A+. HILL COUNTRY FAMILY FITNESS CENTER PROPOSAL. A-001. ENGINEERING DESIGN. SITE LOCATION. U.S.281. Comal County. POND. RODEO DRIVE. A+. SPEAKER : AMANDA WATSON. A-002. ENGINEERING DESIGN. PROPOSED LAYOUT. PROPERTY LINES. RUNNING TRACK. PARKING. 34,000 SQ. FT. BUILDING. A+. - PowerPoint PPT PresentationTRANSCRIPT
A+ENGINEERING
DESIGNA-001
HILL COUNTRY FAMILY FITNESS CENTER PROPOSAL
A+ENGINEERING
DESIGNA-002
POND
Comal County
U.S.281
RODEO DRIVE
SITE LOCATION
SPEAKER : AMANDA WATSON
A+ENGINEERING
DESIGNA-003SPEAKER : AMANDA WATSON
PROPOSED LAYOUT
PROPERTY LINESRUNNING TRACK
PARKING
34,000 SQ. FT. BUILDING
LOT 1 : 2.500 ACRESLOT 2 : 5.018 ACRES
A+ENGINEERING
DESIGNA-004SPEAKER : AMANDA WATSON
TASK 1
LOT 1
LOT 2U.
S.28
1RODEO DRIVE
Amendment to Plat
• Topography Evaluation – Earthwork Volume sheet yielding
• proper amounts of cut and fill to be performed
• final elevation plans of finished grade– Design to be in accordance with County
Building Codes and Texas Storm Water Pollution Prevention Plan (TPDES).
– This task to be done in conjunction with and consideration of the drainage and environmental design task.
-
A+ENGINEERING
DESIGNA-005SPEAKER : JOSH HERRINGTON
TASK 2 Grading and Site Preparation
• All Design will be done in accordance with:
– Permeability and runoff/ drainage concerns
– State and Local building restrictions– ADA compliance and the State of
Texas Architectural Barriers Act, Texas Accessibility Standards (TAS)
– Fire Marshal’s restrictions
A+ENGINEERING
DESIGNA-006SPEAKER : JOSH HERRINGTON
Parking Lot Design
• Design will include:
– Type of paving method/ materials to use
– Maximum # of parking spaces combined with maximum traffic maneuverability
– Proper site lighting– Appropriate signage and ground
paint
A+ENGINEERING
DESIGNA-007SPEAKER : JOSH HERRINGTON
Parking Lot Design
Transportation Analysis & Design
• Traffic Counts• PHF• Critical Lanes• LOS
Traffic Demand Analysis
• No. Lanes• Shoulder width• Sight Distance• Speed Limits• Traffic Signs
Existing Geometric Layout • Number of Trips
Generated• TxDOT Traffic
Volumes• Expected Traffic
Growth Rate
Traffic Forecast
• Traffic Analysis (Existing + Forecasted)
• LOS
Traffic Impact
Background Analysis Impact Analysis
A+ENGINEERING
DESIGNA-008SPEAKER : ARMANDO GOMEZ-FARIAS
TASK 3
• Recommendations and Design
– Drive Way (1 Lane Inbound / 1 Lane Outbound)• Access point from Rodeo Drive to Site
– Acceleration / Deceleration Lanes • TxDOT Access Management
– Modification to existing roadway• Sight Distance / Sight Triangle AASHTO • Traffic Signs
– Permits
Transportation Analysis & Design
HWY
281
RODEO
DR.
Access Point
A+ENGINEERING
DESIGNA-009SPEAKER : ARMANDO GOMEZ-FARIAS
• CONTRIBUTING ZONE PLAN
EDWARDS AQUIFER VIEWER MAPSITE LOCATED WITHIN THE EDWARDS AQUIFER CONTRIBUTING ZONECZP SUBMITTED TO TCEQ
A+ENGINEERING
DESIGNA-010SPEAKER : AMANDA WATSON
TASK 4
SITE
DRAINAGE & ENVIRONMENTAL ANALYSIS
• CONTRIBUTING ZONE PLAN
• STORMWATER POLLUTION
PREVENTION PLAN
FEMA FLOOD INSURANE MAP VIEWERSITE NOT WITHIN 100-YEAR FLOOD BOUNDARIESTEXAS POLLUTION DISCHARGE ELIMINATION SYSTEM
A+ENGINEERING
DESIGNA-011SPEAKER : AMANDA WATSON
DRAINAGE & ENVIRONMENTAL ANALYSIS
• ON-SITE SEWAGE FACILITY
• WATER
• ELECTRICITY
TCEQ CHAPTER 285 & COMAL COUNTY DESIGN REGULATIONS
A+ENGINEERING
DESIGNA-012SPEAKER : AMANDA WATSON
TASK 5 Utility Design & Coordination
PROPOSEDPARKING LOT
WATER UTILITYDesign water main extensionsHydrant connectionsFire Service connectionsIrrigation and Domestic services
A+ENGINEERING
DESIGNA-013SPEAKER : KAREM ALFARO
POWER UTILITYUNDERGROUND SERVICE – Trench, backfill, concrete workCooperative :Cost Estimate
Utility Design & CoordinationPO
WER
LINE
WATER MAIN
IRRIGAT
ION
DOMESTICPOOL
FIRE LINE
POWER CONNECTION
A+ENGINEERING
DESIGNA-014SPEAKER : LIVIER CORONA
• Design all structural components of the building.
– According to the Architect’s Specifications
• Design by Following Codes:– International Building Code (IBC) 2012– American Society of Civil Engineers (ASCE) 7-10– American Institute of Steel Construction Manual (AISC) 2012– American Concrete Institute (ACI) 318-11
• Pre-Design Analysis– Determination of all Applicable Loads– Structural Analysis (SAP 2000)
Structural & GeotechnicalTASK 6
A+ENGINEERING
DESIGNA-015SPEAKER : LIVIER CORONA
• Structural Design– Materials: Steel, Concrete or Both
• Geotechnical Engineering Report– Subcontracted to a geotechnical firm– Results reviewed by our company
• Foundation & Slab Design– Geotechnical Report and Analysis– Pre-Design Analysis– Concrete Foundation
SITE
COMALCOUNTY
Structural & Geotechnical
A+ENGINEERING
DESIGNA-016SPEAKER : ANGELA DE GREEF
Structural and Architectural Features
TASK 7 Green Design
Steel Joists are 96% recycled; lowering energy use
LED lights with motion detectors
Energy efficient windows (triple pane fill with neon gas)
Awnings, location of windows; taking advantages of light
Supply Potable Water for human consumption
Reclaimed water for toilettes flushing and water irrigation
Lavender (light purple) Pipes
DUAL PIPING SYSTEM
A+ENGINEERING
DESIGNA-017SPEAKER : ANGELA DE GREEF
PERVIOUS CONCRETE
High porosityReduced RunoffParking areas, Areas with Light TrafficProtect Water Quality
XERISCAPING
Reduce or Eliminate the Need for Supplemental Water from
Irrigation
Green Design
A+ENGINEERING
DESIGNA-018SPEAKER : ANGELA DE GREEF
SOLAR PANELS
Solar Pool Heaters to reduce Swimming Pool Heating Costs
Self-sustaining gymnasium, combination of human power and solar energy
Electric vehicle charger station
Green Design
A+ENGINEERING
DESIGNA-019
Schedule of Services
SPEAKER : JOSH HERRINGTON
Meeting 1Sept.09
Meeting 2Sept.25
Meeting 3Oct.17START
Sept.02FINISHNov.25
A+ENGINEERING
DESIGNA-020SPEAKER : JOSH HERRINGTON
Cost of ServicesADMINISTRATIVE TASKS $ 24,987
SITE GRADING AND PARKING LOT DESIGN $ 45,270
TRANSPORTATION ANALYSIS AND DESIGN $ 30,450
DRAINAGE AND ENVIRONMENTAL ANALYSIS $ 13,412
UTILITY DESIGN AND COORDINATION $ 42,250
STRUCTURAL ANALYSIS AND DESIGN $ 46,250
GREEN DESIGN $ 30,675
TOTAL COSTS $233,294
Total Cost : $233,294 Design : Sept 02,2013 – November 25, 2013 Require Signature as approval to proceed
Thank you very much for your time and attention
A+ENGINEERING
DESIGNA-021SPEAKER : JOSH HERRINGTON
Conclusion
Questions?