Emiliano Zapata Elementary Academy 2728 S Kostner Ave Chicago, IL 60623 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report) . Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Facility Assessment Report Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors Campus Summary Main 1996 73,845 $3,217,353 2 4-Classroom Modular 0 4,900 $178,982 1 Branch 1908 23,318 $779,358 2 SITE $391,131 Campus Total $4,566,824 102,063 Building: Main Category: Building Exterior Item - Type Quantity Unit Rank Cost Group Entrance Entrance Control - Audio 6 EA 1 $497 Exterior Doors - Exterior Steel Door 6 EA 4 $1,922 Exterior Doors - Overhead Rolling/ Garage Door 5 EA 1 $3,942 Exterior Doors - Side lite 7 EA 28 $0 Exterior Doors - Store Front 6 EA 26 $14,198 Exterior Doors - Transom Lite 7 EA 26 $0 Exterior Stairs - Stone 7 LF 6 $0 Foundation Foundation - Concrete 7 LF 1,256 $0 Superstructure - Steel 7 SF 73,845 $0 Lighting Exterior Lighting - Wall Mounted 5 EA 7 $2,992 Exterior Lighting - Wall Mounted 6 EA 8 $2,310 Roof System Chimney - Metal Flue 6 LF 40 $6,326 Page 1 of 27 ZAPATA Assessment Date: 12/2/2015

Upload: others

Post on 08-Jul-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report) . Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.

Facility Assessment Report

Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors

Campus Summary

Main 1996 73,845 $3,217,3532

4-Classroom Modular 0 4,900 $178,9821

Branch 1908 23,318 $779,3582

SITE $391,131

Campus Total $4,566,824102,063

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Entrance

Entrance Control - Audio 6EA1 $497

Exterior Doors - Exterior Steel Door 6EA4 $1,922

Exterior Doors - Overhead Rolling/ Garage Door 5EA1 $3,942

Exterior Doors - Side lite 7EA28 $0

Exterior Doors - Store Front 6EA26 $14,198

Exterior Doors - Transom Lite 7EA26 $0

Exterior Stairs - Stone 7LF6 $0

Foundation

Foundation - Concrete 7LF1,256 $0

Superstructure - Steel 7SF73,845 $0

Lighting

Exterior Lighting - Wall Mounted 5EA7 $2,992

Exterior Lighting - Wall Mounted 6EA8 $2,310

Roof System

Chimney - Metal Flue 6LF40 $6,326

Page 1 of 27ZAPATA Assessment Date: 12/2/2015

Page 2: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Roof System

Coping - Stone 6LF1,640 $52,673

Downspouts - Interior Downspouts 6LF496 $16,484

Parapet - 16" - 30" Height 7LF1,640 $0

Roof - Modified Bitumen 3SF39,731 $1,089,150

Roof Structure - Steel / Metal Deck/ Concrete Topping 7SF39,731 $0

Walls

Canopy - Metal 5SF800 $42,831

Exterior Walls - Brick 7SF43,304 $0

Exterior Walls - Stone-Cast 7SF7,536 $0

Windows

Clerestory - Glass Double-Pane 7SF96 $0

Curtain wall - Insulated Panel 7SF448 $0

Guard - Guards perforated 5SF5 $0

Guard - Guards perforated 6SF1,939 $24,761

Lintels - Steel 7LF1,049 $0

Windows - Casement Aluminum Double-pane 6SF6,732 $50,252

Windows - Louver 7SF210 $0

Building Exterior Subtotal: $1,308,337

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Automatic Transfer Switch 6EA1 $408

Emergency A/C Power - Corridors and Stairs 6SF16,325 $4,902

Emergency A/C Power - Gym 6SF3,444 $1,280

Emergency A/C Power - Lunchrooms 6SF2,689 $1,000

Emergency Battery Packs - Corridors and Stairs 6EA20 $4,050

Emergency Battery Packs - Gym 6EA2 $405

Emergency Battery Packs - Lunchrooms 6EA2 $405

Emergency Battery Packs - Students Toilets 6EA4 $810

Exit Signs - Corridors and Stairs 2EA35 $19,092

Exit Signs - Gym 2EA2 $1,157

Exit Signs - Lunchroom 2EA2 $1,091

Security System - CCTV 6SF73,845 $22,176

Page 2 of 27ZAPATA Assessment Date: 12/2/2015

Page 3: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Security System - Intrusion Detection 6SF73,845 $19,008

Main Service

Independent Electrical Service for emergency power 6EA1 $2,921

Main Electrical Service - 1600 A 277/480/3PH 6EA1 $5,977

PA System 6SF73,845 $24,288

Power Distribution

Lighting and Power Panels - 100 A 6EA2 $598

Lighting and Power Panels - Above 100 A 6EA12 $5,964

Main Distribution Panels - 400 - 600 amp 6EA2 $1,055

Transformers - 277/480 - 120/208 6EA4 $5,060

Electrical System Subtotal: $121,646

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost Group

Fire Alarm

Fire Alarm Panel 3EA1 $49,477

Fire Alarm Strobe Lights 6SF73,845 $26,400

Fire Alarm_System 6SF73,845 $35,903

Fire Pump Controller 6EA1 $1,823

Pump Room Assembly

Fire Pump - 25-50 hp 6EA1 $1,558

Jockey Pump 6EA1 $758

Sprinkler System

Sprinkler Heads 7SF73,845 $0

Sprinkler Piping 6SF73,845 $13,728

Wet Sprinkler System 6SF73,845 $19,008

Safty System Subtotal: $148,654

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Page 3 of 27ZAPATA Assessment Date: 12/2/2015

Page 4: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Air Conditioning

Condensing Unit- Roof Mounted - 11-20 tons 5EA1 $11,065

Condensing Unit- Roof Mounted - 5-10 tons 5EA1 $9,590

Condensing Unit- Roof Mounted - Greater than 50 tons 5EA2 $34,206

Condensing Unit- Roof Mounted - Less than 5 tons 6EA1 $3,334

Air Handling Systems

Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 12001-20000 cfm

5EA2 $97,184

Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 4000-8000 cfm

6EA1 $3,350

Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 8001-

12000 cfm

6EA1 $3,350

Air Intake 7EA4 $0

Fan Power Box - Fan Power Box with Hot Water Coil 6EA42 $20,697

Indoor Return Fans- Centrifugal Inline - 5000 - 10000 CFM 6EA2 $3,714

Indoor Return Fans- Centrifugal Inline - Greater than 20000 CFM 6EA1 $2,433

Indoor Return Fans- Centrifugal Inline - Less than 5000 CFM 6EA2 $2,564

Make Up Air Unit- Roof Mounted- Gas Heating - Less than 6000 cfm 6EA1 $3,350

Zone Dampers 6EA10 $8,330

Boiler Systems

Boiler Auxiliary- Non Condensing Hot Water - 1001 - 2000 MBH 6EA3 $6,139

Combustion Dampers 6EA7 $2,863

Glycol Feed System 6EA1 $539

Non Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 1001 - 2000 MBH

6EA3 $2,994

Water Fill System 6EA1 $1,168

Gas Booster

Gas Booster 6EA2 $998

Heating Devices

Cabinet Heaters - With Hot Water Coil 6EA8 $2,835

Fin Tube - Hot Water 6LF220 $2,076

Unit Heater - Hot Water 6EA6 $1,675

Mechanical Plumbing

Hot Water Pump - 10 - 20 HP 6EA2 $2,485

Hydronic Supply and Return - Copper 6LF540 $28,332

Hydronic Supply and Return - Steel 6LF160 $12,284

Page 4 of 27ZAPATA Assessment Date: 12/2/2015

Page 5: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Temperature Control

DDC System 5SF73,845 $121,438

Thermostats - DDC 6EA50 $0

Ventilation

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM 6EA4 $2,370

Exhaust Fans- Roof Mounted - Less than 500 CFM 6EA7 $2,073

Roof Mounted Duct Work 6LF20 $7,580

Type I Exhaust Hood- Kitchen 7EA2 $0

Mechanical System Subtotal: $401,609

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost Group

Hot Water

Electric Heater - 20 - 50 KW 5EA1 $2,504

Gas Heater - Greater than 600000 BTU/HR 5EA1 $2,249

Piping

Domestic Piping-Cold Water from Risers to Fixtures 6SF73,845 $14,784

Domestic Piping-Cold Water Horizontal Lines 6SF73,845 $17,952

Domestic Piping-Cold Water Risers 6SF73,845 $13,728

Domestic Piping-Hot Water from Risers to Fixtures 6SF73,845 $11,616

Domestic Piping-Hot Water Horizontal Lines 6SF73,845 $13,728

Domestic Piping-Hot Water Return Lines 6SF73,845 $10,560

Domestic Piping-Hot Water Return Risers 6SF73,845 $10,560

Sanitary Piping 6SF73,845 $67,583

Storm Piping 6SF73,845 $64,415

Vent Piping 6SF73,845 $49,631

Pumps

Pumps - Domestic Booster Pump-Duplex 6EA1 $1,977

Plumbing System Subtotal: $281,286

Building: Main

Category: Classrooms

Page 5 of 27ZAPATA Assessment Date: 12/2/2015

Page 6: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Art Room (1 room)

Casework 6LF5 $126

Ceiling - Lay-in 6SF921 $2,766

Chalk Board 4LF24 $2,203

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF921 $922

Lighting - Lay-in 7EA14 $0

Storage/ Closet 6SF116 $841

Walls - Concrete Block 6SF609 $1,785

Walls - Metal Panel 6SF304 $2,269

Walls - Plaster/Drywall 6SF304 $839

Work Sink 6EA1 $379

Computer Lab (1 room)

Casework 6LF66 $1,667

Ceiling - Lay-in 6SF1,053 $3,162

Doors - Side-lite 6SF6 $100

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF1,053 $1,054

Lighting - Lay-in 6EA12 $1,428

Marker Board 6LF20 $428

Walls - Concrete Block 6SF980 $2,873

Walls - Plaster/Drywall 5SF50 $221

Walls - Plaster/Drywall 6SF265 $731

Kindergarten (2 rooms)

Casework 6LF30 $758

Ceiling - Lay-in 6SF1,842 $5,532

Chalk Board 4LF36 $3,305

Doors - Side-lite 6SF12 $201

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Tile/Sheet 6SF1,842 $1,844

Lighting - Lay-in 7EA28 $0

Storage/ Closet 6SF111 $805

Walls - Concrete Block 6SF2,436 $7,141

Work Sink 6EA6 $2,274

Music Room (1 room)

Ceiling - Lay-in 6SF921 $2,766

Chalk Board 4LF20 $1,836

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF921 $922

Page 6 of 27ZAPATA Assessment Date: 12/2/2015

Page 7: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Music Room (1 room)

Lighting - Lay-in 7EA9 $0

Walls - Concrete Block 5SF914 $9,384

Walls - Metal Panel 6SF304 $2,269

Regular Classroom (24 rooms)

Casework 6LF976 $24,648

Ceiling - Lay-in 6SF21,719 $65,222

Chalk Board 4LF254 $23,319

Doors - Side-lite 6SF120 $2,006

Doors - Wood Doors inclu hw 6EA23 $6,923

Floor - Carpet 6SF426 $908

Floor - Tile/Sheet 6SF21,293 $21,314

Lighting - Lay-in 6EA162 $19,274

Lighting - Lay-in 7EA124 $0

Marker Board 6LF168 $3,599

Marker Board 7LF120 $0

Storage/ Closet 5SF56 $903

Storage/ Closet 6SF36 $261

Walls - Concrete Block 5SF60 $845

Walls - Concrete Block 6SF18,757 $54,986

Walls - Metal Panel 6SF307 $2,292

Walls - Plaster/Drywall 6SF8,467 $23,368

Work Sink 6EA19 $7,201

Science Lab Level 3 (1 room)

Casework 6LF40 $1,010

Ceiling - Lay-in 6SF1,236 $3,712

Chalk Board 4LF16 $1,469

Doors - Side-lite 6SF12 $201

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Tile/Sheet 6SF1,236 $1,237

Lighting - Lay-in 6EA15 $1,785

Science Lab Elements 6SF1,236 $8,378

Walls - Concrete Block 6SF840 $2,462

Walls - Plaster/Drywall 6SF613 $1,692

Work Sink 6EA3 $1,137

Special Education (2 rooms)

Casework 6LF14 $354

Page 7 of 27ZAPATA Assessment Date: 12/2/2015

Page 8: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Special Education (2 rooms)

Ceiling - Lay-in 6SF626 $1,880

Chalk Board 6LF12 $268

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Carpet 6SF626 $1,334

Lighting - Lay-in 6EA10 $1,190

Marker Board 6LF12 $257

Walls - Concrete Block 6SF415 $1,217

Walls - Metal Panel 6SF307 $2,292

Walls - Plaster/Drywall 6SF734 $2,026

Weight (1 room)

Casework 6LF15 $379

Ceiling - Lay-in 6SF921 $2,766

Doors - Side-lite 6SF6 $100

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Weight/ Fitness Room Floor Matting 6SF921 $4,820

Lighting - Lay-in 7EA12 $0

Marker Board 7LF12 $0

Storage/ Closet 5SF56 $903

Walls - Concrete Block 6SF1,218 $3,571

Work Sink 6EA3 $1,137

Classrooms Subtotal: $370,485

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Administrative Suites/Offices

AC Unit 6EA1 $496

Ceiling - Lay-in 5SF14 $112

Ceiling - Lay-in 6SF3,508 $10,535

Ceiling - Plaster/Drywall 6SF92 $318

Doors - Side-lite 6SF114 $1,906

Doors - Steel Doors incl hw 6EA3 $903

Doors - Store Front 6EA1 $1,208

Doors - Wood Doors inclu hw 6EA13 $3,913

Floor - Carpet 6SF2,026 $4,317

Page 8 of 27ZAPATA Assessment Date: 12/2/2015

Page 9: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Administrative Suites/Offices

Floor - Tile Ceramic/ Porcelain 6SF150 $317

Floor - Tile/Sheet 6SF1,438 $1,439

Lighting - Lay-in 6EA11 $1,309

Lighting - Lay-in 7EA42 $0

Power Distribution 6EA8 $16,999

Power Distribution 7EA114 $0

Storage/ Closet 6SF21 $152

Walls - Concrete Block 6SF5,009 $14,684

Walls - Plaster/Drywall 6SF4,374 $12,072

Work SInk 6EA2 $1,016

Gymnasia

Bleacher Seating 6EA96 $2,779

Ceiling - Exposed 6SF3,444 $5,122

Doors - Steel Doors incl hw 6EA4 $1,204

Floor - Sport Flooring 6SF3,444 $7,437

Lighting - Metal Halide/Sodium Vapor 7EA12 $0

Scoreboards 6EA1 $2,244

Sound System 6EA1 $41,654

Storage/ Closet 6SF170 $1,233

Walls - Concrete Block 6SF7,218 $21,160

Kitchen

Ceiling - Lay-in 6SF660 $1,982

Doors - Steel Doors incl hw 6EA1 $301

Floor - Concrete 6SF660 $349

Lighting - Lay-in 7EA17 $0

Storage/ Closet 6SF225 $1,631

Walls - Concrete Block 6SF1,022 $2,996

Library

Casework 6LF230 $5,808

Ceiling - Lay-in 6SF2,983 $8,958

Doors - Wood Doors inclu hw 6EA3 $903

Floor - Carpet 6SF2,983 $6,356

Lighting - Lay-in 6EA28 $3,331

Storage/ Closet 6SF114 $827

Walls - Concrete Block 6SF1,342 $3,934

Walls - Plaster/Drywall 6SF1,342 $3,704

Page 9 of 27ZAPATA Assessment Date: 12/2/2015

Page 10: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Library

Locker/Shower Room

Accessories 6SF222 $870

Benches, ped mounted 6LF4 $436

Ceiling - Lay-In 5SF18 $125

Ceiling - Lay-In 6SF175 $526

Ceiling - Plaster/ Drywall 6SF29 $100

Doors - Steel Doors incl hw 6EA3 $903

Floor - Tile Ceramic/ Porcelain 6SF260 $550

Floor Drain 6EA3 $3,177

Lavatory 6EA2 $639

Lighting - Lay-in 7EA6 $0

Partitions 6EA2 $594

Showers 6EA1 $311

Student Lockers 6EA16 $0

Walls - Concrete Block 6SF979 $2,870

Water Closet 6EA2 $672

Lunch & Multipurpose Room

Ceiling - Exposed 6SF2,159 $3,211

Ceiling - Lay-in 6SF530 $1,592

Doors - Steel Doors incl hw 6EA4 $1,204

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Tile/Sheet 6SF2,689 $2,692

Lighting - Lay-in 7EA15 $0

Lighting - Pendent/Surface 7EA6 $0

Serving Line 6LF12 $714

Walls - Concrete Block 6SF6,390 $18,732

MDF_IDF

AC Unit 6EA1 $496

Doors - Wood Doors inclu hw 6EA1 $301

Finishes 6SF91 $649

Ventilation and Cooling 6EA1 $1,855

Mechanical/ Service Rooms

Janitor's Closet 6SF196 $1,404

Mechanical/ Service Rooms 6SF2,364 $16,936

Storage Room 6SF472 $3,382

Page 10 of 27ZAPATA Assessment Date: 12/2/2015

Page 11: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Mechanical/ Service Rooms

Vaults 6SF228 $1,633

Restroom

Accessories 6SF1,797 $16,575

Ceiling - Lay-in 6SF356 $1,069

Ceiling - Plaster/Drywall 6SF1,441 $4,987

Doors - Wood Doors inclu hw 6EA10 $3,010

Floor - Tile Ceramic/ Porcelain 6SF1,797 $3,803

Floor Drain 6EA18 $19,065

Hand Dryer 6EA8 $1,840

Lavatory 6EA34 $10,867

Lighting - Lay-in 6EA23 $2,736

Lighting - Lay-in 7EA27 $0

Partitions 6EA22 $6,532

Urinals 6EA8 $2,688

Walls - Structural Glazed Tile 6SF5,264 $16,561

Walls - Tile Ceramic/ Porcelain 6SF1,654 $3,737

Water Closet 6EA34 $11,423

Rooms (Other Than Classrooms) Subtotal: $367,676

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Corridor

Ceiling - Lay-in 6SF14,752 $44,300

Doors - Steel Doors incl hw 6EA16 $4,816

Doors - Wood Doors include hw 6EA2 $602

Drinking Fountains - Single Fountain 6EA10 $2,757

Floor - Tile Ceramic/ Porcelain 6SF525 $1,464

Floor - Tile/Sheet 6SF14,752 $8,016

Lighting - Lay-in 6EA86 $10,232

Lighting - Lay-in 7EA98 $0

Walls - Concrete Block 5SF100 $1,409

Walls - Concrete Block 6SF25,766 $75,533

Safety

Camera Viewing Station 5EA4 $11,741

Page 11 of 27ZAPATA Assessment Date: 12/2/2015

Page 12: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Safety

Security Cameras 5EA2 $1,375

Security Cameras 6EA14 $2,717

Stairs

Ceiling - Lay-in 6SF1,000 $3,003

Floor - Terrazzo 6SF1,048 $8,797

Handrails 6LF208 $1,802

Lighting - Lay-in 6EA8 $952

Stairs - Terrazzo 6LF104 $965

Walls - Concrete Block 6SF6,120 $17,941

Vertical Conveyance

Elevator - Hydraulic Elevator 6EA1 $19,238

Building Interior Subtotal: $217,660

Total Building Cost $3,217,353

Building: 4-Classroom Modular

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Entrance

Exterior Doors - Exterior Steel Door 6EA4 $1,922

Exterior Stairs - Concrete 6LF6 $491

Stair Handrail - Steel_Stair Handrail 7LF35 $0

Foundation

Foundation - Masonry 7LF280 $0

Superstructure - Steel 7SF4,900 $0

Lighting

Exterior Lighting - Wall Mounted 5EA3 $1,282

Exterior Lighting - Wall Mounted 6EA3 $866

Roof System

Coping - Metal 6LF270 $10,127

Coping - Metal 7LF280 $0

Downspouts - Exterior Downspouts 6LF190 $6,314

Roof - EPDM/ Synthetic Rubber 6SF4,900 $41,481

Page 12 of 27ZAPATA Assessment Date: 12/2/2015

Page 13: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: 4-Classroom Modular

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Roof System

Roof Structure - Steel / Metal Deck/ Concrete Topping 7SF4,900 $0

Walls

Exterior Walls - Prefabricated Metal Panel Wall 6SF2,670 $15,158

Windows

Guard - Guards wire guard 6SF320 $4,086

Windows - Sash Aluminum Double-pane 6SF320 $2,389

Building Exterior Subtotal: $84,117

Building: 4-Classroom Modular

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Emergency Battery Packs - Corridors and Stairs 6EA12 $2,430

Exit Signs - Corridors and Stairs 6EA6 $898

Security System - CCTV 6SF4,900 $1,471

Security System - Intrusion Detection 6SF4,900 $1,261

Main Service

Independent Electrical Service for emergency power 6EA1 $2,921

PA System 6SF4,900 $1,612

Power Distribution

Lighting and Power Panels - Above 100 A 7EA2 $0

Electrical System Subtotal: $10,594

Building: 4-Classroom Modular

Category: Safty System

Item - Type Quantity Unit Rank Cost Group

Fire Alarm

Fire Alarm Panel 6EA1 $6,406

Fire Alarm Strobe Lights 6SF4,900 $1,752

Fire Alarm_System 6SF4,900 $2,382

Sprinkler System

Sprinkler Heads 7SF4,900 $0

Page 13 of 27ZAPATA Assessment Date: 12/2/2015

Page 14: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: 4-Classroom Modular

Category: Safty System

Item - Type Quantity Unit Rank Cost Group

Sprinkler System

Sprinkler Piping 6SF4,900 $911

Wet Sprinkler System 6SF4,900 $1,261

Safty System Subtotal: $12,712

Building: 4-Classroom Modular

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Temperature Control

Electric Thermostat 6EA4 $0

Unit Ventilation

Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling 6EA4 $0

Ventilation

Exhaust Fans- Roof Mounted - 500 - 1500 CFM 6EA5 $2,962

Mechanical System Subtotal: $2,962

Building: 4-Classroom Modular

Category: Plumbing System

Item - Type Quantity Unit Rank Cost Group

Hot Water

Electric Heater - Less than 20 KW 6EA1 $682

Piping

Domestic Piping-Cold Water Horizontal Lines 6SF4,900 $1,191

Domestic Piping-Hot Water Horizontal Lines 6SF4,900 $911

Sanitary Piping 6SF4,900 $4,484

Storm Piping 6SF4,900 $4,274

Vent Piping 6SF4,900 $3,293

Plumbing System Subtotal: $14,836

Building: 4-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Page 14 of 27ZAPATA Assessment Date: 12/2/2015

Page 15: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: 4-Classroom Modular

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Pre School (4 rooms)

Ceiling - Lay-in 6SF3,200 $9,610

Doors - Wood Doors inclu hw 6EA4 $1,204

Floor - Tile/Sheet 6SF3,200 $3,203

Lighting - Chandelier, Incandescent 4EA3 $3,170

Lighting - Chandelier, Incandescent 6EA1 $478

Lighting - Lay-in 7EA64 $0

Marker Board 6LF12 $257

Marker Board 7LF24 $0

Storage/ Closet 6SF304 $2,204

Walls - Vinyl Coated Gypsum Panel 6SF3,320 $9,163

Classrooms Subtotal: $29,288

Building: 4-Classroom Modular

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Mechanical/ Service Rooms

Mechanical/ Service Rooms 6SF52 $373

Restroom

Accessories 6SF323 $2,979

Ceiling - Plaster/Drywall 6SF323 $1,118

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Tile/Sheet 6SF323 $323

Floor Drain 6EA2 $2,118

Hand Dryer 6EA2 $460

Lavatory 6EA4 $1,278

Lighting - Pendent/Surface 7EA3 $0

Partitions 6EA7 $2,078

Urinals 6EA2 $672

Walls - Vinyl Coated Gypsum Panel 6SF907 $2,503

Water Closet 6EA6 $2,016

Rooms (Other Than Classrooms) Subtotal: $16,521

Building: 4-Classroom Modular

Category: Building Interior

Page 15 of 27ZAPATA Assessment Date: 12/2/2015

Page 16: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Corridor

Ceiling - Lay-in 6SF628 $1,886

Doors - Steel Doors incl hw 6EA4 $1,204

Drinking Fountains - Single Fountain 6EA2 $551

Floor 6SF628 $0

Lighting - Lay-in 7EA7 $0

Walls - Vinyl Coated Gypsum Panel 6SF1,421 $3,922

Safety

Security Cameras 6EA2 $388

Building Interior Subtotal: $7,951

Total Building Cost $178,982

Building: Branch

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Entrance

Entrance Control - Audio 5EA1 $994

Entrance Control - Audio and Video 6EA1 $702

Exterior Doors - Exterior Steel Door 6EA6 $2,883

Exterior Doors - Overhead Rolling/ Garage Door 5EA1 $3,942

Exterior Doors - Store Front 6EA2 $1,092

Exterior Doors - Transom Lite 6EA1 $313

Exterior Doors - Transom Lite 7EA1 $0

Exterior Stairs - Stone 6LF24 $2,712

Fire Escape

Fire Escape 6LF26 $16,426

Foundation

Foundation - Masonry 7LF435 $0

Superstructure - Heavy Timber 7SF23,318 $0

Lighting

Exterior Lighting - Wall Mounted 6EA11 $3,176

Roof System

Chimney - Brick Chimney- Concrete/ Mortar Liner 7LF45 $0

Coping - Stone 6LF410 $13,168

Coping - Terra Cotta 6LF109 $3,501

Page 16 of 27ZAPATA Assessment Date: 12/2/2015

Page 17: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Branch

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Roof System

Downspouts - Exterior Downspouts 6LF250 $8,308

Parapet - 16" - 30" Height 6LF387 $15,462

Parapet - Parapet < 16" Height 6LF72 $1,534

Parapet - Parapet > 30" 6LF60 $3,835

Roof - Asphalt Gravel Ballast 6SF2,241 $22,785

Roof - Modified Bitumen 6SF6,588 $61,989

Roof Structure - Heavy Timber 7SF8,829 $0

Walls

Canopy - Concrete/ Stucco 6SF86 $2,846

Cornice - Masonry Projecting Limestone 6LF676 $23,442

Exterior Walls - Brick 6SF20 $182

Exterior Walls - Brick 7SF15,936 $0

Exterior Walls - Concrete Block 7SF50 $0

Exterior Walls - Stone-Cast 7SF300 $0

Windows

Guard - Guards perforated 6SF362 $4,623

Lintels - Brick 7LF160 $0

Lintels - Steel 7LF392 $0

Windows - Casement Aluminum Double-pane 6SF360 $2,687

Windows - Casement Steel 6SF80 $597

Windows - Decorative 6SF1,828 $13,645

Windows - Louver 6SF16 $119

Windows - Sash Aluminum 6SF1,008 $7,524

Windows - Sash Lexan 5SF117 $3,435

Building Exterior Subtotal: $221,923

Building: Branch

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Automatic Transfer Switch 6EA1 $408

Emergency A/C Power - Corridors and Stairs 6SF2,191 $658

Emergency A/C Power - Lunchrooms 6SF3,937 $1,464

Emergency Battery Packs - Corridors and Stairs 6EA12 $2,430

Emergency Battery Packs - Lunchrooms 6EA4 $810

Page 17 of 27ZAPATA Assessment Date: 12/2/2015

Page 18: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Branch

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Emergency Battery Packs - Students Toilets 6EA2 $405

Exit Signs - Corridors and Stairs 6EA6 $898

Exit Signs - Lunchroom 6EA3 $449

Security System - CCTV 6SF23,318 $7,002

Security System - Intrusion Detection 6SF23,318 $6,002

Main Service

Independent Electrical Service for emergency power 6EA1 $2,921

PA System 6SF23,318 $7,669

Power Distribution

Lighting and Power Panels - 100 A 6EA2 $598

Lighting and Power Panels - Above 100 A 6EA2 $994

Main Distribution Panels - 400 - 600 amp 6EA1 $528

Electrical System Subtotal: $33,237

Building: Branch

Category: Safty System

Item - Type Quantity Unit Rank Cost Group

Fire Alarm

Fire Alarm Panel 7EA1 $0

Fire Alarm Strobe Lights 6SF23,318 $8,336

Fire Alarm_System 6SF23,318 $11,337

Sprinkler System

Sprinkler Heads 7SF23,318 $0

Sprinkler Piping 7SF23,318 $0

Wet Sprinkler System 7SF23,318 $0

Safty System Subtotal: $19,673

Building: Branch

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Air Handling Systems

Air Handling Unit- Package Single Zone- Indoor- Steam Coils - 4000-8000 cfm 6EA1 $3,350

Air Intake 7EA1 $0

Page 18 of 27ZAPATA Assessment Date: 12/2/2015

Page 19: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Branch

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Air Handling Systems

Boiler Systems

Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - Less than 50 HP 6EA1 $2,046

Chemical Feed System 6EA1 $1,078

Chemical Feeder 6EA1 $1,078

Combustion Dampers 7EA1 $0

Condensate Pump 6EA1 $2,021

Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - Less than 50 HP 6EA1 $2,046

Piping - Condensate Pipe- Steel 5LF200 $2,440

Piping - Steam Pipe- Steel 5LF200 $2,817

Steam Traps 5EA49 $64,430

Heating Devices

Radiators - Steam 5EA37 $61,987

Temperature Control

Electric Controls 6SF23,316 $0

Electric Thermostat 6EA1 $0

Ventilation

Exhaust Fans- Roof Mounted - Less than 500 CFM 6EA1 $296

Type II Exhaust Hood- Warming Kitchen 2EA1 $9,916

Mechanical System Subtotal: $153,505

Building: Branch

Category: Plumbing System

Item - Type Quantity Unit Rank Cost Group

Hot Water

Gas Heater - Less than 150000 BTU/HR 5EA1 $2,249

Piping

Domestic Piping-Cold Water from Risers to Fixtures 6SF23,318 $4,668

Domestic Piping-Cold Water Horizontal Lines 6SF23,318 $5,669

Domestic Piping-Cold Water Risers 6SF23,318 $4,335

Domestic Piping-Hot Water from Risers to Fixtures 6SF23,318 $3,668

Domestic Piping-Hot Water Horizontal Lines 6SF23,318 $4,335

Sanitary Piping 6SF23,318 $21,341

Storm Piping 6SF23,318 $20,340

Page 19 of 27ZAPATA Assessment Date: 12/2/2015

Page 20: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Branch

Category: Plumbing System

Item - Type Quantity Unit Rank Cost Group

Piping

Vent Piping 6SF23,318 $15,672

Plumbing System Subtotal: $82,277

Building: Branch

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Library (1 room)

Casework 6LF12 $303

Ceiling - Plaster/Drywall 6SF593 $2,052

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF593 $594

Lighting - Pendent/Surface 6EA9 $1,115

Walls - Plaster/Drywall 5SF50 $255

Walls - Plaster/Drywall 6SF1,269 $3,502

Regular Classroom (9 rooms)

AC Units 6EA6 $2,973

Ceiling - Plaster/Drywall 6SF7,802 $27,000

Chalk Board 4LF8 $734

Doors - Transom Window 6SF124 $2,099

Doors - Wood Doors inclu hw 6EA10 $3,010

Floor - Tile/Sheet 6SF7,802 $7,810

Lighting - Pendent/Surface 6EA50 $6,195

Lighting - Pendent/Surface 7EA108 $0

Marker Board 6LF84 $1,799

Marker Board 7LF190 $0

Storage/ Closet 6SF270 $1,958

Walls - Plaster/Drywall 5SF158 $807

Walls - Plaster/Drywall 6SF15,928 $43,960

Classrooms Subtotal: $106,467

Building: Branch

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Page 20 of 27ZAPATA Assessment Date: 12/2/2015

Page 21: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Branch

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Administrative Suites/Offices

Ceiling - Plaster/Drywall 6SF1,944 $6,727

Doors - Wood Doors inclu hw 6EA4 $1,204

Floor - Carpet 6SF390 $831

Floor - Tile/Sheet 6SF1,554 $1,556

Lighting - Pendent/Surface 6EA38 $4,708

Power Distribution 7EA30 $0

Storage/ Closet 6SF30 $218

Walls - Metal Panel 6SF1,000 $7,465

Walls - Plaster/Drywall 5SF50 $255

Walls - Plaster/Drywall 6SF2,739 $7,559

Kitchen

Ceiling - Plaster/Drywall 6SF351 $1,215

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF351 $351

Lighting - Pendent/Surface 6EA6 $743

Storage/ Closet 6SF50 $363

Walls - Plaster/Drywall 6SF742 $2,048

Lunch & Multipurpose Room

Ceiling - Plaster/Drywall 6SF3,937 $13,624

Doors - Steel Doors incl hw 6EA2 $602

Floor - Tile/Sheet 6SF3,937 $3,941

Lighting - Pendent/Surface 6EA29 $3,593

Serving Line 6LF8 $476

Stage 6SF298 $1,722

Storage/ Closet 6SF270 $1,958

Walls - Metal Panel 6SF500 $3,732

Walls - Plaster/Drywall 6SF1,175 $3,243

Mechanical/ Service Rooms

Boiler Room 6SF450 $3,224

Janitor's Closet 6SF30 $215

Storage Room 6SF450 $3,224

Restroom

Accessories 6SF604 $5,571

Ceiling - Lay-in 6SF133 $399

Ceiling - Plaster/Drywall 6SF471 $1,630

Page 21 of 27ZAPATA Assessment Date: 12/2/2015

Page 22: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Branch

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Restroom

Doors - Wood Doors inclu hw 6EA3 $903

Floor - Tile Ceramic/ Porcelain 6SF471 $997

Floor - Tile/Sheet 6SF133 $133

Floor Drain 6EA2 $2,118

Hand Dryer 6EA4 $920

Lavatory 5EA1 $1,590

Lavatory 6EA7 $2,237

Lighting - Pendent/Surface 6EA4 $496

Partitions 6EA6 $1,782

Urinals 6EA3 $1,008

Walls - Concrete Block 6SF346 $1,014

Walls - Structural Glazed Tile 6SF859 $2,702

Water Closet 6EA9 $3,024

Rooms (Other Than Classrooms) Subtotal: $101,621

Building: Branch

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Corridor

Ceiling - Plaster/Drywall 6SF1,900 $11,765

Ceiling - Splined 6SF157 $454

Doors - Steel Doors incl hw 6EA1 $301

Doors - Store Front 6EA2 $2,416

Doors - Transom Window 6EA15 $254

Drinking Fountains - Single Fountain 6EA1 $276

Floor - Tile Ceramic/ Porcelain 6SF85 $237

Floor - Tile/Sheet 6SF1,915 $1,041

Lighting - Lay-in 7EA1 $0

Lighting - Pendent/Surface 7EA17 $0

Stairs - Wood 6LF6 $70

Walls - Plaster/Drywall 6SF6,352 $28,158

Safety

Camera Viewing Station 6EA1 $683

Security Cameras 6EA5 $970

Page 22 of 27ZAPATA Assessment Date: 12/2/2015

Page 23: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Building: Branch

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Stairs

Ceiling - Plaster/Drywall 5SF15 $307

Ceiling - Plaster/Drywall 6SF390 $2,855

Floor - Tile/Sheet 6SF191 $104

Handrails 6LF150 $1,300

Lighting - Pendent/Surface 6EA1 $124

Lighting - Pendent/Surface 7EA2 $0

Lighting - Wall Mounted 7EA1 $0

Stairs - Rubber 6LF48 $516

Stairs - Tile 6LF18 $167

Walls - Plaster/Drywall 5SF350 $1,936

Walls - Plaster/Drywall 6SF2,435 $6,720

Building Interior Subtotal: $60,654

Total Building Cost $779,358

SITE

Category: Site

Item - Type Quantity Unit Rank Cost Group

Civil/Drainage

Civil/ Drainage - Catch Basin 6EA18 $19,689

Civil/ Drainage - Site Drain 6EA6 $1,862

Civil/ Drainage - Site Manhole 7EA13 $0

Fencing

Fencing - Chain Link 6LF1,215 $22,813

Fencing - New Standard Ornamental 6LF795 $25,363

Landscape

Benches 6EA6 $2,580

Landscape - Grass 6SF29,472 $24,444

Landscape - Hardscape- Concrete 6SF1,456 $7,516

Landscape - Hardscape- Pavers 6SF7,388 $41,837

Lighting - Pole Mounted 5EA4 $8,139

Lighting - Pole Mounted 6EA8 $8,670

Parkway trees 6EA14 $9,241

Planting Beds/ Area 6SF3,038 $4,996

Page 23 of 27ZAPATA Assessment Date: 12/2/2015

Page 24: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

SITE

Category: Site

Item - Type Quantity Unit Rank Cost Group

Landscape

Play Area - Asphalt/ Hardscape 6SF1,363 $3,294

Retaining Wall - Concrete 7SF1,440 $0

Trash Receptacles 6EA1 $312

Parking Lot

Concrete Curbs 7LF2,862 $0

Interior Plantings 6LF140 $5,956

Lighting - Pole Mounted 5EA6 $16,784

Surface - Asphalt 6SF33,407 $80,735

Surface - Concrete 7SF992 $0

Trash Enclosure - Chain Links 6SF400 $7,018

Vehicular Screening 6LF418 $32,912

Playground

Equipment - Combo 3-12 6EA1 $7,092

Equipment - School Age 5-12 6EA1 $3,546

Equipment - Swingset 6EA1 $1,182

Surface - Square Rubber Mats 5SF100 $1,010

Surface - Square Rubber Mats 6SF4,261 $22,971

Sidewalks

Sidewalks - Internal Walks 6LF1,658 $19,916

Sidewalks - Perimeter Sidewalks 5SF400 $3,300

Sidewalks - Perimeter Sidewalks 6SF3,168 $6,297

Signage

Flag Pole - Flag Pole 6EA1 $1,657

Marquee - Free Standing Back Lighted 6EA1 $0

Monument - Sign 6EA1 $0

Site Subtotal: $391,131

Total Site Cost $391,131

Campus Total ² ³ $4,566,824

Page 24 of 27ZAPATA Assessment Date: 12/2/2015

Page 25: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space

reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;

it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are

estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.

Definitions

● Quantity

● Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,

depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and

additional work triggered by building codes.

means, for each item, the total number (or amount) of that item that exists and was evaluated.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like

chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

● Cost

● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to

alleviate overcrowding; these are viewed as separate capital needs.

Page 25 of 27ZAPATA Assessment Date: 12/2/2015

Page 26: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

NNN40841761421921113113Regular ClassroomArt Room 1st Floor

YYN402115440411,053215215Regular ClassroomComputer Lab 2nd Floor

NNN40181321021921103103Regular ClassroomKindergarten 1st Floor

NYN40181321021921105105Regular ClassroomKindergarten 1st Floor

NYN40181321021921115115Regular ClassroomMusic Room 1st Floor

NYN40361081021920101101Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920102102Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920104104Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920106106Regular ClassroomRegular Classroom 1st Floor

NYN40181321021921107107Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920108108Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920110110Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920112112Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920114114Regular ClassroomRegular Classroom 1st Floor

NYN40361081021920116116Regular ClassroomRegular Classroom 1st Floor

NYN40361081021426201201Regular ClassroomRegular Classroom 2nd Floor

NYN40361081021920202202Regular ClassroomRegular Classroom 2nd Floor

NYN40181321021921203203Regular ClassroomRegular Classroom 2nd Floor

NYN40361081021920204204Regular ClassroomRegular Classroom 2nd Floor

NYN40181321021921205205Regular ClassroomRegular Classroom 2nd Floor

NYN40361081021920206206Regular ClassroomRegular Classroom 2nd Floor

NYN40181321021921207207Regular ClassroomRegular Classroom 2nd Floor

NYN40361081021920208208Regular ClassroomRegular Classroom 2nd Floor

NYN40181321021921209209Regular ClassroomRegular Classroom 2nd Floor

YYN40361081021920210210Regular ClassroomRegular Classroom 2nd Floor

NYN402115412211,048209 A211Regular ClassroomRegular Classroom 2nd Floor

NYN40361081021920212212Regular ClassroomRegular Classroom 2nd Floor

NYN40361081021920214214Regular ClassroomRegular Classroom 2nd Floor

NYN40361081021920216216Regular ClassroomRegular Classroom 2nd Floor

NYN402417640411,236213213Science Lab Level 3Science Lab Level 3 2nd Floor

NYN40361081021415201201ARegular ClassroomSpecial Education 2nd Floor

NYN4000621211224224Special EducationSpecial Education 2nd Floor

NYN40181321021921109109Regular ClassroomWeight 1st Floor

4-Classroom Modular

NYN4036761611800N/AM301Regular ClassroomPre School 1st Floor

NYN4036761611800N/AM302Regular ClassroomPre School 1st Floor

Page 26 of 27ZAPATA Assessment Date: 12/2/2015

Page 27: Emiliano Zapata Elementary Academy

Emiliano Zapata Elementary Academy2728 S Kostner Ave Chicago, IL 60623

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

4-Classroom Modular

NNN4036761611800N/AM303Regular ClassroomPre School 1st Floor

NYN4036761611800N/AM304Regular ClassroomPre School 1st Floor

Branch

NNN40927820593NA404Regular ClassroomLibrary 1st Floor

NYN40251251021887NA401Regular ClassroomRegular Classroom 1st Floor

NNN4024721641739NA402Regular ClassroomRegular Classroom 1st Floor

NYN40301501021887NA403Regular ClassroomRegular Classroom 1st Floor

NYN4030901021876501501Regular ClassroomRegular Classroom 2nd Floor

NYN40402001021887502502Regular ClassroomRegular Classroom 2nd Floor

NYN4030901021876503503Regular ClassroomRegular Classroom 2nd Floor

NYN40301501021887504504Regular ClassroomRegular Classroom 2nd Floor

NYN4030901021876505505Regular ClassroomRegular Classroom 2nd Floor

NYN40301501021887506506Regular ClassroomRegular Classroom 2nd Floor

Page 27 of 27ZAPATA Assessment Date: 12/2/2015