eng. hassan ossama cv. 2016 new

9
Eng.Hassan Ossama A.Gawad Mobile no. : 002/01222381965 Address .: 43 Degla st. El Mohandessin. Giza - Egypt E-MAIL: [email protected] EDUCATION : B.Sc. of Civil Engineering, Cairo University.(1988) grade Very Good College De La Salle, Cairo G.C.E. Level 94.5%.(1983) EXPERIENCES : Project Manager ROWAD MODERN ENGINEERING co. (RME) (Work force 4200 person) Period : June 2014 till now INTERNATIONAL RESIDENTIAL PROJECT AT MOKATAM CITY (Project Budget 600 million USD) Responsible of the construction of EMAAR UPTOWN CAIRO Sierras west project (17 BUILDING) . Turnkey project, high luxury finishing including all the infrastructure work ,roads and landscape.

Upload: hassan-ossama

Post on 13-Apr-2017

60 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Eng. Hassan Ossama CV. 2016 New

Eng.Hassan Ossama A.Gawad

Mobile no. : 002/01222381965 Address .: 43 Degla st. El Mohandessin. Giza - EgyptE-MAIL: [email protected]

EDUCATION :

• B.Sc. of Civil Engineering, Cairo University.(1988) grade Very Good

• College De La Salle, Cairo G.C.E. Level 94.5%.(1983)

EXPERIENCES :

Project Manager ROWAD MODERN ENGINEERING co. (RME)

(Work force 4200 person) Period : June 2014 till nowINTERNATIONAL RESIDENTIAL PROJECT AT MOKATAM CITY (Project Budget 600 million USD) Responsible of the construction of EMAAR UPTOWN CAIRO Sierras west project (17 BUILDING) . Turnkey project, high luxury finishing including all the infrastructure work ,roads and landscape.

Page 2: Eng. Hassan Ossama CV. 2016 New

PERIENCES Project Manager UNITED CONSTRUCTION

COMPANY (UCC. ALLAM SONS )(Work force > 3500 person) Period : 2010 till 2014A Mega Compound Golf Project AT 6TH OCTOBER CITY (Project Budget 200 million USD ) Responsible of the construction of Palm Hills Golf Compound 1500 Villa including all the facilities ,roads, landscape and all infrastructure net works .

Page 3: Eng. Hassan Ossama CV. 2016 New

Project Manager REAL STATE DEVELOPMENT SPANISH co. .  MIXTA EGYPT, S.A.E

(From 5/2008 till 5/2010)

Managing the full construction of a new city (BARAH) at Giza . 70 buildings built over 28 hectare including all the facilities and the infrastructure work. Project budget 200 million LE .

Page 4: Eng. Hassan Ossama CV. 2016 New

Projects & Construction Manager El Shorouk For Construction CO.(work manpower > 820 person)Period : March 1996 till 2014Construction and finishing of 2 administration tower buildings in main square in Giza: Residential Tower building & Administration Tower Building 2012-2014

• Porto Sokhna Hotel 1400 room • (Building area 18000 m2 and 24 floors • (Project budget 1900 million LE) (2007-2008)

Compression gaz station

Contract no SC3-GG.1 (Control bld., Maintenance bld., Electric bld., Security bld., Turbo bld. ….) and the Residential City (LA BASE DE VIE) (Project budget 65 million Euro) (2006 – 2007) SONATRACH - ALGERIA.

Page 5: Eng. Hassan Ossama CV. 2016 New

• Five Towers Buildings

17 floors each at Nasr City(Project budget 250 million LE) (2005)

• Private Palace at New Cairo city and Two Relevant buildings at 6th October City. (2004-2005) (Project budget 18 million LE)

• Private Palace on Cairo-Alex highway (Concrete work ,Finishing and Landscape) (Project budget 11 million LE) (2003)

• Construction of 48 Building for the Military Ministry 6th October city.(2003) (Project budget 112 million LE)

Page 6: Eng. Hassan Ossama CV. 2016 New

• Police Hotel 140 room at Nasr City

(Project budget 35 million LE) (2003).

• Villas Compound at Orabi City ( 4 VIP Villas , landscape

and swimming pool)(Project budget 16 million LE) (2003)

• Private Offices Building at Nasr City ( Project budget 64 million LE ) (2003)

Page 7: Eng. Hassan Ossama CV. 2016 New

• Sheikh Coast Hotel Resort Sharm El Sheikh 48 chalet (construction and finishing work) (2002)

• Pyramid Golden Plaza Towers project at Nasr City

(External & Internal Finishing works for two tower buildings) ( Project budget 110 million LE )(2001)

Page 8: Eng. Hassan Ossama CV. 2016 New

• Sun Light Hotel Resort at Ras Sidr–Sinai : Hotel 220 rooms,54 chalets,9 villas,and 2 swimming pools,(

Project budget 75 million LE )(1998-2001)

• El Azizia Garden compound on Cairo-Alex highway which covers 48 villas

(Project budget 29.5 million LE)(1997)

• El Azizia Paradise

compound which covers 54 villas & swimming pools

( Project budget 37 million LE) (1996)

Page 9: Eng. Hassan Ossama CV. 2016 New

Construction Manager, Super Intending Engineer, ABB Susa / Dillingham J.V Co.

Reporting to : Project ManagerPeriod : 1988 till 1995• Suez Waste Water Treatment Plant. (Construction of the Attaka Pumps

Station and Generator building). Project budget USD 180 millions

• Abu Rawash Waste Water Treatment Plant–Giza. (Construction and Finishing Work of the Lift Pump Station and 5 Relevant Buildings). Project budget USD 140 million

SKILLSComputer skills :• WINDOWS NT & XP, EXCEL 7, WORD 7 , AUTO CAD & MS. PROJECT• PRIMAVERA & MS. PROJECT MANAGER.Language:

• Excellent Fluent English & French , Arabic mother tongue.PERSONAL DATA Nationality : Egyptian Military status : Exempted Marital Status : Married Date of Birth: 1/1/1966 MOBILE NO. : 002/01222381965 E-MAIL:[email protected]