engr.mohamed fawzy (cv)
TRANSCRIPT
Page 1
Arch. Mohamed Fawzy. I. Elbastawisy
Curriculum Vitae
1998:2016
Career Summary: 18 years experienced in reviewing projects architectural design, redesign, interior design, reviewing shop drawings for architectural work, coordination drawings, as built drawings, materials, construction document, subcontractor selection and projects supervision.
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page2
Curriculum Vitae Arch. MOHAMED FAWZY IBRAHIM
ELBASTAWISYs
Riyadh - KSA
Mobile Phone (+966-554173469, 594000471)
E-mail- ([email protected])
(eng.moh_f @ yahoo.com)
Personal Data:
Date of Birth: 01-07-1973
Nationality: Egyptian
Military status: Completed
Marital Status: Married, have 2 children
Education Background: B.Sc. Degree of Architectural Engineering.
Mansoura University, Faculty of Engineering, Architecture Department.
Graduation Project: Olympic Games Village Architectural Design.
Graduation Year: 1998.
Skills:
Computer: AutoCAD - Freehand - Internet - Windows - MS Office.
Languages: Arabic - English - Written & verbal
Membership in Professional Societies:
Egyptian Syndicate of Engineers (Architecture).
Society of Egyptian Architect (U.I.A.).
Career Summary:
18 years experienced in reviewing projects architectural design, redesign, interior design, reviewing shop drawings for architectural work, coordination drawings, as built drawings, materials, construction document, subcontractor selection and projects supervision.
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page3
Major projects: Design & Build Terminal 5 and Ancillary Buildings, King Khaled
International Airport in Riyadh, Kingdom of Saudi Arabia.
Criminal Court, Riyadh, kingdom Of Saudi Arabia Includes Mixed Use
Building & Court Complex Mosque Extension.
Development & expansion of Maadi-hospital 800 beds - Cairo (Egypt).
Faculty of aerial defense - Alexandria (Egypt).
The central laboratories building in El Dekheila port - Alexandria (Egypt).
Minya Hotel, Cultural, entertainment and a healthy complex - Minya
(Egypt).
Minya hospital 300 beds - Minya (Egypt).
The Armed Forces Officers Hotel and Social Club at Qaroun Lake - Fayoum
Governorate.
Luxor Cultural Centre - Luxor (Egypt).
Developing Karnack Temple Plaza & tourism market complex (Urban) -
Luxor (Egypt).
Qualification Summary:
Reviewing of the project tender documents.
Reviewing and approving of the project architectural shop drawings.
Evaluation and Approval of Material submittals as per projects specification.
Site supervision for quality assurance as per project approved Specification
& shop drawings.
Quality Control as per standard specified for Architectural works following
project drawings and specifications.
Checking the quality of materials delivered at site.
Estimating the amount of materials required.
Maintaining daily and monthly progress report by keeping Co-ordination
with the site staff.
Checking the assigned job for workers and explaining the best and fastest
way to be executed.
Checking and Reviewing of variation order, change order claims & value
Engr. reports.
Reviewing & approving the project material samples& mock-up samples.
Coordination with all disciplines in the project.
Attending the project technical & progress meetings.
Capable of modifying architectural exterior & interior details to execute it
properly.
Reviewing and approving the project’s design stages, from design concept
stage to working drawing.
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page4
Employment Record:
2010: 2016 work in Riyadh, kingdom Of Saudi Arabia Company: Saudi Consulting Services Co. (SAUDCONSULT)
Section: Supervision
Duration: From 2010 until Now
Job Title: Sr. ARCHTECTURAL Engineer Projects:
Design & Build Terminal 5 and Ancillary Buildings, King Khaled
International Airport in Riyadh, Kingdom of Saudi Arabia
Project cost: 2.00 Billion.SR.
Client: GENERAL AUTHORITY OF CIVIL AVIATION (GACA)
Designer: GMW Lead Designer
Consultant: Saudi Consulting Services Co. (SAUDCONSULT)
Main contractor: TAV-ACC Joint Venture
Duration: From 2014 until 2016
Position: Consultant senior ARCHTECTURAL engineer. Project components: Carry out the Design and Build of Terminal 5 and all related
facilities at King Khaled International Airport, The construction of a new
passenger Terminal 5 with AOC Building, PCP Building, Fire Station Building,
Supply Building and Airside Gate Building.
Scope of work:
- Reviewing the project design stages.
- Reviewing the project architectural shop drawings for approval.
- Reviewing the project material samples& mock-up samples for approval.
- Inspection of the installed work at site.
- Coordination with all disciplines at site.
- Reviewing the time schedule and the progress of the project activities.
- Review the weekly and monthly reports.
- Inspection& supervision for the installed work at site.
Criminal Court, Riyadh, kingdom Of Saudi Arabia Includes Mixed Use
Building & Court Complex Mosque Extension Project cost: 500 Million.SR.
Client: Arrayed Development Authority (A.D.A)
Designer: AS&P-International GmbH
Architects, planners’ www.as-p.de GERMANY
Consultant: Saudi Consulting Services Co. (SAUDCONSULT)
Duration: From 2010 until 2014
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page5
Position: Consultant senior ARCHTECTURAL engineer. Project components: The project site area is (52000.00 square meters) and
consists of 12 floors Main Building includes 61 general courts ( 58000 square
meters area ),4 floors Mixed Use Building for1000 cars parking ( 44000 square
meters area ) & approximately 35000 square meters landscape area for the project
plaza.
Scope of work:
- Reviewing the project tender documents.
- Reviewing the project architectural shop drawings for approval.
- Reviewing the project material samples& mock-up samples for approval.
- Inspection of the installed work at site.
- Coordination with all disciplines in the site.
- Reviewing the time schedule and the progress of the project activities.
- Attend the project technical & progress meetings.
Institute of Imam Al Da'wa in Riyadh, kingdom Of Saudi Arabia
Project cost: 100 Million.SR.
Client: Arrayed Development Authority (A.D.A)
Designer: bhn Studio, Architecture& Design LONDON, UNITED KINGDOM
Consultant: Saudi Consulting Services Co. (SAUDCONSULT)
Duration: From 2012 until 2013
Position: Consultant senior ARCHTECTURAL engineer. Project components: The project site area is (15000.00 square meters) and
consists of 5 floors educational Building includes 30 classrooms, 8 labs, library,
multi function hall& courtyard (25000 square meters area ). Scope of work:
- Reviewing the project tender documents.
- Reviewing the project architectural shop drawings for approval.
- Reviewing the project material samples& mock-up samples for approval.
- Inspection of the installed work at site.
- Coordination with all disciplines in the site.
Street modification for Kasr al Hokm district at Riyadh, kingdom Of
Saudi Arabia Project cost: 100 Million.SR.
Client: Arrayed Development Authority (A.D.A)
Designer: Saudi Consulting Services (SAUDCONSULT)
Landscape Designer: Boedeker Partners Landscape Architects (GERMANY)
Consultant: Saudi Consulting Services Co. (SAUDCONSULT)
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page6
Duration: From 2012 until 2013
Position: Consultant senior ARCHTECTURAL engineer. Project components: The project site area is (150000.00 square meters) and
includes the modification of Daknah Square and surrounding roads Between
Criminal Court Plaza and Multi-Use Building, also Between Criminal Court Plaza
and Salam Park and Falcon Souq and also Between General Court and Criminal Court Plaza and Daknah Square and Al Madinah Al Minawwarah Road.
Scope of work:
- Reviewing the project tender documents.
- Reviewing the project architectural shop drawings for approval.
- Reviewing the project material samples for approval.
- Inspection of the installed work at site.
- Coordination with all disciplines in the site.
- Reviewing the time schedule and the progress of the project activities.
- Review the weekly and monthly reports.
2008: 2010 work in Riyadh, kingdom Of Saudi Arabia Company: Agency of Buildings The Ministry of Education in Riyadh, kingdom Of Saudi Arabia.
Section: studies and designs. Duration: From 2008: 2010
Job Title: ARCHTECTURAL engineer
Projects:
Educational building, schools, multi-use building& Support buildings.
Scope of work:
- Developing and redesign the educational building, schools, multi-use building&
support building all over the Kingdom of Saudi Arabia. - Developing the educational building, schools& multi-use building specifications.
- Feasibility studies for remodeling and up-grading the educational building.
- Up-grading work of the existing educational building
- Preparing of the construction document for the projects.
- Reviewing the project architectural drawings.
- Reviewing the project material samples.
- Coordination with all disciplines.
- Periodic supervision for the projects.
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page7
1998: 2008 work in Arab Republic of Egypt Company: Goiba Contracting Co. and road construction (GOIBA)
Section: Construction
Duration: From 1998:2008
Job Title: ARCHTECTURAL engineer
Projects:
Luxor Cultural Centre
Project cost: 100 Million LE.
Client: Luxor City Council
Designer& Consultant: Mimar Engineering Consultancy (S.A.E.)
Main contractor: Goiba Contracting Co.
Duration: From 2007 until 2008
Position: ARCHTECTURAL engineer. Project components: Multi-media centre including culturama hall 170 seats,
public library and Egyptology centre.
Scope of work:
- Project coordinator and Periodic supervision during construction phase.
- Reviewing the project architectural shop drawings.
- Reviewing the project materials.
- Coordination for all trades & suppliers involved in the project.
- Coordination with all disciplines in the site.
- Review the weekly and monthly reports.
Savoy tourism market& restaurant complex - Luxor
Project cost: 40 Million LE.
Client: Luxor City Council
Designer& Consultant: Mimar Engineering Consultancy (S.A.E.)
Main contractor: Goiba Contracting Co.
Duration: From 2006 until 2007
Position: ARCHTECTURAL engineer. Project components: The project site area is (10000.00 square meters), 4 floors
and includes 60 shops&6 restaurants.
Scope of work:
- Project coordinator and Periodic supervision during construction phase.
- Reviewing the project architectural shop drawings& materials.
- Coordination for all trades & suppliers involved in the project.
- Coordination with all disciplines in the site.
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page8
Developing Karnack Temple Plaza & tourism market complex (Urban)
- Luxor
Project cost: 70 Million LE.
Client: Luxor City Council
Designer& Consultant: Mimar Engineering Consultancy (S.A.E.)
Main contractor: Goiba Contracting Co.
Duration: From 2006 until 2007
Position: ARCHTECTURAL engineer. Project components: The project site area is (60000.00 square meters),
approximately 40000 square meters landscape area for the Karnack Temple
Plaza& includes 30 shops&2 restaurants.
Scope of work:
- Project coordinator and Periodic supervision during construction phase.
- Reviewing the project architectural shop drawings& materials.
- Coordination for all trades & suppliers involved in the project.
- Coordination with all disciplines in the site.
Developing the residential buildings facades in the TV Street (Urban) -
Luxor
Project cost: 50 Million LE.
Client: Luxor City Council
Designer& Consultant: Engineer DR. Ayman Ashour Engineering
Consultancy.
Main contractor: Goiba Contracting Co.
Duration: From 2006 until 2007
Position: ARCHTECTURAL engineer. Project components: Developing more than 100 residential buildings facades in
the TV Street to Classic facades taken from the environmental Culture of Luxor
city.
Scope of work:
- Project coordinator and Periodic supervision during construction phase.
- Reviewing the project architectural shop drawings& materials.
- Coordination for all trades & suppliers involved in the project.
- Coordination with all disciplines in the site.
Faculty of aerial defense – Alexandria
Project cost: 90 Million LE.
Client: Egyptian Ministry of Defense
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page9
Designer& Consultant: Engineer DR. Ayman Ashour Engineering
Consultancy.
Main contractor: Goiba Contracting Co.
Duration: From 2005 until 2006
Position: ARCHTECTURAL engineer. Project components: Educational building, playgrounds, covered halls, clinics,
cafeteria, mosque, administrative building and parking
Scope of work:
- Project coordinator and Periodic supervision during construction phase.
- Reviewing the project architectural shop drawings& materials.
- Coordination for all trades & suppliers involved in the project.
The central laboratories building in El Dekheila port – Alexandria
Project cost: 50 Million LE.
Client: General Organization for Export and Import Control
Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering
Consultancy.
Main contractor: Goiba Contracting Co.
Duration: From 2004 until 2005
Position: ARCHTECTURAL engineer. Project components: Central labs building 6 floors height includes labs for
analyzing samples, administrative offices, cafeteria and parking.
Scope of work:
- Project coordinator and Periodic supervision during construction phase.
- Reviewing the project architectural shop drawings& materials.
- Coordination with all disciplines in the site.
Development and expansion of the Maadi-hospital 800 beds –Cairo
(Egypt).
Project cost: 400 Million LE.
Client: Ministry of Health
Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering
Consultancy.
Main contractor: Goiba Contracting Co.
Duration: From 2003 until 2004
Position: ARCHTECTURAL engineer. Project components: Section of surgery and anesthesia, x-ray, Laboratory and
Blood Bank, Emergency section, an intensive care unit for adults, Kidney dialysis
section, Quality and Patient Safety Section, Medical Rehabilitation Center, Dental
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page10
Section, Pharmacology, maternity section, Outpatient department, physiotherapy
and medical rehabilitation section.
Scope of work:
- Project supervision during construction phase.
- Reviewing the project architectural shop drawings& materials.
- Coordination for all trades & suppliers involved in the project.
- Coordination with all disciplines in the site.
Minya Hotel, Cultural, entertainment and a healthy complex –Minya
(Egypt).
Project cost: 300 Million LE.
Client: Egyptian Ministry of Defense
Designer& Consultant: Engineer DR. Khalid M Turk Engineering
Consultancy.
Main contractor: Goiba Contracting Co.
Duration: From 2002 until 2003
Position: ARCHTECTURAL engineer. Project components: The project site area is (220000.00 square meters) and the
variety of forms of the project is a natural derivative from the following concepts:
inward looking, respect of gravity, comprehensiveness of composition, and a true
expression of the age. The project provides the city with a much needed services
such as: 5-star hotel, shopping mall, convention hall, movies complex, community
center, amphitheatre, Health Centre, 300 bed Hospital, squash court, Tennis court,
Bowling court, cultural center, Library, 1200 Seat Theater, mosque, administrative
building, swimming pole, helicopter landing pad, cars parking& approximately
120000 square meters landscape area for the project plaza.
Scope of work:
- Project coordinator & supervision during construction phase.
- Reviewing the project architectural shop drawings& materials.
- Coordination for all trades & suppliers involved in the project.
The Armed Forces Officers Beach Club in Mustafa Kamel Beach –
Alexandria
Project cost: 50 Million LE.
Client: Egyptian armed forces
Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering
Consultancy.
Main contractor: Goiba Contracting Co.
Duration: From 2001 until 2002
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page11
Position: ARCHTECTURAL engineer. Project components: 100 suites for one day rent, swimming pools, ceremony hall,
green areas, food court and parking.
Scope of work:
- Project coordinator & supervision during construction phase.
- Coordination for all trades & suppliers involved in the project.
The Armed Forces Officers Hotel and Social Club at Qaroun Lake -
Fayoum Governorate.
Project cost: 70 Million LE.
Client: Egyptian armed forces
Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering
Consultancy.
Main contractor: Goiba Contracting Co.
Duration: From 2000 until 2001
Position: ARCHTECTURAL engineer. Project components: 70 hotel rooms& 30 suites, swimming pools, terraces,
fountain, restaurant, ceremony hall, green areas, food court and parking.
Scope of work:
- Reviewing the project architectural shop drawings& materials.
- Coordination for all trades & suppliers involved in the project.
- Coordination with all disciplines in the site.
Developing& up-grading The Armed Forces Officers Hotels at Nasser
city - Cairo.
- Supervision during construction phase.
Duration: From 1999 until 2000
Developing& up-grading The Armed Forces Officers Hotel and Social
Club at El-Agamy - Alexandria.
- Supervision during construction phase.
Duration: From 1999 until 2000
Construction of two jet fuel stations (A-JET) - Cairo Eastern Airport.
- Supervision during construction phase.
Duration: From 1998 until 1999
REFERENCES: Furnished upon request.
Arch. Mohamed F. I. Elbastawisy c.v.
1998:2016
Page13
Terminal 5 , King Khaled International Airport in Riyadh