energy policy” on april 04 – 24, 2010 tokyo, japaneneken.ieej.or.jp/data/3115.pdf9 no expansion...
TRANSCRIPT
11
Country ReportOn
energy SECTOR IN CAMBODIA
By: MR. CHOUMNIT GnhoungOfficer of Planning OfficeEnergy Development Department
Ministry of Industry, Mines and Energy
Training Course on “Energy Policy” on April 04 – 24, 2010Tokyo, JAPAN
IEEJ: April 2010
2
Outline
Electricity STATUS in Cambodia
Energy Supply and Demand
Problem Statement
Conclusion
2
IEEJ: April 2010
44His Excellency Samdech Hun Sen Prime MinisterHead ofGovernment
His Majesty Samdech Preah Baromneath NorodomSihamoni
Head of State
Textiles and Garments, Beverage, Food Processing, Wood Processing
Major Industries
Garments/Textile Product, Sawn Wood Furniture and Rubber
Major ExportProducts
Riel (US$1 = 4150 Riels)Currency
KhmerOfficial Language
13,395,682 Million (2008), Male: 48.6%; Female:51.4%
Population
181,035 sq.kmLand Area
Phnom PenhCapital
Electricity STATUS in Cambodia ( 2 ) Background
IEEJ: April 2010
55ORGANIZATION CHART OF POWER SERVICE
Cambodia's Electricity BusinessEDCPEU PECIPP
Ownership of EDC
Policy; Planning; Development; Technical standardTariff, license, Review the Planned Investments,finances and performance; Enforce the regulations, rules and standardsPEU:Provincial Electricity UtilityPEC:Provincial Electricity CompanyEDC :Electricity Du CambodgeIPP :Independent Power Product
Royal Government of Cambodia
Ministry of Industry, Mines and Energy
Ministry of Economic and Finance
OwnerPolicy maker
Electricity Authority of Cambodia
Regulation
Electricity STATUS in Cambodia ( 3 )
IEEJ: April 2010
6
Cambodia Energy Policy
To provide an adequate supply at reasonable and affordable price.
To ensure a reliable and secured electricity supply of investments in Cambodia and developments of the national economy.
To encourage exploration, environmentally and socially acceptabledevelopment of energy resources.
To encourage the efficient use of energy and to minimize the detrimental environmental effects resulted from energy supply and consumption.
Electricity STATUS in Cambodia ( 4 )
IEEJ: April 2010
7
#
#
#
#
#
#
#
#
#
# #
#
#
#
#
#
#
#
#
##
#
#
#
""
"
!!
!
!
!!!
!
!
!
!
!
!
!
!
!
!!
!
!
!!
!!!!!
!
!
!! !
!!
! !
!
!
!(
!(!(
!(
!(!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
Kep
Takeo
Pailin
PursatKratie
Kandal
Kampot
Siemreap
Koh Kong
Prey Veng
Svay Rieng
Phnom Penh
Battambang
Stung Treng
Mondul Kiri
Ratanak KiriPreah Vihear
Kampong Thom
Kampong Speu
Kampong Cham
Sihanoukville
Oddar Meanchey
Kampong Chhnang
Banteay Meanchey
Coal 700MWCoal 400MW
Coal 200MW
Kep II
Stungsen
Prekpor I
St.piphotKirirom I
Prek ter I
Prek thnot
Prek ter II
St.pursat I
Kirirom III
Prek ter IIISt.pursat II
Prek Liang I
Prek liang IA
Prek Liang II
Upper prek ter
Bokor Planteau
St. Meteuk III
Prek chhlong II
St.battambong I
St.battambong II
USt. russei chrum
Sekong
Sambor
Kam Chay
St.tatay
St. Atay
L.Sesan II
L.Sesan III
Stung Treng
L.Srepok II
L.Srepok IV
St. Meteuk I
L.Srepok III
St.chay Areng
St. Meteuk II
MSt. russei chrum
LSt. russei chrum
ZONE UNDER PROCESS 1100 MW
ZONE (MOU)
5000 MW
Map of Location of Hydro Potential: being constructed 1100 MW (26%),MOU 5000 MW (73%), others left 3500 MW
Cambodia Hydro Potential Source
IEEJ: April 2010
8
: 115 kV : 230 kV : Existing : up to 2008 : up to 2012 : up to 2016 : up to 2020
Legend
図1 送電線延伸計画(案)
THAILAND
LAO
VIETNAM
Map of Proposed Extension of National Grid
Cambodia Transmission line Policy
IEEJ: April 2010
9
Operation YearSize (MW)TypeExpansion of Power SourceNo
2016420HydroSesan & Lower Srepok II hydro generator12
201724HydroStung Battambang I hydro generator13
2012120HydroStung Atay hydro generator7
2013400CoalCoal Power Plant at Coastal Area8
2014235HydroLower Russey Chrum hydro generator9
2015260HydroChay Araing hydro generator10
2016467HydroSambo hydro generator11
2010200CoalCoal Power Plant in Sihanouk Ville6
201732HydroUpper Russey Chrum hydro generator14
201018HydroKirirom III hydro generator5
2010193HydroKamchay hydro generator4
201060ImportImport from Thailand 3
2010120ImportImport from Vietnam 2
201020ImportImport from Laos 1
Expansion Power Source Development
IEEJ: April 2010
10
OutlineElectricity STATUS in Cambodia
Energy Supply and Demand
Problem Statement
Conclusion
10
IEEJ: April 2010
1111
317.49453.282009
217.49247.282008
200.49224.782007
192.40214.782006
142.30160.502005
OutputInstalledYears
Power Generation in Phnom Penh 2009
0.00
100.00
200.00
300.00
400.00
500.00
2005 2006 2007 2008 2009
Years
Pow
er (M
W)
Installed Output
Unit : MW
Energy Supply and Demand ( 1 )
Power Generation for Phnom Penh in 2009
IEEJ: April 2010
1212
85.0244.12009
66.2239.02008
54.2204.52007
52.2165.02006
39.4133.12005
Off PeakPeakYeas
Peak Load for Phnom Penh 2009
-
50.0
100.0
150.0
200.0
250.0
300.0
2005 2006 2007 2008 2009
Years
Pow
er (M
W)
Peak Load
Unit : MW
Energy Supply and Demand ( 2 )
Peak Load Demand in 2009
IEEJ: April 2010
1313
473.75367.55359.85250.16192.47OutputProvinces
616.32401.52390.66278.92233.45InstalledPhnom Penh and
20092008200720062005Facilities
Power Generation in City and Provinces 2009
0100200300400500600700
2005 2006 2007 2008 2009
Years
Pow
er (M
W)
Installed Output
Energy Supply and Demand ( 3 )
Power Generation for City and Provinces in 2009
IEEJ: April 2010
1414
EDC13%Import
31%
IPP 56%
Available Electricity Supply in Phnom Penh 2009
Import TH51%
Import VN19%
IPP12%
EDC18%
Available Electricity Supply in Provinces 2009
Energy Supply and Demand ( 4 )
47.38%
0.39%
45.49%
3.18% 3.56%
Coal HFO Diesel Import Hydro
Source of Energy generation 2009
90.36%
0.52%
0.08%
8.68%
0.05%
0.37%
0.03%
Residential Comercial IndustrialGovernment Administration Others
Customers by Sector 2009
Type of Power Generation in 2009
IEEJ: April 2010
15
5955.385505.382905.382705.382497.381977.381631.381531.381093.38873.38773.38482.38282.38202.38Total
4500000000000000Coal/Gas
9009009007006005004003002001000000Coal
40554055145514551347927681681343223223121212Hydro
360360360360360360360360360360360280800Import
190.38190.38190.38190.38190.38190.38190.38190.38190.38190.38190.38190.38190.38190.38HFO/DO
20202019201820172016201520142013201220112010200920082007Power (MW)
Demand forecasting for 2007 to2020
0
1000
2000
3000
4000
5000
6000
7000
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Inst
all M
W
HFO/DO Import Hydro Coal Coal/Gas
Energy Supply and Demand ( 5 )
Electricity Demand forecasting
IEEJ: April 2010
16
258225822112211219521952191717971577756674463323323120120120120120120total
220220000000000000000000500 kV
1509150912591259109910991084108486427919711000000000230 kV
853853853853853853833713713477477353323323120120120120120120115 kV
20202019201820172016201520142013201220112010200920082007200620052004200320022001Line
National expension transmission line for 2020
120 120 120323 323
463 674
756
1,5771,797
1,9522,112
2,582
0
500
1000
1500
2000
2500
3000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Net
wor
k (K
M)
115 KV 230 KV 500 KV Total Line
Energy Supply and Demand ( 6 )
Forecasting of National expansion transmission line
IEEJ: April 2010
17
OutlineElectricity STATUS in Cambodia
Energy Supply and Demand
Problem Statement
Conclusion
17
IEEJ: April 2010
18
Problem Statement
Inefficiencies created by old generating equipment
Uncompetitive market structures
Inadequate legal frameworks
Inadequate administrative capabilities
Lack of access to electricity
IEEJ: April 2010
19
Outline
Electricity STATUS in Cambodia
Energy Supply and Demand
Problem Statement
Conclusion
19
IEEJ: April 2010
20
Conclusion ( 1 )
• High potential of hydro power source Micro-Hydro power
• Rural areas use battery for lighting at night timeEnergy Storage (Batteries)
• achieve rural electrification, providing electricity services 70% households by year 2030 and develop renewable energy.
Energy Policy andObjective (Biomass,
Solar, Coal…etc.)
• Operation of electricity companies, energy-efficient, and reliable operation of power system.
• The forecasting is an important for planning startup and shut down schedules and load management.
Energy DemandForecasting
ReasonSubjects
Subjects and Reasons
IEEJ: April 2010
21
Conclusion ( 2 )
Expectation for the Training Course Operation of electricity companies to reserve the
generation system, energy-efficient, and reliable operation.
Reliable and cost-effective electricity services to rural areas and equitable way is a major challenge.
To make the policy effective all stakeholders.
IEEJ: April 2010
22
ACKNOWLEDGEMENTS
Thank to the Royal Government of Cambodia and the Ministry of Industry,
Mines and Energy to nominate me to attend the training course in Japan.
Thank to the Royal Government of Japan and the Japan International
Cooperation Agency (JICA) to accept me to be a participant joining
training course on Energy Policy.
IEEJ: April 2010
23
ARE THERE ANY QUESTIONS ?ARE THERE ANY QUESTIONS ?
Thanks for paying attention!
IEEJ: April 2010
Contact:[email protected]