enhanced wide-area visibility in the eastern interconnection for reliability management

17
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Enhanced Wide-Area Visibility Visibility In the Eastern In the Eastern Interconnection for Interconnection for Reliability Reliability Management Management Floyd Galvan, PE Floyd Galvan, PE Entergy Transmission Entergy Transmission Distributed Sensors & Control in Power Systems Clemson University, March 2005

Upload: tracey

Post on 11-Feb-2016

43 views

Category:

Documents


0 download

DESCRIPTION

Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid. Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Floyd Galvan, PE Entergy Transmission. Distributed Sensors & Control in Power Systems Clemson University, March 2005. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Eastern Interconnection Phasor Project

Modernizing North America’s Electric GridEnhanced Wide-Area Enhanced Wide-Area

VisibilityVisibilityIn the Eastern In the Eastern

Interconnection for Interconnection for Reliability ManagementReliability Management

Floyd Galvan, PEFloyd Galvan, PEEntergy TransmissionEntergy Transmission

Distributed Sensors & Control in Power Systems

Clemson University, March 2005

Page 2: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

OverviewOverview Overview of EIPPOverview of EIPP Discussion of Entergy Phasor Discussion of Entergy Phasor

SystemSystem Real-Time Demonstration of Real-Time Demonstration of

Entergy Phasor SystemEntergy Phasor System

http://phasors.pnl.govhttp://phasors.pnl.gov

Page 3: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

August 14th BlackoutBy-The-Numbers

1 Canadian Province 3 deaths 8 U.S. states12 airports closed23 cases of looting in Ottawa250+ power plants9,266 square miles 61,800 MW of power lost1.5 mill Cleveland residents without water50 million people $4.5-10 billion in economic activity lost

Strategic Importance

“…it's clear that the power grid needs an overhaul. It needs to be

modernized. As we go into an exciting new period of American

history, we want the most modern electricity grid for our people… we need more investment; we need

research and development…”President BushSeptember 2003

“When the lights go out, modern life as we know it grinds to a sudden halt. 

Transportation is interrupted, communications fail, water systems

shut down, factory work is disrupted, food spoils, businesses lose money, and people are inconvenienced and

even endangered. ”

Secretary AbrahamApril 2004

Page 4: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

EIPP Working Group EIPP Working Group Vision – improve power system Vision – improve power system

reliability through wide-area reliability through wide-area measurement, monitoring and measurement, monitoring and controlcontrol

EIPP Working Group Organizations (as of EIPP Working Group Organizations (as of 12/2004)12/2004)

US DOE Entergy National Grid*AEP FERC NERCAmeren First Energy NYISOCERTS Hydro One NYPACom Ed* IMO* PJMCon Ed* ISO – NE Southern Co.Dominion MAPP SPPDuke* MISO TVA

at least ten additional Work Group members are vendors of hardware or software* These organizations have expressed interest but have not yet committed resources.

Page 5: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

EIPP Task TeamsEIPP Task TeamsEIPP Work Group

Off Line ApplicationsTask Team

Real Time ApplicationsTask Team

Performance RequirementsTask Team

Business ManagementTask Team

Equipment PlacementTask Team

NetworkingTask Team

Leadership Committee

Coordinate with WECC, ERCOT Eastern Interconnection specific

WECC/ERCOTCoordination

Navin BhattAEP

Terry BilkeMISO

Bruce FardaneshNYPA

Floyd GalvanEntergy

Mike IngramTVA

TBD

Page 6: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Phasor Measurement Phasor Measurement Systems StructureSystems Structure

Critical Grid Locations

ReliabilityCoordinators

Control AreaOperators

SoftwareApplications

Page 7: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Phase I Concentrator Phase I Concentrator LocationsLocations

NYISO

AEPAmeren

TVA

Entergy

Page 8: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Eastern Interconnection Eastern Interconnection Phasor Project PlanPhasor Project Plan

Phase I (Completed 12/04)

20 Instruments installed Resolve major

communications issues Transfer software tools to

users Establish relationships

Phase II (2006) ~50 Instruments Situational awareness and

state estimator app’s demonstrated

All major corridors covered

Data available to research community to begin work on projected benefits

Phase II (2007- ) More than 350

Instruments Situational awareness

and state estimator app’s realized, automatic control app’s beginning

Vendors participating at all levels

Inexpensive instruments and communications available

EIPP

Page 9: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Expected Benefits from EIPP Expected Benefits from EIPP ProjectProject

Improved wide area visibility Improved wide area visibility Improved real time monitoring tools for reliability Improved real time monitoring tools for reliability

coordinatorscoordinatorsand system operatorsand system operators

Improved ability to monitor grid dynamics and stability forImproved ability to monitor grid dynamics and stability forreliability managementreliability management

Time-synchronized data for system assessments and postTime-synchronized data for system assessments and postdisturbance analysisdisturbance analysis

Improvements in state estimationImprovements in state estimation Dynamic system ratings for improved reliability and Dynamic system ratings for improved reliability and

marketmarketperformanceperformance

Public-private industry collaboration to develop newPublic-private industry collaboration to develop newtechnologies and systems for modernizing the electric gridtechnologies and systems for modernizing the electric grid

Page 10: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

NEW ORLEANS, LA

Page 11: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Entergy owns and Entergy owns and operates 30,000 operates 30,000 MW of capacityMW of capacity

22ndnd largest nuclear largest nuclear generator in the USgenerator in the US

Entergy has 2.6 Entergy has 2.6 million customersmillion customers

Entergy has annual Entergy has annual revenues of over revenues of over $10 Billion and $10 Billion and approximately approximately 14,000 employees14,000 employees

Page 12: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

EntergyEntergyPMU LocationsPMU Locations

10 Sites are 10 Sites are operational operational

4 sites coming 4 sites coming on-line May on-line May 20052005

Page 13: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Current System Configuration

Page 14: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Planned System Configuration

Page 15: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management
Page 16: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

Analysis Tool Analysis Tool Development:Development:

Currently Exploring Options for Use of Currently Exploring Options for Use of Phasor Data Including:Phasor Data Including: Dynamic Line LoadingDynamic Line Loading Real-Time Visualization of System Real-Time Visualization of System

StabilityStability Optimal PMU PlacementOptimal PMU Placement State Estimator IntegrationState Estimator Integration

Designing with Eye to Integration of Designing with Eye to Integration of Industry RecommendationsIndustry Recommendations Open Architecture is KeyOpen Architecture is Key

Page 17: Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management

ProcessBook ProcessBook DemoDemo