ENERGOCENTROMONTAZH INTERNATIONAL Ltd. (ECM Inter) Steam and GT power plants
ECM Group overview
Steam, GT & combined cycle
power plantsDesign, consulting,
supply of equipment, supervision, testing, erection, installation,
commissioning, training. EPC and EPCM contracting.
Hydropower Plants
Design, consulting, supply of equipment, supervision, testing, erection, installation,
commissioning, training. EPC and
EPCM contracting. Major equipment
design.
Substations and transmission
linesDesign, consulting,
supply of equipment, supervision, testing, erection, installation,
commissioning, training. EPC and
EPCM contracting up to 500 kV range.
Erection & CommissioningDesign, supervision
commissioning, testing and
commissioning of hydro, nuclear power
plants, transport networks and power
substations.
ECM Group in brief
Since the date of its incorporation, ECM Group has installed the following power facilities:
turbine generators of 60 429 MW total power;
package boilers producing 214 312 tons of steam;
power transformers of 163 302 MVA installed capacity;
high-voltage transmission lines of 5 570 km.
3
ECM Group staff
4
The high competence of ECM specialists and workers who, having decades ofexperience in power plants engineering and construction, allows us to solve, at ahigh quality level, a wide range of problems in the field of construction and operationof power projects in difficult natural environments and climatic conditions.
• Engineers 885252
• Administration 121121
• High Skilled Workers 3 8073 807
• R & D 224444
•• TotalTotal 5 0245 024
Core ActivitiesECM Inter is a Russian leading company that, relying on its own resources, performs any work related to design, engineering, construction, installation and commissioning during the construction of power facilities:
Owner Engineer, EPC or EPCM Contractor;
Designing of thermal, gas turbine power plants, heating networks and boilerhouses, renewable energy sources (solar, wind, etc.);
Procurement of equipment;
Construction, installation, expansion, reconstruction, re-equipping, all kinds ofrepairs and adjustment of energy facilities and equipment;
Surveying, engineering, servicing, erection, installation and commissioningworks for rehabilitation, construction and operation of power facilities;
Operation and maintenance of power plants of different type and capacity;
Transportation of heavy cargo, handling operations, passenger transportation.
5
6
Selected references 2008 – 2013Steam and Gas turbine power plants
Two combined cycle co-generation units with a total capacity of 360 MW, thermal capacity – 227 Gcal/h.4xGT: V64.3A type (Ansaldo Energia 4x65 MW),2xST: T-48/62-7,4/0,12 (Power Machines, 2x60 MW), 4xHRSG: (Podolsk Machine Building Factory).
One combined cycle co-generation unit with a total capacity of 110 MW, thermal capacity – 75 Gcal/h. 1xGT: PG 6111FA type (GE 1x75 MW),1xST: Power Machines, KTZ 1x35 MW), 1xHRSG: (Podolsk Machine Building Factory).
7
Vologda CCPP-110Adler CCPP-360
Selected references 2008 – 2013Steam and Gas turbine power plants
Unit No.1: combined cycle units with capacity 420 MW.1xGT: SGT5-4000F type (Siemens 1x285 MW),1xST: SST-800 (Siemens, 2x135 MW), 4xHRSG: (LOOS, Germany).
Unit No.6: combined cycle unit with capacity 800 MW. 2xGT: SGT-5-4000F type (Siemens 2x279 MW),1xST: К-245-13,3 (Power Machines, 1x260 MW), 2xHRSG: П-132 (EMAlliance).
8
Kirishi CCPP-800Nyagan CCPP-420
Selected references 2008 – 2013Steam and Gas turbine power plants
Unit #3: steam coal-fired unit with capacity 225 MW.1xST: К-225-12.8-3Р (Power Machines, 2x225 MW), 1xSteam boiler: Еп-630-13.8 565БТ (ТПЕ-216М)(EMAlliance).
Combined cycle co-generation unit 410MW. 1xGT: M701F4 type (Mitsubishi Heavy Ind., 2x280 MW),1xST: Т-113/145-12,4 (Ural turbomachinery, 1x130 MW), 2xHRSG: (EMAlliance).
9
Krasnodar CCPP-410Kharanorskaya TPPCoal-fired steam power plant
10
Kirov TPP-4Peat & lignite fired PP
Selected references 2008 – 2013Steam and Gas turbine power plants
Pervomayskaya Co-generation Plant (2 x CCPP-180 units)
Two combined cycle co-generation units with a total capacity of 2x180 MW, thermal capacity – 227 Gcal/h.4xGT: V64.3A type (Ansaldo Energia 4x65,8 MW),2xST: Т-50/64-7,4/0,12 (Power Machines, 2x60 MW), 4xHRSG: (Podolsk Machine Building Factory).
Rehabilitation of steam co-generation units of peat fired. Replacement of existing steam turbines to the new ones type Тп-65/75-12,8 (Ural TurbomachineryWorks).
11
ECM InterSubstations
Core ActivitiesECM Inter is the Russian leading company that, relying on its own resources, performs any work related to design, engineering, construction, installation and commissioning of HV substations:
Construction expansion, renovation, restructuring, technical upgrading, all kinds of technical repair/ overhaul services of electrical facilities and equipment;
Designing and marketing of industrial equipment: power/electrical equipment, electrical facilities;
Design and survey service, developing equipment technology, materials, licensing, patenting.
Complex electrification activities both for industrial and economic/private facilities as well as individual buildings;
Mounting of overhead and cable transmission lines up to and over 110 kV;
General contractor and general designer services for new electrical/power facilities.
12
13
Major turn-key projects2010-2013
14
Novo-Orekhovo Substation GIS 110 / 20 kV, 2 х 80 MVA
Meschanskaya Substation GIS 220 / 20 kV 3 x 100 MVA.
Major turn-key projects2010-2013
Location: South-East Administrative District, Moscow
The standard switchgear GIS-220 kV includes 9 standard gas-insulated cells, switchgear-20 kV of 49 cells. The substation building is of 3 stores of 57.1 x 42 m
Inlets of cable lines of 220 kV “Pererva-ПП Saburovo-Baskakovo” – route length of 1,865 m
Commissioned in Q3 2010
15
Pererva Substation GIS 220 / 20 kV, 2 х 100 MVA
Major turn-key projects2010-2013
16
Pervomayskaya Substation GIS 220 / 20 / 10 kV , 3 х 100 MVA
Novo-Kuzminki Substation GIS 220 / 20 kV 2 x 160 MVA.
Major turn-key projects2010-2013
17
Krasnoselskaya Substation GIS 220 / 20 kV , 3 х 100 MVA
Mnevniki Substation GIS 220 / 20 kV 3 x 100 MVA
Major turn-key projects2010-2013
Location: East Administrative District, Moscow
The installed capacity of the substation is 3 x 100 MVA.
The integrated switchgear GIS-220 kV includes 7 standard gas-insulated cells, switchgear-20 kV of 56 cells.
The substation building is of 3 stores of 72 x 36 m.
Commissioning – Q1 2013
18
Novo-Izmaylovo Substation GIS 220 / 20 kV 3 x 100 MVA
19
THANK YOU!