eng ali ibrahim cv.docx

17
ENGR. Ali Ibrahim Ibrahim MECHANICAL ENGINEERING POSITION: W&WW HEAD DIVISION TECHNICAL SUPPORT / EXECUTION / SUPERVISING / MONITERING / AUDITING MOB. +974 77788625 / 77371289 E-MAIL: [email protected] Career profile: Mechanical Engineering professional with varied Experience in quickly understanding complex project objectives, generating project scope documentation, building stakeholder consensus to delivery approach. Collaboratively manages global team resources to deliver project objectives. Able to mitigate and resolve issues, re-establish project momentum throughout all stakeholder tiers including end users, technicians, engineers, subject matter experts as well as management in both business and/or operations. Relies on extensive legacy technical background to quickly assimilate new information technologies within project scope, and organizational culture to build rapport needed to deliver successfully on projects. OBJECTIVE To work in the field where I can implement the things I have learnt, to expand the horizon of learning new things and soon become a Contributing member for the organization. Responsibilities and Skills: Page-1 Eng. Ali Ibrahim CV

Upload: ali-ibrahim

Post on 12-Apr-2017

85 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Eng  Ali Ibrahim CV.docx

ENGR. Ali Ibrahim Ibrahim MECHANICAL ENGINEERING POSITION: W&WW HEAD DIVISION TECHNICAL SUPPORT / EXECUTION / SUPERVISING / MONITERING / AUDITING

MOB. +974 77788625 / 77371289 E-MAIL: [email protected]

Career profile:

Mechanical Engineering professional with varied Experience in quickly understanding complex project objectives, generating project scope documentation, building stakeholder consensus to delivery approach. Collaboratively manages global team resources to deliver project objectives. Able to mitigate and resolve issues, re-establish project momentum throughout all stakeholder tiers including end users, technicians, engineers, subject matter experts as well as management in both business and/or operations. Relies on extensive legacy technical background to quickly assimilate new information technologies within project scope, and organizational culture to build rapport needed to deliver successfully on projects.

OBJECTIVE

To work in the field where I can implement the things I have learnt, to expand the horizon of learning new things and soon become a Contributing member for the organization.

Responsibilities and Skills:

Companied knowledge, skills, tools and techniques to apply on project applications to meet project requirements.

Management of each discipline in the project like civil , mechanical , electrical and ICA works

Have good experience in construction filed especially beet sugar factory, thermal power plant (underground utilities ), sewage treatment

Page-1Eng. Ali Ibrahim CV

Page 2: Eng  Ali Ibrahim CV.docx

plants started from execution, individual inspection, commissioning, final inspection and hand over to client as contract

Good experience to supervise installation , startup and commissioning of the following items in water and waste water field :

- All types of pumps (submersible, centrifugal and etc.……..)- Multimedia filters and sand filters - Aeration system like air diffusers , surface aerator floating type and

fixed type- Odor control units- Screens equipment’s ( rack screen , belt screen , screw screen )- All types of screw conveyors - Logger facility ( tanker reception equipment’s )- Pre-treatment compact units ( grit , oil and fat removal ) - Anoxic mixers bridge mounted - Pipe lines in all types of pipes (DI , HDPE , PVC and galvanized CS

and SS pipes etc.…….) Executes project work plans and revises as appropriate to meet

changing needs and requirements.

Identifies resources needed and assigns individual responsibilities. Ensures the ongoing work is within the action plan designed by the

management and as per time schedule.

Manages day-to-day operational aspects of a project and scope. Reviews deliverables by contractor on day today basis. Effectively applies our methodology and enforces project standards in

the case of contractors.

Prepares for engagement reviews and quality assurance procedures. Minimizes our exposure and risk on project. Tracks and reports team hours and expenses on a weekly basis. Manages project budget within the scope defines by the management.

Page-2Eng. Ali Ibrahim CV

Page 3: Eng  Ali Ibrahim CV.docx

Determines appropriate revenue recognition, ensures timely and accurate invoicing, and monitors receivables for project.

Follows up with contractors and service suppliers, when necessary Analyzes project profitability, revenue, margins, bill rates and

utilization. Holds regular status meetings with project team. Keeps project team well informed of changes within the organization

and general corporate news.

Effectively communicates relevant project information to superior Delivers engaging, informative, well-organized presentations.

Resolves and/or escalates issues in a timely fashion.Strength:

Team Builder and efficient Communicator. Ability to set goals and achieve objectives. Good Analytic & Communication Skills. Caring & Understanding nature. Ready to work under pressure in challenging environment. Adaptability to changing environments. Good grasping power and hard working. Have a good spirit and cooperative with colleagues and supervisors. Tough, intelligent, highly qualified and hard working person. Manage the projects, the site in-charges and the site workers to

achieve timely completion also quality and optimized material and manpower.

Perform engineering for procurement, including material specifications & submittals, material purchase & requisition, technical evaluation and review documents.

Page-3Eng. Ali Ibrahim CV

Page 4: Eng  Ali Ibrahim CV.docx

Professional Profile:

Working at WATANIAWATANIA - For electromechanical worksAs Water & wastewater division head, since Jan 2016 – till Date

Responsibilities: -

Directs the day-to-day operation of the water and wastewater teams and

assigns work to the Team members with monitoring the progress of each.

Create strategy`s to Open new business in water and waste water fields

through marketing team.

Open many channels with the technology providers to bring the latest and

advanced technologies to the company to re-present to the water market.

Make hiring, training, disciplining and evaluating employees.

Assists the Director with planning and organizing the water division

Assists with the planning of future short term and long term needs.

Compiles various reports regarding water and wastewater and provides

information on such to clients.

Deals with Division personnel difficulties; handles difficulties that lead team

members and supervisors cannot handle.

Provides technical assistance and consults with other departments on technical proposals and materials submittals.

Working at PPROTECROTEC - Professional Technical Services (Water & Energy Technologies) Doha, Qatar

As Deputy project manager, since Jan 2015 – Dec 2015

Page-4Eng. Ali Ibrahim CV

Page 5: Eng  Ali Ibrahim CV.docx

Project: Design and built of reverse osmosis desalination plant and supporting infrastructure – 20,000 M³/ day – Education City

Owner: Owner: QQATARATAR FOUNDATIONFOUNDATION , Doha, State of Qatar., Doha, State of Qatar. Technology provider Technology provider : GE water & process technologies , USA DDC : White young Qatar & Neil soft engineering services

Responsibilities:-

Acting member of project team during tender stage and currently design stage.

Contact with vendors during tender stage regarding technical issues according client requirements.

Assist in Co-ordination between Civil, mechanical and electrical design.

Follow up all RFI`s for all clarifications needed for design.

Ensure scope and design changes and delivering reports to PM

Supervising the site preparation to start structural works like topographical survey , Geotechnical and soil investigation

Identifies resources needed and assigns individual responsibility.

Involved in planning, controlling, monitoring, managing and directing the assigned project resources to meet project objective.

Ensures project documents are complete, current, and stored.

Attending progress meeting with client and PMC

Periodical reporting on technical progress meetings

Main responsibility for ensuring that the project team completes the tasks at contractual time schedule as per client requirements.

Working at PPROTECROTEC - Professional Technical Services (Water & Energy Technologies) Doha, Qatar

As construction manager, since Jan 2012 – till Dec 2014

Page-5Eng. Ali Ibrahim CV

Page 6: Eng  Ali Ibrahim CV.docx

Project: Temporary Package Treatment Plant (PTP) – 10,000 M³/ day X 2 WASTE WATER TREATMENT TECHNOLOGY

OwnerOwner: : AASHGHALSHGHAL (Public Works Authority), Doha, State of Qatar. (Public Works Authority), Doha, State of Qatar. PMC PMC : AECOM middle east consultant , USA DDC : Worley parsons consultant , AUS

Responsibilities:-

Acting member of management project team during tender stage, design stage and executive stage.Identifies resources needed and assigns individual responsibility. Contact with vendors during procurement stage regarding technical issues according detail design. Manages day-to-day operational aspects of a project and scope.Minimizes our exposure and risk on project.Responsible for project accounting and manages project budget. Coordinate and control drafting team during preparation of Civil, Mechanical and Electrical drawings and General Arrangement layouts.Co-ordination between Civil, mechanical and electrical works.Ensure scope and design changes and delivering reports to the team leader.Resolve any outstanding issues among the project teams that cannot be resolved within the team.Monitoring project Quality department communication like RMI`s for all materials arrive to site, RFI`s for all individual activities at site.Managing the commissioning stage to reach the design parameters for water analysis Involved with The planning, controlling, monitoring, and also managing and directing the assigned project resources to best meet project objective.Ensures project documents are complete, current, and stored.Periodical reporting on technical progress.Review deliverables prepared by our team before passing to client. Follows up with clients, when necessary, regarding unpaid invoices.Attending progress meeting with client and PMC

Page-6Eng. Ali Ibrahim CV

Page 7: Eng  Ali Ibrahim CV.docx

Main responsibility for ensuring that the project team completes the project at contractual time schedule as per client requirements.

Working at PPROTECROTEC - Professional Technical Services (Water & Energy Technologies) Doha, Qatar

As project manager in charge, since January 2011 –Dec 2011

Project: Intermediate Treatment Plant ( small plant ) WASTE WATER TREATMENT TECHNOLOGY

OwnerOwner: : AASHGHALSHGHAL (Public Works Authority), Doha, State of Qatar. (Public Works Authority), Doha, State of Qatar. DDC : GHD , AUS

Responsibilities:-

Responsible for managing project during initiating ,planning , executing , monitoring & controlling and closing stages Identifies resources needed and assigns individual responsibility. Leader of procurement stage regarding technical issues according detail design. Responsible for project accounting and manages project budget. Coordinate and control drafting team during preparation of Civil, Mechanical and Electrical drawings and General Arrangement layouts.Co-ordination between Civil, mechanical and electrical works.Ensure scope and design changes and delivering reports to the team leader.Resolve any outstanding issues among the project teams that cannot be resolved within the team.Monitoring project Quality department communication like RMI`s for all materials arrive to site, RFI`s for all individual activities at site.Involved with The planning, controlling, monitoring, and also managing and directing the assigned project resources to best meet project objective.Managing the commissioning stage to reach the design parameters for water analysis Ensures project documents are complete, current, and stored.Follows up with clients, when necessary, regarding unpaid invoices.Main responsibility for ensuring that the project team completes the project at contractual time schedule as per client requirements.

Page-7Eng. Ali Ibrahim CV

Page 8: Eng  Ali Ibrahim CV.docx

Worked at BESIX/ORASCOM Construction Industries – OCI, EGYPTAs Senior Piping Engineer, from August 2010 to Dec. 2010

Project: ABU QIR THERMAL POWER PLANT - Alexandria – Egypt

Owner: West Delta Electricity Production Company - Egypt

PMC PMC : PGESCO EGYPTBESIX/ORASCOM The BESIX Group is a group of industrial companies operating in construction, roads, infrastructure, environmental, concessions and property development sectors. Founded in 1909, the Group has a record of regular and impressive growth. It profiles itself as a Multi-services group.

Responsibilities:-Co-ordinate preparation of MEP drawings and General Arrangement layouts.

Perform site selection, material specification Supervision of piping installation according to P & ID, isometric and pipe plans.

Supervision of piping installation according to ASME

Monitor construction installation, field co-ordination and solve problems arising during installation.

Managing mechanical execution team

Material control for pipe materials like carbon steel, stainless steel, HDPE, ductile, cast iron, copper, PVC, UPVC.

Revise shop drawings and reporting variations.

Planning Erection activities at site and man power break down.

Reporting to the Project Manager.

Worked at ORASCOM Construction Industries – OCI, EGYPTAs Site and technical office Engineer, from June 2008 to July 2010.

Project: NILE SUGAR FACTORY PROJECT- Alexandria – EGYPT Consortium leader: BMA Company (Germany).

Page-8Eng. Ali Ibrahim CV

Page 9: Eng  Ali Ibrahim CV.docx

Sub company form BMA: Maguin CO. & Eberhardt CO. & Ekol CO. & Dotec CO. SPX CO. & Venema CO.

Responsibilities:-

Co-ordination between Civil and mechanical works and perform site selection, material specification and coordinate preparation of drawings.Material control for all equipments, steel structure and piping materials (pipes, fitting, valves).Monitoring Imported Equipments and Local Fabrications Shipments arrived at Site.Contacting and follow up with Local Fabrications Suppliers.Quantities surveyor for preparation invoicing for owner and subcontractors Revise shop drawings and reporting variations. Providing Technical Documents and Drawings to Site Staff and sub-contractors.Supervision of piping installation according to isometric and pipe plans. Process building (front-end: 1200 lines & sugar- house: 1100 lines) include (vapour lines, Condensate lines, juice lines) according to DIN.Supervision of installation for following items:

1. Process building equipments for following section (extraction, purification, evaporation, condensation, A station, B station, C station, sugar draying, sugar bagging) 4000 ton.Like extraction tower, carbonation tanks , filling film evaporators ,condensate tanks , centrifugals , vacuum bans , sugar dryer , sugar cyclones , pumps , plate heat exchangers and screw conveyors.

2. tanks Molasses tank (17000 m2 with 50 diameters according to API

standard. Solar tank (6200 m2 with 25 diameter) according to API

standard, 3. Steel structure up to 5000 tons in the following areas in the

project : Process building 3400 ton

Boiler (steel structure 90 ton ),

turbine (steel structure 450 ton),

Page-9Eng. Ali Ibrahim CV

Page 10: Eng  Ali Ibrahim CV.docx

Beet storage (steel structure 250ton).

Pulp press (steel structure 150 ton).

Lime kiln (steel structure 80 ton).

Sugar storage (steel structures & cladding 300 ton).

Ware house (steel structures & cladding 105 ton).

Workshop (steel structures & cladding 250 ton).

Planning Erection activities at site and man power break down. Preparing inspection reports to release any job to test.Supervision of Electromechanical Installation and commissioning till final handing over. Approval of materials, shop drawings, as-built drawings, etc.

Technical discussions, liaison meetings with clients, meeting with contractors and respective service authorities.

Complete correspondence of Contractual letters and monitoring progress etc.Reporting to the Project Manager.

Worked at TARDCO INTERNATIONAL COMPANY For Projects and Contracting, EGYPT. (TARDCO)

is the construction contractor active in emerging markets Responsible for Fabrication, Supplying and Erection of steel structure, equipments and piping material. As Site and technical office Mechanical Engineer, from Jan 2007 to May 2008

Project: SOFT WATER PROJECT - AMOC OIL COMPANY

Responsibilities:-

Providing Technical Documents and Drawings to Supervision team.Revise shop drawings and reporting variations.Monitoring Imported Equipments and Local Fabrications Shipments arrived at Site.Observation of installation for all Activities at site (pumps, pipe racks and pipelines).Follow up and making Progress Report about Site Activities

Page-10Eng. Ali Ibrahim CV

Page 11: Eng  Ali Ibrahim CV.docx

Preparing inspection reports to release pipes to tests (RT, PT, and UT).Contacting with the Owner and Sub-Contractors.Technical discussions, liaison meetings with clients, meeting with contractors and respective service authorities.Supervision of commissioning till final handing over. Reporting to the Project Manager.

Worked at SECOND MILITARY ARMY – EGYPT ARMED FORCE As Operation and Maintenance Engineer From October 2005 to December 2006

Project: CHICKEN SLAUGHTERHOUSE PROJECT – ISMAILIA - EGYPT

Responsibilities:-

1. Technical line: Operation and Maintenance engineer for Chicken Slaughterhouse (1):

Refrigeration plant (Capacity : 250 ton for keeping , 30 ton for frozen) All sections equipments in Slaughterhouse for Slaughtering ?Water treatment stationFire tube boiler for steam generationRecycling station for wastes.

B - Implementation engineer for Chicken Slaughterhouse (2) at second military army:

Supervision of installation for equipments:Refrigeration plant (Capacity : 300 ton for keeping , 50 ton for frozen) Fire tube boiler for steam generationAll sections equipments in Slaughterhouse for Slaughtering (opening, eviscerate). Supervision of installation for steel structure (3 buildings)Supervision of installation for pipe lines according to isometric and pipe plan.

Educational Qualifications:

B.Sc. Mechanical Engineering B.Sc. Mechanical Engineering

University: Alexandria University – Faculty of Engineering

Department: Mechanical power Engineering

Page-11Eng. Ali Ibrahim CV

Page 12: Eng  Ali Ibrahim CV.docx

Graduation Year: 2005Graduation Grade: GoodGraduation Project: "Waste Heat Recovery System in Combined Gas and Steam Cycle"Graduation Project Grade: Excellent

Courses

Advanced project management by authorized person certified by PMI

Primavera P6 V7.0 Project management professional ( PMP ) under preparation for

exam at project management institute (PMI)

AutoCAD 2-D SEMINAR

Petroleum Gas Co Alexandria Trainee (2002) : Three Months Maintenance Department. Instillation of pipe lines. Egyptian Petrochemicals CO. Alexandria Trainee ( 2003) : Three

Months Type of pump and maintenance Pipe line maintenance. El-Maria for oil refinery CO. Alexandria Trainee (2004) : Three

Months Maintenance and operation of all machines

Personal Details:

Name : Ali Ibrahim IbrahimDate of Birth : 11th January 1981 Gender : MaleMarital Status : MarriedNationality : EgyptianMilitary Status : Completed Permanent Address : Alexandria, Egypt

Page-12Eng. Ali Ibrahim CV

Page 13: Eng  Ali Ibrahim CV.docx

Languages Known : Arabic – Excellent in Reading & Writing

(Mother tong) English – Fluent in Speaking, Reading

&Writing

E-mail ID : [email protected] at orascom and besix companies:

Emil Nairouz Michael

Mech.Tech.Office ManagerOrascom Construction IndustriesEgyptian Fertilizers Company New Boiler projectMob: +20-018-8225220E-mail: [email protected] Michael

Project ManagerOrascom Construction IndustriesEgyptian Fertilizers Company New Boiler projectMob: +20-012-22291789E-mail: [email protected] Salamaproject ManagerOrascom Construction IndustriesAbu Qir Thermal Power Plant Project.

Mobile:        +20122 398 0568E-mail:      [email protected]

Page-13Eng. Ali Ibrahim CV