Engine Systems Business Unit
Process Capability Checks (PCC) according ASPICEImplementation
May 11th, 2017
www.continental-corporation.com Powertrain Division
Public
Powertrain Engine Systems
Topic
Introduction
Proceeding & Examples
Results and Conclusion
Process Capability Checks (PCC) Coaching is better than Assessing
Overview
Coaching Is Better Than Assessing
11. May 2017
2Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
Introduction
11. May 2017
3Hans Freyberg, © Continental AG
Hans Freyberg
Powertrain Division, Engine Systems
Quality System Engineering
intacsTM Principal Assessor
AUTOMOTIVE SPICE®
Certification No. intacs-4961-1031-20294-03
Public
Powertrain Engine Systems
Topic
Introduction
Proceeding & Examples
Results and Conclusion
Process Capability Checks (PCC) Coaching is better than Assessing
Overview
Coaching Is Better Than Assessing
11. May 2017
4Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
Process Capability Checks (PCC) - OverviewCoaching is better Than Assessing
11. May 2017
5Hans Freyberg, © Continental AG
Automotive SPICE assessments are mostly seen as a big shock, little help is
given afterwards.
Primary focus is on evaluation of performance and managing attributes.
Improvement suggestions are given, but implementation is rarely supported by
line organization. Thus, project teams feel left alone and get de-motivated.
Assessment Day
Public
Powertrain Engine Systems
Topic
Introduction
Proceeding & Examples
Results and Conclusion
Process Capability Checks (PCC) Coaching is better than Assessing
Overview
Coaching Is Better Than Assessing
11. May 2017
6Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
The PCCs cover selected topics of ASPICE and evaluate capability in projects in a step by step approach
So-called Handbooks, available for each ASPICE-process, help to translate ASPICE expectations into the project environment.
Process Capability Checks are carried out via interviews by intacsTM certified internal assessors, who are the project quality managers (project core team member) at the Business Unit. Based on detailed insight, feeling the pain and the common interest to perform better, coaching and implementation of improvement actions becomes more efficient.
Results, gaps and necessary improvement actions are documented in detail. (PCC checklist/rating-sheet).
Weakness found on Process House descriptions shall be forwarded to the responsible Process-Managers. Definition & implementation of related improvement measures needs not to be monitored &reported within the project context but on organizational-level.
Long term goal is a self managed project team which uses the Business-Unit-Process House (mapped to Automotive SPICE Process Assessment Model) to carry out all project activities.
Process Capability Checks (PCC) – Main topics Coaching is better Than Assessing
11. May 2017
7Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
Topic
Introduction
Proceeding & Examples
Results and Conclusion
Process Capability Checks (PCC) Coaching is better than Assessing
Overview
Coaching Is Better Than Assessing
11. May 2017
8Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
Process Capability Checks (PCC) - Proceeding How are we going to learn how to live managed processes?
11. May 2017
9Hans Freyberg, © Continental AG
Input
Phases
Output
Line Management
ASPICE Assessor
QMP
Tasks
Method
Template
Process Manager
Project Team
• Line Management
Requests
• Customer Requests on
ASPICE Capabilities
• PM/QA-Plan
(Chapter 8.7)
• Project Schedule
• Determine relevant
ASPICE Processes
• Determine target
Capability Level for
each process
Plan PCC
• PM/QA-Plan Template
• PCC Guideline
R
S
S
A
I
I
R
I
I
• PCC Planning in PM/QA-
Plan
• Project Schedule
• Meeting invitations
• PCC Template prepared
• Determine appropriate
timing for each process in
scope
• Determine necessary
project team members and
process managers or line
manager
• Place invitations
Invite
for PCC
• Process Manager List
• Organization Charts
• PCC-Template
S
S
R
S
S
• ASPICE and Process
House Requirements
• Explanations & evidences
from project team
• PCC Template with
evaluation results and
process rating
• Explain ASPICE
requirements and
expected activities & work
products from Process
House
• Evaluate & rate
explanations & shown
evidences
Conduct
PCC
• Process House
Descriptions
• ASPICE Process
Assessment Model
R
I
I
S
• Process Conformance
Check Sheet with
improvement measures
• Feedback from respon-
sibles on implementation
status
• PCC Template (updated
improvement measures)
• Project QA Report
• Update improvement
actions in Process
Conformance Sheet
• Report PCC results and
status of improvement
measures
Monitor &
Report
• Project QA Report
Template
R
S
S
S
• Weaknesses /
Improvement suggestions
from ASPICE assessor
• Feedback from Process /
Line Manager
• PCC Template with
improvement measures
• Process Change Requests
• Analyze PCC findings
• Clarify unclear topics with
ASPICE assessor,
Process / Line Manager
• Define improvement
actions incl. responsible &
target date
Define
Improvements
• Process House
Descriptions
• ASPICE PIM.3
S
Public
Powertrain Engine Systems
Process Capability Checks (PCC)ASPICE Handbook - Example MAN.3 (1/4)
How is it “translated”?
1) The original ASPICE-question is visible in column 1 and 2
2) The next columns gives detailed information about:
1) What can be proven by these outputs?
2) Explanation for strategy and workflow. (= “How the evidences/outputs are fitting in a common concept?”)
3) Evidences (= “What documents must be available to proof the systematic usage?”)
4) What the PM has to consider to fulfill sufficient quality of outputs (= This column contains the relevant
information from Processes and experience from former ASPICE assessments.)
5) Specifc requests to fulfill Level 2 (= further experiences from former ASPICE-assessments, focus on efficient
performance in the projects.)
3) Sometimes the Strategy and Workflow is visualized on separate sheets, to enable better understanding of the
workflow.
Structure
Public
Powertrain Engine Systems
Process Capability Checks (PCC)ASPICE Handbook - Example MAN.3 (2/4)
11. May 2017
11Hans Freyberg, © Continental AG
Recommendations and Evidences for “Base Practice – MAN.3 BP4”
Public
Powertrain Engine Systems
Process Capability Checks (PCC)ASPICE Handbook - Example MAN.3 (3/4)
11. May 2017
12Hans Freyberg, © Continental AG
2. ASPICE for PMs at a glance
Public
Powertrain Engine Systems
Process Capability Checks (PCC)ASPICE Handbook - Example MAN.3 (4/4)
11. May 2017
13Hans Freyberg, © Continental AG
Recommendations and Evidences for “Base Practice – MAN.3 BP 4”
– Workflow and strategy for BP 4 with evidences -
Public
Powertrain Engine Systems
Process Capability Checks (PCC) PCC Rating Sheet (1/2)
11. May 2017
14Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
Process Capability Checks (PCC) PCC Rating Sheet (2/2)
11. May 2017
15Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
Process Capability Checks (PCC) Monitoring & Reporting of Findings (open/closed)
11. May 2017
16Hans Freyberg, © Continental AG
Mar16
Apr16
May16
Jun16
Jul16
Aug16
Sep16
Oct16
Nov16
Dec16
Jan17
Feb17
Mar17
Apr17
May17
Jun17
Jul17
Aug17
Sep17
Oct17
Nov17
Dec17
PCC Follow-up on ASPICE Assessments 2016-2017 (12 locations)
CLOSED
OPEN
target line
open
topics
ca. 22 PCC/7 Assessments in year 2016 (75% at 2-nd-half of the year)
Following ASPICE-PIM.3-process-requirements delay for improvements
~ 2..6 months after finding-detection depending on finding-type
(organizational/process/project)
Public
Powertrain Engine Systems
Topic
Introduction
Proceeding & Examples
Results and Conclusion
Process Capability Checks (PCC) Coaching is better than Assessing
Overview
Coaching Is Better Than Assessing
11. May 2017
17Hans Freyberg, © Continental AG
Public
Powertrain Engine Systems
Process Capability Checks (PCC) Results
11. May 2017
18Hans Freyberg, © Continental AG
Achievements: Project-PCC 2016 vs. Customer Assessment 2017)
But: Level 1 fully still not achieved in many processes
Gaps for Level 2 existing in some processes
Public
Powertrain Engine Systems
Process Capability Checks (PCC) Conclusion
11. May 2017
19Hans Freyberg, © Continental AG
1st year 2nd year 3rd year 4th year 5th year 6th year 7th year
Automotive SPICE Target Level Achievement
The PCC Method offers a better
balance between project team needs
(delivery driven) and line
management / process management
expectations (meeting objectives).
PCCs brings ASPICE to the whole organization !
The PCCs are mainly used for
coaching, self-assessment and
improvement.
The PCCs offer more flexibility on assessing different type of projects. Scope and
time frame can be easily adjusted to the specific project use case
Significant improvements of ASPICE-capability-levels in different projects
visible
Public
Powertrain Engine Systems 11. May 2017
20Hans Freyberg, © Continental AG