entEN Status of TCSP manufacturing
Collimation Working Group (CWG)24 June 2013
A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini, P. Francon, P. Moyret
On behalf of the TCTP/TCSP design, prototyping and manufacturing team
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 2
MME deliverable
Status of sub-assemblies production: Movable table
Vacuum tank
Jaw assembly
RF system
BPM cables
Future planning
Outlook
24 June 2013
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 3
Deliverables
24 June 2013
Tank
Jaw assemblyMovable table
EN/MME to provide EN/STI with 3 TCSP collimators (2 + 1 spare) inside a welded tank (same deliverable as CERCA during Phase I production); STI to prepare collimators for installation.
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 4
Movable table
24 June 2013
All tables (6x) available and assembled
Several Tests performed on a (7th) prototype table on test-bench: 1st complete Lifecycle endurance test
(15’000 standard cycles) @ -135˚ Torque measurement every 5k
cycles Back-driving tests in all orientations
without motors 3 months inactivity 2nd complete Lifecycle endurance test
(15’000 standard cycles) @ -135˚ Torque measurement every 5k
cycles Back-driving tests in all orientations
without motors
Surface analysis of bearing shafts after 2 lifecycle tests, EDMS 1136770
Tests passed !!!
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 5
Vacuum tank
24 June 2013
All tanks (3x) assembled and available; cover to be welded after jaw installation.
Leak tests performed to assess the vacuum tightness of weldings and bellows.
Pressure tests performed on vacuum tank cooling circuits as prescribed on manufacturing drawings (30 bars pressure test).
Tests passed !!!
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 6
Jaw assembly
24 June 2013
All jaws (6x) assembled Components cleaned following prescribed procedures
as specified on drawings: Cooling pipes, EMDS n. 1210658 Stainless steel, EDMS n. 1210660 Glidcop, EDMS n. 1210661 Copper-Beryllium RF contacts, EDMS n. 1210662
CFC Jaws recovered from Phase I production, re-machined to fit TCSP taperings (Firing procedure 2hours @ 1000˚C performed again)
Metrology measurements validate flatness requirements on all TCSP jaws, EDMS n. 1275108
Outgassing test performed on one TCSP jaw without ferrite. Document under preparation by G. Cattenoz.
BPM positioning with respect to active jaw surface within 0.05 mm of tolerance (as specified on drawings)
Pressure tests of cooling pipes 50 bar (20 minutes)
0
10
20
30
40
50
60
70
Jaw 1 Jaw 2 Jaw 3 Jaw 4 Jaw 5 Jaw 6
Jaw
Fla
tnes
s (m
icro
n)
Tests passed
TE-VSC to formally confirm
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 7
Jaw assembly – conductance tests
24 June 2013
Conductance tests performed by I. Leitao in order to assess quality of jaw brazing . Acceptance value 7000 W/m2/K (average value over jaw length). All the 6 jaws are accepted.
Conductance tests of TCSP jaws – courtesy of I. Leitao
Tests passed !!!
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 8
RF system
24 June 2013
Thermal treatment procedure developed by TE/VSC and EN/MME: 1000 ˚C, 48h in air + 48h under vacuum; EDMS document 1276976
Firing of 5 ferrite batches already performed (for 3 TCSP + 1 TCTP proto + 1 TCSM proto)
Material for ferrite housing and EM shielding: 316 LN (no CrO coating) Maximum temperature accepted on ferrite: 100 ˚C (imposed by UHV requirements) BE/ABP team to confirm the RF-induced losses in operation (end of June?) RF contacts for end transitions same as Phase I
RF system conform to UHV requirements
BE/ABP inputs to be confirmed
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 9
BPM cables
24 June 2013
First BPM batch received in 2010; leak tight cables (4 out of 6) used for endurance test on table test bench, to be then re-used for TCSM prototype
16 pre-series TCTP cables received in July 2012 available for 1 proto and 3 series units
Delivery of TCSP cables still pending; expected by 28th June
Outgassing test strategy for TCSP: 8 cables in one test run;(initial strategy: 4 cables in one test run, to be increased in case of positive results on the first batches)
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 10
Action list to complete TCSP assembly
24 June 2013
1. BPM cables receptionI. Measurements of the height of shafts shoulder for the positioning of the jaw into the tank (done)II. BPM cables electrical tests (C. Boccard)III. BPM cables outgassing tests (G. Cattenoz)
2. Collimator assemblingI. BPM cables assembling on jaws II. Assembling of RF contacts on the top and bottom of the tankIII. Assembling of jaws inside the tank and connection of BPM and T cables on the flanges; assembling of
flanges + seals3. Measurements and tests on assembled collimator
I. Regulation of end stops and micro switches on 3D machineII. Control of position and flatness tolerances of jaws inside the tankIII. Torque test IV. BPM test with antenna (C. Boccard)
4. Further actions before tank closure:1. Welding of vacuum caps on the axes 2. Positioning of tank cover3. Torque test before tank welding
5. Tank cover EB welding6. Tests after welding:
I. Leak testII. Outgassing test
7. Delivery to EN/STI; RF contacts in the transitions + limit switch to be assembled by STI
Engi
neer
ing
Depa
rtm
entEN
A. Dallocchio – EN-MME 11
Time schedule
24 June 2013
Delivery of BPM cables by end of June?
After cables reception, at least 10 days needed for electrical + outgassing tests
MME activities (listed in previous slide) take about 4 weeks per collimator
Assembly period right in the middle of summer holidays for most key players!
6 weeks needed by STI to prepare each TCSP for installation
Optimization of the planning will be performed once BPM cables delivery is confirmed
Engi
neer
ing
Depa
rtm
entEN