EMu Slice Test – Status & Plans. Frank Geurts FNAL/Rice http://cern.ch/EmuSliceTest. Objectives. Hook-up CSCs to Peripheral Crates use final electronics, as much as possible revert to Beam-Test solutions whenever needed Hook up Peripheral Crates to Trigger and DAQ - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EMu Slice Test  – Status & Plans

EMu Slice Test – Status & Plans

Frank GeurtsFNAL/Rice

http://cern.ch/EmuSliceTest

Page 2: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 2

Objectives Hook-up CSCs to Peripheral Crates

use final electronics, as much as possible revert to Beam-Test solutions whenever needed

Hook up Peripheral Crates to Trigger and DAQ use TrackFinder for self-trigger use EMu-FED and Central-DAQ

Establish and finalize procedures and software timing and calibration procedures test methods (shared with 904 crew) software integration

Prepare towards the CMS Magnet Test Cosmic Challenge with CMS-wide slice can we deliver a 60° sector, i.e. 39 CSCs?

Page 3: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 3

Spring Test Preparations

“A journey of more than four hundred chambers starts with a first CSC”

Connect & Configure 6 CSCs on YE+2: 3 ME+2 and 3 ME+3 chambers HV + LV + gas

Self-trigger on cosmics provide MPC data to TF get trigger back from TTC

Provide S-Link data to Central-DAQ and spy data to DQM

Concurrent CMS installation activities at SX5 YE+ disk moves, cabling activities, electronics procurement March Test pushed to early Spring

Page 4: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 4

Current Status -1-

[before disks moves] two chambers

ME+2/1/16 ME+3/1/16

part of HV long term test

gas and LV are connected

27

32

16

27

1432

16

ME2

ME3

Page 5: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 5

Current Status -2-

Peripheral Crate “old school” 6U backplane standard Wiener crate

Dynatem D360 2 pairs of DMB/TMB

TMB2004, w/o RAT DMB production board

CCB + MPC DDU (temp.)

Page 6: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 6

Peripheral Crate

ME3/1/16

ME2/1/16

DDU(temp.)CCB

MPC

“oil, grease &

dust cover”

dynatemD360

Page 7: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 7

Current Status -3-

External Racks “mini counting house”

Control & DAQ pc remotely accessible protected by UPS

Network power switch allow remote power-cycling of

Peripheral Crate Pre-SpringTest location for

pFED†, TF and TTC crates awaiting rack allocation in

counting house, and fiber installation

†pseudo = old DDU/CCB in peripheral mini-crate

Rack -1- Rack -2-TF crate• SBS-620• SP• CCB’01 (spec.)

• MS

TTC crate• CAEN v1718• TTCvi• TTCvx

pFED† crate• D360• CCB’04• DDU• FedKit

DAQ & Control• [emuslice01]• emuslice02• UPS

Page 8: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 8

Current Status -4-

SX5: Provisional Wall removal completed Effects from dust still unclear

see next slide Final disk movement underway

Services (gas, LV, HV) need to be re-instated EMu Slice Test interrupted until then

DCS integration DIM additions to PeripheralCrate library

Successfully tested (see Valeri’s presentation)

TriDAS/emu integration see next slide

Page 9: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 9

“Smoke Dust Gets In Your Eyes …”

TTC fiber input (CCB)

ME+4/1 protection

MPC fiber output

MPC fiber output

Dust in fiber connections?Repeatedly cleaned …

vacuum cleaning (afterwards)

Page 10: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 10

Slice Test Software Organization TriDAS/emu integration

Project/Package structure: emu/<package> Standardized Makefile structures

Preparation for CMS integration (XDAQ v3) One collection of all relevant EMU libraries: easier for XDAQ

executives PeripheralCrate first “package”

emuDCS, emuDAQ, emuDQM should follow Sub-packages allowed

TriDAS/trigger/csctf similar efforts (Ildefons Magrans, et al.) Uncovered nasty CVS administrative issue: make sure package

names are unique throughout CVS structure. New mailing list: EMU-SOFTWARE

Help coordinate various software efforts Announce updates and releases

Page 11: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 11

Spring Test Schedule

Spring Test: 2nd half of April Fibers installed (see next slide) FED electronics and experts available Timing and trigger experts available (?)

Final YE+2 location SX5 configuration up to swiveling (Alain Hervé):

Page 12: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 12

Fiber Duct Installation & DAQ Room We have asked Luit de Jong et al. to install fiber ducts for the

Slice Test and Magnet Test EMU Fibers

DAQ path = DMB-DDU + CrateController-Hub TRG path = TTC-CCB + MPC-SP

all are multi-mode fibers with LC connectors except for TTC-CCB: single-mode with ST connectors

From Slice Test towards Magnet Test: 60° ME2,3 sector, i.e. 2 crates. Patch panel will be on the YE+2 mini-rack (Trigger Sect.5)

test various patch connector options Magnet Test

60° ME1-4 sector, i.e. 5 crates patch panel on YE+1 Finalize requirements soon (i.e. during CMS week)

Page 13: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 13

YE

+2

YE

+2

49m 10m 10m

18m

15m

20m

SX5 Fiber Path for CMS-EMu -1-horizontal distances inside SX5 only

reconsider alcove by-passes

new end positions for Slice Test

current positionslice test

by-pass this alcove?

CountingHouse

(see next page)

YE

+2

magnet test

Page 14: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 14

Fiber Patch Panels & Duct Config.

excerpt from quote

Page 15: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 15

15m

8m

SX5 Fiber Path for CMS-EMu -2-horizontal distances Counting House only

EMU racks in Rack Wizard

EMU Preference for DSS row

runco

ntrol

detec

tors

mag

net

DAQ

Counting Housea.k.a. the Green Barrack

EMU Racks

S-Link Receivers

Central-DAQ

rack

wiz

ard

Page 16: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 16

From the Picture Book …

EMU Rack Space Outdoor Cable Tray Indoor Cable Space

Page 17: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 17

Short term plans

Chamber timing use test tools with (remote) help from TMB and DMB experts

CSC trigger: configure TF + TTC Local DAQ Add up to 4 large chambers:

ME 2/2/31-32 and ME3/2/31-32 Use Counting House whenever possible

Preferred location for Spring Test fibers installation TF, TTC and (pseudo†) FED crate in EMU racks EMu racks were the first to be entered in the Rack Wizard

†pseudo = old DDU/CCB in peripheral mini-crate

Page 18: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 18

Spring Test

A 20° sector of ME2 and ME3 chambers one peripheral crate with 6 chambers timed in

Self-trigger using TrackFinder EMuDAQ to Central-DAQ via S-Link

all of which in the Counting House

Spring Configuration: ME{2,3}/1/16 + ME{2,3}/2/31-32

27

1432

16

ME2

27

1432

16

ME3

Page 19: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 19

Mid-term Plans

Replace electronics with final versions as much as possible CSC LV, CSC HV, Peripheral Crate Backplane, CRB (LV

cooling), TMB (RAT), Crate Controller, DDU, DCC SX5 is not a debugging area: use 904 to test electronics

first Extend number of participating chambers towards

Magnet Test goals limit to Sector 5 (corresponds to DT Sects. 10 and 11)

preference for ME2 and ME3 chambers

Page 20: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 20

Mid-term Plans (cont’d)

Port software libraries to XDAQ v3 CMS-DAQ preferred software environment for Magnet Test porting guide is now available April 25: follow-up on EMu-Central DAQ meeting

Repeat Beam-Test style cross-system integration: Interest from HCAL for joined test (Laza Lazic et al.)

non-critical systems integration ~May/June’05 Strong interest from Local Trigger Controller Group (Tim

Christiansen et al.) Want us to join LTC trigger integration, ~July’05 Potential next “Summer Test” milestone

Configuration dBase Integration Too many chambers to keep track of

Page 21: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 21

Slice Test Equipment Manifest (1)

Feb Mar Apr May Jun Jul Aug Sep Oct

CSCs 2 4 6 12 18 24 36 39 39

P.Crates 1 1 1 2 2 3 4 5 5

TMB’04 4 10 +2 +8 +14 ? ?? ???

DMB 3 9 +3 +9 +15 +27 +30 +30

MPC’04 1 1 +1 +1 +2 +3 +4 +4

CCB’04 2 1† +1 +2 +3 +4 +4

FED/DCC - +1 +1 +1 +1 +1 +1 +1

DDU 1† 1† +1 +1 +2 +2 +3 +3 +3

†) old DDU will be temporarily hosted in dedicated “FAST”-site type peripheral crate (which needs its own CCB)

Off-chamber and FED electronics

Page 22: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 22

Slice Test Equipment Manifest (2)

Feb Mar Apr May Jun Jul Aug Sep Oct

P.Crates 1 1 1 2 2 3 4 5 5

TF-CCB 1 1 1

TF backplane 1 1 1

SP 1 1 1

MS 1 1 1

TTCvi/ci 1 1 1 1 / +1 1 / +1 1 / +1 +1 +1

TTCvx 1 1 1 +1

TTCex +1‡ +1 +1 +1

‡) TTCvx can only supply 4 outputs. For more outputs a TTCex is required.

Trigger and TTC electronics

Page 23: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 23

Schedules:EMu Slice Test and Cosmic Challenge

Spring T

est (DA

Q)

ten

tative S

umm

er Test (LT

C)

396EMu CSCs

Cosm

ic Challenge

Page 24: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 24

Cosmic Challenge

~January 2006(!) closure of CMS ~November 2005

60° sector of CSCs on ME+1, 2, 3 and 4 39 chambers, provided availability of off-chamber

electronics Trigger:

external and/or CSC TrackFinder FED:

DCC read out over S-Link central DAQ

DDU read out over spy channel local DAQ, local DQM

Page 25: EMu Slice Test  – Status & Plans

CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 25

EMu Slice Test Web Pages