Page 1: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

Engineering & Operations Committee Item 8-3 July 10, 2017

Page 2: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 2 July 10, 2017

2016 2017 2018 2019

Feasibility Phase

Planning Phase

Board Action

Regulatory Coordination

CEQA

Design Phase

Feasibility Study

Demo Plant Design

Operations

Construction

Facilities Planning & Eng.

Institutional Arrangements

Conceptual/Prelim Design

Public Outreach

Page 3: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 3 July 10, 2017

Appropriate $2,000,000

Award $13,856,000 contract to Kiewit Infrastructure West Co. to construct an advanced water treatment (AWT) demonstration plant

Authorize increase of $300,000 to agreement with Stantec Consulting, Inc., for a new not-to-exceed total of $1,500,000

Page 4: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 4 July 10, 2017

November 2015 – Board action Appropriated $15,000,000 Authorized recycled water demonstration project Authorized agreement with LA County Sanitation District No. 2 for development of potential regional recycled water program

March 2016 – Board action Authorized agreement with MWH Americas, Inc. (now Stantec Consulting, Inc.) to design the AWT demonstration plant

Page 5: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 5 July 10, 2017

CASTAIC LAKE

GARVEY RESERVOIR

LIVE OAK RESERVOIR

SILVERWOOD LAKE

LAKE PERRIS

DIAMOND VALLEY LAKE

LAKE SKINNER

LAKE MATHEWS Joint Water

Pollution Control Plant

Page 6: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 6 July 10, 2017

Demonstration Plant Site

110

Sepulveda Blvd.

JWPCP Boundary

Lomita Blvd.

Mai

n St

.

Page 7: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 7 July 10, 2017

Test effectiveness of various advanced water treatment processes Confirm treatment costs Assist with regulatory approval of the proposed advanced treatment process Provide basis for technical recommendations for design, operation, & optimization of full-scale regional recycled water program Provide vehicle for public outreach & acceptance

Page 8: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 8 July 10, 2017

Aerobic and Anoxic Tanks

for MBR

Reverse Osmosis UV/AOP

Membrane System for MBR

Membrane System for MBR

Waste Activated Sludge to JWPCP RO Brine to JWPCP

Non-Nitrified Secondary

Effluent from JWPCP

Return to

JWPCP

Page 9: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 9 July 10, 2017

Unique nature of source water Process optimization

Potential to eliminate one treatment process Reduce capital/O&M costs of full-scale facility Address scale-up issues

Regulatory approval of proposed process train Public acceptance

Page 10: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 10 July 10, 2017

Specifications No. 1879

Bids received May 10, 2017 No. of bidders 5 Low bidder Kiewit Infrastructure West Co. Low bid $13,856,000 Range of other bids $15.3M to $16.6M Engineer’s estimate $11.8M SBE participation* 26.7% * SBE participation level set at 5%

Page 11: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 11 July 10, 2017

Low bid is $2M over allocated budget Possible reasons for difference

Expectation of competitive eqpt. prices not realized in bids High demand of subcontractors in specialized areas

Complexity of instrumentation & controls to allow remote monitoring

Limited economy of scale on eqpt. Assessment of risk relative to magnitude of contract Limited opportunity for contractor to propose alternates

Page 12: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 12 July 10, 2017

Site work & utility connections Membrane bioreactors

Biological treatment basins Membrane modules

Reverse osmosis system Advanced oxidation system Chemical storage & handling facilities Electrical building System start-up & commissioning

Page 13: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 13 July 10, 2017

MBR – Membrane

Modules

RO

Chemical Feed Systems UV/AOP

MBR – Aerobic

& Anoxic Tanks

Page 14: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 14 July 10, 2017

Metropolitan Construction management Field inspection & survey Program management

Stantec Consulting, Inc. Submittal reviews Technical input & responses to RFIs

LA County Sanitation Districts Construction of utility extension to AWT demonstration plant On-site assistance as needed

Page 15: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 15 July 10, 2017

Performed design of AWT demonstration plant Increase of $300,000 for technical support during construction New not-to-exceed total - $1,500,000 10% SBE/DVBE participation Subconsultants

Trussell Tech, Inc. Carollo Engineers, Inc. DDB Engineering, Inc. Katz & Associates William R. Mills & Associates

Page 16: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 16 July 10, 2017

Funds previously appropriated $ 15,000,000 Current funds requested 2,000,000 Total amount to complete AWT demonstration plant $ 17,000,000

$1 M in grant funds pending from SWRCB’s Water Recycling Funding Program Staff will continue to pursue grant funding

Page 17: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 17 July 10, 2017

Project 2019

AWT Demonstration Plant

2017 2018

Board Action Design

Completion of Construction Testing/Studies

Construction

Page 18: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 18 July 10, 2017

Option #1 Adopt CEQA determination that the proposed action has been previously addressed in the 2015 NOE, & that no further envir. analysis or documentation is required Appropriate $2,000,000 Award $13,856,000 contract to Kiewit Infrastructure West Co. to construct an AWT demonstration plant Authorize increase of $300,000 to agreement with Stantec Consulting, Inc., for new NTE total of $1,500,000

Option #2 Do not proceed with the AWT demonstration plant at this time

Page 19: Engineering & Operations Committee Item 8-3 July 10, 2017mwdh2o.com/PDF_About_Your_Water/07102017 BOD 8-3 Presentation.pdfConceptual/Prelim Design Public Outreach . E&O Committee Item

E&O Committee Item 8-3 Slide 19 July 10, 2017

Option #1