Page 1 Arch. Mohamed Fawzy. I. Elbastawisy Curriculum Vitae 1998:2016 Career Summary: 18 years experienced in reviewing projects architectural design, redesign, interior design, reviewing shop drawings for architectural work, coordination drawings, as built drawings, materials, construction document, subcontractor selection and projects supervision.

Upload: mohammed-fawzy

Post on 14-Apr-2017

158 views

Category:

Documents


0 download

TRANSCRIPT

Page 1

Arch. Mohamed Fawzy. I. Elbastawisy

Curriculum Vitae

1998:2016

Career Summary: 18 years experienced in reviewing projects architectural design, redesign, interior design, reviewing shop drawings for architectural work, coordination drawings, as built drawings, materials, construction document, subcontractor selection and projects supervision.

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page2

Curriculum Vitae Arch. MOHAMED FAWZY IBRAHIM

ELBASTAWISYs

Riyadh - KSA

Mobile Phone (+966-554173469, 594000471)

E-mail- ([email protected])

(eng.moh_f @ yahoo.com)

Personal Data:

Date of Birth: 01-07-1973

Nationality: Egyptian

Military status: Completed

Marital Status: Married, have 2 children

Education Background: B.Sc. Degree of Architectural Engineering.

Mansoura University, Faculty of Engineering, Architecture Department.

Graduation Project: Olympic Games Village Architectural Design.

Graduation Year: 1998.

Skills:

Computer: AutoCAD - Freehand - Internet - Windows - MS Office.

Languages: Arabic - English - Written & verbal

Membership in Professional Societies:

Egyptian Syndicate of Engineers (Architecture).

Society of Egyptian Architect (U.I.A.).

Career Summary:

18 years experienced in reviewing projects architectural design, redesign, interior design, reviewing shop drawings for architectural work, coordination drawings, as built drawings, materials, construction document, subcontractor selection and projects supervision.

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page3

Major projects: Design & Build Terminal 5 and Ancillary Buildings, King Khaled

International Airport in Riyadh, Kingdom of Saudi Arabia.

Criminal Court, Riyadh, kingdom Of Saudi Arabia Includes Mixed Use

Building & Court Complex Mosque Extension.

Development & expansion of Maadi-hospital 800 beds - Cairo (Egypt).

Faculty of aerial defense - Alexandria (Egypt).

The central laboratories building in El Dekheila port - Alexandria (Egypt).

Minya Hotel, Cultural, entertainment and a healthy complex - Minya

(Egypt).

Minya hospital 300 beds - Minya (Egypt).

The Armed Forces Officers Hotel and Social Club at Qaroun Lake - Fayoum

Governorate.

Luxor Cultural Centre - Luxor (Egypt).

Developing Karnack Temple Plaza & tourism market complex (Urban) -

Luxor (Egypt).

Qualification Summary:

Reviewing of the project tender documents.

Reviewing and approving of the project architectural shop drawings.

Evaluation and Approval of Material submittals as per projects specification.

Site supervision for quality assurance as per project approved Specification

& shop drawings.

Quality Control as per standard specified for Architectural works following

project drawings and specifications.

Checking the quality of materials delivered at site.

Estimating the amount of materials required.

Maintaining daily and monthly progress report by keeping Co-ordination

with the site staff.

Checking the assigned job for workers and explaining the best and fastest

way to be executed.

Checking and Reviewing of variation order, change order claims & value

Engr. reports.

Reviewing & approving the project material samples& mock-up samples.

Coordination with all disciplines in the project.

Attending the project technical & progress meetings.

Capable of modifying architectural exterior & interior details to execute it

properly.

Reviewing and approving the project’s design stages, from design concept

stage to working drawing.

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page4

Employment Record:

2010: 2016 work in Riyadh, kingdom Of Saudi Arabia Company: Saudi Consulting Services Co. (SAUDCONSULT)

Section: Supervision

Duration: From 2010 until Now

Job Title: Sr. ARCHTECTURAL Engineer Projects:

Design & Build Terminal 5 and Ancillary Buildings, King Khaled

International Airport in Riyadh, Kingdom of Saudi Arabia

Project cost: 2.00 Billion.SR.

Client: GENERAL AUTHORITY OF CIVIL AVIATION (GACA)

Designer: GMW Lead Designer

Consultant: Saudi Consulting Services Co. (SAUDCONSULT)

Main contractor: TAV-ACC Joint Venture

Duration: From 2014 until 2016

Position: Consultant senior ARCHTECTURAL engineer. Project components: Carry out the Design and Build of Terminal 5 and all related

facilities at King Khaled International Airport, The construction of a new

passenger Terminal 5 with AOC Building, PCP Building, Fire Station Building,

Supply Building and Airside Gate Building.

Scope of work:

- Reviewing the project design stages.

- Reviewing the project architectural shop drawings for approval.

- Reviewing the project material samples& mock-up samples for approval.

- Inspection of the installed work at site.

- Coordination with all disciplines at site.

- Reviewing the time schedule and the progress of the project activities.

- Review the weekly and monthly reports.

- Inspection& supervision for the installed work at site.

Criminal Court, Riyadh, kingdom Of Saudi Arabia Includes Mixed Use

Building & Court Complex Mosque Extension Project cost: 500 Million.SR.

Client: Arrayed Development Authority (A.D.A)

Designer: AS&P-International GmbH

Architects, planners’ www.as-p.de GERMANY

Consultant: Saudi Consulting Services Co. (SAUDCONSULT)

Duration: From 2010 until 2014

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page5

Position: Consultant senior ARCHTECTURAL engineer. Project components: The project site area is (52000.00 square meters) and

consists of 12 floors Main Building includes 61 general courts ( 58000 square

meters area ),4 floors Mixed Use Building for1000 cars parking ( 44000 square

meters area ) & approximately 35000 square meters landscape area for the project

plaza.

Scope of work:

- Reviewing the project tender documents.

- Reviewing the project architectural shop drawings for approval.

- Reviewing the project material samples& mock-up samples for approval.

- Inspection of the installed work at site.

- Coordination with all disciplines in the site.

- Reviewing the time schedule and the progress of the project activities.

- Attend the project technical & progress meetings.

Institute of Imam Al Da'wa in Riyadh, kingdom Of Saudi Arabia

Project cost: 100 Million.SR.

Client: Arrayed Development Authority (A.D.A)

Designer: bhn Studio, Architecture& Design LONDON, UNITED KINGDOM

Consultant: Saudi Consulting Services Co. (SAUDCONSULT)

Duration: From 2012 until 2013

Position: Consultant senior ARCHTECTURAL engineer. Project components: The project site area is (15000.00 square meters) and

consists of 5 floors educational Building includes 30 classrooms, 8 labs, library,

multi function hall& courtyard (25000 square meters area ). Scope of work:

- Reviewing the project tender documents.

- Reviewing the project architectural shop drawings for approval.

- Reviewing the project material samples& mock-up samples for approval.

- Inspection of the installed work at site.

- Coordination with all disciplines in the site.

Street modification for Kasr al Hokm district at Riyadh, kingdom Of

Saudi Arabia Project cost: 100 Million.SR.

Client: Arrayed Development Authority (A.D.A)

Designer: Saudi Consulting Services (SAUDCONSULT)

Landscape Designer: Boedeker Partners Landscape Architects (GERMANY)

Consultant: Saudi Consulting Services Co. (SAUDCONSULT)

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page6

Duration: From 2012 until 2013

Position: Consultant senior ARCHTECTURAL engineer. Project components: The project site area is (150000.00 square meters) and

includes the modification of Daknah Square and surrounding roads Between

Criminal Court Plaza and Multi-Use Building, also Between Criminal Court Plaza

and Salam Park and Falcon Souq and also Between General Court and Criminal Court Plaza and Daknah Square and Al Madinah Al Minawwarah Road.

Scope of work:

- Reviewing the project tender documents.

- Reviewing the project architectural shop drawings for approval.

- Reviewing the project material samples for approval.

- Inspection of the installed work at site.

- Coordination with all disciplines in the site.

- Reviewing the time schedule and the progress of the project activities.

- Review the weekly and monthly reports.

2008: 2010 work in Riyadh, kingdom Of Saudi Arabia Company: Agency of Buildings The Ministry of Education in Riyadh, kingdom Of Saudi Arabia.

Section: studies and designs. Duration: From 2008: 2010

Job Title: ARCHTECTURAL engineer

Projects:

Educational building, schools, multi-use building& Support buildings.

Scope of work:

- Developing and redesign the educational building, schools, multi-use building&

support building all over the Kingdom of Saudi Arabia. - Developing the educational building, schools& multi-use building specifications.

- Feasibility studies for remodeling and up-grading the educational building.

- Up-grading work of the existing educational building

- Preparing of the construction document for the projects.

- Reviewing the project architectural drawings.

- Reviewing the project material samples.

- Coordination with all disciplines.

- Periodic supervision for the projects.

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page7

1998: 2008 work in Arab Republic of Egypt Company: Goiba Contracting Co. and road construction (GOIBA)

Section: Construction

Duration: From 1998:2008

Job Title: ARCHTECTURAL engineer

Projects:

Luxor Cultural Centre

Project cost: 100 Million LE.

Client: Luxor City Council

Designer& Consultant: Mimar Engineering Consultancy (S.A.E.)

Main contractor: Goiba Contracting Co.

Duration: From 2007 until 2008

Position: ARCHTECTURAL engineer. Project components: Multi-media centre including culturama hall 170 seats,

public library and Egyptology centre.

Scope of work:

- Project coordinator and Periodic supervision during construction phase.

- Reviewing the project architectural shop drawings.

- Reviewing the project materials.

- Coordination for all trades & suppliers involved in the project.

- Coordination with all disciplines in the site.

- Review the weekly and monthly reports.

Savoy tourism market& restaurant complex - Luxor

Project cost: 40 Million LE.

Client: Luxor City Council

Designer& Consultant: Mimar Engineering Consultancy (S.A.E.)

Main contractor: Goiba Contracting Co.

Duration: From 2006 until 2007

Position: ARCHTECTURAL engineer. Project components: The project site area is (10000.00 square meters), 4 floors

and includes 60 shops&6 restaurants.

Scope of work:

- Project coordinator and Periodic supervision during construction phase.

- Reviewing the project architectural shop drawings& materials.

- Coordination for all trades & suppliers involved in the project.

- Coordination with all disciplines in the site.

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page8

Developing Karnack Temple Plaza & tourism market complex (Urban)

- Luxor

Project cost: 70 Million LE.

Client: Luxor City Council

Designer& Consultant: Mimar Engineering Consultancy (S.A.E.)

Main contractor: Goiba Contracting Co.

Duration: From 2006 until 2007

Position: ARCHTECTURAL engineer. Project components: The project site area is (60000.00 square meters),

approximately 40000 square meters landscape area for the Karnack Temple

Plaza& includes 30 shops&2 restaurants.

Scope of work:

- Project coordinator and Periodic supervision during construction phase.

- Reviewing the project architectural shop drawings& materials.

- Coordination for all trades & suppliers involved in the project.

- Coordination with all disciplines in the site.

Developing the residential buildings facades in the TV Street (Urban) -

Luxor

Project cost: 50 Million LE.

Client: Luxor City Council

Designer& Consultant: Engineer DR. Ayman Ashour Engineering

Consultancy.

Main contractor: Goiba Contracting Co.

Duration: From 2006 until 2007

Position: ARCHTECTURAL engineer. Project components: Developing more than 100 residential buildings facades in

the TV Street to Classic facades taken from the environmental Culture of Luxor

city.

Scope of work:

- Project coordinator and Periodic supervision during construction phase.

- Reviewing the project architectural shop drawings& materials.

- Coordination for all trades & suppliers involved in the project.

- Coordination with all disciplines in the site.

Faculty of aerial defense – Alexandria

Project cost: 90 Million LE.

Client: Egyptian Ministry of Defense

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page9

Designer& Consultant: Engineer DR. Ayman Ashour Engineering

Consultancy.

Main contractor: Goiba Contracting Co.

Duration: From 2005 until 2006

Position: ARCHTECTURAL engineer. Project components: Educational building, playgrounds, covered halls, clinics,

cafeteria, mosque, administrative building and parking

Scope of work:

- Project coordinator and Periodic supervision during construction phase.

- Reviewing the project architectural shop drawings& materials.

- Coordination for all trades & suppliers involved in the project.

The central laboratories building in El Dekheila port – Alexandria

Project cost: 50 Million LE.

Client: General Organization for Export and Import Control

Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering

Consultancy.

Main contractor: Goiba Contracting Co.

Duration: From 2004 until 2005

Position: ARCHTECTURAL engineer. Project components: Central labs building 6 floors height includes labs for

analyzing samples, administrative offices, cafeteria and parking.

Scope of work:

- Project coordinator and Periodic supervision during construction phase.

- Reviewing the project architectural shop drawings& materials.

- Coordination with all disciplines in the site.

Development and expansion of the Maadi-hospital 800 beds –Cairo

(Egypt).

Project cost: 400 Million LE.

Client: Ministry of Health

Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering

Consultancy.

Main contractor: Goiba Contracting Co.

Duration: From 2003 until 2004

Position: ARCHTECTURAL engineer. Project components: Section of surgery and anesthesia, x-ray, Laboratory and

Blood Bank, Emergency section, an intensive care unit for adults, Kidney dialysis

section, Quality and Patient Safety Section, Medical Rehabilitation Center, Dental

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page10

Section, Pharmacology, maternity section, Outpatient department, physiotherapy

and medical rehabilitation section.

Scope of work:

- Project supervision during construction phase.

- Reviewing the project architectural shop drawings& materials.

- Coordination for all trades & suppliers involved in the project.

- Coordination with all disciplines in the site.

Minya Hotel, Cultural, entertainment and a healthy complex –Minya

(Egypt).

Project cost: 300 Million LE.

Client: Egyptian Ministry of Defense

Designer& Consultant: Engineer DR. Khalid M Turk Engineering

Consultancy.

Main contractor: Goiba Contracting Co.

Duration: From 2002 until 2003

Position: ARCHTECTURAL engineer. Project components: The project site area is (220000.00 square meters) and the

variety of forms of the project is a natural derivative from the following concepts:

inward looking, respect of gravity, comprehensiveness of composition, and a true

expression of the age. The project provides the city with a much needed services

such as: 5-star hotel, shopping mall, convention hall, movies complex, community

center, amphitheatre, Health Centre, 300 bed Hospital, squash court, Tennis court,

Bowling court, cultural center, Library, 1200 Seat Theater, mosque, administrative

building, swimming pole, helicopter landing pad, cars parking& approximately

120000 square meters landscape area for the project plaza.

Scope of work:

- Project coordinator & supervision during construction phase.

- Reviewing the project architectural shop drawings& materials.

- Coordination for all trades & suppliers involved in the project.

The Armed Forces Officers Beach Club in Mustafa Kamel Beach –

Alexandria

Project cost: 50 Million LE.

Client: Egyptian armed forces

Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering

Consultancy.

Main contractor: Goiba Contracting Co.

Duration: From 2001 until 2002

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page11

Position: ARCHTECTURAL engineer. Project components: 100 suites for one day rent, swimming pools, ceremony hall,

green areas, food court and parking.

Scope of work:

- Project coordinator & supervision during construction phase.

- Coordination for all trades & suppliers involved in the project.

The Armed Forces Officers Hotel and Social Club at Qaroun Lake -

Fayoum Governorate.

Project cost: 70 Million LE.

Client: Egyptian armed forces

Designer& Consultant: Engineer DR. Hakim EL Afifi Engineering

Consultancy.

Main contractor: Goiba Contracting Co.

Duration: From 2000 until 2001

Position: ARCHTECTURAL engineer. Project components: 70 hotel rooms& 30 suites, swimming pools, terraces,

fountain, restaurant, ceremony hall, green areas, food court and parking.

Scope of work:

- Reviewing the project architectural shop drawings& materials.

- Coordination for all trades & suppliers involved in the project.

- Coordination with all disciplines in the site.

Developing& up-grading The Armed Forces Officers Hotels at Nasser

city - Cairo.

- Supervision during construction phase.

Duration: From 1999 until 2000

Developing& up-grading The Armed Forces Officers Hotel and Social

Club at El-Agamy - Alexandria.

- Supervision during construction phase.

Duration: From 1999 until 2000

Construction of two jet fuel stations (A-JET) - Cairo Eastern Airport.

- Supervision during construction phase.

Duration: From 1998 until 1999

REFERENCES: Furnished upon request.

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page12

Criminal Court, Riyadh

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page13

Terminal 5 , King Khaled International Airport in Riyadh

Arch. Mohamed F. I. Elbastawisy c.v.

1998:2016

Page14

Terminal 5 , King Khaled International Airport in Riyadh