emu slice test – status & plans
DESCRIPTION
EMu Slice Test – Status & Plans. Frank Geurts FNAL/Rice http://cern.ch/EmuSliceTest. Objectives. Hook-up CSCs to Peripheral Crates use final electronics, as much as possible revert to Beam-Test solutions whenever needed Hook up Peripheral Crates to Trigger and DAQ - PowerPoint PPT PresentationTRANSCRIPT
EMu Slice Test – Status & Plans
Frank GeurtsFNAL/Rice
http://cern.ch/EmuSliceTest
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 2
Objectives Hook-up CSCs to Peripheral Crates
use final electronics, as much as possible revert to Beam-Test solutions whenever needed
Hook up Peripheral Crates to Trigger and DAQ use TrackFinder for self-trigger use EMu-FED and Central-DAQ
Establish and finalize procedures and software timing and calibration procedures test methods (shared with 904 crew) software integration
Prepare towards the CMS Magnet Test Cosmic Challenge with CMS-wide slice can we deliver a 60° sector, i.e. 39 CSCs?
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 3
Spring Test Preparations
“A journey of more than four hundred chambers starts with a first CSC”
Connect & Configure 6 CSCs on YE+2: 3 ME+2 and 3 ME+3 chambers HV + LV + gas
Self-trigger on cosmics provide MPC data to TF get trigger back from TTC
Provide S-Link data to Central-DAQ and spy data to DQM
Concurrent CMS installation activities at SX5 YE+ disk moves, cabling activities, electronics procurement March Test pushed to early Spring
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 4
Current Status -1-
[before disks moves] two chambers
ME+2/1/16 ME+3/1/16
part of HV long term test
gas and LV are connected
27
32
16
27
1432
16
ME2
ME3
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 5
Current Status -2-
Peripheral Crate “old school” 6U backplane standard Wiener crate
Dynatem D360 2 pairs of DMB/TMB
TMB2004, w/o RAT DMB production board
CCB + MPC DDU (temp.)
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 6
Peripheral Crate
ME3/1/16
ME2/1/16
DDU(temp.)CCB
MPC
“oil, grease &
dust cover”
dynatemD360
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 7
Current Status -3-
External Racks “mini counting house”
Control & DAQ pc remotely accessible protected by UPS
Network power switch allow remote power-cycling of
Peripheral Crate Pre-SpringTest location for
pFED†, TF and TTC crates awaiting rack allocation in
counting house, and fiber installation
†pseudo = old DDU/CCB in peripheral mini-crate
Rack -1- Rack -2-TF crate• SBS-620• SP• CCB’01 (spec.)
• MS
TTC crate• CAEN v1718• TTCvi• TTCvx
pFED† crate• D360• CCB’04• DDU• FedKit
DAQ & Control• [emuslice01]• emuslice02• UPS
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 8
Current Status -4-
SX5: Provisional Wall removal completed Effects from dust still unclear
see next slide Final disk movement underway
Services (gas, LV, HV) need to be re-instated EMu Slice Test interrupted until then
DCS integration DIM additions to PeripheralCrate library
Successfully tested (see Valeri’s presentation)
TriDAS/emu integration see next slide
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 9
“Smoke Dust Gets In Your Eyes …”
TTC fiber input (CCB)
ME+4/1 protection
MPC fiber output
MPC fiber output
Dust in fiber connections?Repeatedly cleaned …
vacuum cleaning (afterwards)
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 10
Slice Test Software Organization TriDAS/emu integration
Project/Package structure: emu/<package> Standardized Makefile structures
Preparation for CMS integration (XDAQ v3) One collection of all relevant EMU libraries: easier for XDAQ
executives PeripheralCrate first “package”
emuDCS, emuDAQ, emuDQM should follow Sub-packages allowed
TriDAS/trigger/csctf similar efforts (Ildefons Magrans, et al.) Uncovered nasty CVS administrative issue: make sure package
names are unique throughout CVS structure. New mailing list: EMU-SOFTWARE
Help coordinate various software efforts Announce updates and releases
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 11
Spring Test Schedule
Spring Test: 2nd half of April Fibers installed (see next slide) FED electronics and experts available Timing and trigger experts available (?)
Final YE+2 location SX5 configuration up to swiveling (Alain Hervé):
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 12
Fiber Duct Installation & DAQ Room We have asked Luit de Jong et al. to install fiber ducts for the
Slice Test and Magnet Test EMU Fibers
DAQ path = DMB-DDU + CrateController-Hub TRG path = TTC-CCB + MPC-SP
all are multi-mode fibers with LC connectors except for TTC-CCB: single-mode with ST connectors
From Slice Test towards Magnet Test: 60° ME2,3 sector, i.e. 2 crates. Patch panel will be on the YE+2 mini-rack (Trigger Sect.5)
test various patch connector options Magnet Test
60° ME1-4 sector, i.e. 5 crates patch panel on YE+1 Finalize requirements soon (i.e. during CMS week)
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 13
YE
+2
YE
+2
49m 10m 10m
18m
15m
20m
SX5 Fiber Path for CMS-EMu -1-horizontal distances inside SX5 only
reconsider alcove by-passes
new end positions for Slice Test
current positionslice test
by-pass this alcove?
CountingHouse
(see next page)
YE
+2
magnet test
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 14
Fiber Patch Panels & Duct Config.
excerpt from quote
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 15
15m
8m
SX5 Fiber Path for CMS-EMu -2-horizontal distances Counting House only
EMU racks in Rack Wizard
EMU Preference for DSS row
runco
ntrol
detec
tors
mag
net
DAQ
Counting Housea.k.a. the Green Barrack
EMU Racks
S-Link Receivers
Central-DAQ
rack
wiz
ard
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 16
From the Picture Book …
EMU Rack Space Outdoor Cable Tray Indoor Cable Space
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 17
Short term plans
Chamber timing use test tools with (remote) help from TMB and DMB experts
CSC trigger: configure TF + TTC Local DAQ Add up to 4 large chambers:
ME 2/2/31-32 and ME3/2/31-32 Use Counting House whenever possible
Preferred location for Spring Test fibers installation TF, TTC and (pseudo†) FED crate in EMU racks EMu racks were the first to be entered in the Rack Wizard
†pseudo = old DDU/CCB in peripheral mini-crate
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 18
Spring Test
A 20° sector of ME2 and ME3 chambers one peripheral crate with 6 chambers timed in
Self-trigger using TrackFinder EMuDAQ to Central-DAQ via S-Link
all of which in the Counting House
Spring Configuration: ME{2,3}/1/16 + ME{2,3}/2/31-32
27
1432
16
ME2
27
1432
16
ME3
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 19
Mid-term Plans
Replace electronics with final versions as much as possible CSC LV, CSC HV, Peripheral Crate Backplane, CRB (LV
cooling), TMB (RAT), Crate Controller, DDU, DCC SX5 is not a debugging area: use 904 to test electronics
first Extend number of participating chambers towards
Magnet Test goals limit to Sector 5 (corresponds to DT Sects. 10 and 11)
preference for ME2 and ME3 chambers
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 20
Mid-term Plans (cont’d)
Port software libraries to XDAQ v3 CMS-DAQ preferred software environment for Magnet Test porting guide is now available April 25: follow-up on EMu-Central DAQ meeting
Repeat Beam-Test style cross-system integration: Interest from HCAL for joined test (Laza Lazic et al.)
non-critical systems integration ~May/June’05 Strong interest from Local Trigger Controller Group (Tim
Christiansen et al.) Want us to join LTC trigger integration, ~July’05 Potential next “Summer Test” milestone
Configuration dBase Integration Too many chambers to keep track of
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 21
Slice Test Equipment Manifest (1)
Feb Mar Apr May Jun Jul Aug Sep Oct
CSCs 2 4 6 12 18 24 36 39 39
P.Crates 1 1 1 2 2 3 4 5 5
TMB’04 4 10 +2 +8 +14 ? ?? ???
DMB 3 9 +3 +9 +15 +27 +30 +30
MPC’04 1 1 +1 +1 +2 +3 +4 +4
CCB’04 2 1† +1 +2 +3 +4 +4
FED/DCC - +1 +1 +1 +1 +1 +1 +1
DDU 1† 1† +1 +1 +2 +2 +3 +3 +3
†) old DDU will be temporarily hosted in dedicated “FAST”-site type peripheral crate (which needs its own CCB)
Off-chamber and FED electronics
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 22
Slice Test Equipment Manifest (2)
Feb Mar Apr May Jun Jul Aug Sep Oct
P.Crates 1 1 1 2 2 3 4 5 5
TF-CCB 1 1 1
TF backplane 1 1 1
SP 1 1 1
MS 1 1 1
TTCvi/ci 1 1 1 1 / +1 1 / +1 1 / +1 +1 +1
TTCvx 1 1 1 +1
TTCex +1‡ +1 +1 +1
‡) TTCvx can only supply 4 outputs. For more outputs a TTCex is required.
Trigger and TTC electronics
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 23
Schedules:EMu Slice Test and Cosmic Challenge
Spring T
est (DA
Q)
ten
tative S
umm
er Test (LT
C)
396EMu CSCs
Cosm
ic Challenge
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 24
Cosmic Challenge
~January 2006(!) closure of CMS ~November 2005
60° sector of CSCs on ME+1, 2, 3 and 4 39 chambers, provided availability of off-chamber
electronics Trigger:
external and/or CSC TrackFinder FED:
DCC read out over S-Link central DAQ
DDU read out over spy channel local DAQ, local DQM
CERN -- March 15, 2005 F.Geurts -- EMu Slice Test 25
EMu Slice Test Web Pages