engineer to engineer · maintenance manager stéphane lemiale says payback on this investment will...

1
32 May/June 2012 Plant Engineer ENGINEER TO ENGINEER GKN Wheels plant in Telford believes it will save some £25,000 per year, following the installation of an ABB low voltage ac drive. One of the plant’s lines, which makes wheels for the likes of Caterpillar and JCB, includes a walking beam with reciprocating parallel bars to pass rolled and welded wheel rims from an oil dip to a flare press. Production manager Kevin Evans explains that a problem has been that, as the beam reaches top dead centre, the larger wheel rims can cause it to over-speed, with the momentum then carrying them too quickly towards the press, which can, in turn, jam. “This type of stoppage can take an average of two hours to remedy, resulting in lost production time and associated costs,” he says. So, to maintain schedules, the plant had to run overtime following such incidents, leading to the £25,000 estimate. With Estil, a systems integration company, and ABB already on site, investigating potential energy savings, Evans asked them to come up with a better control system as well. Phil Lampitt of Estil, which designed the system, explains that it uses a 1.5kW ABB standard drive. At the beginning of the walking beam’s cycle, the drive starts and the internal timer runs it for one second at full speed. Then the drive is switched to two-thirds speed and gradually decelerated. Hence the beam, carrying the wheel rim, slows as it approaches the press. As the wheel rim reaches the press, the beam triggers a limit switch that stops the drive to complete the cycle. “We worked closely with ABB to fine-tune the application to get a steady positioning of the wheel rims,” says Lampitt. “ABB also helped us size the drive – particularly critical in view of the need to cater for the heavier rims in the range,” he continues. “As there is limited space, we had to mount the drive externally. This led to challenges from the harsh environment of the production building and we needed to specify an IP54 rated drive casing to resist the ingress of oil.” Evans confirms that, since its installation, the plant has not experienced a single stoppage on this part of the process. “This is a significant saving for us and we are also looking to standardise on ABB drives throughout the plant to save further costs.” Drive saves £25,000 of downtime at GKN CompAir puts energy savings on the menu Allessa Chemie goes mobile for plant SCADA monitoring Since installing fixed and regulated speed compressors, from CompAir, at its plant in Sablé sur Sarthe, France, food processor Société Marie says it has achieved annual electricity savings of €10,500. Maintenance manager Stéphane Lemiale says payback on this investment will be less than two years. Compressed air is used throughout manufacturing, from controlling hot water valves to packaging the finished product – 10,000 tonnes of fresh and frozen ready meals per annum. However, its previous compressors were 20 years old and an air audit out by CompAir promised huge savings by installing two new compressors, as well as a heat recovery system. “Based on the air audit, we opted to install a fixed speed CompAir L50 and regulated speed L55RS compressor, in addition to heat exchangers,” explains Lemiale. “The regulated speed technology in the L55RS means that the correct volume of air is produced at all times, [which] reduces offload running.” And he adds: “Using heat exchangers, we can recover and transfer the heat generated during compression to our water supply.” Since installing the new compressors, Société Marie has reduced electricity consumption for compressed air by 25%. In addition, the new heat recovery system has reduced natural gas consumption by 15%. Speciality chemicals manufacturer Allessa Chemie has implemented Schad’s Extend7000 Mobile SCADA system to get instant notification of power plant problems. The company, which runs two production plants in the Rheinland area of Germany, selected the system for its Frankfurt-Fechenheim plant to improve the consistency of energy distribution monitoring within its 400V plant power supply. Klaus Knahl, head of EMR operations at Allessa Chemie, explains that changes to power distribution can cause losses in production, as well as compromising health and safety. “We needed to identify a way to improve the existing fixed monitoring capabilities,” says Knahl. “Extend7000 was the perfect solution. It allowed us to continue using our existing SCADA system and enhance it [for] mobile working,” he adds. Immediate notifications delivered directly to plant engineers through Extend7000 will, he says, significantly reduce downtime. He also explains that the system has been configured to trigger switching devices and monitor bus bars – both of which actions previously needed manual intervention from the control room. P032_PENG_JUN12_Layout 1 21/05/2012 16:58 Page 32

Upload: phamtram

Post on 10-Sep-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENGINEER TO ENGINEER · Maintenance manager Stéphane Lemiale says payback on this investment will be less than two years. Compressed air is used throughout manufacturing, from

32 May/June 2012 Plant Engineer

ENGINEER TO ENGINEER

GKN Wheels plant in Telford believes itwill save some £25,000 per year,following the installation of an ABB lowvoltage ac drive.

One of the plant’s lines, which makeswheels for the likes of Caterpillar andJCB, includes a walking beam withreciprocating parallel bars to pass rolledand welded wheel rims from an oil dipto a flare press.

Production manager Kevin Evansexplains that a problem has been that,as the beam reaches top dead centre,the larger wheel rims can cause it toover-speed, with the momentum thencarrying them too quickly towards thepress, which can, in turn, jam.

“This type of stoppage can take anaverage of two hours to remedy,resulting in lost production time andassociated costs,” he says. So, tomaintain schedules, the plant had torun overtime following such incidents,leading to the £25,000 estimate.

With Estil, a systems integrationcompany, and ABB already on site,investigating potential energy savings,Evans asked them to come up with abetter control system as well.

Phil Lampitt of Estil, which designedthe system, explains that it uses a1.5kW ABB standard drive. At thebeginning of the walking beam’s cycle,the drive starts and the internal timerruns it for one second at full speed.Then the drive is switched to two-thirdsspeed and gradually decelerated.Hence the beam, carrying the wheel

rim, slows as it approaches the press.As the wheel rim reaches the press, thebeam triggers a limit switch that stopsthe drive to complete the cycle.

“We worked closely with ABB tofine-tune the application to get a steadypositioning of the wheel rims,” saysLampitt. “ABB also helped us size thedrive – particularly critical in view of theneed to cater for the heavier rims in therange,” he continues.

“As there is limited space, we had tomount the drive externally. This led tochallenges from the harsh environmentof the production building and weneeded to specify an IP54 rated drivecasing to resist the ingress of oil.”

Evans confirms that, since itsinstallation, the plant has notexperienced a single stoppage on thispart of the process. “This is a significantsaving for us and we are also looking tostandardise on ABB drives throughoutthe plant to save further costs.”

Drive saves £25,000 of downtime at GKN

CompAir puts energysavings on the menu

Allessa Chemie goes mobilefor plant SCADA monitoring

Since installing fixed and regulated speed compressors, fromCompAir, at its plant in Sablé sur Sarthe, France, foodprocessor Société Marie says it has achieved annual electricitysavings of €10,500. Maintenance manager Stéphane Lemialesays payback on this investment will be less than two years.

Compressed air is used throughout manufacturing, fromcontrolling hot water valves to packaging the finished product– 10,000 tonnes of fresh and frozen ready meals per annum.However, its previous compressors were 20 years old and anair audit out by CompAir promised huge savings by installingtwo new compressors, as well as a heat recovery system.

“Based on the air audit, we opted to install a fixed speedCompAir L50 and regulated speed L55RS compressor, inaddition to heat exchangers,” explains Lemiale. “Theregulated speed technology in the L55RS means that thecorrect volume of air is produced at all times, [which] reducesoffload running.”

And he adds: “Using heat exchangers, we can recover andtransfer the heat generated duringcompression to our water supply.”

Since installing the new compressors,Société Marie has reduced electricityconsumption for compressed air by 25%. Inaddition, the new heat recovery system hasreduced natural gas consumption by 15%.

Speciality chemicals manufacturerAllessa Chemie has implementedSchad’s Extend7000 Mobile SCADAsystem to get instant notification ofpower plant problems.

The company, which runs twoproduction plants in the Rheinland areaof Germany, selected the system for itsFrankfurt-Fechenheim plant to improvethe consistency of energy distributionmonitoring within its 400V plant power supply.

Klaus Knahl, head of EMR operations at Allessa Chemie,explains that changes to power distribution can cause lossesin production, as well as compromising health and safety.“We needed to identify a way to improve the existing fixedmonitoring capabilities,” says Knahl.

“Extend7000 was the perfect solution. It allowed us tocontinue using our existing SCADA system and enhance it[for] mobile working,” he adds.

Immediate notifications delivered directly to plantengineers through Extend7000 will, he says, significantlyreduce downtime. He also explains that the system has beenconfigured to trigger switching devices and monitor bus bars– both of which actions previously needed manualintervention from the control room.

P032_PENG_JUN12_Layout 1 21/05/2012 16:58 Page 32