Energy Performance Certificates

Building Services - Cooling

PRESENTED BY

Page 2: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Cooling Systems

Local air conditioning systems include through-the-wall packaged units and split systems to provide comfort cooling, or heating and cooling, but not humidity control.

Ventilation air needs to be handled separately, and thus there is little scope for controlled free cooling. Whilst it is not common to base a major new design on individual local air conditioning units, they are commonly used to introduce air conditioning in major refurbishment of naturally ventilated buildings.

Individual local units have lower CoPs than centralised plant and often lack a coherent control strategy

Page 3: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

However, they provide scope for energy savings through: 

Avoiding multiple heat exchange (into/out of chilled water and condenser water) and fouling at each water heat transfer surface.

Avoiding pumping large volumes of chilled and condenser water

Simpler heat rejection equipment (i.e. direct air cooled condensers instead of cooling towers with their energy consumption and water treatment consequences)

Plant operating only in those areas that need cooling at a given time.

Page 4: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Although more localised plant may increase maintenance costs, this approach may provide greater standby in areas served by a number of local units.

Where it has been decided that air conditioning is unnecesary in the building as a whole, it may be appropriate to use highly localised units to cool hot spots in a mixed-mode approach, thus avoiding larger cooling systems. A similar approach may be appropriate where cooling requirements are more stringent in one small area than in the building as a whole.

Page 5: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Through-the-wall’ packages

 

These units are difficult to integrate into a coherent system, but may be applicable where a single room within a building needs to be cooled, either to different temperatures, or at different times, from the remainder which has a co-ordinated system. Cooling CoP lies in the range 1.5 to 2.3.

Heating is sometimes provided by electric resistance heaters, which should be appraised carefully in life cycle cost terms. Care should be taken to ensure that they do not operate in conflict with any separate space heating system, or with other similar units in the same zone, and that they are time controlled to function only when required.

Page 6: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

• Through-the-wall’ packages

Page 7: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Individual reversible heat pumps

 

Packaged heat pumps have much the same limitations as through-the-wall packages except that heating can be provided more efficiently by reversing refrigerant flow through the indoor and outdoor coils.

This saves energy in comparison with electric resistance heating, but care needs to be taken to compare the total running cost of heat from this source with other alternatives such as a separate central heating system.

Page 8: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Split unit packages 

Split units have a separate outdoor unit to house the compressor and condenser thus avoiding noise problems in the space being served. Some units offer variable speed compressors that enable cooling to be modulated, and thus the energy use can be matched more closely to cooling requirements. Split systems provide cooling CoPs of 2.5 to 3.0 whereas through the wall units only give 1.5 to 2.3. 

Otherwise, they should only be used in the same context as individual packaged units, with extra care taken to avoid the prospect of leaks from the connecting refrigerant lines. Most typically used in refurbishments, they often lack a coherent control strategy when multiple units supply the same space leading to simultaneous heating and cooling.

Page 9: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Page 10: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Variable refrigerant flow rate

Variable refrigerant flow rate (VRF) multi-split systems are generally regarded as local systems but are increasingly used as distributed cooling systems. More than one indoor unit can be connected to the same outdoor unit.  

However, it is important to comply with the manufacturer’s recommendations on horizontal pipe runs, number of bends and vertical lift, in order to minimise energy losses.

In each circulation loop, the refrigerant flow rate can be varied to match the heat transport requirements, thus making energy savings. Some suppliers offer heat recovery between zones on the same circulation loop, and it is in this mode that the system operates at its peak CoP of 3.1

Page 11: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

 

In heating only, or cooling only, modes the best system CoPs lie in the range 2.3 to 2.5.

In some installations, several outdoor units for individual refrigerant loops have been located in a bank adjacent to each other, but not connected, which can give the false impression of a co-ordinated system. Care should be taken to ensure a coherent control strategy with this approach.

In particular, controls for multiple units serving the same space should be linked to avoid simultaneous heating and cooling. Dead-bands between heating and cooling set points should be adequate to avoid individual units cycling between heating and cooling modes.

Page 12: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Ducted Installations 

Ducted split heat pump units work under the same principles as the ceiling or wall mounted units only they are located within ceiling voids or bulkheads and the conditioned air is transported to the occupied zone by means of a system of ductwork, this type of system would prove difficult to assess as all the items of plant are hidden with the only visible items of plant being grilles or diffusers. The assessor must view the installation to take records of the type of plant installed so efficiencies may be determined.

Ducted units generally have a system of ventilation working alongside this installation. this may be viewed as being outside the requirements of a Level 3 assessment, however some simpler more common systems are described below.-

Page 13: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Page 14: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING

Other Forms of Cooling 

There are numerous other types of mechanical cooling available which would be outside the realms of a Level 3 assessment. The following are the most common used and are for reference purposes.

• Constant volume• Dual duct• Variable air volume• Partially centralised air/water systems• Centralised air with reheat• Induction• Fan coils• Chilled beams and ceilings• Displacement ventilation

Page 15: Energy Performance Certificates

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD v1.3

LEVEL 3 BUILDING SERVICES TRAINING