North Anna Site-Specific ISFSI License Renewal (SNM-2507) Paul Aitken Manager Nuclear Engineering March 21, 2016

Upload: others

Post on 05-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

North Anna

Site-Specific ISFSI License Renewal

(SNM-2507)

Paul Aitken

Manager Nuclear Engineering

March 21, 2016

Page 2: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

• ISFSI Background

• NRC Regulations & Guidance

• LRA Content

• Lead Cask Inspections

• ISFSI Licensing Activities

• Summary

Agenda

2

Page 3: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

ISFSI Background

• Site-specific 20-year license

• Transnuclear TN-32 dry storage casks

(27 casks), storing low burn-up fuel only

• LRA for TN-32 casks, stored fuel

assemblies, & pad No. 1

• License expires June 30, 2018

3

Page 4: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

NRC Regulations & Guidance

• 10 CFR Part 72

• 10 CFR Part 51

• NUREG-1927, Rev 0 & Rev 1, as appropriate

• NUREG-1748 (Env. Review with NMSS Programs)

• ISGs

• Other applicable codes & standards

4

Page 5: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

LRA Content

• General Information (Section 1)

• Scoping Evaluation (Section 2)

• Aging Management Reviews (Section 3)

• Aging Management Programs (App. A)

• TLAAs (App. B) - None

• SAR Supplement (App. C)

• Tech Specs (App. D) – No Changes

• ER Supplement (App. E)

• Additional Information (App. F) – Lead Cask Inspections

• Non-Quantifiable Terms (App. G)

5

Page 6: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

General Information

• Application Format and Content

• Information Required by 10 CFR 72.22

− Facility Description

− Description of Business or Occupation of Applicants

− Organization and Management of Applicants

Virginia Electric and Power Company (VEPCo)

Old Dominion Electric Cooperative (ODEC)

− Financial Qualifications

− Financial Assurance for Decommissioning

6

Page 7: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Scoping Evaluation

• Scoping Methodology

– Documentation Sources North Anna ISFSI Technical Specifications

North Anna ISFSI Safety Evaluation Report

TN-32 Dry Storage Cask Topical Safety Analysis Report (TSAR)

North Anna ISFSI Safety Analysis Report (SAR)

Other – docketed correspondence, etc.

• Scoping Results

– TN-32 dry storage cask

– Spent Fuel Assemblies

– Reinforced Concrete Pad No. 1

7

Page 8: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Aging Management Reviews

• AMR Methodology

− Identification of In-scope Subcomponents Requiring AMR

− Identification of Materials and Environment

− Identification of Aging Effects Requiring Management/OE

EPRI Tools Documents

NUREG-1801

− Determination of the Activities Required to Manage the Effects of

Aging

• AMR Summary Results Table

− Dry Storage Cask

− Spent Fuel Assemblies

− Reinforced Concrete Pad No.1

8

Page 9: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Aging Management Programs

• TN-32 Dry Storage Cask Aging Management Program

– AMP Description

– AMP Evaluation using NUREG-1927 program elements

– Parameters Monitored or Inspected

• Interseal Pressure Monitoring

• Radiation Monitoring

• Visual Inspections of TN-32 Casks

– OE

– Recommended Enhancements

– Conclusion – Implementation of current activities with proposed

Enhancements will adequately manage aging effects during PEO

9

Page 10: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Aging Management Programs

• Monitoring of Structures Aging Management Program

– AMP Description

– AMP Evaluation using NUREG-1927 program elements

– Parameters Monitored or Inspected

• Groundwater Chemistry Sampling

• Periodic visual monitoring of Reinforced Concrete Pad No. 1

• Below grade monitoring if excavated

– OE

– Recommended Enhancements

– Conclusion – Implementation of proposed Enhancements will

adequately manage aging effects during PEO

10

Page 11: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Environmental Report Supplement

• Alternatives

• Affected Environment

• Environmental Impacts

• Cost-Benefit

– Proposed ISFSI license renewal for an additional 40

years of operation would provide an economic

advantage over other storage alternatives

11

Page 12: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Lead Cask Inspections

•Cask Bottom and Cask Top Inspections

•Selection Criteria included

– physical location

– accessibility

– time since loading

– decay heat

– seismic impacts

– prior OE

•Visual inspection techniques (VT-1 and/or VT-3) of cask

bottom, protective cover, & components under the

protective cover

•Results determined no detectable loss of material from the

base metal, and capability to perform intended functions

12

Page 13: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.49 Cask Bottom

13 NAPS ISFSI License Renewal – March 21, 2016

GP-2,

GP-19,

GP-22,

GP-10,

SLR-8

Page 14: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.49 Cask Bottom

14

GP-2 showing no detectable

loss of material from base metal

Page 15: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.49 Cask Bottom

15

GP-19 showing no detectable

loss of material from base metal

Page 16: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.49 Cask Bottom

16

GP-22 trunnion showing

no detectable loss of

material from base metal

Page 17: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.49 Cask Bottom

17

GP-10 showing no detectable

loss of material from base metal

Page 18: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.49 Cask Bottom

18

SLR-8 showing no detectable loss

of material from base metal

Page 19: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.23 Top Inspection

19

SLR-20,

SLR-35,

SLR-39

Page 20: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.23 Top Inspection

20

SLR-20 protective cover

exterior showing no detectable

loss of material from base metal

Page 21: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.23 Cask Top

21

SLR-35 protective cover interior

showing no detectable loss of

material from base metal

Page 22: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Cask TN-32.23 Cask Top

22

SLR-39 cask without

protective cover showing no

detectable loss of material

from base metal

Page 23: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

ISFSI Licensing Activities

23

Submit SNM-2507 License Renewal Application (LRA)

LAR review complete

Submit supplement to LRA with HBU Cask

information

Scheduled completion of LRA review (w/supp)

August 2015 (complete)

April 2016 June 2018

January 2017

1Q 2017

HBU Cask placed at North Anna ISFSI

Pad 1

August 2017

Submit License Amendment Request

(LAR) for HBU Cask

HBU LAR

License Renewal Activities

Page 24: Enclosure 3: Handout - Dominion Presentation on North Anna ...•AMR Methodology ... April 2016 June 2018 January 2017 1Q 2017 HBU Cask placed at North Anna ISFSI Pad 1 August 2017

Summary

• Dominion has successful experience with lSFSI license

renewal & aging management at Surry Power Station

• ISFSI LRA is compliant with Parts 72 & 51, followed

NUREGs-1927 & -1748 and prepared while maintaining

active participation with additional regulatory & industry

developments

• The effects of aging for the TN-32 dry storage casks and the

reinforced concrete pad will be adequately managed so that

there is reasonable assurance that the intended functions will

be maintained into the Period of Extended Operation

24