Page 1: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering Program

Construction ProjectsInstalled boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes.

Page 2: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering Program

Construction ProjectsIn concert with CPW, discovered underground problems with abandoned drainage pipes in the intersection of Poinsett and Miller. Plugged abandoned pipes and mapped functional ones, adding some capacity to the system in the area.

Page 3: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering Program

Analysis and DesignPrepared a conceptual plan to construct a portion of Fernwood Street from the end of the existing pavement to the City Limits.

Page 4: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering Program

Analysis and DesignCompleted a design for improving the storm water flow in the Sunnydale Subdivision and began working on implementation plan.

Page 5: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering ProgramRoadway Maintenance Program

The roadway assessment program that has been developed has resulted in having our most highly distressed roads repaired. Completion of the next annual resurfacing season will result in all of the roads with an index of 60 or below having been resurfaced.

Page 6: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering Program

Inventory DataWe have begun compiling our inventory data into zones to simplify the process of planning an annual program of

inspections and reporting as required by our MS4.

Page 7: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering Program

Inventory DataAdding subdivision names along with other inventory data to the zone data base to ease the process of location and identification.

Page 8: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering Program

Subdivision CompletionSome subdivisions have been left in a state of incompletion due to the economic conditions. We are reviewing where we can make an impact by collecting security and completing the necessary infrastructure.

Page 9: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering ProgramSubdivision Issues

We are continuing to work with local home builders to generate construction plans that will provide for good drainage. Examples are shown below.

Page 10: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering ProgramTransportation Coordination

Provide inputs and assist in public hearings for important transportation improvement projects that are planned by SCDOT through the MPO>

Page 11: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering ProgramIllicit Discharge Identification

Illicit discharges are those locations where there is flow in periods of dry weather. This might indicate that a problem exists and could be waste water entering the storm water stream or it could indicate a leak in the potable water system. We have identified locations where chemical analysis is needed to determine the source of the discharge. Should the discharge be determined to be of a nature as needing further measures to either reduce, eliminate or control the discharge in some specific manner. We must use a pipe camera system to photograph the interior of the pipes feeding such discharge points in order to locate and identify the physical source of the flow.

Page 12: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Engineering ProgramIllicit Discharge Identification

The graphic below depicts a location where the discharge is continuous throughout the year. Since this the point through which storm water passes from a large portion of the downtown area east of Main Street, it becomes important to determine the source of the continuous flow. We have identified eight such locations to date.

Page 13: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report Public Education & Outreach

Public Involvement/Participation

Illicit Discharge

Pollution Prevention/Waste Disposal

Construction

Post-Construction

Page 14: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual ReportSTORMWATER UTILITY FEE

YEAR GREENVILLE SPARTANBURG TOTAL

2010 $449,712.20 $198,204.0 $647,916.20

2009 $437,140.80 $197,530.5 $634,671.30

2008 $426,792.00 $195.413.7 $622,205.70

2007 $411,717.60 $180,705.60 $592,423.20

2006 $383,702.4 $166,492.80 $550,195.20

2005 $302,961.60 $162,388.80 $465,350.40

Page 15: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual ReportENGINEERING PLAN REVIEWS

26 PROJECTS (two re-designs)

Commercial - 13 Residential - 5

Linear - 3 Site Preparation - 4

63 PLAN REVIEWS

24 FIRST REVIEWS

18 SECOND REVIEWS

14 THIRD REVIEWS

5 FOURTH REVIEWS 2 FIFTH REVIEWS

33 PROJECT PLAN REVIEW MEETINGS

Construction Program

Page 16: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

PRE-CONSTRUCTION MEETINGS – 12

Construction Program

$35,725.30COLLECTED IN ENGINEERING PLAN FEES SINCE 1/1/2010

A Standard Notes file is provided to all engineers submitting plans, significantly reducing the need to review notes thus reducing review time.

Stormwater Program

2010 Annual Report

Page 17: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report AS-BUILT REVIEW PROGRAM CONSISTS OF:

• SITE INSPECTION,• REVIEW OF AS-BUILT

SURVEY, AND• REVIEW OF ENGINEER’S

CERTIFICATION• TO ASSURE THAT

SYSTEMS ARE INSTALLED THAT WILL FUNCTION ACCORDING TO THE APPROVED PLANS.

Construction/Post-Construction Program

Page 18: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

As-built Reviews of Engineering Certifications and Calculations - 10

Construction And Post-Construction Program

COMMERCIAL CO INSPECTIONS - 13

Stormwater Program

2010 Annual Report

Page 19: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

SEDIMENT, EROSION CONTROL AND STORMWATER MANAGEMENT INSPECTIONS

TOTAL SITES INSPECTED - 13

FULL INSPECTIONS – 20

(Includes a written report that is either mailed or emailed to the permittee.)

INITIAL INSPECTIONS - 4

(New process and form to meet the new MS4 permit requirements. Ensures that basic controls are in place prior to clearing and grading.)

Construction Program

Page 20: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

SEDIMENT, EROSION CONTROL AND STORMWATER MANAGEMENT INSPECTIONS

TOTAL NUMBER OPEN STORMWATER PERMITS – 35

TOTAL ACREAGE OPEN PERMITS – 1391

TOTAL DISTURBED ACREAGE 543

UNDER THE NEW MS4 PERMIT WE WILL BE REQUIRED TO CONDUCT INITIAL AND MONTHLY INSPECTION OF ALL SITES.

Construction Program

Page 21: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

SEDIMENT, EROSION CONTROL AND STORMWATER MANAGEMENT INSPECTIONS

RESIDENTIAL LOT INSPECTIONS – 3(during construction, silt fencing, gravel entrances)

RESIDENTIAL LOT FINAL

INSPECTIONS – 13(includes lot drainage, grassing, debris removal)

MEETINGS - 12

Construction Program

Page 22: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

SEDIMENT, EROSION CONTROL AND STORMWATER MANAGEMENT PROGRAM REVISIONS

REVISED STANDARD PROCEDURES – (Inspection Tracking, Initial Inspection, Full Inspection.)

Updated Grading Permit Application – (Can be completed online.)

Revised City of Greer Inspection Report. (PDF file with fill in fields.)

Prepared a “Contractor’s Construction Compliance Inspection Report Form”. (PDF file with fill in fields.) Construction Program

Page 23: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

SEDIMENT, EROSION CONTROL AND STORMWATER MANAGEMENT PROGRAM REVISIONS

Stormwater Construction Activity Inspection Spreadsheet

• Designed to meet new MS4 permit tracking requirements.

• Repository for all construction activity inspections.

• Each inspection report is stored and easily retrieved in PDF format.

• An electronic copy of site specific information stored in PDF format.

•Tracks Deficiencies and enforcement activities.

• Maintains up-to date tallies for total and disturbed acreage.

Construction Program

Page 24: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

STORMWATER POND INSPECTIONS – 8

(Written report inspection form with cover letter. New form complies with new MS4 permit.)

Post- Construction Program

Page 25: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

CONSTRUCTION/ POST- CONSTRUCTION PROGRAM

ENFORCEMENT

STOP WORK ORDERS

1

COURT APPEARANCE TICKETS

0

NUMBER OF SITES

1

Page 26: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program2010 Annual Report

TEAMED WITH GREENVILLE COUNTY

IN THE KEEP AMERICA BEAUTIFUL “CIGARETTE

LITTER PREVENTION PROGRAM”

TEAM TOOK FIRST IN A NATIONAL KEEP AMERICA BEAUTIFUL COMPETITION

PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM

Page 27: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes
Page 28: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report

PUBLIC EDUCATION

• CABLE CHANNEL - SLIDES• STORMWATER BOOTH AT LAKE ROBINSON DAY• SPEAKER SERIES – Hosted by City of Greer, City of Spartanburg, Upstate Forever and SC DHEC.

Page 29: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report

PUBLIC EDUCATION

Page 30: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report

PUBLIC EDUCATION

Page 31: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report PUBLIC EDUCATION

Stormwater Speaker Series

October 12, 2010 – Water Securing Our Future – Impacts of pesticides, fertilizers, sanitary sewer overflows, used oil, and pet waste on our streams. 64 Attendees

November 19, 2010 – What’s Your LoadTotal Maximum Daily Loads and Impaired Waters 53 Attendees

Page 32: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report POLLUTION PREVENTION AND GOOD HOUSEKEEPING

STREET SWEEPING CATCH BASIN CLEANING

INDUSTRIAL STORMWATER PERMIT

POLLUTION PREVENTION AND GOODHOUSEKEEPING TRAINING

SPILL KITS AND SPILL EQUIPMENT

Page 33: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report POLLUTION PREVENTION AND GOOD HOUSEKEEPING

SPILL KITS AND SPILL EQUIPMENT

SPILL KIT AT RECYCLE CENTER

Page 34: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report POLLUTION PREVENTION AND GOOD HOUSEKEEPING

SPILL KITS AND SPILL EQUIPMENT

LARGERSPILL KIT AT RECYCLE CENTER

SMALL FIVE GALLON SPILL KITS WERE DISTRIBUTED TO PARKS AND RECREATION

Page 35: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report POLLUTION PREVENTION AND GOOD HOUSEKEEPING

SPILL EQUIPMENT PURCHASED FOR FIRE DEPARTMENT

Page 36: Engineering Program Construction Projects Installed boxes and drain lines from Poinsett along RR and crossed Line St with storm drain pipes

Stormwater Program

2010 Annual Report POLLUTION PREVENTION AND GOOD HOUSEKEEPING

POLLUTION PREVENTION AND GOOD HOUSEKEEPING ANNUAL TRAINING INCLUDING SPILL REPORTING AND

RESPONSE

Public Services and Parks and Recreation Training on 3/12/2010Recycle Center Employees on 6/30/2010