: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - ASHTABULAOH0400711

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2DS201 6600 SANBORN ROAD ASHTABULA

Dual Sample Required between 11/14/2021at: DS201DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2DS202 3041 SR WEST SANBORN ROAD ASHTABULA

Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2DS203 4011 E. CENTER ST. NORTH KINGSVILLE

Dual Sample Required between 2/14/2021at: DS203DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2035/8/2021 andDual Sample Required between 8/14/2021at: DS2038/8/2021 andDual Sample Required between 11/14/2021at: DS20311/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2DS204 3110 WEST MAIN STREET KINGSVILLE

Dual Sample Required between 2/14/2021at: DS204DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2045/8/2021 andDual Sample Required between 8/14/2021at: DS2048/8/2021 and

Page 25: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - ASHTABULAOH0400711

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2DS204 3110 WEST MAIN STREET KINGSVILLE

Dual Sample Required between 11/14/2021at: DS204DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - ASHTABULA DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202130LEAD - 1030 AND COPPER - 1022 6/1/2021 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 26: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ASHTABULA COUNTY WATER SYSTEMOH0400803

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202115TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/202115 2/1/2021 andSample(s) Required between 3/31/202115 3/1/2021 andSample(s) Required between 4/30/202115 4/1/2021 andSample(s) Required between 5/31/202115 5/1/2021 andSample(s) Required between 6/30/202115 6/1/2021 andSample(s) Required between 7/31/202115 7/1/2021 andSample(s) Required between 8/31/202115 8/1/2021 andSample(s) Required between 9/30/202115 9/1/2021 andSample(s) Required between 10/31/202115 10/1/2021 andSample(s) Required between 11/30/202115 11/1/2021 andSample(s) Required between 12/31/202115 12/1/2021 and

Sample(s) Required between 1/31/202115TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/202115 2/1/2021 andSample(s) Required between 3/31/202115 3/1/2021 andSample(s) Required between 4/30/202115 4/1/2021 andSample(s) Required between 5/31/202115 5/1/2021 andSample(s) Required between 6/30/202115 6/1/2021 andSample(s) Required between 7/31/202115 7/1/2021 andSample(s) Required between 8/31/202115 8/1/2021 andSample(s) Required between 9/30/202115 9/1/2021 andSample(s) Required between 10/31/202115 10/1/2021 andSample(s) Required between 11/30/202115 11/1/2021 andSample(s) Required between 12/31/202115 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1DS201 ROME FIRE HALL

Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 and

Page 27: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ASHTABULA COUNTY WATER SYSTEMOH0400803

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1DS201 ROME FIRE HALL

Dual Sample Required between 11/14/2021at: DS201DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1DS202 PLYMOUTH FIRE HALL

Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1DS203 INDUSTRIAL PARK

Dual Sample Required between 2/14/2021at: DS203DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2035/8/2021 andDual Sample Required between 8/14/2021at: DS2038/8/2021 andDual Sample Required between 11/14/2021at: DS20311/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1DS204 ASHTABULA ATECH

Dual Sample Required between 2/14/2021at: DS204DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2045/8/2021 andDual Sample Required between 8/14/2021at: DS2048/8/2021 and

Page 28: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ASHTABULA COUNTY WATER SYSTEMOH0400803

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1DS204 ASHTABULA ATECH

Dual Sample Required between 11/14/2021at: DS204DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ASHTABULA COUNTY WATER SYSTEM DISTRI Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

Page 29: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ORWELL VILLAGE PWSOH0401012

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452819EP001

Facility Name: ORWELL WTP

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 30: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ORWELL VILLAGE PWSOH0401012

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ORWELL, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20212TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and

Sample(s) Required between 1/31/20212TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20212 2/1/2021 andSample(s) Required between 3/31/20212 3/1/2021 andSample(s) Required between 4/30/20212 4/1/2021 andSample(s) Required between 5/31/20212 5/1/2021 andSample(s) Required between 6/30/20212 6/1/2021 andSample(s) Required between 7/31/20212 7/1/2021 andSample(s) Required between 8/31/20212 8/1/2021 andSample(s) Required between 9/30/20212 9/1/2021 andSample(s) Required between 10/31/20212 10/1/2021 andSample(s) Required between 11/30/20212 11/1/2021 andSample(s) Required between 12/31/20212 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ORWELL, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 261 SUNSET STREET

Dual Sample Required between 9/30/2021at: DS201DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 31: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ORWELL VILLAGE PWSOH0401012

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ORWELL, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 179 WEST MAIN STREET

Dual Sample Required between 9/30/2021at: DS202DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ORWELL, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202110LEAD - 1030 AND COPPER - 1022 6/1/2021 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 32: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ROCK CREEK VILLAGEOH0401111

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROCK CREEK, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20211TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and

Sample(s) Required between 1/31/20211TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROCK CREEK, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 385 RANDALL COURT

Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 and

Page 33: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ROCK CREEK VILLAGEOH0401111

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROCK CREEK, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 385 RANDALL COURT

Dual Sample Required between 11/14/2021at: DS201DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROCK CREEK, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 2835 ROME ROCK CREEK ROAD

Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ROCK CREEK, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

Page 34: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WHISPERING WILLOW MHP PWSOH0401212

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

452821EP001

Facility Name: WHISPERING WILLOW MHP STU 1

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 35: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WHISPERING WILLOW MHP PWSOH0401212

ENTRY POINT MONITORING SCHEDULE

2021 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

460265EP002

Facility Name: WHISPERING WILLOW MHP STU 2

Effective Date: 01/01/2021

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 36: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WHISPERING WILLOW MHP PWSOH0401212

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WHISPERING WILLOW MHP DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20211TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and

Sample(s) Required between 1/31/20211TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20211 2/1/2021 andSample(s) Required between 3/31/20211 3/1/2021 andSample(s) Required between 4/30/20211 4/1/2021 andSample(s) Required between 5/31/20211 5/1/2021 andSample(s) Required between 6/30/20211 6/1/2021 andSample(s) Required between 7/31/20211 7/1/2021 andSample(s) Required between 8/31/20211 8/1/2021 andSample(s) Required between 9/30/20211 9/1/2021 andSample(s) Required between 10/31/20211 10/1/2021 andSample(s) Required between 11/30/20211 11/1/2021 andSample(s) Required between 12/31/20211 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WHISPERING WILLOW MHP DISTRIBUTION Facility Class: CLASS 1DS201 OFFICE (FORMER MR001)

Dual Sample Required between 9/30/2021at: DS201DISINFECTION BYPRODUCTS 7/1/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Page 37: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WHISPERING WILLOW MHP PWSOH0401212

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WHISPERING WILLOW MHP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

Page 38: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

GENEVA CITY PWSOH0401712

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GENEVA CITY DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20218TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20218 2/1/2021 andSample(s) Required between 3/31/20218 3/1/2021 andSample(s) Required between 4/30/20218 4/1/2021 andSample(s) Required between 5/31/20218 5/1/2021 andSample(s) Required between 6/30/20218 6/1/2021 andSample(s) Required between 7/31/20218 7/1/2021 andSample(s) Required between 8/31/20218 8/1/2021 andSample(s) Required between 9/30/20218 9/1/2021 andSample(s) Required between 10/31/20218 10/1/2021 andSample(s) Required between 11/30/20218 11/1/2021 andSample(s) Required between 12/31/20218 12/1/2021 and

Sample(s) Required between 1/31/20218TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20218 2/1/2021 andSample(s) Required between 3/31/20218 3/1/2021 andSample(s) Required between 4/30/20218 4/1/2021 andSample(s) Required between 5/31/20218 5/1/2021 andSample(s) Required between 6/30/20218 6/1/2021 andSample(s) Required between 7/31/20218 7/1/2021 andSample(s) Required between 8/31/20218 8/1/2021 andSample(s) Required between 9/30/20218 9/1/2021 andSample(s) Required between 10/31/20218 10/1/2021 andSample(s) Required between 11/30/20218 11/1/2021 andSample(s) Required between 12/31/20218 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GENEVA CITY DISTRIBUTION Facility Class: CLASS 1DS201 467 NORTH AVE

Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 and

Page 39: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

GENEVA CITY PWSOH0401712

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GENEVA CITY DISTRIBUTION Facility Class: CLASS 1DS201 467 NORTH AVE

Dual Sample Required between 11/14/2021at: DS201DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GENEVA CITY DISTRIBUTION Facility Class: CLASS 1DS202 126 BEACH ST.

Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GENEVA CITY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

Page 40: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - VILLAGE OF JEFFERSONOH0401812

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - VILLAGE OF JEFFERSON DISTR Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20214TOTAL COLIFORM (TCR) - 3100 1/1/2021 andSample(s) Required between 2/28/20214 2/1/2021 andSample(s) Required between 3/31/20214 3/1/2021 andSample(s) Required between 4/30/20214 4/1/2021 andSample(s) Required between 5/31/20214 5/1/2021 andSample(s) Required between 6/30/20214 6/1/2021 andSample(s) Required between 7/31/20214 7/1/2021 andSample(s) Required between 8/31/20214 8/1/2021 andSample(s) Required between 9/30/20214 9/1/2021 andSample(s) Required between 10/31/20214 10/1/2021 andSample(s) Required between 11/30/20214 11/1/2021 andSample(s) Required between 12/31/20214 12/1/2021 and

Sample(s) Required between 1/31/20214TOTAL CHLORINE - 1000 1/1/2021 andSample(s) Required between 2/28/20214 2/1/2021 andSample(s) Required between 3/31/20214 3/1/2021 andSample(s) Required between 4/30/20214 4/1/2021 andSample(s) Required between 5/31/20214 5/1/2021 andSample(s) Required between 6/30/20214 6/1/2021 andSample(s) Required between 7/31/20214 7/1/2021 andSample(s) Required between 8/31/20214 8/1/2021 andSample(s) Required between 9/30/20214 9/1/2021 andSample(s) Required between 10/31/20214 10/1/2021 andSample(s) Required between 11/30/20214 11/1/2021 andSample(s) Required between 12/31/20214 12/1/2021 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - VILLAGE OF JEFFERSON DISTR Facility Class: CLASS 1DS201 27 EAST JEFFERSON ST

Dual Sample Required between 2/14/2021at: DS201DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2015/8/2021 andDual Sample Required between 8/14/2021at: DS2018/8/2021 and

Page 41: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

AQUA OHIO - VILLAGE OF JEFFERSONOH0401812

2021 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - VILLAGE OF JEFFERSON DISTR Facility Class: CLASS 1DS201 27 EAST JEFFERSON ST

Dual Sample Required between 11/14/2021at: DS201DISINFECTION BYPRODUCTS 11/8/2021 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - VILLAGE OF JEFFERSON DISTR Facility Class: CLASS 1DS202 222 BEACH ST

Dual Sample Required between 2/14/2021at: DS202DISINFECTION BYPRODUCTS 2/8/2021 andDual Sample Required between 5/14/2021at: DS2025/8/2021 andDual Sample Required between 8/14/2021at: DS2028/8/2021 andDual Sample Required between 11/14/2021at: DS20211/8/2021 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO - VILLAGE OF JEFFERSON DISTR Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202120LEAD - 1030 AND COPPER - 1022 6/1/2021 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

Page 42: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

COLEBROOK LOUNGE

2021 MONITORING SCHEDULE

OH0430012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: COLEBROOK LOUNGE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 43: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

COLEBROOK LOUNGE

2021 MONITORING SCHEDULE

OH0430012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: COLEBROOK LOUNGEGround Water

452824

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 44: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BEACHCOMBER TAVERN

2021 MONITORING SCHEDULE

OH0430712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEACHCOMBER TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 45: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BEACHCOMBER TAVERN

2021 MONITORING SCHEDULE

OH0430712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEACHCOMBER TAVERNGround Water

452826

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 46: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP A PWS

2021 MONITORING SCHEDULE

OH0431612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-CAMP A DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 47: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP A PWS

2021 MONITORING SCHEDULE

OH0431612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-CAMP A DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/22/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 48: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP A PWS

2021 MONITORING SCHEDULE

OH0431612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT BSA CAMP AGround Water

452828

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 49: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP C PWS

2021 MONITORING SCHEDULE

OH0431712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT,BSA/C-CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 1/31/2021

Sample(s) Required between1 2/1/2021 and 2/28/2021

Sample(s) Required between1 3/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 4/30/2021

Sample(s) Required between1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/31/2021

Sample(s) Required between1 11/1/2021 and 11/30/2021

Sample(s) Required between1 12/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 50: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP C PWS

2021 MONITORING SCHEDULE

OH0431712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT BSA CAMP CGround Water

452829

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 51: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, DEEP WOODS PWS

2021 MONITORING SCHEDULE

OH0431812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP BEAUMONT/DEEP WOODS DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 52: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, DEEP WOODS PWS

2021 MONITORING SCHEDULE

OH0431812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT/DEEP WOODS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 53: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, DEEP WOODS PWS

2021 MONITORING SCHEDULE

OH0431812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT DEEP WOODSGround Water

452830

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 54: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA HEALTH CENTER PWS

2021 MONITORING SCHEDULE

OH0432012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT BSA HEALTH CENTER DISTRIBUGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 1/31/2021

Sample(s) Required between1 2/1/2021 and 2/28/2021

Sample(s) Required between1 3/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 4/30/2021

Sample(s) Required between1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/31/2021

Sample(s) Required between1 11/1/2021 and 11/30/2021

Sample(s) Required between1 12/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 55: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA HEALTH CENTER PWS

2021 MONITORING SCHEDULE

OH0432012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT BSA HEALTH CENTERGround Water

452831

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 56: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CUB SCOUT WORLD PWS

2021 MONITORING SCHEDULE

OH0432212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-CUB SC DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 57: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CUB SCOUT WORLD PWS

2021 MONITORING SCHEDULE

OH0432212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-CUB SC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 58: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CUB SCOUT WORLD PWS

2021 MONITORING SCHEDULE

OH0432212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT BSA CUB SCT WDGround Water

452832

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 59: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA BEAUMONT VILLAGE

2021 MONITORING SCHEDULE

OH0432312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-BEAUMONT VILLAGE DISTRGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 60: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA BEAUMONT VILLAGE

2021 MONITORING SCHEDULE

OH0432312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-BEAUMONT VILLAGE DISTRGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 61: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA BEAUMONT VILLAGE

2021 MONITORING SCHEDULE

OH0432312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT BSA BEAUMONT VILLAGEGround Water

452833

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 62: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP B PWS

2021 MONITORING SCHEDULE

OH0432412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-CAMP B DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 63: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP B PWS

2021 MONITORING SCHEDULE

OH0432412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT,BSA-CAMP B DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 64: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, BSA CAMP B PWS

2021 MONITORING SCHEDULE

OH0432412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT BSA CAMP BGround Water

452834

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 65: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, WHISPERING LEAVES PWS

2021 MONITORING SCHEDULE

OH0432912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP BEAUMONT/WHISPERING LEAVES DISTRIBUGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 66: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, WHISPERING LEAVES PWS

2021 MONITORING SCHEDULE

OH0432912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP BEAUMONT/WHISPERING LEAVES DISTRIBUGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 67: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP BEAUMONT, WHISPERING LEAVES PWS

2021 MONITORING SCHEDULE

OH0432912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP BEAUMONT WHISPERING LEAVESGround Water

452836

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 68: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP KOINONIA - MAIN CAMP PWS

2021 MONITORING SCHEDULE

OH0433412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP KOINONIA - MAIN CAMP DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 69: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP KOINONIA - MAIN CAMP PWS

2021 MONITORING SCHEDULE

OH0433412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP KOINONIA - MAIN CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/31/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 70: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP KOINONIA - MAIN CAMP PWS

2021 MONITORING SCHEDULE

OH0433412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP KOINONIA - MAIN CAMPGround Water

452838

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 71: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP WHITEWOOD

2021 MONITORING SCHEDULE

OH0433612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP WHITEWOOD DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 72: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CAMP WHITEWOOD

2021 MONITORING SCHEDULE

OH0433612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP WHITEWOODGround Water

452840

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 73: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF-CLUBHOUSE

2021 MONITORING SCHEDULE

OH0434412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WINDY HILL GOLF-CLUBHOUS DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 74: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF-CLUBHOUSE

2021 MONITORING SCHEDULE

OH0434412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WINDY HILL GOLF-CLUBHOUS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 75: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF-CLUBHOUSE

2021 MONITORING SCHEDULE

OH0434412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WINDY HILL GOLF CLUB GOLF COURSEGround Water

452844

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 76: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

SCOOTERS BAR AND GRILL PWS

2021 MONITORING SCHEDULE

OH0434712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SCOOTERS BAR & GRILL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 77: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

SCOOTERS BAR AND GRILL PWS

2021 MONITORING SCHEDULE

OH0434712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SCOOTERS BAR & GRILLGround Water

452846

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 78: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WAGON TRAILS RES - NORTH WELL

2021 MONITORING SCHEDULE

OH0435412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WAGON TRAILS RES/NO WELL DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 79: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WAGON TRAILS RES - NORTH WELL

2021 MONITORING SCHEDULE

OH0435412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

05/14/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WAGON TRAILS RES/NO WELL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 80: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WAGON TRAILS RES - NORTH WELL

2021 MONITORING SCHEDULE

OH0435412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WAGON TRAILS RES NORTH WELLGround Water

452848

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 81: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WAGON TRAILS RES - SOUTH WELL

2021 MONITORING SCHEDULE

OH0435512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WAGON TRAILS RES/SO WELL DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 82: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WAGON TRAILS RES - SOUTH WELL

2021 MONITORING SCHEDULE

OH0435512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

05/14/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WAGON TRAILS RES/SO WELL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 83: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WAGON TRAILS RES - SOUTH WELL

2021 MONITORING SCHEDULE

OH0435512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WAGON TRAILS RES SOUTH WELLGround Water

452849

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 84: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

HARTSGROVE TAVERN

2021 MONITORING SCHEDULE

OH0436212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HARTSGROVE TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 85: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

HARTSGROVE TAVERN

2021 MONITORING SCHEDULE

OH0436212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HARTSGROVE TAVERNGround Water

452854

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 86: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

HEMLOCK SPRINGS GOLF CLUB

2021 MONITORING SCHEDULE

OH0436412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HEMLOCK SPRINGS GOLF CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 87: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

HEMLOCK SPRINGS GOLF CLUB

2021 MONITORING SCHEDULE

OH0436412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HEMLOCK SPRINGS GOLF COURSEGround Water

452855

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 88: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

HICKORY GROVE GOLF COURSE

2021 MONITORING SCHEDULE

OH0436712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HICKORY GROVE GOLF-CH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 89: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

HICKORY GROVE GOLF COURSE

2021 MONITORING SCHEDULE

OH0436712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HICKORY GROVE GOLF COURSEGround Water

452858

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 90: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

JEFFERSON LANES

2021 MONITORING SCHEDULE

OH0437112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JEFFERSON LANES DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 91: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

JEFFERSON LANES

2021 MONITORING SCHEDULE

OH0437112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JEFFERSON LANESGround Water

452859

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2021 and 6/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 92: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

JEFFCO LAKES CAMPGROUND

2021 MONITORING SCHEDULE

OH0438012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: JEFFCO LAKES CAMPGROUND DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 93: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

JEFFCO LAKES CAMPGROUND

2021 MONITORING SCHEDULE

OH0438012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JEFFCO LAKES CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 94: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

JEFFCO LAKES CAMPGROUND

2021 MONITORING SCHEDULE

OH0438012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP004 Facility Source:

Facility Name: JEFFCO LAKES CAMPGROUND STU 4Ground Water

460269

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 95: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

JEFFCO LAKES CAMPGROUND

2021 MONITORING SCHEDULE

OH0438012 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JEFFCO LAKES CAMPGROUND STU 1Ground Water

452861

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 96: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ODOT REST AREA 4-42 PWS

2021 MONITORING SCHEDULE

OH0438512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODOT-REST AREA 4-42 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 97: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ODOT REST AREA 4-42 PWS

2021 MONITORING SCHEDULE

OH0438512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODOT REST AREA 4-42Ground Water Facility Class: CLASS A

452863

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 98: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WRIGHT BUILDING

2021 MONITORING SCHEDULE

OH0438912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WRIGHT BUILDINGGround Water

452864

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 99: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PINE LAKES CAMP - BATH HOUSE PWS

2021 MONITORING SCHEDULE

OH0439112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: PINE LAKES CAMP/BATH HOU DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 100: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PINE LAKES CAMP - BATH HOUSE PWS

2021 MONITORING SCHEDULE

OH0439112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PINE LAKES CAMP/BATH HOU DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 101: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PINE LAKES CAMP - BATH HOUSE PWS

2021 MONITORING SCHEDULE

OH0439112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PINE LAKES CAMP/BATH HOUSEGround Water

452865

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 102: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PINE LAKES CAMP - PUMP 3 PWS

2021 MONITORING SCHEDULE

OH0439212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: PINE LAKES CAMP-PUMP 3 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 103: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PINE LAKES CAMP - PUMP 3 PWS

2021 MONITORING SCHEDULE

OH0439212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PINE LAKES CAMP-PUMP 3 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 104: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PINE LAKES CAMP - PUMP 3 PWS

2021 MONITORING SCHEDULE

OH0439212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PINE LAKES CAMP PUMP 3Ground Water

452866

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 105: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING LAKE DRIVE-IN-THEATER

2021 MONITORING SCHEDULE

OH0439512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PYMA LAKE DRIVE-IN THETR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 106: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING LAKE DRIVE-IN-THEATER

2021 MONITORING SCHEDULE

OH0439512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PYMA LAKE DRIVE-IN THEATERGround Water

452867

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 4/1/2021 and 6/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 107: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING VALLEY RESORT 3 PWS

2021 MONITORING SCHEDULE

OH0439812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: PYMATUNING VLY RESORT 3 DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 108: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING VALLEY RESORT 3 PWS

2021 MONITORING SCHEDULE

OH0439812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PYMATUNING VLY RESORT 3 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2021 and 4/30/2021

Sample(s) Required between1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 109: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING VALLEY RESORT 3 PWS

2021 MONITORING SCHEDULE

OH0439812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PYMATUNING VALLEY RESORT 3Ground Water Facility Class: CLASS A

452868

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 110: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WILDWOOD ACRES CAMPGROUND

2021 MONITORING SCHEDULE

OH0442312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WILDWOOD ACRES CAMPGROUN DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 111: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WILDWOOD ACRES CAMPGROUND

2021 MONITORING SCHEDULE

OH0442312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WILDWOOD ACRES CAMPGROUN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/15/2021 and 4/30/2021

Sample(s) Required between1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 10/15/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 112: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WILDWOOD ACRES CAMPGROUND

2021 MONITORING SCHEDULE

OH0442312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to4/1 10/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WILDWOOD ACRES CAMPGROUNDGround Water

452875

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 113: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

TAYLORS PUB

2021 MONITORING SCHEDULE

OH0442812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TAYLORS PUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 114: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

TAYLORS PUB

2021 MONITORING SCHEDULE

OH0442812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TAYLORS PUBGround Water

452877

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 115: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ODNR - PYMATUNING STATE PARK

2021 MONITORING SCHEDULE

OH0443111 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODNR-PYMATUNING STATE PK DISTRIBUTIONSurface Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 2 1/1/2021 and 1/31/2021

Sample(s) Required between2 2/1/2021 and 2/28/2021

Sample(s) Required between2 3/1/2021 and 3/31/2021

Sample(s) Required between2 4/1/2021 and 4/30/2021

Sample(s) Required between2 5/1/2021 and 5/31/2021

Sample(s) Required between2 6/1/2021 and 6/30/2021

Sample(s) Required between2 7/1/2021 and 7/31/2021

Sample(s) Required between2 8/1/2021 and 8/31/2021

Sample(s) Required between2 9/1/2021 and 9/30/2021

Sample(s) Required between2 10/1/2021 and 10/31/2021

Sample(s) Required between2 11/1/2021 and 11/30/2021

Sample(s) Required between2 12/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 116: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ODNR - PYMATUNING STATE PARK

2021 MONITORING SCHEDULE

OH0443111 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PYMATUNING STATE PARK-WATER PLANTGround Water Facility Class: CLASS 1

452878

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 117: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF-CAMP A

2021 MONITORING SCHEDULE

OH0444312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WINDY HILL GOLF-CAMP A DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 118: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF-CAMP A

2021 MONITORING SCHEDULE

OH0444312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WINDY HILL GOLF-CAMP A DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 119: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF-CAMP A

2021 MONITORING SCHEDULE

OH0444312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WINDY HILL GOLF CAMP AGround Water

452882

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 120: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING VALLEY RESORT 1 PWS

2021 MONITORING SCHEDULE

OH0444712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PYMATUNING VLY RESORT 1 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 121: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING VALLEY RESORT 1 PWS

2021 MONITORING SCHEDULE

OH0444712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PYMATUNING VALLEY RESORT 1Ground Water

452885

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 122: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING VALLEY RESORT 2 PWS

2021 MONITORING SCHEDULE

OH0444812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PYMATUNING VLY RESORT 2 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 123: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

PYMATUNING VALLEY RESORT 2 PWS

2021 MONITORING SCHEDULE

OH0444812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PYMATUNING VALLEY RESORT 2Ground Water

452886

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 124: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF - CAMP B

2021 MONITORING SCHEDULE

OH0445312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WINDY HILL CAMPGROUND B DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 125: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF - CAMP B

2021 MONITORING SCHEDULE

OH0445312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WINDY HILL CAMPGROUND B DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2021 and 5/31/2021

Sample(s) Required between1 6/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 7/31/2021

Sample(s) Required between1 8/1/2021 and 8/31/2021

Sample(s) Required between1 9/1/2021 and 9/30/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 126: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

WINDY HILL GOLF - CAMP B

2021 MONITORING SCHEDULE

OH0445312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WINDY HILL CAMPGROUND BGround Water

452890

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 127: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ROSABELLA WINERY

2021 MONITORING SCHEDULE

OH0446012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ROSABELLA WINERY DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 128: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

ROSABELLA WINERY

2021 MONITORING SCHEDULE

OH0446012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ROSABELLA WINERYGround Water

461763

Sample(s) Required betweenNITRITE - 1041 1 1/1/2021 and 5/31/2021

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 129: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BUSHNELL STORE PWS

2021 MONITORING SCHEDULE

OH0446212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BUSHNELL STORE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 130: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BUSHNELL STORE PWS

2021 MONITORING SCHEDULE

OH0446212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BUSHNELL STOREGround Water

462172

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 131: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DORSET CONVENIENCE STORE PWS

2021 MONITORING SCHEDULE

OH0446312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DORSET CONVENIENCE STORE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 132: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DORSET CONVENIENCE STORE PWS

2021 MONITORING SCHEDULE

OH0446312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DORSET CONVENIENCE STOREGround Water

462189

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 133: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

EMERINE ESTATES WINERY PWS

2021 MONITORING SCHEDULE

OH0446612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: EMERINE ESTATES WINERY DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 134: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

EMERINE ESTATES WINERY PWS

2021 MONITORING SCHEDULE

OH0446612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: EMERINE ESTATES WINERYGround Water

462391

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 135: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BYLERS COMMUNITY KITCHEN PWS

2021 MONITORING SCHEDULE

OH0447013 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BYLERS COMMUNITY KITCHEN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 136: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

BYLERS COMMUNITY KITCHEN PWS

2021 MONITORING SCHEDULE

OH0447013 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BYLERS COMMUNITY KITCHENGround Water

462395

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 137: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CHERRY VALLEY FURNITURE

2021 MONITORING SCHEDULE

OH0447015 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 138: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

CHERRY VALLEY FURNITURE

2021 MONITORING SCHEDULE

OH0447015 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHERRY VALLEY FURNITURE PLANTGround Water

462397

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 139: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DOLLAR GENERAL 19942 - WILLIAMSFIELD PWS

2021 MONITORING SCHEDULE

OH0447016 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 140: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DOLLAR GENERAL 19942 - WILLIAMSFIELD PWS

2021 MONITORING SCHEDULE

OH0447016 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL WILLIAMSFIELD PLANTGround Water

462398

Sample(s) Required betweenNITRITE - 1041 1 6/1/2021 and 10/31/2021

Sample(s) Required betweenNITRATE - 1040 1 6/1/2021 and 10/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 141: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DOLLAR GENERAL #20931 - PIERPONT, OH

2021 MONITORING SCHEDULE

OH0447017 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2021 and 3/31/2021

Sample(s) Required between1 4/1/2021 and 6/30/2021

Sample(s) Required between1 7/1/2021 and 9/30/2021

Sample(s) Required between1 10/1/2021 and 12/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

Page 142: ENTRY POINT MONITORING SCHEDULE · 2020. 12. 18. · DISTRIBUTION MONITORING SCHEDULE ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2021 Chemicals Monitoring Requirements

DOLLAR GENERAL #20931 - PIERPONT, OH

2021 MONITORING SCHEDULE

OH0447017 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2021Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL - PIERPONT, OH PLANTGround Water

462399

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2021 and 5/31/2021

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or