en13445:2009 asme boiler & pressure vessel code viii...
TRANSCRIPT
EN13445:2009ASME Boiler & Pressure Vessel CodeVIII Division 1Rules for construction of pressure vessels
Design standard
Certificate of Conformity
Pressure Equipment Directive (PED)
Nominal volume
Dimensions
Nozzles
Category
Module
Type
Max allowable pressure
Test pressure
Design temperature
Roof inspection manhole
Mantle inspection manhole
Design materials, shells
Design materials, dished bottoms type, material
Weight indicator type, make
Empty weight
EN13445:2009, ASME Boiler & Pressure Vessel Code
VIII Division 1 Rules for construction of pressure vessels
CE
97/23/EC
160m3
Ø=4000mm, H=15290mm
Inlet/Outlet: DN125, Vent. pipe: DN100, Safety valve: DN80, Air pipe: DN50
IV
B+F
Dry bulk vessel
6 BAR
12.1 BAR
-20…40o C
DN700
DN800
P355NL2, 12mm
KORBOGEN, DIN28013/28014/SMS482, P295GH, 14mm
INTUITIVEL-L 100ton
19500 KG
160m3 DRY BULK TANK
MANUAL
Tank is equipped with 2 manholes N6, N7 for cleaning and service purposes. To avoid vacuum and over pressure hazard the vessel must be equipped with safety relieve and block valve - nozzles N2, N3. Set pressure for safety relieve valve is max 6.6 BAR.
When loading up the tank, barite is blown from a vessel to the tank via the ventilation nozzle N2 DN100. Working pressure up to 6 BAR from compressor.
When unloading air is blow into the tank from nozzle N5 DN80 and Barite is leaving the tank via unloading pipe N4 DN125 on the lower part of the cone. Working pressure up to 6 BAR from compressor. When finished the tank is unloaded (no air pressure).
Maximum loading weight of barite is 330 tons (max level 12,430m). The vessel is equipped with weighting system to avoid overfilling hazard and monitoring the volume of product inside. On each leg the weight indicator with controller must be installed: Model INTUITIVE-L 100ton. See appendix 5 for further informa-tion.
Vessel must be installed on site to prefabricated metal frame.
The vessel can be lifted ONLY in empty condition.
The pressure vessel is designed, fabricated and tested accordingto EN 13455:2009 standard.
EW Production OÜ
Maleva 2G, 11711, Tallinn, EstoniaPhone: +372 6 610 945Fax: +372 6 610 946E-mail: [email protected]