ENG FORM 2538-2, MAY 1994 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2 VERSION 1.0
1. DATE (YYYYMMDD) 2. REPORT NUMBERQUALITY ASSURANCE REPORT (QAR) DAILY LOG OF
CONSTRUCTION - CIVIL For use of this form see ER 1180-1-6; the proponent agency is CEMP-CE.
YES
NOTE: THE OCR WILL BE ATTACHED TO OR FILED WITH THE QAR.
6. PROJECT
4. CONTRACT NUMBER 5. CONTRACTOR (or hired labor)
7. WEATHER
19. INFORMATION ON PROGRESS OF WORK, CAUSES FOR DELAYS AND EXTENT OF DELAYS, PLANT, MATERIAL, ETC.,
NO
3. TO
18. DAYS OF NO WORK AND REASONS FOR SAME
17. WORK PERFORMED TODAY: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in table above.)
ATTACH A LIST OF THE FOLLOWING: (a) MAJOR ITEMS OF EQUIPMENT EITHER IDLE OR WORKING AND (b) NUMBER AND CLASSIFICATION OF CONTRACTOR PERSONNEL ONSITE. NOTE: IF THE CONTRACTOR'S QUALITY CONTROL REPORT (QCR) CONTAINS THE INFORMATION IT NEED NOT BE REPEATED.
16. CONTRACTOR AND SUBCONTRACTORS AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY:
a.
b.
c.
d.
e.
f.
g.
8. PORTION OF SCHEDULED DAY SUITABLE FOR OPERATIONS 9. TEMPERATURE F
a. STRUCTURAL EXCAVATION %
b. BORROW EXCAVATION %
c. EMBANKMENT %
d. CONCRETE %
e. STRUCTURE % a. MINIMUM
b. MAXIMUM
11. 24 HOUR PRECIPITATION10. HAS ANYTHING DEVELOPED ON THE WORK WHICH MIGHT LEAD TO A CHANGE ORDER OR FINDING OF FACT? a. INCHES b. ENDING M
12. NUMBER OF GOVERNMENT EMPLOYEES 13. RIVER STAGE
a. FEET b. TIME Ma. SUPERVISORY b. OFFICE c. LAYOUT d. INSPECTION e. TOTAL f. LABOR
14. NUMBER OF CONTRACTOR'S EMPLOYEES
d. TOTALc. LABORERSb. SKILLEDa. SUPERVISORY
15. NUMBER OF SHIFTS
a. FROM M b. TO M d. TO Mc. FROM M f. TO Me. FROM M
1 2 3
-
ENG FORM 2538-2, MAY 1994 Page 2 of 2
c. QA REPRESENTATIVE'S SIGNATUREb. DATE (YYYYMMDD)
23. CONTROVERSIAL MATTERS IN DETAIL
24. INFORMATION, INSTRUCTIONS OR ACTIONS TAKEN NOT COVERED ON QCR REPORT OR DISAGREEMENTS.
25. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel. Specify corrective action taken.)
26. REMARKS: (Include visitors to project and miscellaneous remarks pertinent to work.)
27a. NAME AND TITLE (Last, First MI)
c. SUPERVISOR'S SIGNATUREb. DATE (YYYYMMDD)28a. NAME AND TITLE (Last, First MI)
22. VERBAL INSTRUCTIONS GIVEN TO CONTRACTOR: (Include names, reactions and remarks)
21. RESULTS OF QA INSPECTIONS AND TESTS, DEFICIENCIES OBSERVED, ACTION TAKEN AND CORRECTIVE ACTION OF CONTRACTOR. INCLUDE COMMENT PERTAINING TO CONTRACTORS CQC ACTIVITIES
20. CQC CONTROL PHASES ATTENDED AND INSTRUCTIONS GIVEN
ENG FORM 2538-2, MAY 1994 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2
VERSION 1.0
QUALITY ASSURANCE REPORT(QAR) DAILY LOG OF CONSTRUCTION - CIVIL
For use of this form see ER 1180-1-6; the proponent agency is CEMP-CE.
NOTE: THE OCR WILL BE ATTACHED TO OR FILED WITH THE QAR.
ATTACH A LIST OF THE FOLLOWING: (a) MAJOR ITEMS OF EQUIPMENT EITHER IDLE OR WORKING AND (b) NUMBER AND CLASSIFICATION OF CONTRACTOR PERSONNEL ONSITE.
NOTE: IF THE CONTRACTOR'S QUALITY CONTROL REPORT(QCR)CONTAINS THE INFORMATION IT NEED NOT BE REPEATED.
16. CONTRACTOR AND SUBCONTRACTORS AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY:
8. PORTION OF SCHEDULED DAY SUITABLE FOR OPERATIONS
9. TEMPERATURE F
11. 24 HOUR PRECIPITATION
10. HAS ANYTHING DEVELOPED ON THE WORK WHICH MIGHT
LEAD TO A CHANGE ORDER OR FINDING OF FACT?
12. NUMBER OF GOVERNMENT EMPLOYEES
13. RIVER STAGE
14. NUMBER OF CONTRACTOR'S EMPLOYEES
15. NUMBER OF SHIFTS
ENG FORM 2538-2, MAY 1994 Page 2 of 2
1.1
Form Design Team CEIT-PMO-I
ENG FORM 2538-2 Quality Assurance Report QAR Daily Log of Construction Civil MAY 1994
Mark Cooper
ENG FORM 2538-2 Quality Assurance Report QAR Daily Log of Construction Civil MAY 1994
20110817
20110817
PrintForm: YYYYMMDD: CAPTIONS: Button1: CheckBox1: 0repsign: repdate: repname: supsign: supdate: supname: