Emergency Action Plan for Bhadra Dam KA06HH0058 Water Resources Department State of Karnataka.

Upload: others

Post on 24-Jan-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan for

Bhadra Dam

KA06HH0058

Water Resources Department

State of Karnataka.

Page 2: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan

Bhadra Dam

[KA06HH0058]

Prepared for

Karnataka Water Resource Department (KARNATAKA NEERAVARI NIGAM LIMITED)

Prepared by

Central Water Commission

2/4/2019

Bhadra Dam

Project ID Code KA06HH0058

Shivamogga

Page 3: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-3

Emergency Action Plan for Bhadra Dam is publishing For the First Time during April -2019

Disclaimer

Every effort has been taken to estimate the severity of flooding and inundation areas likely to be

affected by Bhadra dam in an emergency condition. These estimates are based on available prima-

ry and secondary data. Every effort has been made to foresee varied emergency possibilities and

develop appropriate notification procedures for timely rescue and relief operations. However, im-

plementation of the Emergency Action Plan (EAP) involves many agencies, who are required to

work in a coordinated manner to reduce the consequences of the emergency triggered by the dam

site condition. Effectiveness of the rescue and relief operations depend on many factors including

the adequacy and accuracy of the estimation of the severity of flooding, coordinated efforts of all

the agencies involved in rescue and relief efforts and availability of facilities like power, telephones,

road communications, etc. EAP Developer may therefore, not be held responsible for the efficacy of

the EAP.

For any information, please contact: Diwakar Nayak Superintending Engineer Bhadra Project Circle B.R.Project Phone Number:9480585973

Page 4: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-4

Emergency Action Plan -Bhadra Dam

Contents

1 Notification Flowchart (Watch Condition) A-6

2 Notification Flowchart (Failure Condition) A-7

3 EAP Distribution List A-8

4 Log Sheet of Changes A-13

5 Approval and Implementation A-14

Emergency Action Plan

6 Purpose A-15

7 Dam Description A-15

7.1 General A-15

7.2 Reservoir Operations A-15

7.3 Reservoir Operations during floods A-16

8 Responsibilities A-16

8.1 Watch condition A-16

8.1.1 Assistant executive engineer/Executive engineer responsibilities A-16

8.1.2 Superintending engineer -Emergency planning manager responsibilities A-17

8.1.3 Chief Engineer Responsibilities A-18

8.1.4 Managing Director Responsibilities A-19

8.1.5 S.D.S.O Responsibilities A-19

8.2 Failure Condition A-19

8.2.1 Assistant executive engineer/Executive engineer responsibilities A-19

8.2.2 Superintending engineer -Emergency planning manager responsibilities A-19

8.2.3 Chief Engineer Responsibilities A-20

8.2.4 Managing Director Responsibilities A-21

8.2.5 S.D.S.O Responsibilities A-21

8.2.6 District commissioners Responsibilities A-21

8.2.7 superintend of police Responsibilities A-21

8.3 Responsibilities for Notification A-22

8.4 Emergency Operations Center A-22

8.5 Responsibilities for Evacuation A-22

8.6 Responsibilities for Duration, Security, Termination, and Follow-up A-22

8.7 Communications A-22

9 Emergency Detection, Evaluation, and Classification A-23

9.1 Emergency Detection A-23

9.1.1 Situations A-23

9.1.2 Signs of Failure A-23

A) Embankment Dam A-23

B) Masonry Dam A-24

9.2 Emergency Evaluation and Classification A-25

9.2.1 Internal alert Condition -BLUE A-26

A) Embankment Dam A-26

B) Masonry Dam A-26

9.2.2 External alert Condition -ORANGE A-27

A) Embankment Dam A-27

B) Masonry Dam A-28

9.2.3 External alert Condition -RED A-28

A) Embankment Dam A-28

B) Masonry Dam A-29

9.3 Previously Known Problems A-29

10 Preparedness A-32

10.1 Surveillance A-32

10.1.1 Response on forecast of excessive inflow A-32

10.1.2 Response during weekends and holidays A-32

10.1.3 Response during period of darkness and adverse weather A-32

10.2 Access to the site A-33

10.3 Possible preventive measures A-33

Page 5: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-5

11 Supplies and Resources A-34

11.1 Contracts A-34

11.2 Reports A-34

12 Emergency operation center activity log A-35

12.1 Costs of emergency operation center A-36

13 Inundation Area A-36

13.1 Local Evacuation Plan A-36

14 Implementation A-37

14.1 Development A-37

14.2 Updating A-37

14.3 Testing A-37

14.4 Training A-37

TAB-1 Vicinity Map A-38

TAB-2 Inundation Map A-39

TAB-3 Dam Description A-41

TAB-4 Sample Public Announcements A-44

TAB-5 Evidence of Distress A-45

TAB-6 Supplies and Resources A-46

TAB-7 Annual EAP Evaluation Checklist A-47

TAB-8 Plan Review and Update A-48

TAB-9 Training Record A-49

ANNEXURES

1 Access routes to Bhadra Dam Site 1

2 List of affected bridges 4

3 Barricading locations during affected bridges 6

4 Local evacuation plan village wise 9

5 Contact details of officers/Workers working in Bhadra dam 31

6 Contact details of officers working KPCL/KEB/Saideepthi power projects 33

7 Contact details of Upstream/Downstream/Same catchment dam owners 35

8 Contact details of C.E.O of Zilla panchayath 37

9 Contact details of National/State/District Disaster management authority 39

10 Contact details of Assistant commissioners 43

11 Contact details of Tasildar 45

12 Contact details of Municipal commissioners 47

13 Contact details of C.O Taluk Panchayath 49

14 Contact details of Police officers SP/ASP/DYSP/CPI/SI 51

15 Contact details of Fire department 60

16 Contact details of National Highway 63

17 Contact details of Public works department 65

18 Contact details of KRIDL 67

19 Contact details of Media and department of information and public relation 72

20 Contact details of Health department and Hospitals 76

21 Contact details of Education department and Schools 98

22 Contact details of DSRP members 102

Page 6: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-6

1.0 BHADRA DAM –WATCH CONDITION NOTIFICATION FLOW CHART

Page 7: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

HADRA DAM –WATCH CONDITION NOTIFICATIONFLOW CHART

3

1 1

Dam owner

Upper tunga project Zone office

Name: YathishChandran

Title: Chief Engineer

Mobile Number: 9449088441

Alternate Number:9449223659

Office Number:08182-256749

Email Id:[email protected]

Name: Mahajanshettar Title: Deputy Chief Engineer

Mobile Number:9448205664

Office Number:08182-258872

Emaid id:[email protected]

Emergency Planning manager Bhadra project Circle office

Name: H K Diwakar Nayak Name: Natraj Patil

Title: Superintending Engineer Title: Technical Assistant

Mobile Number: 9480585973 Mobile Number:7829744116

Alternate Number: 9902711682 Alternate Number: 8197751519

Office landline:08282- 256338 Email.id: [email protected]

House Number:08282-256247

Email id:[email protected] Email id:[email protected]

No.4 BRLBC Division office Bhadravathi

Name: Ravichandran

Title: Executive Engineer

Mobile Number: 9482415651

Landline Number:08182-256749 Email Id:[email protected]

Name: Pradeep M

Title: Asistatnt Engineer (PA to EE)

Mobile Number:9448159225

Alternate Number:8310795623

Email.id:[email protected]

DAM SITE OFFICE

Office of No.1 BRLBC Subdivision B.R.Project

Name: Manjunath Title: Assistant Executive Engineer

Mobile Number: 9449088441

Landline Number:08182-256749

Email Id :[email protected]

Name: Rajkumar M R Name: Satheesh

Title: Assistant Engineer Title: Junior Engineer

Mobile Number: 9742768098 Mobile Number:7975533138

Landline Number:NA Landline Number:NA

Email Id :[email protected] [email protected]

Title: Asistant Engineer

Mobile Number: 9591262131

Available Resources (Tab -6)

Gates Repair Works

Name:Nagbhushan

Narayan Engineers

Mobile Number:9900265122

Name:Mohammed Zarar

Mobile Number:9448744978

Name:Nandibasvaraj

Nandi Steels

Mobile Number 9945628888

Civil Works

Name:Vedumoorthy

Denten Constructions

Mobile Number:9900265122 Name:D Parashuram

Mobile Number:9845498982

Name: T.k.Nagraj

Mobile Number:9845119872

Name: Aswath Reddy

Mobile Number:8147830388

Gantry Crane Repair Works

Name:Ghorpade

Transpade Engineers

Mobile Number:9448824333

Design Wing

(Under Chief engineer Upper tunga project

Zone office)

Name: Thimme gowda

Title: Chairman

Mobile Number: 9449088441 Office Number: 08182-258872

Email Id:[email protected]

Name: Ravikumar N

Title: Member

Mobile Number:9448768973

Office Number:08182-234065

Emaid id:[email protected]

Name: Avinash G B

Title: Member

Mobile Number:8971171471 Office Number:08182-258872

Emaid id:[email protected]

SDSO

Karnataka water resource department

Shri.Anil Kumar

Tittle: Additional Secretary to Govt& Nodal Officer(DRIP),WRD, Bangalore.

Mob:9448784468

Phone 080-22259985& 080-22034003

Email:[email protected]

Shri.Pradeep Mitra

Tittle: Project Director (DRIP),WRD, Bangalore. Mob:9886501256

Phone 080-22259985& 080-22034003

Email:[email protected]

Design Wing

(Under managing director Karnataka neeravri nigam

limited)

Name: Janardhan

Title: Executive engineer

Mobile Number: 9480611701

Office Number: 080-22283074

Email Id:[email protected]

Name: Eshwarchadra Title: Asistant executive engineer

Mobile Number:9448200271

Office Number:080-22386015

Emaid id:e.chadraks@@gmail.com

Dam safety Review panel

Name: S.B.Koimuttur Title: Vice Chairman

Mobile Number: 8950626001

Alternate Number:9986626065

Email Id:sbkoimuttur @gmail.com

Electrical Works

Name:Ajjappa praksh

Mobile No:9845265260

Concrete

Mobile Number:9448824333

Civil Works (Special Repairs)

Name:Anupam Bidasriya

Ferrow Constructions

Mobile Number:9900265122

Under water diving

Name:Narendra

Sagar Divers

Mobile Number:9900265122

1 2

4

5

4

5

6

Note:

Detailed List of Contractors enclosed

vide Tab-1

List Workers working in bhadra dam

enclosed vide Annexure-5

Karnataka Neeravari Nigam Limited

Name: Mallikarjun B gunge

Title: Manging Director

Mob No: 9481169126

Off No:080-22283074-78

Email Id:[email protected]

[email protected] Name: Sri Venktesh prasad

Title: Superintending Engineer

Mob No: 9449223659

Off No: 080-22283074-78

Email Id:[email protected]

6

Page 8: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-7

2.0 BHADRA DAM –FAILURE CONDITION NOTIFICATION FLOW CHART

Page 9: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

BHADRA DAM –FAILURE CONDITION NOTIFICATION FLOW CHART

4

4

4

4

4

3

1

2

3

Emergency Planning manager Bhadra project Circle office

Name: H K Diwakar Nayak Name: Natraj Patil Title: Superintending Engineer Title: Technical Assistant Mobile Number: 9480585973 /9902711682 Mobile Number:7829744116/8197751519 Office landline:08282- 256338 / 256247 Email.id: [email protected] Email id:[email protected]/ [email protected]

Office of the District Collector (Shimoga)

Name: K A Dayananda (KAS)

Title: District Collector

Mob:9481492999

Off No:08182-271101

Fax No: 08182-277082

[email protected]

District Collector office

Chikkamaglore

Name: Sri Rangayya KAS

Title: District Collector

Mob: 9449030402

Off No:08262-230401/235336

Name: Vyshali

Tittle: Additional District Collector

[email protected]

District Collector office

(Davanagere)

Name: D S Ramesh

Title: District Collector

Mob: 725070055

Off No:08192-234640/257778

Name:Padma Basanthappa

Tittle: Additional District Collector

[email protected]

District Collector office

(Haveri)

Name: Dr Venktesh M V(IAS)

Title: District Collector

Mob: 984485949

Off No:08375-249015

Fax No:08375-249088

[email protected]

District Collector office

(Gadag)

Name: Manoj jain (IAS)

Title: District Collector

Mob: 9945372004

Off No:08372-237300

Fax No: 08372-232413 [email protected]

District Collector office

(Koppal)

Name: M kanagavalli (IAS)

Title: District Collector

Off No:08539-220844/221235

Name:Rudresh sangappa Ghali

Tittle: Additional District Collector

[email protected]

District Collector office

(Ballari)

Name: Ramprakash manohar v(IAS)

Title: District Collector

Mob: 9980201111

Off No:08392-277100/272538

Name :S T Somshekar

Tittle: Additional District Collector

[email protected]

Karnataka Neeravari Nigam Limited

Name: Mallikarjun B gunge

Title: Managing Director

Mob No: 9481169126

Off No:080-22283074-78

Email Id:[email protected]

[email protected]

Name: Sri Venktesh prasad

Title: Superintending Engineer

Mob No: 9449223659 Off No: 080-22283074-78

Email Id:[email protected]

Water Resource Department karnatka

Shri.Anil Kumar

Tittle: Additional Secretary to Govt&

Nodal Officer(DRIP),WRD, Bangalore.

Mob:9448784468

Phone 080-22259985& 080-22034003

Email:[email protected]

Shri.Pradeep Mitra

Tittle: Project Director (DRIP), Mob:9886501256

Phone 080-22259985& 080-22034003

Email:[email protected]

Superintendent of police Shimoga Name: Ashwini (IPS)

Title: S.P. Shimoga

Mob: 9480803301

Off No:08182-261400

[email protected]

Name :Mutturaj

Tittle Additional S.P

Mob :9480806230

Off No:08182-261400

State Disaster Management Authority

Name: Gangaram Badreiya (IAS)

Title: Director Off No: 08022032995

[email protected]|

Details Vide Annexure -9

National Disaster Management Authority

Name: A K Sanghi

Title: Joint Secretary

Mitigatiion,IT and comn

Office Number:011-26701718

Office Number: 011-26701864

[email protected]

Government of karnataka

Name :Rakesh sing (IAS)

Title: Principal Secretary

Off:080-22257064/22034710

Name :Jayaprakash (IAS)

Title: Secretary

Off:080-22255524/22034714

Central Water Commission Name: N K mathur Title: Chief Engineer(CDSO) Mobile Number: 971733380 Office Number:011-26106848 [email protected] Name: Pramod narayan

Title: Director DRIP,CWC Mobile Number:9958975928 Office Number: 011-26192633 [email protected]

Dam safety review Panel (Annexure 22)

Name:Y.K Moorthy Title:Chairman

Mob:9909264040 Email.id:[email protected] Off No:011-2633926

Karnataka Engineering Research station Name :T N Chikkarayappa

Title: Director Off:08236-257223/257224 Email:[email protected] Name : Title: Joint Director Off: 08236-297011 Email:[email protected]

Superintendent of police

Chikkamaglore

Superintendent of police

Davanagere

Superintendent of police

Haveri

Superintendent of police

Ballari

Superintendent of police

Gadag

Superintendent of police

Koppal

Irrigation Central Zone

Munirabadh (Tungbhadra dam)

Name: Bojanaik N kattimani

Title: Chief Engineer

Mob No: 9845318959

Off No: 08539-70026

Email id:[email protected]

D11ams Under Same Catchment Tunga dam

D.B.kere pickup

Gondhi anicut

Anjanapura

Ambligola

Hagaribommnahalli

Madagmasur

Singtaloor

Contact details enclosed separately

vide annexure 7

DAM SITE OFFICE

Office of No.1 BRLBC Subdivision B.R.Project (Annexure-5)

Name: Manjunath Title: Assistant Executive Engineer Mobile Number: 9449088441

Landline Number:08182-256749

Email Id :[email protected]:

Rajkumar M R Satheesh Title: Assistant Engineer Title: Junior Engineer Mobile Number: 9742768098 Mobile: 975533138

Email Id :[email protected] [email protected]

No.4 BRLBC Division office Bhadravathi

Name: Ravichandran Title: Executive Engineer

Mobile Number: 9482415651 Landline Number:08182-256749 Email Id:[email protected]

Name: Pradeep M Title: Assistant Engineer Mobile:9448159225

Mobile:8310795623

[email protected]

Dam owner

Upper tunga project Zone office Name: YathishChandran Title: Chief Engineer Mobile Number: 9449088441/9449223659

Office Number:08182-256749 Email Id:[email protected]

Name: Mahajanshettar Title: Deputy Chief Engineer Mobile Number:9448205664 Office Number:08182-258872 Emaid id:[email protected]

Note: Contact details of all Superintendent of police enclosed

vide annexure

Contact details during emergency (Taluk wise)

Police stations-Annexure-14

Fire departments-Annexure-15

National highway department-Annexure-16

Public works department- Annexure-17

KRDAL:Annexure 18

Media-Annexure-19

Contact details during emergency (Taluk wise)

Assistant Commissioner –Annexure 10

Thashildar –Annexure 11

Municipal Commissioner- Annexure 12

C.E.O. Taluk panchayath –Annexure 13

Government Hospitals –Annexure -20

School Details:-21

Contact details during emergency (District wise)

C.E.O Zilla panchyath –Annexure-8

State and District Disaster management-

Annexure-9

Name: G Anuradha(KAS)

Title: Additional District Collector

Mob:9844488360

Off No:08182-221010

[email protected]

Karnatka Power corporation

limited (Bhadra) Karnataka

Electriccity Board and sai

deepthi power house

Details enclosed vide

Annexure-6

Name: S.B Koimuttur Tittle:Vice Chairman Mobile Number: 8950626001 Alternate Number:9986626065 Email Id:sbkoimuttur @gmail.com

Mechanical works

Civil works

Civil Works (Special Repairs)

Electrical works

Geotechnical works

Underwater Diving Works

Contact details enclosed vide tab-6

Available Resources

1 1

1

2

2

2

3

3

2

2

State Disaster Monitoring centre

Name: Dr.G.S Srinivasa Reddy

Title: Director

Ph: 080- 67355000/67355198

[email protected] | [email protected]

Page 10: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-8

3.0 EAP Distribution List

A copy of the EAP has been provided to the following people:

Authority Name, Title, Phone Address

Governament of Karnataka Rakesh sing (IAS)

Principal Secretary

Off:080-22257064/22034710

Vikasasoudha Banglore Karnataka

District Collector and Dis-trict Disaster management

authority Shimoga

K A Dayananda (KAS) District Collector Mob:9481492999

Off No:08182-271101

Shimoga , Karnataka

District Collector and Dis-trict Disaster management authority Chikkamagalore

Sri Rangayya KAS District Collector

Mob: 9449030402 Off No:08262-230401

Chikkamaglore, Karnataka

District Collector and Dis-trict Disaster management

authority Davanagere

D S Ramesh IAS District Collector Mob: 725070055

Off No:08192-234640

Davanagere, Karnataka

District Collector and Dis-trict Disaster management

authority Haveri

Dr Venktesh M V(IAS) District Collector Mob: 984485949

Off No:08375-249015

Haveri Karnataka

District Collector and Dis-trict Disaster management

authority Gadag

Manoj jain (IAS) District Collector

Mob: 9945372004 Off No:08372-237300

Gadaga ,Karnataka

District Collector and Dis-trict Disaster management

authority Koppal

M kanagavalli (IAS) District Collector

Off No:08539-220844 Koppal, Karnataka

District Collector and Dis-trict Disaster management

authority Ballari

Ramprakash manohar v(IAS) District Collector

Mob: 9980201111 Off No:08392-277100

Bellari, Karnataka

Superintendent of police Shimoga

Abhinav Kare (IPS) Superintendent of police

Mob: 9480803301

Off No:08182-261400

Shimoga , Karnataka

Superintendent of police Chikkamagalore

Harish pandey Superintendent of police

Mob: 9480805101 Off No:08262-230403

Chikkamaglore, Karnataka

Superintendent of police Davanagere

R.Chethan Superintendent of police Off No:08192-253400

Davanagere, Karnataka

Superintendent of police Haveri

K Parashuram Superintendent of police Mobile No:9480804501

Landline No:08375 44501

Haveri Karnataka

Superintendent of police Gadag

Santhosh babu (IPS)

Superintendent of police Mob: 9480804401

Off No:08372235066

Gadaga ,Karnataka

Superintendent of police Koppal

Renuka k sukumar (IPS) Superintendent of police

08539-23011 Koppal, Karnataka

Page 11: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-9

Superintendent of police Ballari

Arun Rangrajan (IPS) Superintendent of police

Mob: 9480803001 Off No:08392-258300

Bellari, Karnataka

Government of Karnataka Jayaprakash

Secretary irrigation department Off:080-22255524/22034714

Vikasasoudha Banglore Karnataka

Central Dam safety organi-zation

N K mathur Chief Engineer(CDSO)

Mobile Number: 971733380

Room No 313 S, Sewa Bhava R K puram Newdelhi Delhi

110066

Central water commission Pramod narayan

Title: Director DRIP,CWC Mobile Number:9958975928

Room No 313 S, Sewa Bhava R K puram Newdelhi Delhi

110066

Dam safety Review Panel Dr.Y.K.Murthy, Chairman DSRP

Central WaterCommis-sion,Champa D-44,Gulmohar

park, New Delhi-110 049

National Disaster man-agement authority

A K Sanghi Joint Secretary

Office Number:011-26701718/26701864

NDMA Bhavan, A-1,Safdarjung Enclave

New Delhi-110029

State Disaster manage-ment authoruty

Shri. Gangaram Baderiya,IAS Mobile9483869160

Landline-080-22032995

Principal Secretary Revenue Department (Disaster

Management) 1st Gate , Room #627, 6th

Floor, M.S Building, Bengaluru

Water resource depart-ment and SDSO

Anil Kumar Additional Secretary to Govt& Nodal

Officer(DRIP),WRD, Bangalore. Mob:9448784468

Phone 080-22259985& 080-22034003

Office of Water Resource De-partment Anand Rao Circle

Banglor

Water resource depart-ment and SPMU

Shri.Pradeep Mitra Tittle: Project Director (DRIP),

Mob:9886501256 Phone 080-22259985& 080-22034003

Office of Water Resource De-partment Anand Rao Circle

Banglor

Karnataka State Natural Disaster Monitoring

authority

Dr.G.S Srinivasa Reddy Director

Off No: 080- 67355000/67355198

Director , Karnataka State

Natural Disaster Monitoring

Centre, KSNDMC Campus,

Major Sandeep Unnikrishnan

Road,Near Attur Layout, Ye-

lahanka Bangalore - 560 064,

Karnataka, INDIA,

Dam Owner

Sri Mallikarjun Gunge Managing Director

Mob No: 9481169126 080-22283074-78

Office of Karnataka Neeravari

Nigam Limited coffee Board

Ambedkar veedhi Banglore

Dam Owner

Name: YathishChandran Title: Chief Engineer

Mobile Number:

9449088441/9449223659 Office Number:08182-256749

Email Id:[email protected]

Office of Upper Tunga Project

Zone Sagara Road Shimoga

Page 12: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-10

Karnatka Engineering re-search station

Name :T N Chikkarayappa Title: Director

Off:08236-257223/257224 Email:[email protected]

Karnatka Engineering research station Krishnarajasagara

mandya

State Public Works De-partment

R Shrinivas Chief Engineer (South) Phone No:9483008987

Office No: 080-22212830/2274301

Chief Engineer, Communica-tion & Buildings(South) K.R.

Circle Bangalore 560001.

Emergency planning man-ager

H K Diwakar Nayak Superintending Engineer

Mobile Number: 9480585973 /9902711682

Office landline:08282- 256338 / 256247

Superintending Engineer Office of Bhadra Project Circle

B R Project

District Public Works De-partment

Shimoga circle

Shivanand Banakar Superintending Engineer

Phone +91 97499 08182 270926 /225641

Superintending Engineer, PWD Shimoga circle, RMR Road,

Durgi Gudi, Shimoga 577201

District Public Works De-partment

Hassan circle

Chandrashekar T J Superintending Engineer

08172268385

Superintending Engineer, PWD Hassan cicrcle, Dharwad

District Public Works De-partment

Bellary circle

Shivyogi Hirematt Superintending Engineer

08392274775

Superintending Engineer, PWD Bellary cicrcle, Dharwad

District Public Works De-partment

Dharwad circle

Kundargi Superintending Engineer

08362748138

Superintending Engineer, PWD Dharwad cicrcle, Dharwad

Dam Operator

Name: Ravichandran Title: Executive Engineer

Mobile Number: 9482415651 Landline Number:08182-256749 Email Id:[email protected]

O/O Executive Engineer No.4 BRLBC Division Miltary

Camp Bhadravathi

Assistant Commissioner

Sangappa Assistant Commissioner

Mobile Number: 990260222 Landline Number: 08261-222220

Email Id: [email protected]

Assistant Commisoner

Tarikere

Assistant Commissioner

Krishna Murthy Assistant Commissioner

Mobile Number: 7760292048 Landline Number: 8182222204 Email Id: [email protected]

Assistant Commissioner Shimoga

Assistant Commissioner

Najma G Assistant Commissioner

Mobile Number: 9480712365 Landline Number: 08398-28057 Email Id: [email protected]

Assistant Commissioner Harapnahalli

Assistant Commissioner

Lokesh P N Assistant Commissioner

Mobile Number: 9986886348 Landline Number: 08375-232468

Email Id: [email protected]

Assistant Commissioner Haveri

Page 13: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-11

Assistant Commissioner

P S Manjunath Assistant Commissioner

Mobile Number: 9986647236 Landline Number:08182-256749

Email Id: [email protected]

Assistant Commissioner Gadag

Assistant Commissioner

B T Kumarswamy Assistant Commissioner

Mobile Number: 944928625 Landline Number: 08392-277413

Email Id: [email protected]

Assistant Commissioner Bellary

Assistant Commissioner

C.D Geetha (In charge) Assistant Commissioner

Mobile Number: 9886660847 Landline Number: 08539 220247 Email Id: [email protected]

Assistant Commissioner Koppal

Tashildar

Manjegowda Tashildar

Mobile Number: 9448401397 Landline Number: 08182-279312

Email Id: [email protected]

Tashildar Shimoga

Tashildar

Nagaraj Tashildar

Mobile Number: 9164058056 Landline Number: 08282-267283

Email Id: [email protected]

Tashildar Bhadravathi

Tashildar

Dharmoji Rao Tashildar

Mobile Number: 9449251389 Landline Number: 8261222259

Email Id: [email protected]

Tashildar Tarikere

Tashildar

Rheen Pasha Tashildar

Mobile Number: 9845540868 Landline Number:08192-272959

Email Id:[email protected]

Tashildar harihara Harihara

Tashildar

Gurubaswaraj Tashildar

Mobile Number: 9731289202 Landline Number: 08398-280262

Email Id: [email protected]

Tashildar harapnalli

Tashildar

Nagaraj N J Tashildar

Mobile Number: 9900656699/ 9448766570

Landline Number: 08188-251025 Email Id: [email protected]

Tashildar Honnali

Tashildar

G B Majjagi Tashildar

Mobile Number: 9620972112 Landline Number: 08375-232445

Email Id: [email protected]

Tashildar Haveri

Tashildar

Ramamurthi Tashildar

Mobile Number: 9448576124 Landline Number: 08373-266450

Email Id: [email protected]

Tashildar Ranibennur

Page 14: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-12

Tashildar

A V Shiggavi Tashildar

Mobile Number: 9448006853 Landline Number: 08487-242430 Email Id: [email protected]

Tashildar Hirekerur

Tashildar

Amaravadagi Tashildar Mobile Number: 9448412133Landline

Number: 08487-242430 Email Id: [email protected]

Tashildar Sirahatti

Tashildar

Bramaramba Gubbishetti Tashildar Mobile Number: 9741625229

Landline Number: 08371-262237Email Id: [email protected]

Tashildar Mundargi

Tashildar

Vijayakumar Tashildar Mobile Number: 9980265830

Landline Number: 08397-238255

Email Id: [email protected]

Tashildar Hagaribommnahalli

Tashildar

Raghavesndra Rao Tashildar

Mobile Number: 8496859985 Landline Number: 08399-240238

Email Id: [email protected]

Tashildar Hadagali

Tashildar

Gurubasavaraj Tashildar Mobile Number: 9880994147

Landline Number: 08539 220381 Email Id: [email protected]

Tashildar Koppal

Downstream dam owner

Bojanaik N kattimani Chief Engineer

Mob No: 9845318959 Off No:08539-70026

Chief Engineer Office of Irrigation Central

Zone Munirabadh

Downstream dam owner (Singtaloor barrage)

Malligwad Mob: 9916146827

Executive engineer No 1 Sin-gataloor Lift irrigation Division

Mundargi

Downstream dam owner (Madagmasur tank)

Ravi M B Landline Number 08373-267071

Mobile No :9886336403

Executive Engineer,

KNNL, UTP Division, Raneben-nur

Same catchment (Tunga Dam)

Shivkumar Mob No:96207-08211

Land Line: 08182-254832 /08182-257189

Executive Engineer, KNNL, UTP Division, Shimoga,

Sagar Road - 577201

Same catchment (D.B. kere Pickup)

Rajendra Prasad

Landline Number '08192-268754 Mobile No :9448218873

Executive Engineer, KNNL No:3, Bhdra canal Division,

Malebennur.

Same catch-

ment(Anjanapura and Ambligola reservior

S H Pawar Mobile No :81971-10007

Landline Number 08187-222206

Executive Engineer KNNL, Dandavathi Project Di-vision, Shikaripura 577427

National Highway Authori-ty Shimoga

Executive Engineer 08182-255042

Executive Engineer KSHIP di-vision A block Sharavathi na-

gar shimoga

Page 15: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-13

National Highway Authority haveri

Asisstant Executive Engineer 9844536598

Asistant Executive Engineer KSHIP subdivision APMX compound Hanagal haveri

National Highway Authority

Davanagere

Asisstant Executive Engineer 08419/262736/261139

Asistant Executive Engineer KSHIP subdivision

Taralabalu nagar,vidyanagar

Davanagere

4.0 Log Sheet of Changes

The following changes have been made to the EAP and revisions have been provided to the peo-ple shown on the EAP Distribution List.

Date Change Made Signature

Page 16: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-14

Bhadra Dam

Project ID Code [KA06HH0058]

Approval and Implementation This Emergency Action Plan is hereby approved. This plan is effective immediately and super-sedes all previous editions.

Jayaprakash. Secretary to Government of Karnataka water resource department Banglore 05/1/2019

I have received a copy of this Emergency Action Plan and concur with the notification proce-dures. Yathish Chandran Chief Engineer UTP zone Shimoga Diwakar Nayak Superintending Engineer Bhadra Project Circle B.R.Project Ravichandra Executive Engineer No.4 BRLBC Division Bhadravathi

Date:02/4/2019

Page 17: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-15

Emergency Action Plan

6.0 Purpose

The purpose of this Emergency Action Plan (EAP) is to identify emergencies that could threaten Bhadra Dam and to plan for an expedited, effective response to prevent failure of the dam and warn downstream residents of impending danger. This plan defines the notification procedures to be followed in the event of a potentially hazardous situation. The procedures are intended to protect lives and prevent property damage from an excessive release of water from the dam spillways or an uncontrolled outflow of water from the breached portion of dam.

7. Dam Description

7.1. General

Bhadra dam and reservoir are owned and operated by karnataka neeravari nigam lim-ited constructed across river Bhadra near Lakkavalli village in Tarikere Taluk, Chickmagalur District of Karnataka State at an elevation of 601.00 meter above M.S.L. The Dam is located at a Latitude of 13 0 42’ 00” N and Longitude of 75 0 38’ 20” E . The Gross capacity of the dam is 71.535 T.M.C. whereas the live storage is 63.035 T.M.C. It is a multipurpose dam irrigating 105570 ha and generating an electricity of 39.20 MW, completed during 1962. The Dam is constructed with masonry wall with length of 440.43 m. There are three saddles on L/S of Dam

i.e. first saddle earthen embankment with length of 487.68 m, Second saddle with length of 262.13m and the third saddle with length of 432.80 m which is located in the back water of res-ervoir. The maximum water level of the reservoir is +186’ (i.e. 2158 feet or 657.758 m above the MSL from the bed level of the river. The left Bank situated at +36 from the river bed (i.e. 2008 feet or 612.038 m above MSL) The designed discharge of left bank canal is 380 cusecs. The atchkat under the left bank canal is 8300 acres. The Right Bank having Two Sluices situated at RL of 2008 The designed discharge of Right bank canal is 2650 cusecs. The atchkat under the left bank canal is 97270 acres.

A vicinity map showing the location of the dam is presented in Tab 1. Inundation maps showing the areas subject to flooding as a result of a dam failure are provided in Tab 2. The inundation maps described in detail in the Inundation Area section of the report. Lastly, a description of the dam, its spillways, and other features are outlined in the Dam Description in Tab 3.

7.2. Reservoir Operations

Reservoir Features

1 Full reservoir level 657.926 mtr (2158 ft)

2 Maximum water level 657.926 mtr (2158 ft)

3 Road Level of the Dam 660.360 mtr (2166 ft)

4 Original design flood 3398.02 Cumecs

5 Revised design flood 7472.00 Cumecs

6 Total flood discharge capacity of the dam 3398.02 (1,20,000 cusecs)

7 Spillway Capacity 3021.38 cumecs (1,06,700 cusecs)

8 River sluice gate discharge capacity 376.55 cumecs (13300 cusecs)

9 Sill Level of the Crest gate 650.76 (2134.5 ft)

10 Hoist Level of Crest Gate 687.195 (2254 ft)

11 Sill Level of River Sluice gate 614.93 (2017 ft)

12 Hoist level of River Sluice gate 653.96 (2145 ft)

The spillway provided with 4 Nos. of crest gates of size 7.62X 18.28 Mtr (60 ft x 25 ft) (ver-tical lift) to discharge a flood of 3021.38 cumecs (1,06,700 cusecs). Supplemented by two river sluice gates to discharge balance flood of (13300 cusecs) as per S.P.F. calculations.

Page 18: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-16

As per CWC letter Ref. CWC No. 7/Kar -58/2008- Hyd (S)/194; dated 18/07/2017 (see An-nex C), the existing spillway was designed for a flood of 3021 m3/sec. As per BIS11223-1985 criteria, the dam is classified as large dam and therefore, qualifies for Probable maximum flood (PMF) as design flood. CWC has modified the design flood study for the project using hydro-meteorological approach. The revised PMF worked out to be 7472 m3/sec and as per the flood routing spillway discharge capacity 4224 m3/sec planned during large controlled release.

7.3 Reservoir operation during flood

It is proposed to have 2.5 tmc storage capacity as flood absorption below FRL during active monsoon so as to have safe and effective reservoirs operation schedule. The gross storage ca-pacity and reservoir level with 2.5 tmc flood absorption capacity below FRL are as below.

The rainfall in the catchment area generally starts from 1st week of June and it is very ac-tive generally during July, August and September months. If the flood absorption capacity of 2.5 TMC is maintained, the reservoir level has to be kept at 657.926 i.e., 0.6 mtr below FRL. It is better to start the reservoir operation schedule duly predicting the inflow in the reservoir based on gauged discharge at Balehonnur and from the daily rainfall records of upstream rain gauge station in the catchment from 1st week of June itself.

However, the reservoir level of RL 657.926 mtr with cushion of 0.6 mtr should be main-tained until the end of August by suitably matching the inflow and outflow discharges. During the month of September depending up on the inflow pattern, the reservoir water level may be raised to safer level (i.e., 0.30 mtr below the FRL). From October and onwards the reservoir wa-ter level may be brought to the FRL level depending up on the inflow pattern and forecast of floods/ monsoon.

If any flash floods or cyclonic floods are expected during October / November, careful pre-diction of inflows from the upper gauge stations and from weather forecast should be done and the reservoirs operation in advance to keep cushion for the inflow has to be carefully done.

Advance warning with quantity of water to be released in the river will be intimated by the Superintending Engineer, Bhadra Project Circle, BRP, to the Chief Engineer, UTP Zone Shivamogg/ Deputy commissioners of Shimoga, Chikkamaglore, Davanagere/ Superintendent of Police of Shimoga, Chikkamaglore, Davanagere and concerned Tahsildars through phone,emails in addition during mansoon season police department establishes wireless com-munication centre (dedicated radio frequency) at dam site with the help of this information the concerned police department will get the information time to time . Before releasing water to the river vide publicity will be given through radio, T.V., and daily Newspaper.

8. Responsibilities

The dam owner, Chief Engineer Upper tunga project zone shimoga is responsible for all dam op-eration and maintenance. The EAP will not designate a specific person for a specific responsibil-ity but instead will designate the person’s duties or job description.

8.1 Watch Condition

8.1.1 Assistant Executive Engineer/Executive engineer

Collection of real time information of rainfall in the catchment and inflow status at the Balehonnur gauge point and to bring it to the notice of the SE/CE.

Assist the SE/CE to issue notification to the villagers downstream through Newspapers, Radio, TV News channel to be alert regarding the flood releases.

Assist the SE/CE to coordinate with the Revenue authorities (District Administration) to alert the downstream people.

R.L. Capacity in Tmc

FRL 657.926 (2158 ft) 71.535 2.500 tmc

RL 657.31 (2156 ft) 69.035

Page 19: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-17

Maintain the reservoir water level gauge register and to update on hourly basis during floods and to bring to the notice of SE/CE.

Assess the inflows in the reservoir as per the approved reservoir operation and to prepare proforma consisting of the status of the reservoir capacity and releases from the reservoir as per the standard Performa and to submit the same to the SE/CE

Reporting inflows and releases from the reservoir and status of the reservoir twice in the

day to the SE/CE.

Operate the Spillway crest gates for flood mitigation as per the instructions of the SE/CE and to update the Gate operation Log book.

Observe the seepages in the drainage Gallery with respect to the reservoir head and rec-ord the seepages in the infiltration gallery and to immediately bring to the notice of the SE/CE in case of any abnormal variation in seepage, leakage in any specific blocks and porous drains.

Observe the gates and to see that the drain holes are not clogged and floating debris are not deposited in the gate components.

Monitor the condition of the Welding transformers, gas-cutting sets, umbrellas, tool kits torches chain blocks ropes ballistic on daily basis and to see that things are in place to

handle any emergency.

Observe the Gates, hoists and handling equipment during operation of gates for their smooth movements and to immediately report any untoward excessive sounds in the mo-tors, pumps or vibrations in the gate to SE/CE

Observe the dam top, embankment, catwalk, approach roads etc., and ensure that all well maintained by housekeeping personnel.

Observe the performance of the Dam and its appurtenant structures / Gates and Hoists during flood water releases and to report to the EE/SE/CE in case of any untoward inci-dents or malfunctioning of the gates of excessive seepages, leakages etc.

Observe seepages in Saddle dam 1 and 2 with respect to the reservoir head and record the seepages and to immediately bring to the notice of the EE/SE/CE in case of excessive seepage or muddy water

Observe any settlements if any in the Saddle dam 1 and 2 and report the same to SE/CE for any settlement based on the levels observed on the predefined settlement posts estab-lished on the saddle dams with reference to permanent bench mark established on the dam top.

Observe seepage in the Right bank abutment hillocks with respect to the respect to the

reservoir head and record the seepages flow rate and variation if any shall be immediate-ly brought to the notice of the SE/CE.

Inspect tail channel, divide wall, spillway abutments and piers regularly. If anything found awkward inform the same to SE/CE.

Prepare estimates and to take approval from SE/CE and contact Contractors if requires Immediate repair to be attended.

8.1.2 Superintending engineer- Emergency planning manager

Collecting information about the rainfall in the catchment and inflow status at the balehonnur guage point from EE.

Assess the inflows in the reservoir by taking assistance from of EE to operate the crest gates.

Issue Instructions to Operate the Spillway crest gates for flood mitigation to EE/AEE

Issue notification to the villagers downstream of dam in the Newspapers, Radio, TV News channel to be alert regarding the flood releases.

Page 20: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-18

Coordinate with the Revenue authorities (District Administration) to alert the downstream people, through EE.

Inspection of drainage Gallery Every month and check the seepages with respect to the

reservoir head and also check the log books and immediately bring to the notice of the CE in case of excessive seepage, leakage in any specific blocks and porous drains, suggest the remedies to EE/AEE

Observe the gates and to see that the drain holes are not clogged and floating debris are

not deposited in the gate components

Observe the Gates, hoists and handling equipment during operation for the smooth movements and to immediately take action if any untoward excessive sounds in the mo-tors, pumps or vibrations in the gate and also report to CE

Observe the performance of the Dam and its appurtenant structures / Gates and Hoists during floodwater releases and to take action in case of any untoward incidents or mal-functioning of the gates of excessive seepages, leakages etc. and report to CE.

Observe Saddle dam 1and 2 and check the seepage with respect to reservoir head, check

the seepage log books, check the settlements, check downstream side revetments and grade walls, check the seepages coming from tunnel from M/s Saideepthi power house which is located in saddle-1, if anything found suspicious take action and report to CE.

Observe seepage in the Right bank abutment hillock with respect to the reservoir head, record the seepages, and to immediately take action to report to CE for any variation found in the seepage.

Inspect tail channel, divide walls, Dry wells of sluice gates, upstream surface of dam, KPCL Power house gates, spillway abutments and piers regularly. Reporting to the CE regarding the problems which is need to be attended immediately

Taking necessary action for preparation of estimates and for approval from the competent authority.

Contacting Design wing officials and taking assistance regarding problems, which needs to be attended

Assist Design wing officials/ DSRP official during their visits to the Bhadra dam

Inform District administration and Police departments, in advance for any possible dan-

ger situation.

8.1.3 Chief Engineer

Collecting information about the rainfall in the catchment and inflow status at the Balehonnur from SE.

Providing Instructions to Operate the Spillway crest gates for flood mitigation to SE.

Conduct Pre-monsoon and Post-monsoon inspection along With SE/EE/AEE/AE In a year and check all the components of Bhadra dam and suggest the remedies as per the standard checklist/ Questionnaire.

Approval of estimates for executing the works, which are required for smooth operation of the of the dam.

Reporting to Managing Director Karnataka neeravari nigam limited regarding any severe problems occurred in the dam, seeking fund requirements and for taking assistance from design wing.

Page 21: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-19

Reporting to SDSO for any severe problem in Bhadra dam and also taking assistance from state DSRP.

8.1.4 Managing Director

Inspecting the dams once in a year.

Providing Funds for normal operation expense and for any immediate repair works as per the site requirement based on the estimates submitted by CE.

Deputing design wing officials or the technical experts as and when required and request-ed by CE.

8.1.5 S.D.S.O.

Check the pre monsoon and post monsoon reports and identify the problems which are

need to be attended and provide suitable remedial measures.

Making suitable arrangements to DSRP officials for inspection as and when required.

Reporting problems faced of forecasted to CDSO.

8.2 Failure Condition-Responsibilities

8.2.1 Assistant Executive Engineer/Executive engineer

Informing Karnataka Power Corporation limited officials to stop generation of power and

to vacate the powerhouse from dam premises immediately.

Collecting weather forecasts and the inflow forecasts by taking updates from hourly basis from Balehonnur gauge point and inflow measuring station during rainy season and to give alert for any potential emergency situation to SE/CE .

Conducting routine dam maintenance, such as annual weed control, conducting dam

integrity inspections, and notifying SE/CE of any potential emergencies.

Reporting to SE/CE of any chances of failure in the Main dam or Saddle dams.

Alerting the Bhadra colony, Fishery department, lakkavalli villages for any chances of failure imminent with the help of local police and Thashildar.

Contacting contractors for any emergency repairs.

Informing downstream Dam operators regarding flood situation.

Informing each and every situation of failure in the dam to the SE/CE Time to time

AEE/EE/AE are responsible for following any directions given by the Superintending engineers

8.2.2 Superintending engineer-Emergency Planning manager

Implementation of the EAP.

To classify the events into the Emergency Alerts. To ensure effective transmission of hydro-meteorological and flow data within the de-

partment.

Page 22: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-20

Contacting Emergency personnel if dam failure is imminent as per the flow chart.

Issue notification to the villagers downstream in Newspapers, Radio, TV News channel to be alert regarding the flood releases or Failure situations.

Coordinate with the Revenue authorities (District Administration) to alert the downstream

people Through EE.

Providing Each and every situation details in the dam to emergency personel time to time as per the flow chart.

Issuing necessary instructions to Operate the Spillway crest gates and sluice gates for flood mitigation to EE/AEE.

Issuing suitable directions to the lower level officers for the further course of action dur-ing failure.

Reporting to CE regarding the failure situation and also explaining the further course of action and requirement of funds for the emergency works/ evacuation etc.,

To ensure that the current approved version of the EAP is functional and available to all

stakeholders.

Conducting annual EAP review to ensure that contact names and numbers are updated on the Notification Flowcharts.

Superintending engineer is the first line of dam observer and is the person responsible for initiating implementation of the EAP

The Executive Engineer is responsible for collecting weather forecasts and the inflow fore-casts and alerting of any potential emergency situation to SE/CE

The Superintending Engineer is responsible for contacting emergency personnel should a dam failure be imminent.

The Superintending engineer is responsible for updating the EAP. An annual EAP review will be conducted to ensure that contact names and numbers are current on the Notifica-tion Flowcharts.

The Superintending Engineer is responsible for directing specific, incident appropriate ac-

tions during an emergency, such as opening or closing water outlets and remedial con-struction activities such as earth moving, etc.

Superintending Engineer Engineer can depute any EE/AEE/AE/JE under his Circle dur-ing emergency

8.2.3 Chief Engineer Collecting information about the rainfall in the catchment and inflow status at the

Balehonnur from SE.

Providing Instructions to Operate the Spillway crest gates for flood mitigation to SE as

and when required.

Conduct Pre monsoon, Post monsoon inspection along With SE /EE /AEE /AE In a year, and check all the components of Bhadra dam and suggest the remedies.

Providing suitable directions for executing the works, which is, needs to attend for Bhadra dam during failure condition.

Page 23: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-21

Reporting to Managing Director Karnataka neeravari nigam limited regarding problems occurred in the dam, for the fund requirements and also for taking assistance from design wing.

Reporting to SDSO for the conditions in Bhadra dam and also taking assistance from ex-perts like KERS and DSRP.

8.2.4 Managing Director Inspection of the dams and taking decisions regarding further course of actions and di-

recting CE/SE to handle the situation time to time. Providing Funds for any immediate repair works. Sending design wing officials as and when required Informing the emergency situation at Govt of Karnataka through principal secretary of

irrigation department

8.2.5 S.D.S.O.

Making suitable arrangements for DSRP officials and KERS officials for inspection of dam.

During emergency situations

Reporting CDSO if problem is severe and seeking technical expertise to Bhadra dam.

8.2.6 District Commissioners Shimoga District commissioner is responsible for informing other district administration re-

garding the emergency occurring at the dam.

Each District commissioner is responsible to alert district disaster management authority and fix the responsibilities.

District commissioner is responsible for alerting Assistant commissioner, Tashiladar for pro-tecting the people from the failure by assigning the responsibilities.

District commissioner is responsible for alerting health department and hospitals to Fix their responsibilities.

District commissioner is responsible for spreading the information regarding the Failure

through district administration.

District administration is responsible for contacting NGOs if necessary.

District administration is responsible for directing PWD, Municipal, ZP Engineering wing to work under the Failure situation.

District administration responsible for alerting CEO of Zillapanchayath and Muncipal com-missioners and fix their repsonsipbilities

District administration is responsible for providing temporary shelter for the Inmates.

8.2.7 Superintendent of police

SP shimoga responsible for alerting all other district SP regarding the Failure or flood situa-

tion at the dam.

Page 24: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-22

District SP is responsible alerting each every police stations coming under Bhadra catch-ment.

District SP responsible alerting Fire Department and fix their responsibilities.

District Police is responsible for evacuation of flood-affected people with the help of other concerned deparment

Dsitrcit police responsible for restricting highways and bridges by barricading if required by taking help of PWD, ZP and Municipal Engineering wings.

8.3 Responsibilities for Notification

The Superintending engineer is responsible for inspecting the dam in a potential emergency such as the potential threat of high waters or a tropical cyclone. The Superintending engineer will contact the Shimoga city District Police and District Collector

If warranted, the Superintending engineer will notify the State and District Disaster Manage-ment Authorities. The Shimoga city District Police will notify downstream residents. The Shimoga city District Collector will implement the Notification Flowchart for regional and state disaster management contacts.

8.4 Emergency Operations Center

In the event of a failure condition, the Superintending engineer will activate the Emergency Operations Center to serve as the main distribution center for warning and evacuation activities. The Emergency Operation Center will be established at the Office of superintending Engineer KNNL Bhadra project circle B.R.Project. The superintending Engineer will be responsible for initi-ating actions from this location.

8.5 Responsibilities for Evacuation

The Shimoga city,chikkamaglore,davanagere,haveri,gadag,bellari and koppal District collectors Police officers and state disaster management authorites responsible for initiating evacuations.

8.6. Responsibilities for Duration, Security, Termination, and Follow-up

The Executive Engineer is responsible for monitoring of emergencies at the dam and keep-ing authorities informed, based on the Notification Flowcharts.

The superintending Engineer and the Shimoga District Collector are responsible for declaring that an emergency at the dam is terminated. Applicable authorities will be notified based on the Notification Flowcharts.

The superintending Engineer will ensure that a follow-up evaluation is completed by all partic-ipants after the emergency. The results of the evaluation should be documented in a written re-port and filed with the EAP.

8.7. Communications

Local officials and downstream residents will be notified by landline telephone, cell phones fax, or emergency personnel. The various contacts for emergency situation en-closed separately (Details in Failure condition flow chart)

Authentication of the situation can be made by the Superintending Engineer, by taking assistance from executive engineer and by contacting the Chief Engineer upper tunga project shimoga

Television, Radio, whats up groups social media and bulk SMS facilities of the local Mo-bile Network Operators can be used as much as possible to notify area residents of the

possible dangers.(Contact details enclosed in Failure condition flow Chart)

Public announcements are to be issued by the Superintending Engineer, Bhadra Project Circle, BRP

Sample public announcements annexed separately vide Tab 4

Page 25: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-23

9. Emergency Detection, Evaluation, and Classification

9.1. Emergency Detection

9.1.1 Situations

Many dam conditions can lead to emergencies, not all of which will necessitate the imple-mentation of the EAP. However, if any of them occur, the appropriate actions must be taken.

Severe Storms/Inclement Weather: Although generally not in themselves, a threat to the dam, severe storms and other inclement weather conditions can contribute to an ex-isting problem and hinder any remediation efforts. Severe storms also cause the uncon-trolled release of floodwater, and increase flow in already rain-swollen areas.

Tropical cyclones: Tropical cyclones do occur in the area, with the potential for structur-al damage to the dam, possibly resulting in its failure. If a tropical cyclone has struck in the area, an inspection of the dam for any signs of damage will be appropriate.

Earthquakes: Bhadra dam is located in the seismic zone II .An earthquake is a possibil-ity, and appropriate post-earthquake inspections should be performed

Sabotage: A threat to damage the dam has been made. Appropriate actions must be tak-en to protect the dam by the shimoga and chikkmaglore district police.

Equipment malfunction : If gates gets strucked or not working during flood scenario proper inspection should be made before mansoon and SE should Certified the Gate in good condition my making inspection

9.1.2 Signs of Failure

The Executive Engineer is responsible for conducting routine inspections and identifying conditions that could indicate the onset of problems leading to a dam failure and reporting to Superintending engineer. The early identification of potentially dangerous conditions can al-low time for the implementation of EAPs. It is important to understand how distress can de-velop into failure. With appropriate action, distress need not lead to a catastrophic failure of the dam. The following sections describe some of the different types of failure, which could lead to a dam failure.

A) Embankment Dams

Slope or Embankment failure due to slips

Slips of the embankment slope or its foundation will occur if the activating forces causing instability exceed the resisting forces bringing about failure. Such a situation may develop owing to development of high pore-pressures within the soil mass or due to extraneous forces not considered in the design of the dam coming into play, e.g., Earthquake forces etc.,

The failure of embankment slopes/foundation material manifests itself in the form of longi-tudinal cracks appearing in the top portions of the slipped area, bulging or heaving of the slopes, movement of the embankment toe or the foundation material.

Failure by piping within embankment or foundation

Failure by piping can be caused by two different processes one by back-ward sub-surface erosion and the other by heave. The piping by heave is termed vertical piping and piping by sub-surface erosion as horizontal piping.

When this condition is reached, the upward pressure of the issuing water just balances the submerged weight of the particles. This gradient is also called a critical gradient or a flota-tion gradient. When the Escape gradient (determined by flow nets) exceeds the critical gradi-ent, the soil particles will start migrating with the flow of the water and when this condition

persists over long duration, causes progressive erosion of soil particles, resulting in the for-mation of pipe with consequent connection of the headwater with the tail water. In the event of such a formation of the pipe and direct access from the head water, the banks could breach by a sudden subsidence and consequent over-topping of the banks.

Burrowing animals like rodents can form a pipe within the embankment brining about failure. Even trees that develop roots, which spread wide and deep may also, cause pipes to de velop along the contact zone of the root with soil.

Page 26: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-24

Excessive seepage and toe erosion

Excessive uncontrolled seepage and absence of filter to drain the seeping water may cause wetness in the toe regions of the bank and if the wetness continues for long durations will cause sloughing of the toe resulting in the slipping of the slope of the embankment.

Excessive settlement of embankment and its foundation

High embankments formed without proper and adequate compaction and formed of clay ma-terial are likely to fail by excessive settlements after couple of years of completion of Dam. If the settlements are of high order as to exceed the free board allowances made for the dam there would be over-topping resulting in breach.

Poor junctions with structures or abutments

The junctions of earth embankments with masonry structures/abutments form vulnerable areas for seepage of water.

Over-topping of Dam Crest

The dams may get breached due to over topping caused by any of the following reasons.

Excessive settlements.

Subsidence due to piping.

Inadequate free board due to insufficient spillway capacity owing to flood intensities exceeding design floods.

The earth Dams are most sensitive and vulnerable to damages caused by water flowing over the crest of the dam owing to poor resistance to eroding action of flowing water. Overtopping of dam crest can be due to any of the above three causes.

B) Masonry Dam

Due to over topping and consequent erosion of the foundation in the toe region.

Failure by over stressing of dam sections resulting from

Deterioration of concrete or masonry due to aging. The aging is attributable to both phys-ical and chemical factors. Physical factors relate to changes in forces acting on the struc-tures including those caused by temperature variations. Chemical factors include Alkali aggregate reaction, leaching concrete/mortar due to infiltration of aggressive water con-taining inorganic acids, sulphates, etc.

Due to development of forces not considered earlier in the design of the dam such as forc-es resulting from earthquake etc.

Use of defective or inferior materials in the construction of dam e.g., poorly bonded ce-ment, weak aggregate or mineral laden water.

Freezing and thawing damage.

Erosion or softening of foundation material may bring about failure due to sliding

through the foundation or contact between the dam and foundation being bro-

ken.Formation of underground cavities like caverns in deposits like lime stones

which dissolve under water.

Development of excessive uplift due to lifting of the dam in the heel region.

The sliding along any joint in the body of the dam may be due to excessive uplift due to propagation of crack in the event of development of tensile stresses in the heel region.Failure by sliding is manifested by the rupture of joints and relative displacement and tilting of dam monoliths and with consequent over topping and toe erosion. If the over topping continues unabated it would result in the undermining of the dam foundation at the toe region result-ing in overturning of the dam.

Failure of the abutment hills due to slides along the weak seams or formations ex-isting in the abutment hills triggered off due to leaching of the material and lu-

brication. The rock slide of the abutment hill will result in large displacement of

water which may over top the dam and cause toe erosion and consequent failure

Page 27: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-25

Crushing of the foundation material due to over stressing.

When the stresses induced in the dam exceed the crushing strength of the insitu material of the dam whose strength might have impaired due to aging or other factors, the materials would crush in the over stressed region thereby throwing the loads to the adjoining sections which likewise fail under crushing. As a result the effective supporting width is reduced, which causes the resultant of the loads to move away from downstream middle third towards

the toe. This process continues and throws the resultant of the loads out of the base with consequent over turning of the dam masonry.

Further, if the tensile cracks are formed due to development of tensile stresses in excess of tensile strength of concrete/masonry, the effective supporting width of the masonry is re-duced and in addition the uplift forces will increase causing propagation of cracks further towards toe. This will cause over stressing of the toe and failure of the dam by over turning of the block.

Material Deterioration Problems

The problems of concrete/masonry deterioration may be due to:

o Expansion and consequent volume changes due to shrinkage, cracking, thermal ef-fects of cement hydration, temperature changes in the body of the dam and alkali ag-

gregate reaction.

o Use of poor materials:- Use of poorly graded or weak aggregate in the concrete mix.

Due to poor workmanship like -Lean mixPoor, compactionoor joints, preparation Aggres-sive water in the reservoir (acidic),Frost action in the cracks,Freezing and thawing action and Vegetation growth

Alkali aggregate reaction

The structural damage and deterioration of the concrete is generally quite evident when the total alkali concentration is greater than about 0.60 per cent expressed as Na2O and there is an abundance of highly reactive siliceous - material in the aggregates.

Cracking, usually of random pattern at a fairly large scale on the surface extending to a depth of 15 cms to 45 cms.

Oozing of gelatenous and whitish amorphous deposits on the surface.

Chalky appearance of the freshly fractured concrete.

Sulphate attack

Certain salts like sulphates of Sodium, Potassium, Calcium or Magnesium are sometimes found in soil or dissolved in ground water adjacent to concrete structures and they can at-

tack concrete.

Leaching of Lime

The process of dissolution and removal of Calcium Hydroxide from the hardened cement by the water percolating through the body of concrete or masonry dam is known as lime leach-ing. When the seapage water containing soluble product of cement hydration evaporates at the surface of concrete, a white deposit of calcium carbonate is formed on the surface of the concrete due to reaction of Calcium Hydroxide with the atmospheric Carbon Dioxide. This is also known as "Efflorescence". All concrete/masonry structures constructed with Portland cement have to inevitably undergo lime leaching and after a certain period of time, loose co-hesiveness leading to collapse.

9.2. Emergency Evaluation and Classification

This section lists the conditions and actions, which may be used to classify the level of emer-gency response, as a guide for the Superintending engineer. Specific dam observations and corresponding emergency classification levels can be found in the Evidence of Distress table in Tab 5.

Page 28: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-26

9.2.1 Internal Alert Condition- BLUE

A “watch” condition. A problem has been detected at the dam that requires constant moni-toring. At this time, the distress condition is manageable by dam personnel. The Superintend-

ing engineer will be responsible for monitoring and repair as soon as possible and implement-ing the appropriate Notification Flowchart. The following is a list of conditions that would initiate this condition:

A) Embankment dam

Signs of water logging, Slushy conditions or growth of aquatic weeds on the downstream of the dam. Standing pools of water in the downstream of Dam

Slopes having a tendency to develop severe rain cuts at any locations

Excessive or uneven settlement

Undulations and local depressions or heaving in the surface of the crest

Visible cracks in transverse or longitudinal directions in crest and slopes

Edges of the crest got eroded and cut up resulting in reduced effective width

Upstream and downstream slopes show any sign of bulging or cavity

Signs of distress to stability of slope noticed at any time in any part of the dam

Upstream of downstream slopes show existence of crab holes made by rodents or burrow-ing animials or anti-bills.

Any wet or slushy patches and concentrated leaks springs or trickles observed on the downstream slopes or the toe

Existence of leaks-springs or wet spots in the earth work in the Vicinity of the junctions between earth work and masonry works

Tendency for separations cracking, settlement or upheaval and surface erosion at junc-tions of the earth work in the vicinity of masonry

Conditions of the crest and slopes specially in the zones adjacent concrete structures: any formations, settlements, cracks or other distress conditions, caused by external ero-sion due to wind rain etc.,

Seepage at junctions between, earth dam and masonry concrete retaining wall or corch type junctions with concrete dams is a possible source of trouble and should be carefully watched.

Cloudy or dirty seepage or seepage with an increase in flow, boils, piping, or bogs

Seepage around conduits

Large sinkholes with corresponding seepage anywhere on the embankment or down-stream from the toe

Any slide that degrades the crest of the embankment or that is progressively increasing in size

Excessive seepage from the embankment

Development of high pore water pressure

Excessive seepage from the saideepthi power house limited tunnel

B) Masonry Dam

Exceptionally heavy rainfall in the catchment of the dam reservoir

Cracking or movement of any Masonry structure

Variation in Uplift Pressure with respect to water level

Failure of alternate Power sources like generators

Page 29: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-27

Malfunction of crest gates and Gantry cranes after commencement of Mansoon

Excessive seepage in Porus holes, joints and drainage holes in drainage gallery

Heavy leakages observed in Left bank canal guide wall

Excessive sweating observed in in portion of Upstream face of masonry dam

Development of cracks and excessive jetting in dry wells of Sluice gates

Excessive jetting in the Spillway portion,spillway abutments and peirs

Excessive seepage from the Right bank abutment hillock

Any damages to the body of the dam corresponding KPCL power house gates

Fire in KPCL Power house due to Short circuit

Wildfire around Bhadra dam

Excessive seepage and leaching through the body of the dam and foundation

Excessive deflection and tendency of gradual slide in the masonry dam

Cracking and upheaval of settlement in any part of the body wall or foundation

Conspicious weathering of materials or components in any portion of thebody wall or the

foundations.

9.2.2 External Alert Condition - ORANGE

This is indicative of a dam condition that is progressively getting worse; and there is a high probability of dam failure. Although there is no immediate danger, the dam could fail if condi-tions continue to deteriorate. The Superintedning engineer will be responsible for initiating immediate repairs, including lowering the reservoir if appropriate and implementing the appro-priate Notification Flowchart. The following is a list of conditions that would initiate this condi-tion:

A) Embankment dam

Excessive or uneven settlement Undulations and local depressions or heaving in the sur-face of the crest

Extension of cracks in transverse or longitudinal directions in crest and slopes

Edges of the crest got eroding rapidly and cut up resulting in reduced effective width

Upstream and downstream slopes showing large sign of bulging or cavity

Wet or slushy patches and Heavy leakages s observed on the downstream slopes or the

toe

Heavy leaks-springs or wet spots in the earth work in the Vicinity of the junctions be-tween earth work and masonry works

Tendency for separations cracking, settlement or upheaval and surface erosion at junc-tions of the earth work in the vicinity of masonry

Worst Conditions of the crest and slopes specially in the zones adjacent concrete struc-

tures,

Development of high pore water pressure respect to water level crossing more than factor of safety considered in the design

Severe damages to saideepthi power house limited tunnel in saddle dam 1 leads to failure of saddle embankment

Page 30: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-28

Large boils, increasing in size and flow rate, especially if there is flowing muddy water in the embankment

Significantly increasing seepage, especially flowing muddy water in the embankment

Slides involving a large mass of material that impairs the crest of the dam and is continu-ing to move in the embankment

Sinkholes with seepage flowing muddy water in the embankment

B) Masonry dam

Near to ‘Design Flood’ inflow forecast

An increase in the reservoir level to near the top of the dam i.e 2166 ft

Large cracks, movement or failure of a portion of any major Masonry structure that forms an integral part of the dam

High Uplift Pressure with respect to water level crossing more than factor of safety con-sidered in the design

Failure of crest gates and Gantry cranes during flood water releases results in overtop-ping

Uncontrollable leakage in Porus holes, joints and drainage holes in drainage gallery

Development of large cracks and uncontrollable jetting in dry wells of Sluice gates

which is weaker section in the dam

Uncontrollable jetting in the Spillway portion, spillway abutments and piers leads to fail-ure of overflow section

Uncontrollable seepage from the Right bank abutment hillock leads to failure of Right flank

Severe damages to the body of the dam corresponding to KPCL power house gates

Uncontrollable Fire in KPCL Power house due to Short-circuit

Excessive deflection and tendency of sliding in the masonry dam

Cracking and upheaval of settlement in any part of the body wall or foundation

9.2.3 External Alert Conditions- RED

These are “failure” conditions. Either the dam is in immediate danger of failing or has already

failed. No time remains to implement measures to prevent failure. Evacuate immediately. Evac-

uation efforts will continue until the situation is stabilized. The Superintednig engineer is re-sponsible for implementing the appropriate Notification Flowchart. The following is a list of con-ditions that would initiate “imminent dam failure” or “dam failure” conditions:

A) Embakment Dam

Rapid development of settlement Undulations and local depressions or heaving in the

surface of the crest

Rapid Extension of cracks in transverse or longitudinal directions in crest and slopes

Upstream and downstream slopes showing large sign of bulging or cavity

Heavy leakages s observed on the downstream slopes or the toe

Heavy leaks-springs or wet spots in the earth work in the Vicinity of the junctions be-

tween earth work and masonry works

Tendency for separations cracking, settlement or upheaval and surface erosion at junc-tions of the earth work in the vicinity of masonry become high

Worst Conditions of the crest and slopes specially in the zones adjacent concrete struc-tures,

Page 31: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-29

Collapse of saideepthi power house limited tunnel in saddle dam 1 leads to failure of sad-dle embankment

Rapidly increasing boils or the presence of new, significantly flowing boils, particularly

muddy ones near previously identified ones

Rapidly increasing seepage, especially flowing muddy water

Slides involving a large mass of material or which have degraded the crest of the em-bankment to a level that approaches the water surface level, or if significant seepage is observed through the slide area

Settlement that is predicted to degrade to the reservoir level

Cracks that extend to the reservoir level

Significant movement or failure of any structure that forms an integral part of the dam

Overtopping of an earthen dam

B) Masonry Dam

Uncontrollable release of the reservoir due to design flood

Crest gate failure leads to increase in water level

Collapse of Crest gates

Rapid development of cracks or jetting in dry wells of sluice gates leads structural failure

Collapse of right bank abutment hillock of Masonry dam

Rapid developments of crack or jetting in spillway peirs abutments leads to failure of overflow section

Overtopping failure

Severe damage to the body of the dam corresponding to KPCL power house gates

Uncontrollable Fire in KPCL Power house due to Short-circuit

Excessive deflection and high tendency of sliding in the masonry dam

Rapidly increasing seepage in drainage gallery from Porus holes or drainage holes or joints

9.3. Previously Known Problems

As Per The DSRP inspection Report 2005

A

Sl No

Obsevations Implemented/Not

Implemented

11

This dam is built as long back as more than 40 years using lime surki mortar in the construction of the dam. It is likely that the mor-

tar used in its construction may have suffered loss in strength alt-hough the dam may apparently look to be performing well. It is therefore necessary verity the strength of the mortar in the stone masonry and also that the zone of interface at the foundations.

Not Implemented

W

2

The structural stability analysis may be updated and checked for the

earthquake condition.

Not Implemented

Page 32: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-30

23

On a closer examination of the profile of the Saddle Dam sections some unevenness is seen on the upstream slope revetment protec-tion, indicating possible settlements. It is recommended to establish

settlement monuments on top and slopes of the dam sections and conduct observation of levels periodically and superimpose the same of the designed profiles to identify any settlements for taking further remedial measures.

Not Implemented

44

The dam masonry appears to have become pervious in some reaches

through which water is finding access from the reservoir as evi-denced from the seepage and jetting appearing in the dam masonry.

Implemented

55

The foundation materials are also getting eroded as evidenced from blackish materials appearing through foundation drainage holes.

Not Implemented

66

Most of the foundations drainages holes have been clogged and have become inoperative there by inducing high uplift pressure at the base of the dam.

Implemented

77

The vertical drainage holes and foundation drainage holes which are clogged and become in operative needs to be reamed to make then functional.

Implemented

88

The Dam is resting on weak foundation rock whose strength may have further reduced due to impoundment of water in the reservoir.

The safety of Dam against crushing of foundation rock need to be checked for maximum stress conditions. For this purpose undis-turbed rock samples from the foundation should be extracted and tested for its compressive strength.

Not Implemented

As per the DSRP 2014 Inspection Report

99

Seepage in the foundation drains indicates carriage of particles in-cluding dark blackish grey sludgy material which should be moni-tored further. Water seepage pressures should be monitored by in-struments.

Not Implemented

110

The seepage through the right abutment hill observed earlier should be examined afresh and seepage should be measured with different

reservoir levels and the location and source of seepage requiring treatment should be investigated by Tracer / Isotope studies by de-ploying services of expert organizations like CWPRS, Pune / KERS.

Not Implemented

111

Physical characteristics of the rock mass of the foundations rock

should be determined by taking core samples on the downstream

side of the dam for evaluation of the possible behaviour of the dam structure and for earth quake effects.

Not Implemented

112

The dam masonry appears to have become pervious in the above reach through which the water is finding access from the reservoir as evidenced from the seepage and jetting appearing in the dam ma-sonry and besides there is considerable lime leaching observed on

the downstream face of the dam in the above reach as a result of which loss of strength of the masonry is apprehended. It is therefore necessary to determine permeability of the existing masonry in addi-tion to determining the strength of the mortar and masonry

Not Implemented

1

14

Data on the salt efflorescence developed on the downstream face of

Non overflow dam section owing to Lime leaching from the lime surki mortar should be maintained henceforth to assess loss of strength if any by testing strength of in-situ mortar and masonry as recom-mended earlier by DSRP in September 2002 and remedial actions initiated if warrante

Not Implemented

Page 33: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-31

115

Cavities formed in the concrete around the gate grooves and the ex-posed aggregates should be repaired by filling with high strength fi-ber reinforced silica fume concrete after treating the affected surface.

Implemented

116

Reasons for heavy leakage observed in Porous hole No. 5 provided in drainage gallery on the left flank non-over flow section

Implemented

117

Reasons for the wetness seen on the upstream face of the gallery and heavy seepage in the left side gallery Porous drain Nos. 5, 11, 12 & 13 should be investigated and remedial action initiated after moni-

toring the effect of treatment to upstream face of dam in this reach as recommended in Item 1 above.

Implemented

118

The blackish material deposited at the end of the gallery on the right side should be got tested and remedial action initiated if found det-rimental to the safety of the dam.

Not Implemented

119

Choked drainage holes should be reamed and made functional. Implemented

220

Leakages in the dry wells of Right bank irrigation sluices and River Sluices Service gates should be repaired and stopped.

Not Implemented

221

Leakages observed from the damaged gate grooves of all the sluices (Emergency and Service gates) should be stopped by using high strength fiber reinforced concrete.

Not Implemented

222

Reasons for water leaking through right side wall of Left bank canal at top and bottom portions near KPC power house should be ascer-tained and rectified.

Implemented

223

"The cause for the settlements on the left flank of the Saddle No.l from Ch 50 to 100 m, 190 to 290 m and 390 to 470 m should be in-vestigated and rectification measures undertaken.Damaged grade walls of revetment of the Saddle No.l should be repaired.. Damaged

concrete noticed for the grade walls of Saddle No. 2 and the cavities seen in the portions of upstream pitching should be repaired.Road surface drainage for the Saddle dams No. 1 8& 2 should be provided as per IS standards. Erosion seen at the end of the Saddle No. 2

which is undermining the existing bund at Ch 250 m should be rec-tified.

Not Implemented

224

The source of seepage occurring in Saddle dams 1 &2 should be es-tablished by carrying out investigations . Further the functionality of internal drainage system should be ascertained by introducing man-holes in the Rocktoe at few locations along its length on either banks upto deepest valley as recommended. Piezometers in the downstream

casing zone upstream of rocktoe may be installed to measure pore pressure developments, if any and carry out stability analysis of slopes and initiate strengthening measures if deemed necessary.

Not Implemented

2

25

The problems associated with emergency gates of sluices highlighted

above should be attended to as recommended there in and the same

test operated when the reservoir fills to its capacity.

Not Implemented

226

The gates and hoists should be operated and maintained in accord-ance with the standards brought out in IS 7718-1991 in respect of “Fixed wheel Gates” and IS 6938-2005 in respect of rope drum hoists. In this connection, it is mandatory to also follow the recom-

Not Implemented

Page 34: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-32

mended guidelines for inspection brought out by the Water Resource Department of Government of Karnataka. In addition it is also nec-essary to follow guidance and recommendations contained in the op-

eration and maintenance manuals supplied by the manufacturers of gates and hoists.

227

The operating condition of gates and hoists shall be checked periodi-cally and more often during monsoon months when severe floods are

expected to enter the reservoir. The IS codes specially recommend pre and post monsoon inspections which should also be carried out

.

Not Implemented

10. Preparedness

Preparedness actions are to be taken both before and following the development of emergency conditions and should identify ways of preparing for an emergency, increasing response readi-

ness in a uniform and coordinated manner, and helping to reduce the effects of a dam failure. The following are some steps that could prevent or delay failure after an emergency is first dis-covered

10.1 Surveillance:

Superintending engineer will monitor the dam during emergencies such as severe storm event Executive engineer, assistant executive engineer will be assisting the Superintending engi-

neer, and he will be reporting to chief engineer.

10.1.1 Response on forecast of excessive inflow:

Advance warning with quantity of water to be released in the river will be intimated by the Superintending Engineer, Bhadra Project Circle, BRP, to the Chief Engineer, UTP Zone Shivamogg/ Deputy commissioners of Shimoga, Chikkamaglore, Davanagere/ Superintendent of Police of Shimoga, Chikkamaglore, Davanagere and concerned Tahsildars through phone, emails ,fax and what’s up groups

In addition, during monsoon season police department establishes wireless communication centre (dedicated radio frequency) at dam site with the help of this information to the concerned police department will get the information time to time and this Information will be sent con-cerned officials. Vide publicity will be given through radio, T.V., and daily News paper social me-dia before and after releasing of water, Assistant engineers will under shift duty for monitoring the flood throughout the day (Details of contacts annexed in Failure condition flow chart)

10.1.2 Response during weekends and holidays:

Executive Engineer will be available for emergency response during weekends and holidays instead of emergency planning manager and he should be present in the dam site within 30 minutes of detection of an emergency condition,he is responsible for working as a emergency planning manager

Assistant Executive Engineer should be available at dam site within 5 minutes of emergen-cy detection; he will be the in charge if executive engineer is absent. Assistant engineers will be

under shift duty for 24 hours for informing the situation to higher authorities. (Details of con-tacts annexed in watch condition flow chart)

10.1.3 Response during periods of darkness and adverse weather:

Bhadra dam has express line from the Karnataka power corporation private limited(KPCL) which provides 24X7 power due to this power failure chances are very less even though if any

failure occurs mainly due to adverse weather, falling of tress over power line or from KPCL is-

sues. If power failure occurs, bhadra dam is having 64 KVA Diesel Generators, which is in Good Condition. Electrical engineer and electrician is working under the dam site AEE. regarding any power supply issues electrical engineer and elctrcians are responsible.

Page 35: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-33

Responsibilities of Electrical engineer during period of Darkeness

Electrical engineer is responsible for maintainance of the generators regarding servicing, battery and any other issues related to generator

Electrical engineer is responsible for keeping Diesel for running generators for 24 hours

Electrical engineer is responsible for clearing any obstruction in the power supply line

Electrical engineer is to report AEE/EE regarding any adverse condition related to power supply issues

AEE is responsible to arrange alternate generators and lighting facilities if existing gener-ators are not working condition

Executive Engineer/Assistant executive engineer will access the site during adverse weather conditions by foot or their government provided vehicle

10.2 Access to the site:

It must be ensured that primary and secondary routes to site are well maintained and site is easily approachable during emergency hours. Means of access to site should be clearly defined in case of emergency situation when it is urgently required to arrange for reconstruction activi-

ties a layout plan of area showing existing routes,alternative routes and new routes for easy ap-

proach is attached with detailed map vide annexure 1

10.3 Possible Preventive Measures

Preventive measures can be taken in an emergency to prevent the catastrophic failure of the dam, but such repairs should be undertaken with extreme caution. The repairs are only tempo-rary, and an engineer should design a permanent repair as soon as possible. The following ac-

tions should only be undertaken under the direction of a professional engineer or contractor. In all cases, the appropriate Notification Flowchart must be implemented and the personnel of the SDSO must be notified.

Consider the following preparedness actions if the dam’s integrity is threatened by:

A) Embankment dam

Seepage Failure

Plug the flow with whatever material is available (hay, bentonite, or plastic) if the entrance is in the reservoir.

Lower the water level in the reservoir by using the low flow outlet necessary, until the flow decreases to a non-erosive velocity or until it stops. Place an inverted filter (a protective layer of sand and gravel) on the exit area to hold the material in place.

Continue operating at a lower level until a repair is made.

Foundation Sliding

Lower the water level in the reservoir to an elevation considered safe, given the slide condi-tion.

Stabilize the slide, if on the downstream slope, by weighting the toe area below the slide with soil, rock, or gravel.

Continue operating at a lower level until a repair is made.

Structural Failure

Implement temporary measures to protect the damaged structure, such as placing rock riprap in the damaged area.

Lower the water level to a safe elevation through the low flow outlet if necessary.

B) Masonry Dam

Lower the water level when high uplift pressure recorded in the gallery until its reducing and

also clean the choked drainage holes

Page 36: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-34

Lower the water level if heavy seepage is observed in the drainage gallery from the joints, from porus holes until its reducing ,proper treatment like body grouting and horizontal grouting may be executed

Lower the water level for keeping cushion in dam water level of 6 tmc if there is chances of two days flood forecasts reaches more than the design flood

Lower the water level and execute grouting and Pu grouting works when Cracks and jetting

observed in the dam body or in the dry well of sluice gates

Lower the water level when Seepage exceeds from the right bank abutment hillock until its reducing grouting will be done for the entire hillock

If heavy leakages observed in Left bank canal guide wall vacate the KPCL power house and seal the emergency gates with the help of underwater divers

Any damages to the body of the dam corresponding KPCL power house gates lower the water level and treatment will made from the both upstream and downstream

11. Supplies and Resources

11.1. Contracts

Karnatka Neeravari Nigam limited personnel and resources prove to be inadequate during an

emergency, requests will be made for assistance from other local jurisdictions, other agencies, and industry, as needed. Such assistance may include equipment, supplies, or personnel. De-tailed list contractors for works, equipment and supplies enclosed vide Tab-6

11.2. Reports

Records that may be required for proper inspection and maintenance shall be available at site.

these shall be properly maintained and regularly updated by including latest available infor-mation. Where no records are available, efforts shall be made to regenerate them to the extent possible. Data in respect of upstream gauging stations, flood warning system and communica-tion channels, if installed, shall be properly maintained. Additional data such as rainfall, wave height, wind velocity, temperature, humidity, etc., shall also be collected.

Final detailed project report and details of modifications done during construction.

Geological/geotechnical data and reports on the foundation and abutment.

Details of special foundation and abutment treatment carried out.

A set of completion drawings according to which the project was constructed.

Details (including types) and location of instruments embedded/installed in and around the structure.

Detailed drawings of all service facilities like internal lighting, emergency lighting, drainage,

etc.

Records of corrective measures, repair or treatments that have been done subsequent to completion.

Important inspection reports as well as reports of consultants of pre- construction, during construction and post-construction.

Details of design criteria followed.

Photographs in chronological order showing all phases of construction and subsequent maintenance with detailed description.

Index plan of the area in which the dam is located showing important towns, roads, rail

routes and communication facilities.

Index plan of downstream area showing natural flood zone, corresponding to highest ob-served flood and spillway design flood. Serious efforts shall be made to conduct dam break

analysis and prepare flood zone corresponding to this analysis. The index plan shall depict all important towns/villages and properties lying in the above mentioned flood zones. Caution boards indicating these flood zones/levels shall be displayed in downstream areas.

Page 37: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-35

Contour map of dam site extending upto 200 m or 10 times the dam height, whichever is more, on both upstream and downstream, showing all features of the dam like toe lines, ac-cess roads, etc.

Reservoir maps showing silted basin at suitable intervals, through conventional or satellite imageries.

Plan of the catchment area showing rain gauge stations, and capacities of upstream storages.

Details of communication system, telephones, wireless, etc, directory of important key offic-ers, flood warning procedures, etc.

Flood Forecasting System

Record of availability of emergency material/equipment/machines which may be required during emergency repair and maintenance.

Structural behaviours reports during initial filling of reservoirs and for subsequent periods on the basis of instruments data, if available.

Seismicity of the area on the basis of data collected from various seismic observatories locat-ed on seismic network of the project.

Area Capacity Curve of Reservoir 4.1.23 Design/Revised Inflow Hydrograph 4.2 For Con-

crete and Masonry Dams

Summarized data of observations on embedded / installed instruments, including initial readings and instrument constants.

Summarized data on control tests carried out during construction in respect of concrete, mortar and their constituent materials, if available.

Details of construction history including stages of construction particularly in low blocks where considerable time has elapsed prior to resumption of work.

Reports on Hydraulic Model Studies

Manual of operation and maintenance of spillway gates. The operation of spillway gates shall be as per designed criteria and model studies for energy dissipation system.

Discharging capacity curves of spillway for full as well as partial opening of gates.

Performance report of energy dissipators during normal as well as high floods upto a dis-tance of 1 km downstream of all surplussing arrangements (at least once in two years).

Stage-wise construction record of the dam showing volumes and heights achieved in each season and time rate of progress.

Record of special compaction done near concrete/masonry structure, abutment contacts and outlet locations, if available.

Summarized records of compaction, control sampling and complete laboratory and field test results on all samples on record during construction and pre-construction periods.

Record of relief wells, piezometers and seepage drains.

Manual of Operation and Maintenance

Above Technical records stored and carefully maintained by AEE/EE/SE/CE offices.

Pre-monsoon and post-monsoon inspections of the dam will be made by the EE/SE/CE and

submiited to SDSO to evaluate its structural safety, stability, and operational adequacy. After evaluation SDSO suggest the repairs or any other remedies for problems in the dam will be giv-en. In the event of an abnormal occurrence, reference to these reports, particularly the photo-

graphs, can be beneficial in the evaluation of a potential problem.

12.0 Emergency Operations Center Activity Log

Any unusual or emergency condition should be documented, including the following:

Activation or deactivation of emergency facilities

Page 38: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-36

Emergency notifications to other local governments and to state and central government agencies

Significant changes in the emergency

Major commitments of resources or requests for additional resources from external sources

Telephone calls should be recorded in chronological order

Issuance of protective action recommendations to the public

Evacuations

Casualties

Termination of the incident

12.1 Costs of the Emergency Operations Center

For major emergencies, the emergency operations center will maintain detailed records of costs expended. These records may be used to recover costs from the responsible party or insurers, or as a basis for requesting financial assistance allowable response and recovery costs from the state or central government. Documented costs should include:

Personnel costs, especially overtime

Equipment operation

Equipment leasing and rental

Contract services to support emergency operations

Specialized supplies expended in emergency operations

13. Inundation Area

The inundation map illustrates the areas subject to flooding from a failure of the dam, and can be found in Tab 2. The map was prepared using the results of a full breach analysis.

After examining the results of the breach analysis of Bhadra Dam, it has been deter-mined that there were a significant number of structures that could be affected due to a design flood or sunny-day dam breach. These structures are located along the Bhadra river and the Thunga Bhadra River. (Affected structures Annexed Vide Annexure 2) Shimo-

ga,Chikkmaglore,davanagere can suffer a significant impact from a breach of the dam. In addi-tion water resulting from a breach and associated damages can under certain circumstances, travel down the Thunga Bhadra River affecting Davanagere,Haveri,Koppal,Bellari Districts.

The breach analysis contains profiles of the peak flood levels expected, as well as an esti-

mation of the time from the beginning of the breach to the peak flood elevations. A comparison of the areas that are likely to be flooded with the plots showing the times from the start of the

breach to the flooding shows the areas of evacuation and the time constraints involved.

13.1 Local Evacuation Plan

If imminent failure of the dam with uncontrolled downstream flooding is anticipated superin-tending engineer will notify the downstream people through possible maximum way already ex-plained in above chart .District administration and law enforcement personnel make evacua-tion in the most expedient manner possible.

The organizations and personnel on the Notification Flowchart should be contacted immedi-ately. Local law enforcement officials, along with local mobile network operators, radio and tele-vision stations can best spread the notice for evacuation. The immediate impact will be to areas

along Bhadra and Thungabhadra river downstream of the dam. For sunny-day and design flood breaches, the following actions should be taken:

Barricading all Road that could possibly be flooded to prevent access to the affected area. These roads include the Bhadra and Thungabhadra River crossings details enclosesd vide annexure 3

Page 39: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-37

The district police and district administration assist with the notification of all persons and agencies involved, with the possibility of additional support—including contacting others not accessible by radio or telephone.

District officials are generally familiar with developed areas in their jurisdiction. Such knowledge, coupled with the requirements of state law that they respond to disasters, make them the logical officials to be notified and to spread the warning message to all ar-

eas subject to flooding.

Using the Inundation Maps results, identified principal and alternate evacuation routes for every settlement/village and establish the correspond shelter/refuge. Prioritized based on the wave arrival time (Details enclosed vide annexure 4)

14. Implementation

14.1. Development

The draft EAP was sent to the SDSO for review, and agency comments were incorporated into this document, a copy of which is currently on file with the SDSO.

14.2 Updating

Copies of the EAP have been provided to the appropriate persons and the EAP has been ap-

proved and signed by the owner and the person(s) in charge of emergency response, as shown on the Distribution List and Approval and Implementation sheets at the front of the report. This

plan will be reviewed and updated annually by Superintending engineer in conjunction with Chief Engineer’s annual maintenance inspection of the dam. The Superintedning engineer will review and complete all items on the Annual EAP Evaluation Checklist in Tab 7. After the annu-al update is complete, a new Approval and Implementation sheet will be attached and the annu-al update will be documented on the Plan Review and Update sheet in Tab 8.

If revisions to the EAP are made as a result of the annual update, such changes will be rec-

orded on the Log Sheet of Changes form at the front of the report. A copy of the updated portions of the EAP will be sent to the SDSO and all other concerned as per the EAP Distribution List. If the EAP was reviewed and revisions were not required, the superintending engineer will submit written notification to all concerned that no updates to the EAP have been adopted or imple-mented.

14.3 Testing

A table top drill will be conducted at least once every five years. The table top drill involves a meeting of Superintending engineer with local and state disaster management officials in a conference room. The drill begins with a description of a simulated event and proceeds with dis-cussions by the participants to evaluate the EAP and response procedures, and to resolve con-

cerns regarding coordination and responsibilities. Any problems identified during a drill should be included in revisions to the EAP. Records of training and drills will be maintained in Tab 9.

14.4 Training

People involved in the EAP will be trained to ensure that they are thoroughly familiar with its elements, the availability of equipment, and their responsibilities and duties under the plan. Personnel will be trained in problem detection, evaluation, and appropriate corrective measures. This training is essential for proper evaluation of developing situations at all levels of responsi-bility. Training records will be maintained in Tab 9.

Page 40: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-38

Tab 1

Vicinity Map

Page 41: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-39

Tab 2

Inundation Map

Page 42: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-40

Inundation maps showing

1) Maximum water depth,

2) Maximum water velocity,

3) Maximum water-surface elevation, and

4) Vulnerability

Were prepared for each of the three flooding cases considered (non-flood failure, overtopping and large controlled release). An additional map showing the time of arrival of the flood wave since the start of failure (that is, since the initiation of breaching) is provided for each of the dam breach floods(overtopping and piping). Flood hazard reference values consisting of maximum wa-

ter depth, maximum depth-averaged velocity, and flood wave arrival time at various locations downstream from Bhadra Dam are presented in this Annex. Reference values were determined close to the identified positions and represent the degree of danger that would be created by the flood. Flood wave arrival times are provided only for the two dam breach scenarios (that is, fail-ures caused by overtopping and internal erosion.)

NOTE: Because of the method, procedures, and assumptions used to determine the flood-

ed areas; the limits of flooding shown and flood wave travel times are approximate and should be used only as a guideline for establishing evacuation zones. Areas inundated in

an actual event will depend on actual failure conditions and may differ from areas shown on the maps.

Page 43: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-41

TAB-3 Dam Description

Official Dam Name (1) Bhadra Dam

Name of Stream Bhadra River

Dam Location 28 Kms From Shimoga District

Latitude/Longitude 13 42’ 00” N and Longitude 75 38’ 20” E

Seismic Zone Zone III

Year of Starting of Dam Construction: 1946

Year of First Impoundment: 1962-63

Year of Commissioning of Dam Project: 1946

Name of Immediate Upstream Dam: Lakhya Dam

Name of Immediate Downstream Dam: Gondi Anicut

Dam Owner(2): J E Yatish chandran Chief Engineer Water Re-source Department(Karnataka Neervari Nigam Lim-ited)Phone Number: 9449088441

Dam Owner’s Address: O/O Chief Engineer Knnl Upper thunga Project

Zone Shimoga

Main Dam

Type Masonry Dam

Year Constructed 1946-1962

Length 440 .00metres

Maximum Height 76.1metres (from deepest Foundation)

Top Width 4.51 metres

Top of Embankment Elevation 666.461 metres-msl

Main spillway Arrangements

Type Controlled ogee weir

Location Centre of the main dam

Crest Level of Spillway 650.726 mtrs

Top Level of Spillway 657.926 mtrs

Type of Spillway Ogee Type

Type of gate Vertical Lift

No. of Bays 4

Size of the gate Height=7.62mtrs width :18.28 mtrs

Total Spillway capacity of all the Bays 3021.84 Cumecs

Energy Dissipation arrangement Stilling Basin

Emergency Spillway- Not Available

Embankment

Saddle Dam-1

Type Earthen embankment (comprising of zoned section having impervious central zone and semipervious outer zone)

Year Constructed 1946-1962

Length 503.04metres

Maximum Height 36.28 metres

Top Width 5.48 metres

Top of Embankment Elevation 662.5 metres-msl

Saddle Dam-2

Type Earthen embankment (comprising of zoned section having impervious central zone and semipervious outer zone)

Page 44: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-42

Year Constructed 1946-1962

Length 256.09 metres

Maximum Height 16.25 metres

Top Width 5.48 metres

Top of Embankment Elevation 662.5 metres-msl

Saddle Dam-3

Type Earthen embankment (comprising of zoned section having impervious central zone and semipervious outer zone)

Year Constructed 1946-1962

Length 18.28 metres

Maximum Height 8.50 metres

Top Width 2.74 metres

Top of Embankment Elevation 661.58 metres-msl

No Spillway Arrangements for Embackment Portion

Inlet-Outlet Works

Right Bank Irrigation Sluice Gates

Type Vertical Lifting with Hoisting Arrangments

Numbers 2 nos

Location Right Bank

Gates 2 Service gate and 2 Emergency gates

Invert Elevation (Inlet) 631.70 metres-msl

Invert Elevation (Outlet) 631.70 metres-msl

Original Capacity 375 cumecs

Designed discharge 75 Cumecs

KPCL Right bank-1 and 2 (Power House Right bank Canal Releases)

Type Kaplan Turbine

Location Right Flank

Invert Elevation (Inlet) 635.36 metres-msl

Invert Elevation (Outlet) 635.36 metres-msl

Capacity 47.98 cumecs (each)

Left Bank Sluice Gates

Type Vertical Lifting with Hoisting Arrangments

Numbers 1 nos

Location Left Flank

Gates 1 Service gate and 1 Emergency gates

Invert Elevation (Inlet) 612.195 metres-msl

Invert Elevation (Outlet) 612.195 metres-msl

Original Capacity 150 cumecs

Designed discharge 10.85 Cumecs

KPCL Left Bank (Power House Released to the canal)

Type Kaplan Turbine

Location Left Flank

Invert Elevation (Inlet) 619.51mtr

Invert Elevation (Outlet) 619.51mtr

Capacity 6.91 cumecs

Page 45: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-43

River Sluice Gates

Type Vertical Lifting with Hoisting Arrangments

Numbers 2 nos

Location Left Flank

Gates 2 Service gate and 2 Emergency gates

Invert Elevation (Inlet) 614.939 metres-msl

Invert Elevation (Outlet) 614.939 metres-msl

Original Capacity 376 cumecs

KPCL River Bed Unit 1 and 2 (Power House- Released to the River)

Type Kaplan Turbine

Location Left Flank

Invert Elevation (Inlet) 619.51 meter

Invert Elevation (Outlet) 619.51 meter

Capacity 47.98 cumecs(each)

Upper Bhadra Gates (Saddle 4)

Type Vertical Lifting with Hoisting Arrangments

Numbers 4 nos

Location Right Flank (Saddle 4)

Invert Elevation (Inlet) 645.70 metres-msl

Invert Elevation (Outlet) 645.70 metres-msl

Designed Discharge Capacity 80 cumecs

Reservoir

Elev. Top of Conservation Pool 657.9256 metres-msl

Capacity Conservation Pool (Normal Pool) 240 Millions of cubic metres

Capacity at Top of Dam (Maximum) 2025 .80 millions of cubic metres

Surface Area 1962 Square Kilometers

Page 46: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-44

Tab 4

Sample Public Announcements

Note:These messages are communicated to downstream residents to alert the public of impend-

ing danger. The Superintending engineer Bhadra Project Circle Karnataka Neervari Nigam Lim-ited B..R Project should coordinate with the District Magistrates/Collectors for Shimo-

ga,Chikkamaglore,Davanagere,Haveri,Gadag,Koppal and Bellari prior to release. Messages can be communicated via radio, television, bulk SMSs of local mobile networks, and other media outlets.

Announcement for a Slowly Developing “Watch” Condition (BLUE Emergency Level)

Superintending engineer Bhadra Project Circle Karnataka Neervari Nigam Limited B..R Project has declared a BLUE Level “Watch” condition for Bhadra Dam, Project Identification Code [KA06HH0058] as of [time and date]. [Briefly describe the problem or condition.] Although there is no immediate danger of the dam failing, [Describe what actions are being taken to monitor and control the situation.] [State the quantity of any releases from the reservoir.]

Announcement for a Worsening “Watch” Condition (BLUE`Emergency Level)

Superintending engineer Bhadra Project Circle Karnataka Neervari Nigam Limited B..R Project

has declared a BLUE Level “Watch” condition for Bhadra Dam, Project Identification Code [KA06HH0058] as of [time and date]. [Briefly describe the problem or condition.] Although there is no immediate danger of the dam failing a possibility now exists that the dam will fail if correc-tion efforts are unsuccessful. Describe what actions are being taken to monitor and correct the situation.] [State the quantity of any releases from the reservoir]. Additional news will be made

available as soon as it is received.

Announcement for a Probable“Failure” Condition (ORANGE Emergency Level)

Urgent! This is an emergency message. Superintending engineer Bhadra Project Circle Karna-taka Neervari Nigam Limited B..R Project has announced that Bhadra Dam, KA06HH0058 is probably going to fail. [Describe what actions are being taken to monitor and control the situa-tion.] It is possible that the dam will fail in [##] hours. Residents in low lying areas along the

[Stream], the [Stream], and the [Stream], as well as the town of [Name], should prepare for im-mediate evacuation. Additional news will be made available as soon as it is received.

Announcement of an Impending“Failure” Condition (REDEmergency Level)

Emergency! This is an emergency message. Bhadra Dam, KA06HH0058 is going to fail at any moment. Residents who have not yet done so should immediately evacuate the city of [Name] and low-lying areas along the [Stream], the [Stream], and the [Stream]. The flood waters have

already reached [Highway] and [Road]. Additional news will be made available as soon as it is

received.

Announcement of an Ongoing “Failure” Condition (REDEmergency Level)

Emergency! This is an emergency message. Bhadra Dam, KA06HH0058 failed at [time and date]. Residents who have not yet done so should immediately evacuate the city of [Name] and low-lying areas along the [Stream], the [Stream], and the [Stream]. The flood waters have already

reached [Highway] and [Road]. Additional news will be made available as soon as it is received.

Page 47: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Project ID Code KA06HH0058 Page A-45

Tab 5

Evidence of Distress

Page 48: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

General observation Specific observation Emergency

condition level Emergency action Equipment, material, and supplies Data to record

Small boils, no increase of water flow, flowing clear water. BLUE

Closely check all of downstream toe, especially in the vicinity of boil for additional boils, wet spots,

sinkholes, or seepage. Closely monitor entire area for changes or flow rate increases.

None Site and location, approximate flow

Large or additional boils near previously identified ones, without increasing flow rate, but carrying

small amount of soil particles.BLUE

Initiate 24-hour surveillance. Monitor as described above. Construct sandbag ring dikes around boils, to cover them with water to retard the movement of soil

particles. Filter cloth may be used to retard soil movement, but do not retard the flow of water.

Sandbags, filter cloth Site and location, approximate flow

Large or additional boils near previously identified ones, increasing flow rate, carrying soil particles. ORANGE

Continue 24-hour surveillance. Continue monitoring and remedial action as described above. Initiate

emergency lowering of the reservoir. Issue a warning to downstream residents.

Sandbags, pump Site and location, approximate flow

Rapidly increasing size of boils and flow increasing and muddy water. RED

Downstream evacuation. Employ all available equipment to attempt to construct a large ring dike

around the boil area.

Dozer, shovels, source of earth fill

Site and location, approximate flow

Minor seepage of clear water at toe, on slope of embankment, or at the abutments. BLUE

Closely check entire embankment for other seepage areas. Use wooden stakes or flagging to delineate

seepage area. Try to channel and measure flow. Look for upstream whirlpools.

Wooden stakes, flagging Site, location, approximate flow

Additional seepage areas observed flowing clear water and/or increasing flow rate. BLUE

Initiate 24-hour surveillance. Monitor as described above. Construct measuring weir and channel all

seepage through weir. Attempt to determine source of seepage.

Dozer, shovels Site, location, approximate flow

Seriously or rapidly increasing seepage, under-seepage, or drain flow. ORANGE

Continue 24-hour monitoring and remedial action as described above. Initiate emergency lowering of the reservoir. Construct a large ring dike around the

seepage area.

Dozer, shovels, source of fill material

Site location, approximate flow

Additional seepage areas with rapid increase in flow and muddy water. RED

Downstream evacuation. Employ all available equipment to attempt to construct a large ring dike

around the seepage area.

Dozer, shovels, source of fill material

Site location, approximate flow

TAB-5Evidence of Distress

Boils

Seep

age

Emabanckment Dam

Page 49: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

General observation Specific observation Emergency

condition level Emergency action Equipment, material, and supplies Data to record

Skin slide or slough on slope of embankment. No further movement of slide and embankment crest

not degraded.BLUE

Examine rest of embankment for other slides. Place stakes in slide material and adjacent to it for

determining if further movement is taking place.Stakes, tape measure Distance between

stakes

Slide or erosion involving large mass of material, crest of embankment is degraded, no movement or

very slow continuing movement.BLUE

Initiate 24-hour surveillance. Mobilize all available resources and equipment for repair operations to

increase freeboard and to protect the exposed embankment material. Start filling sandbags and

stockpile near slide area.

Dozer, shovels, sources of fill material, sandbags

Distance between stakes

Slide or erosion involving large mass of material, crest of embankment is degraded, progressively

increasing in size.ORANGE

Continue monitoring and remedial actions as described above. Place additional material at the toe of

the slope to stop the slide.

Dozer, shovels, source of fill material, pump

Distance between stakes

Slide or erosion involving large mass of material, crest of embankment is severely degraded,

movement of slide is continuing and may reach pool level.

REDDownstream evacuation. Utilize all available

equipment and personnel to sandbag the degraded slide area to prevent it from overtopping.

Dozer, shovels, sandbags, pump

Distance between stakes

Sinkholes anywhereon the embankmentor within 150 metresdownstream from the toe. BLUE

Carefully walk the entire embankment and downstream area looking for additional sinkholes,

movement, or seepage.Stakes, flagging Size, location

Sinkholes with corresponding seepage anywhere on the embankment or downstream from the toe. BLUE

Initiate 24-hour surveillance. Monitor as above. Construct sandbag dike around the seepage exit point

to reduce the flow rate. Start filling sandbags and stockpile near sinkhole.

Dozer, shovels, pump Size, location

Large sinkholes with corresponding seepage anywhere on the embankment or downstreamfrom

the toe.ORANGE

Continue monitoring and remedial action as described above. Utilize sandbags to increase the freeboard on

the dam if necessary.Sandbags, dozer, pump Size, location

Sinkholes rapidly getting worse, seepage flowing muddy water and increasing flow. RED

Downstream evacuation. Utilize all available equipment and personnel to attempt to construct a

large ring dike around the area.Dozer, shovels, pump Size, location

Obvious settlement of the crest of the embankment, especially adjacent to concrete

structures.BLUE Look for bulges on slope or changes in crest alignment. None Size, location

Settlement of crest of embankment that is progressing, especially adjacent to concrete

structures or if any corresponding seepage is present.

BLUE

Initiate 24-hour surveillance. Mobilize all available resources for repair operations to increase freeboard. Fill and stockpile sandbags. Identify any boils near settlement points for flowing material and pursue

action for boils.

Sandbags, dozer, shovels, source of fill material Size, location

Settlement of crest of embankment that is rapidly progressing especially adjacent to concrete

structures or if any corresponding seepage is flowing muddy water or increasing flow.

ORANGEContinue monitoring and remedial actions as described above. Use sandbags to increase the

freeboard on the dam if necessary.

Sandbags, shovels, dozer, source of fill material Size, location

Progressing settlement that is expected to degrade the embankment to reservoir level. RED

Downstream evacuation. Utilize all available equipment and personnel to build up the crest in the area that is settling. Identify any boils near settlement points for flowing material and pursue action for boils.

Dozer, shovels, source of fill material, sandbags Size, location

Sinkholes

Settlement

Slides or severe erosion

Page 50: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

General observation Specific observation Emergency

condition level Emergency action Equipment, material, and supplies Data to record

Cracks in the embankment crest or on slopes. BLUE Walk on entire crest and slope and check for additional cracking. Stakes, tape measure Size, location

Numerous cracks in crest that are enlarging, especially those perpendicular to the centerline of

the dam.BLUE

Initiate 24-hour surveillance. Carefully monitor and measure cracking to determine the speed and extent of the problem. Mobilize to fill cracks. Cracks parallel to the centerline indicate a slide. Follow remedial action

for slides.

Stakes, tape measure, dozer, shovels, source of

fill materialSize, location

Large cracks in the crest that are rapidly enlarging, especially those perpendicular to the centerline of

the dam.ORANGE Continue monitoring and remedial action as described

above.Dozer, shovels, source of

fill material Size, location

Cracking that extends to pool elevation. RED Downstream evacuation. Continue remedial actions as described above.

Dozer, shovels, source of fill material Size, location

Upstream whirlpool

Whirlpool in the lake in the vicinity of the embankment RED

Downstream evacuation. Attempt to plug the entrance of the whirlpool with riprap from the slope of the

embankment. Search downstream for an exit point and construct a ring dike to retard the flow of soil

particles.

Dozer, fill material, sandbags, filter cloth,

straw, rocksSize, location, flow rate

Minor cracking and/or movement. BLUE Immediately install measuring device to monitor movement.

Crack Monitors, stakes, tape measure Size, location

Significant cracking and/or movement. BLUE

Initiate 24-hour surveillance. Lower burlap on upstream face of crack to reduce flow of soil particles. Dump large rock on downstream of moving concrete

structure monolith to resist the movement.

Burlap, rock, dozer, shovels Size, location, flow rate

Serious cracking and/or movement ORANGE Prepare for evacuation. Continue monitoring and remedial action as described above.

Dozer, rock, burlap, crack monitors

Size, movement, flow rate

Major cracking and/or movement REDDownstream evacuation. Dam failure is imminent.

Continue monitoring and remedial actions as described above.

Dozer, shovels, rock Size, location, flow rate

Crest gate machine faliure when dam level is at MWL ORANGE Try to operate through manual and immedetly repair

from the mecahnicElectriacal and

Mechanical ContractorCrsetgate in the main

dam

Collapse of Crest gate when the dam level is at MWL ORANGEThere will chance of collpase of one crest gate out of

four. Lower the water level because no stoplog arrangement for bhadra dam

Electriacal and Mechanical Contractor

Crsetgate in the main dam

Malfunction of gate

Cracking

Cracking or movement of

concrete structure

Masonry dam

Page 51: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

General observation Specific observation Emergency

condition level Emergency action Equipment, material, and supplies Data to record

Water flowing over the dam and lake continuing to rise. No significant erosion of downstream

embankment.ORANGE Prepare for evacuation. Continue monitoring.Generate

inflow forecasts every 3 hours.

Dozer, fill material, sandbags, filter cloth,

rocksLake level, rainfa

Water flowing over the dam, the lake continuing to rise, and significant erosion of downstream

embankment with development of head-cuts encroaching on the dam crest, or significant movement of sections of concrete or masonry

portions of the dam.

RED Immediate evacuation. Dam failure is imminent or ongoing. Cameras.

Status of breach formation. Width of

breach as it enlarges.

Upto 20000 cuses BLUE Initiate 24-hour surveillance of reservoire level and inflow by putting AE/JE In shift duty. Office Vehicle Inflow &Outflows

Upto 50000 cusecs ORANGE

Initiate 24-hour surveillance of reservoire level and inflow. Warn the downstream population and

downstream dams with the help of revenue/Police Department.

Office Vehicle Inflow &Outflows

Above 1,00 000 cusecs RED

Initiate 24-hour surveillance of reservoire level and inflow. Warn the downstream population and

downstream dams with the help of revenue/Police Department.

Office Vehicle Inflow &Outflows

Rapidly rising lake Lake level rising and rain continuing BLUE Initiate 24-hour surveillance of lake level and

rainfall.Generate inflow forecasts every 12 hours. Lake level, rainfall

Upto 20000 cuses BLUE Initiate 24-hour surveillance of reservoire level and inflow by putting AE/JE In shift duty. Office Vehicle Inflow &Outflows

Upto 50000 cusecs ORANGE

Initiate 24-hour surveillance of reservoire level and inflow. Warn the downstream population and

downstream dams with the help of revenue/Police Department. Vacate people from the affected areas in

Bhadravathi and tarikere taluk

Office Vehicle Inflow &Outflows

Above 1,00 000 cusecs RED

Initiate 24-hour surveillance of reservoire level and inflow. Warn the downstream population and

downstream dams with the help of revenue/Police Department.Vacate all affected areas

Office Vehicle Inflow &Outflows

Ouflow Range when dam level from 182 feet to

186 feet

Inflow Range when dam level from 182 feet to

186 feet

Overtopping

Page 52: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

General observation Specific observation Emergency

condition level Emergency action Equipment, material, and supplies Data to record

Uplift Pressure in drainage gallery BLUE  Lower the water level when high uplift pressure recorded in the gallery until its reducing clean the

choked drainage holes

Uplift Pressure mearing Instrument, Drilling machine, Eletrical

equipmnets

Amount uplift pressure in the draiange gallery

Heavy seeepage in the drainage gallery BLUE

Lower the water level Heavy seepage in the draianage gallery from the joints, from porus holes until its reducing proper treatment like body grouting and

horizontal grouting may be executed

Drilling machine, Eletrical equipmnets grouting machines, grouting

materials

Sepage measrement in V notch at the drianage

gallery

Jetting in dam body BLUELower the water level and execute grouting and Pu

grouting works when Cracks and jetting observed in the dam body or in the dry well of sluice gates

Drilling machine, Eletrical equipmnets grouting machines, grouting

materials

Approxmate amount of

Seepaage in the Right bank abutment hillcok BLUE Lower the water level when Seepage exceeds from the

right bank abutment hillock until its reducing grouting will be done for the entire hillock

Drilling machine, Eletrical equipmnets grouting machines, grouting

materials

Sepage measrement in V notch at the Right

flank KPCl Power house

Leakage in the left bank Guide wall BLUEIf Heavy leakages observed in Left bank canal guide

wall vacate the KPCL power house and seal the emergency gates with the help of underwater divers

Underwater divers, Diving equimpments,Fast setting

cement

Sepage measrement in the sluice gates

Problmes in KPCL Power House BLUE

Any damages to the body of the dam corresponding KPCL power house gates lower the water level and treatment will made from the both upstream and

downstream

Uplift Pressure mearing Instrument, Drilling machine, Eletrical

equipmnets

Sepage measrement in the sluice gates and

Under water videography records

Instrementation To be established

Masonry dam

Page 53: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Tab 6

Supplies and Resources

Project ID Code KA06HH0058 Page A-46

Page 54: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of Contractor Address Mobile Number Area of Specialization

1 Aditya construction company Plot.No.2553, Sector No.12, Mal Marutu Extension, Belgaum - 590016

9343208220/9449571595

2 Amruth Consturction Private Limited

Amrutha Constructions Pvt Ltd.#384/A Sindhura Apartment

RMV 2 nd stage 2 nd block Ashwath Nagar ,

Bangalore

08041235113/080/41235953

3 Haigreeva Infratech Projects Limited

#2,13th Cross.2nd Main, Hanumaiah Layout, Sanjaynagar, Bangalore-94

0891-2798619Fax: 040-27662080

4 Dawalasab L KamagatagiHouse no: 481, R/O Kodekal , Tq: Shorapur, Dist: Yadgir-

585 237 9741089665

5N D Waddar, KPWD class-1

H.O # 2-12 -32A/ 54, friends colony , Kalaburgi Road, Lingasgur, Lingasgur taluk, Raichur dist: 584 122

8296424242/9108884242/7259424242/08537 258111

6 Ocean constructions ( India) Pvt ltd# 203, 2nd floor In land Ornate, Navabharath Circle ,

Mangalore 575 003 Karnataka 0824 4257739/9448125339

7 Gayatri Projects LtdB-1, TSR Towers, 6-3-1090, Raj Bhavan Road Somajiguda,

Hyderabad 500 082 4023314296/4023310330

8Kollur Gurunath Construction

Infra Pvt ltd #8-9-21/1, 4th floor, GK tower, Udgir road, Bidar, 585 40108482 220808 /08482

224111

9 RNS infrastructure ltdNaveen complex, 7th floor, # 14 M G Road Bangalore 560

001 8042897000

10 Sharda Construction & corporation Pvt ltd

# 72, Sharda Tower, Ashok Nagar, Nanded 4316052462264810/2462262688

11St. Anthony constructions Philip

D’ costa& co1st floor, Mahakali Towers, D.no 269/5, - VI, 269/6-VI,

Fish market road, Kundapura 576 201 9945477222

12 BSR infratech india ltd# 851, D-block, 15th cross, Shankaranagar, Bengaluru,

560092 8023623701/8023623700

13 Jagadish Khubano: 8-6-51/52,Kasturi Nivas, JP Nagar, Janwada Road

Bidar 585 401 9900409890

14 GVPR Plot no 739 A, Road no-37, Jubilee Hills Hyderabad 500033 4066586666/4066586658

TAB-6 SUPPLIES AND RESOURCESSpecialized in all type of works

Specialized in All type of Works

Page 55: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of Contractor Address Mobile Number Area of Specialization

1

M/s ITD Cementation India Limited, Mumbai (Manish Kumar)

ITD Cementation India LimitedNational Plastic Building,

A Subhash Road, Paranjape B Scheme,Vile Parle (East),Mumbai 400 057

Tel.: + 91 – 22 – 6693 1600Fax: + 91 – 22 – 6693 1627

/ 28Email: [email protected]: www.itdcem.co.in

2

M/S. FERRO CONCRETE CONSTRUCTION (INDIA) PRIVATE LIMITED(ANUPAM BIDASARIA),

INDORE, MADHYA PRADESH

Industrial Estate, Gokul Road, Hubli – 580 030 (Karnataka) India

Phone No.: 0836 – 2330024, 2330025

Fax : 0836 – 2331429

3M/s Kasturi Projects Pvt Ltd : 22, sawarlata apartment, gokhle road, navpada, thane

west, Thane - 400602, Maharashtra , India

91-22-25423358Mobile : +919322707313

4

M/S Kavle's pressure Concrete Pvt. Ltd, Mumbai 396 B,LARISSA, NARAYAN PATHARE MARG,,MAHIM

(WEST),Mumbai,Maharashtra,INDIA,400016

[email protected]

5

M/s Dynasoure Concrete, MumbaiDYNASOURE CONCRETE TREATMENT PVT. LTD

419, New Sonal Service Ind. Estate,Link Road, Malad (W),

Mumbai - 400 06

91 22-28821668 / 6699846

[email protected]

6Sri.B.S.loni, gokaka Shri B S Loni, Main Road, Gokak, Belgaum - 591307,

Gokakk

9448126891

7

Sri. S. Narayanreddy Mr. S. Narayana Reddy,Class I PWD Contractor,

Reg. No.157, Nagasamudra Road,Channarayapatna - 573 116,

Hassan District.

9945262610

Specialized in Dam repair works

Dam Special Repair and Geo Technical

works

Page 56: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of Contractor City Mobile Number Area of Specialization

1 Narayan Engineers Hopspet Bellary 9448128060/9449840705

2 Nandi steels Davangere 8192234712

3 Transpede Engineers Banglore 9945066431

4 Mohammed Zarar Shimoga 9448744978

9 Texmaco -KolkattaBelgharia, 24 Paragnas (North),

Kol - 700 056,West Bengal, Indi

91 33 2569 1500/91 33 2541 2448/2452

10Om Metals Infrastructure Pvt

Ltd,

Om Metals Infraprojects LtdGround Floor,Ramakrishna Sadan

63, Pochkhanwala RoadWorli, Mumbai - 400 025.

24970836/24952515Email: [email protected]

11Precision Techno Fab,

Ahmedabad

Bavla- Bagodra NH-8ABavla-382220, Taluka-Dholka,

Dist: Ahmedabad, Gujarat, India.

91- 95- 2714-232839 [email protected]

5 M.P. Engineering Works Shimoga 098802 26975

6 dharmatala engineering works Shimoga 070197 21388

7 Netravathi Industries Shimoga 090088 52195

8 Furkhan Engineering Works Shimoga 077604 09971

Mechanical Contractors

All type of Gate and Crane Works

Local welding and Fabrication Works

Page 57: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of Contractor City Mobile Number Area of Specialization

1 RR Services Bhadravathi 98454019532 H.R. Rajagopal, Shimoga 944866560623 Thippanna, Electrical

Contractor,Shimoga 9986626065

4 Vachan Electricals Shimoga 094482 561395 Pavan Eletricals Shimoga 099007 679596 Gangureshwara Electricals Shimoga 099013 390037 V Tech Powers Shimoga 094802 066328 SLE Eletrical Service Shimoga 099017 725649 Seema Eletricals Shimoga 088619 46248

10 Somendra Marketing Shimoga 973161620811 Silver tree technologies Shimoga 098444 11184

12UIT TECHNO SOLUTIONS INDIA

PVT LTD Shimoga 099800 63180

Sl No Name of Contractor City Mobile Number Area of Specialization

1 EMGE DiversNear D Y Patil College, Thane Belapur Main Road, Nerul

Navi Mumbai9323161414

2 Akshata Divers Belagam 9448115362/8105441010

3 Sagar Divers B.R Project 9448971491/7022997203

4 Kaveri Diving Services Mysore 9980287754/9449849705

5 Varadayya B.R Project 8050128050

6 Planys Technologies

No. 5 Jaya Nagar extension,Balaji Nagar Main road,

G.K. Avenue, Puzhuthivakkam, Chennai 600091, Tamil Nadu, India

91 98336 41091/ 91 84481 88507

[email protected]

ROV Under water Videography

Electrical Contractors

Diving and Under water Repair and

Video

Electrical Works

CC TV

Underwater Videography and Divers

Page 58: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of Contractor City Mobile Number Area of Specialization

1 Aimil LimitedNaimex House

88/1, Outer Ring Road, Nagavara, Bengaluru - 560 045080-30080129080-25435003

[email protected]

2 Unique Instruments & Manufacturers Private Limited

0. 423, 11th Cross Road, 3rd Main, 4th Phase, Peenya Industrial Area, Near Indian Oil Petrol Bunk, Bengaluru,

Karnataka 560058 080 2836 2765

Sl no Name of the agency City contact number Area of Specialization

1 Ramesh p Chinnakar Shimoga 9448466526

2 Bhoomara builders Shimoga 8095052222

3 Eshwar Gogi Shimoga 9449815063

4 Spoorthi constructions (Gowrsih) Shimoga 9448179209

5 Ashwath Reddy Shimoga 9880278999

6 T.k Nagraj Shimoga 9845119872

7 N.t Nagraj Shimoga 9448817775

8 Vedamoorthy Shimoga 9900265122

9 D Parshuram Shimoga 9845498982

10 Someshwar Shimoga 9448289671

11 Devegowda Shimoga 9916867722

12 Nageshwar rao Shimoga 9901119129

13 Sree Rajarajeshwari Construction,. Davanagere 944839466314 Prasanna Shimoga 9448016391

15 Sandeep Shimoga 9620666522

Instrumentation

Matrials,Earthmoving equipments and civil

works

Insturmentation

Matrials,Earthmoving equipments and civil works around Bhadra dam

Page 59: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

16 Shashi Shimoga 9449174596

17 Mastan Shimoga 9483664826

18 Shivarudreshwar Shimoga 9886217131

19 Harish Balagatte Shimoga 9449401811

20 Siddartha Shimoga 9481624951

21 Halappa Shimoga 9483591424

22 Lokesh Shimoga 7022915165

23 Sheshgiri Shimoga 9448344327

24 Nagraj Shimoga 9449100439

25 Balaveerayya Shimoga 8971712372

26 Bhadrayya Shimoga 9481063327

27 B K Chandrashekar Shimoga 9008540406

28 Chandrashekar Shetty Shimoga 9686372802

29 Chinnappa Shimoga 8762994726

30 Daya Shimoga 8105290007

31 Desai Shimoga 9448577690

32 Eqbal Shimoga 9742315072

33 Gangadhar Shimoga 9739498699

34 Jameel Nallur Shimoga 9844270982

35 K S Nagaraj Shimoga 9686708999

36 Kavathi Shimoga 9986750077

37 Krishnakumar Shimoga 9880041886

38 Krishnamoorthy Shimoga 9449967999

39 Laxminaryan Shimoga 9964685555

40 Madhu Honnali Shimoga 9845291458

41 Manjunath Mp Shimoga 9844092240

Matrials,Earthmoving equipments and civil

works

Page 60: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

42 Murugendrayya Shimoga 9448628281

43 Nithesh kumar Shimoga 9902774911

44 Prakash Shimoga 9964845118

45 Prakash Chikkamaglore Shimoga 8747913913

46 Rangswamy Shimoga 9448213202

47 Sadhananda Shimoga 9448154236

48 Someshwar Shimoga 9980348606

49 Sunil Shimoga 9538415773

50 Venktheshmoorthy Shimoga 9945993548

51 Vinay Shimoga 9901114072

52 Gopal Shimoga 9448581595

53 Nandakumar Shimoga 9449923798

54 Abubakar Shimoga 9448525364

55 Anil Shetty Shimoga 9448787969

56 Appanna Shimoga 9900512005

57 Ashok Shimoga 9902190614

58 Ganesh Bhat Shimoga 9448525216

59 Bhalaram Shimoga 9900174108

60 Chandrashekar Shimoga 9449813624

61 Chennabasavayya Shimoga 9880809004

62 Narayan Shimoga 9448900531

63 Ganesh Shimoga 9900256948

64 Jeveir Shimoga 9900601534

65 Keshav Shimoga 9448207963

66 Kuberappa Shimoga 9886973543

67 Lingaraju Shimoga 9620664470

Matrials,Earthmoving equipments and civil

works

Page 61: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

68 Mohan Shimoga 9480006867

69 Muoulaali Shimoga 9972379140

70 Parmaeshwara Shimoga 9448226179

71 Preasad reddy Shimoga 9483472948

72 Ramreddy Shimoga 9448128097

73 Sandeep Shimoga 9449101523

74 Sanjay Shimoga 9538107651

75 Shashikumar Shimoga 9449174596

76 shivaswamy Shimoga 9449616405

77 Nagesh Shimoga 9449265873

78 Venktesh Shimoga 9448444574

79 Ajjjappa Prakash Shimoga 9448146634

80 Basavaraj Shimoga 9535837800

81 Madesha Shimoga 9980237584

Matrials,Earthmoving equipments and civil

works

Page 62: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Tab 7

Annual EAP Evaluation Checklist

Was the annual dam inspec-tion conducted?

□ Yes □ No

If yes, has the EAP been revised to include any signs of failures observed during the inspection?

□ Yes □ No

Was weed clearing, animal burrow removal, or other maintenance required?

□ Yes □ No

If yes, describe actions taken and date:

Was the outlet gate operable? □ Yes □ No

If no, describe actions taken and date:

Does the Notification Flowcharts require revision?

(Note that revision of the con-tact information will not re-quire EAP approval; however, the revised contact infor-mation pages will need to be redistributed as replacement pages.)

□ Yes □ No

If yes, list the dates of the contact information revision and redistribution:

Was annual training or a tab-letop drill conducted?

□ Yes □ No

Circle: training drill

Date conducted:

Are inspection and training records included in the EAP?

□ Yes □ No

Was the EAP reviewed? □ Yes □ No

If yes, review date:

Were changes required to the EAP?

□ Yes □ No

If yes, date of revised EAP approval:

Superintending engineer Date: KNNL Bhadra project circle BRP

Project ID Code KA06HH0058 Page A-47

Page 63: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Tab 8

Plan Review and Update

This plan will be reviewed and updated annually and tabletop drills will be carried out at least once every five years. Document these reviews below. Date of review: Participants: Date of review: Participants:

Date of review: Participants: Date of review: Participants: Date of tabletop drill: Participants:

Project ID Code KA06HH0058 Page A-48

Page 64: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Emergency Action Plan For Bhadra Dam April-2019

Tab 9

Training Record

Use this form to record training sessions. File the completed form in the appropriate Tab of the

EAP. All items in the EAP should be thoroughly reviewed during training. Appropriate [Dam Owner] employees and EAP team members should attend a training session annually (or par-ticipate in a simulated drill).

TRAINING LOCATION:

DATE: TIME: INSTRUCTOR:

CLASS SIGN-IN:

Type of Simulation Conducted: Circle Emergency Type: Emergency water release Watch condition Possible dam failure Imminent dam failure Actual dam failure

Comments, Results of Drill:

Revisions Needed to EAP Based on Results of Drill? □ Yes □ No If yes, list revisions required:

Project ID Code KA06HH0058 Page A-49

Page 65: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 1

1

Page 66: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

A

A2 A1

A3

B C

C1 C2

D

D1 D3

E

Saddle 1

Main Dam

F

F1 F2

Dam Top Road

Existing Roads

New Roads

Boat Route S.H.57

D2

ANNEXURE

ACCESS ROUTE MAP TO THE BHADRA DAM SITE

2

Page 67: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ACCESS ROUTE MAP DETAILS OF THE BHADRA DAM SITE

Sl No Accsess Route Name Accesess to

Name given in the Map Remarks

1 From SH 57 Left Flank Saddle1,2 and Main dam D to D1 Existing Route

2 from Left Bank canal service road Saddle 1 D2 to D3 New Route

3 From SH 57 Left bank Power House Main Dam,Stilling basin and KPCL Powerhouse C to C 1 Existing Route

4 From SH 57 Left bank Power House KPCL Powerhouse C to C 2 Existing Route

5 From SH 57 Right Flank Power House Right Flank Power house and Stilling Basin B to A2 Existing Route

6 From SH 57 Kadali Ranganatha temple Right Flank of Main dam A To A1 Existing Route

7 From SH 57 Kadali Ranganatha temple KPCL right flank power house A To A2 Existing Route

8 From Lakshmi Narasimhaswamy temple Saddle 2 E to E1 New Route

9 From Kadali ranganatha temple (Sunset veiw point) Main Dam A to A 3 New Route

10 Boat Route From Rivetern lodge to Dam top Ib F to F1 New Route

11 Boat Route From River Tern lodge to Saddle 1 F to F2

3

Page 68: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 2

4

Page 69: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Taluk Remarks

1SH-57 Tarikere- manglore road Bhadravathi Infront of Bhadra Dam

2NH-69 Banglore-Shimoga Road Bhadravathi

Bypass Road (Outside the

Bhadravathi City)

3SH-65 BH ROAD Bhadravathi

Old Bridge(Bhadravathi

City)

4Bhadravathi

New Bridge (Bhadravathi

City)

5Bhadravathi Bhadravathi City

6NH-369 Shimoga- Chitradurga Road Bhadravathi Near Holehonnur

7NH-369 Shimoga- Chitradurga Road Shimoga

Near Bekkinakalmata

Shimoga City

8Shimoga Shimoga City

9NH-69 Banglore-Honnavra Road Shimoga Bypass Shimoga City

10Shimoga Joining SH -148

11Honnali Joining SH-25

12SH -25

Shimoga Harihara Hospet

RoadHonnali Near Govt Bus depot

13Honnali

Crossing To Reach

Nadigudi

14NH -48 Banglore Mumbai Highway Harihara Inside the harihara city

15NH -49

Banglore Mumbai Highway

(By Pass)Harihara outside the harihara city

16SH -76 Inside Harihara city Harihara Harihara city

17Harihara Harihara city

18Harihara Village Connecting road

19SH-2 Mylara to Guttal Road Haveri

21SH-45 Madalamatti to Korlahalli Hoovinahadagali

20Hoovinahadagali Barrage

21Bhadrvathi Barrage

22Hagaribommanahalli Barrage

Gondi Anicut

Hagaribommanahalli Barrage

Singataloor Dam

List of Bridges and Barrage affected

ANNEXURE- 2

New Bridge Road

Road Name

Kadekal Mattur Road

Holalur-Hadonahalli Road

Tumminkatte Ukkadagatri Road

Railway Bridge crossing

Haranagiri to harivi

Railway Bridge crossing

Railway Bridge crossing

5

Page 70: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 3

6

Page 71: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Taluk Remarks

1 SH-57 Tarikere- manglore road Bhadravathi Near Junction (all four Direction)

2 NH-69 Tarikere- manglore road Bhadravathi Near Lakkavalli Cross Tarikere

3 NH-69 Junction Point (Miliatry Camp) Bhadravathi Near Pwd Inspection Bnglow (All four Direction)

4

5 NH-69 and SH 116 Shimoga- Banglore Highway Bhadravathi Near Hallimane Hotel mosarahalli village

6

7 NH-69 Tarikere To Shimoga Tarikere Near Lakkavalli Cross Tarikere

8 Tarikere Trains should Not be allowed Towards Bhadrvathi

9 Shimoga Trains should Not be allowed Towards Bhadrvathi

10 SH 115 Bhadravathi to Ubrani Road Bhadravathi Near Antharagange

11 NH-69 Shimoga- Bhadravathi Road Shimoga Near Bypass (ESSAR Petrol Bunk)

12 SH-65 and SH 115Chennagiri Bhadravathi and Sasvehalli-Bhadravathi

RoadShimoga Near Arabilichi

13 NH-369 and SH 115Shimoga Chitradurga Road and Bhadravathi sasevehalli

Road Shimoga Arahatolalu Post, Kaimara, Karnataka 577233 ( All Four Direction)

14 NH-69 Shimoga- Banglore Highway Shimoga Malavagoppa, Shivamogga, Karnataka 577222 ( Including Deviation Road

15 SH - 57 Sringeri Shimoga Road Shimoga Near Lakkinkoppa

16 SH - 57 Sringeri Shimoga Road Shimoga Near MRS Shimoga

17 NH -169 Theerthahalli- shimoga Road Shimoga NT Road, Harakere, Shivamogga, Karnataka 577202

18 NH -69 Sagara -Shimoga Road Shimoga Near Alkola Circle

19 SH57 Savalanga Shimoga Road Shimoga Near Kommanal

20 VR Sominkoppa Road Shimoga Near devraj aras Layout

21 SH-52 Shikaripura Honnali Road Honnali SH 52, Hiremata, Karnataka

22 SH -76 Shimoga -Honnali Road Honnali

23 SH -115 Santhebennur- Honnali Road Honnali Hunasehalli, Karnataka 577224

24 SH 25 Malebennur Honnali Road Malebennur Masadi, Karnataka 577217

25 SH-52 Halgeri to Honnali Ranibennur Near Halgeri Police Station

26 SH 57Halgeri to Shikaripura (Between these roads

Rattehalli,Masur and Kooli Road Should be BlockedRanibennur Near Halgeri Police Station

27 SH 62 Halgeri to Hirekerur Ranibennur Near Halgeri Police Station

28 SH 57Halgeri to Ranibennur (Between these roads Chalageri

road Should be BlockedRanibennur Near Halgeri Police Station

29 SH 25 Shimooga Harihara Road Harihara Indain Oil Fuel Station

30 NH 48/AH 47 Hole Junction Should Be Barricated Harihara Mahajenahalli, Karnataka 577601( SH 25 Joining NH 48)

31 Harihara Trains should Not be allowed Towards Harihara

32 Harihara Trains should Not be allowed Towards HArihara

33 SH -76 Davangere Harihara Road Harihara Towards Harihar Court ( Neelanahalli, Karnataka)

34 NH 48/AH 47 Harihara Bypass Harihara Makanur, Karnataka 581123

36 SH-25Harihara harpanhalli road (Deviation Roads Between

Telagi to Karlahalli Should be Closed)Harihara

Near Hanumappa temple Shimoga - Harihar - Hospet Rd, Harpanahalli,

Karnataka 583131

ANNEXURE- 3

Barricading Details

Road Name

Davangere Train Station

Ranibennur Train Station

Tarikere Train Station

Deviation roads between Military camp to Mosarhalli Village should be Permanetly closed

Deviation Roads Between Mosralli village to Lakkavalli Cross near MC halli Village Should be Permanetly Closed

Shimoga Train Station

7

Page 72: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

37 VR Ranibeenur To Medleri and Airani RanibennurNear FPP SHOP SH 25, Duggavathi, Karnataka 583137 Near Sant Sri Sevalal

Temple Govinda Badavanni Tanda Ranibennur Rural, Karnataka 581115

38 VR Chalgeri To Airani and Airani Ranibennur Near KVG bank Chalageri, Karnataka 581145

39 VR Ranibeennur to kudrihal/Gadagur RanibennurShaneshwar Temple Bayalu Haleya Gangapur Road,, Ranebennur, Karnataka

581115

40 VRRanibeenur To Guttal All Deviation Roads Towards

rivers Should be blockedHaaveri Near Kadu Shiva Temple ranibennur and doddahonda Lake Guttal

41 SH -2 Guttal to Holalu HaaveriNear havanur deviation road Guttal and Pujar Petroleum SH 2,Holalu (Both

Side)

42 VR Guttal to Havanur Haaveri Near Holalu deviation road Guttal

43 VRGuttal to Neeralagi-M-Guttal Joining SH136 (Including

all Deviation Roads Towards rivers )Haaveri Near sbi bank India, Guttal, Karnataka 581108 and Joining SH 136 (Both Side)

44 SH -57Guttal To Balehosur (Including all Deviation Roads

Towards rivers )Haaveri

Navachetana Vividyoddesh Souharda Sahakari NiyamitaLaxmeshwar Rd, Guttal,

Karnataka 581108 and SH 136 Towards Hosratti Deviation Road (Both Side)

45 SH-136Balehosur-Thagond-Jyavalgi (Including all Deviation

Roads Towards rivers )Hoovinahadagli

Near Deviation Road towards Suranagi and Mailaralingeshwara Temmple

Jyalawadgi, Karnataka 582118 both side

SH-57 and SH45 Surnagi to Bannikoppa Only deviation Roads Hoovinahadagli Near Surnagi ,Belahatti and Bannikoppa deviations

46 SH-40Holalu- Hoovinahadagli (Including All Deviation Roads

Towards River)Hoovinahadagli

Near Sadhana Petroleum SH 40, Holalu, Karnataka 583217 and Near Gadi

Durgamma Temple SH 40, Hoovina Hadagali, Karnataka 583219 (Both Side)

47 SH-45Hoovinahadagali-Koorlahalli-Mundargi (Incliding

Deviation Roads)

Mundargi and

Hoovinahadagli

HPC Dealers Maddalagatta Circle Gadag Road, Huvinahadagalli,, Hoovina

Hadagali, Karnataka 583219 and Neary Sherya Petrol bunk Arabhavi -

Challakere Rd, Mundargi, Karnataka 582118

48 SH-129Mundargi-Hydernagar-Tigari-matur-Hiresindogi

(Including Deviation Roads)Mundargi

Near Ashraya Colony Mundargi and Near Over Head Tank SH 23, Hiresindogi,

Karnataka 583238 (Both side)

49 SH-23 Mundargi-Hiresindogi (Including Deviation Roads) Mundargi

Near Mallikarjun Trading Co. (Bharat Petroleaum Dealer)·Koppal Road,

A.D.Nagar, Mundargi, Karnataka 582118 and Near Over head Tank SH 23,

Hiresindogi, Karnataka 583238 (Both side)

50 VR Hoovinahadagali-Hampasagar-Thamrahalli Hoovinahadagli bangarappa nagar,Hampasagar road h hadagalii, Dasarahalli, Karnataka 583219

8

Page 73: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 4

9

Page 74: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

Distance ͣ

downstrem

from dam

(km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

1 0.7 0.05 Vadiyuru 2 Existing VR joining Towards

Tarikere SH -57Use Right Bank Canal Service Road

Use this alternate Road

ImmediatlyTarikere City Tarikere Chikkamaglore

2 0.8 0.10 Vadiyuru 1Existing VR Joining Towards

Shimoga SH -57Use Dam Zigzag Road No Alternate Routes

Thammadihalli Near

Mariyamma TempleBhadravathi Shimoga

3 1.5 0.15 Lakkavalli/UpparbirnahalliExisting VR joining Towards

Tarikere SH -57Use Right Bank Canal Service Road

Use this alternate Road

ImmediatlyTarikere City Tarikere Chikkamaglore

4 1.1 0.20 Garage camp-ChikkamagaluruExisting VR joining Towards

Tarikere SH -57Use Right Bank Canal Service Road

Use this alternate Road

ImmediatlyTarikere City Tarikere Chikkamaglore

5 1.0 0.20 Thavaraghatta/ShankarghattaExisting VR Joining Towards

Shimoga SH -57Use SH-57 Towards Shimoga No Alternate Routes

Thammadihalli Near

Mariyamma TempleBhadravathi Shimoga

6 3.0 0.20 MalligenahalliExisting VR Joining Towards

Shimoga SH -57Use SH-57 Towards Shimoga No Alternate Routes

Thammadihalli Near

Mariyamma TempleBhadravathi Shimoga

7 3.0 0.30 KenchikoppaExisting VR Joining Towards

Tarikere SH -57Use Right Bank Canal Service Road

Use this alternate road after 30

MinutesTarikere City Tarikere Chikkamaglore

8 4.9 0.30 Sompura 2Existing VR Joining Towards

Tarikere SH -57Use Right Bank Canal Service Road

Use this alternate road after 30

MinutesTarikere City Tarikere Chikkamaglore

9 6.0 0.35Unnamed Settlement 64-

Karkucchi

Existing VR Joining SH-57

Towards Tarikere v ia Bhavikere SH-57 Towards Tarikere

Use this alternate road after

35 MinutesTarikere City Tarikere Chikkamaglore

10 6.1 0.40 RangenahalliExisting VR Joining Towards

Tarikere via SH -57Use Right Bank Canal Service Road

Use this alternate road after 35

minutesTarikere City Tarikere Chikkamaglore

11 1.1 0.41 NellisaraExisting VR Joining Towards

Shimoga via SH -57Use SH-57 Towards Shimoga No Alternate Routes

Thammadihalli Near

Mariyamma TempleTarikere Chikkamaglore

12 7.1 0.45

Ganjigere

1/2/3,Saleboranahalli/Basavna

halli

Existing VR Joining Towards

Tarikere via SH -57Use Right Bank Canal Service Road

Use this alternate road after

45 MinutesTarikere City Tarikere Chikkamaglore

13 4.8 0.45 Sompura 1Existing VR Joining Towards

Tarikere via SH -57Use Right Bank Canal Service Road

Use this alternate road after

45 MinutesTarikere City Tarikere Chikkamaglore

14 5.0 0.50 Sompura 3Existing VR Joining Towards

Tarikere SH -57Use Right Bank Canal Service Road

Use this alternate road after

50 MinutesTarikere City Tarikere Chikkamaglore

15 5.1 0.50 GonibeeduExisting VR Joining Tarikere-

Manglore Road SH-57No Alternate Road

Move Towards Junction

(Hunasekatte) within 55

minutes

Hunasekatte Bhadravathi Shimoga

16 7.4 0.55 HonnehattiExisting VR Joining SH-65

towards UmblebyluNo Alternate Road

Move Towards Junction

(Hunasekatte) within 55

minutes

Hunasekatte Bhadravathi Shimoga

ANNEXURE-4

1

2

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

LOCAL EVACUATION PLAN (Based on wave arrival time)

Less Than 30 Minutes

Less than 1 Hour

10

Page 75: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

17 8.6 3 1.00 GanguruExisting VR Joining NH 69 at MC

Halli and move towards tarikere

Existing VR Joining Towards SH-57

Via Bhavikere and move towards

tarikere

Use this alternate road after 1

HourTarikere City Tarikere Chikkamaglore

18 7.6 4 1.05 Kalanakatte 2

Existing VR Joining Bhadravathi

-Manglore Road SH-65 and move

towards Hunasekatte (Junction)

All other alternate roads will be

submerged

Move Towards Junction

(Hunasekatte) within 1 HourHunasekatte Bhadravathi Shimoga

19 9.1 5 1.05 Kalanakatte 1

Existing VR Joining Bhadravathi

-Manglore Road SH-65 and move

towards Hunasekatte (Junction)

All other alternate roads will be

submerged

Move Towards Junction

(Hunasekatte) within 1 HourHunasekatte Bhadravathi Shimoga

20 5.1 6 1.10Gundenahalli/Sompura/Kesark

oppa

Existing VR Joining SH -57

Towards Tarikere

Use Right Bank Canal Service Road

and move towards tarikere

Use this alternate road after 1

HourTarikere City Tarikere Chikkamaglore

21 5.1 7 1.10Siddlipura/Siddlipura

1/Karkucchi

Existing VR Joining Towards SH-

57 Via Bhavikere SH-57 Towards Tarikere

Use this alternate road after 1

HourTarikere City Tarikere Chikkamaglore

22 5.1 8 1.10Bhavikere/Yarebylu/Hirekathu

rSH-47 Towards Tarikere SH-57 Towards Tarikere

Use this alternate road after 1

HourTarikere City Tarikere Chikkamaglore

23 9.3 9 1.15 Kalanakatte

Existing VR Joining Bhadravathi

-Manglore Road SH-65 and move

towards Hunasekatte (Junction)

All other alternate roads will be

submerged

Move Towards Junction

(Hunasekatte) within 1 HourHunasekatte Bhadravathi Shimoga

24 9.9 10 1.20 Gopala 1/Gopala colonyExisting VR Joining NH 69 at MC

Halli and move towards tarikere

Existing VR Joining Towards SH-57

Via Bhavikere and move towards

tarikere

Use this alternate road after 1

HourTarikere City Tarikere Chikkamaglore

25 9.8 11 1.20 Holegangur/Tharikatte

Existing VR Joining Bhadravathi

-Manglore Road SH-65 and move

towards Hunasekatte (Junction)

All other alternate roads will be

submerged

Move Towards Junction

(Hunasekatte) within 1 HourHunasekatte Bhadravathi Shimoga

26 13.0 12 1.20 Bhadra Packaids Pvt LimitedExisting V R Via NH 69 Towards

Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 1 .20 HourTarikere City Bhadravathi Shimoga

27 9.2 13 1.25 Gopala 2Existing VR Joining NH 69 at MC

Halli and move towards tarikere

Existing VR Joining Towards SH-57

Via Bhavikere and move towards

tarikere

Use this alternate road after 1

HourTarikere City Tarikere Chikkamaglore

28 9.2 14 1.25MC halli/H

rangapura/Karehalli 1

Existing V R Via NH 69 Towards

Tarikere NH 69 towards Tarikere

Use this alternate road after

1.25 HourTarikere City Tarikere Chikkamaglore

29 13.5 15 1.25 Shimogga 2 (Near Barandur)Existing V R Via NH 69 Towards

Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 125 Hour Tarikere City Bhadravathi Shimoga

30 12.5 16 1.30 Karehalli 2 (Near Barandur)Existing V R Via NH 69 Towards

Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 1 .30 HourTarikere City Bhadravathi Shimoga

31 13.6 17 1.30 Shimogga 1Existing V R Via NH 69 Towards

Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 1.30 HourTarikere City Bhadravathi Shimoga

32 13.0 18 1.35

Unnamed Sttlement

69/Thimmlapura

/Bommanakatte

Existing VR Joining

Bommanakatte and Move

Towards NH -69

Existing VR Joining SH-65 Move

Towards Hunasekatte

Use this alternate road after

1.35 Hours

Laxmipura

(Bhadrvathi) or

Hunasekatte

Bhadravathi Shimoga

33 13.9 19 1.35 Jannapura / Bhadravati

Existing VR Joining

Bommanakatte and Move

Towards NH -69

Existing VR Joining SH-65 and

Move Towards Hunasekatte

Use this alternate road after

1.35 Hours

Laxmipura

(Bhadrvathi) or

Hunasekatte

Bhadravathi Shimoga

34 8.3 20 1.35Unnamed Settlement

46/Honnehatti

Existing VR Joining SH-65 and

Move Towards Hunasekatte

All other alternate roads will be

submerged

Move Towards Junction Using

SH-65(Hunasekatte) within

1.35 hours

Hunasekatte Bhadravathi Shimoga

See Annexure 8

to 15 and Failure

Notification flow

chart

Less than 2 Hours

11

Page 76: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

35 10.7 21 1.35Unnamed Sttlement

68/Rubberkadu

Existing VR Joining SH-65 and

Move Towards Hunasekatte

All other alternate roads will be

submerged

Move Towards Junction Using

SH-65(Hunasekatte) within

1.35 hours

Hunasekatte Bhadravathi Shimoga

36 16.5 22 1.40 YarehalliExisting VR Joining SH-65 and

Move Towards Hunasekatte

All other alternate roads will be

submerged

Move Towards Junction Using

SH-65(Hunasekatte) within

1.40 hours

Hunasekatte Bhadravathi Shimoga

37 16.6 23 1.40

Kanaka Nagar/ Siddharudha

Nagara Hosamane /

Gowdrahalli/ Hanumantha

Colony

Existing City Roads Joining SH-

65 and Move Towards

Chennagiri

Move Towards Veerapura Using SH-

65 or all other conncectivity roads

Move Towards Veerapura

within 1.40 HoursVeerapura Bhadravathi Shimoga

38 10.5 24 1.45 RubberkaduExisting VR Joining SH-65 and

Move Towards Hunasekatte

All other alternate roads will be

submerged

Move Towards Junction Using

SH-65(Hunasekatte) within

1.45hours

Hunasekatte Bhadravathi Shimoga

39 14.4 25 1.55 BarandurExisting V R connecting NH 69

and move Towards Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 1.55 hoursTarikere City Bhadravathi Shimoga

40 15.5 26 1.55 MasarahalliExisting V R connecting NH 69

and move Towards Tarikere

Existing VR Connecting SH-115

towards Ubrani via Antaragange

Use Alternate raod after 1.55

Hours

Ranganathapura,

dhoderi gangur

road, Bhadravati,

Bhadravathi Shimoga

41 17.4 27 1.55 GourapuraExisting V R connecting NH 69

and move Towards Tarikere

Existing VR Connecting SH-115

towards Ubrani via Antaragange

Use Alternate raod after 1.55

Hours

Ranganathapura,

dhoderi gangur

road, Bhadravati,

Bhadravathi Shimoga

42 16.8 28 2.00 GuninarasipuraExisting V R connecting NH 69

and move Towards Tarikere

Existing VR Connecting SH-115

towards Ubrani via Antaragange

Use Alternate raod after 2

Hours

ranganathapura,

dhoderi gangur

road, Bhadravati,

577246

Bhadravathi Shimoga

43 18.2 29 2.30 DevanarasipuraExisting VR Connecting SH-115

towards Ubrani via AntaragangeNo Alternate Root

Move towards ubrani within

2.30 hours

ranganathapura,

dhoderi gangur

road, Bhadravati,

577246

Bhadravathi Shimoga

44 12.9 30 2.35 Thimmalapura

Existing VR Joining

Bommanakatte and Move

Towards NH -69

Existing VR Joining SH-65 Move

Towards Hunasekatte

Use this alternate road after

235 Hours

Laxmipura

(Bhadrvathi) or

Hunasekatte

Bhadravathi Shimoga

45 15.4 31 2.35 HallikereExisting V R Connecting NH 69

and Move towards Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 2.35 hoursTarikere City Bhadravathi Shimoga

46 17.1 32 2.35 Shimoga 3Existing V R connecting NH 69

and move Towards Tarikere

Existing VR Connecting SH-115

towards Ubrani via Antaragange

Use Alternate raod after 2.35

Hours

ranganathapura,

dhoderi gangur

road, Bhadravati,

577246

Bhadravathi Shimoga

47 17.0 33 2.40 Kadadkate

Existing City Roads connecting

NH-69 and move Towards

Shimoga

Use Exisiting VR Towards

Lakshmipura Bhadravathi

Use this alternate road after

2.40 HoursLaxmipura Bhadravathi Shimoga

48 18.0 34 2.50 KorapakoppaExisting VR Connecting SH-115

towards Ubrani via AntaragangeNo Alternate Root

Move towards ubrani within

2.50 hours

ranganathapura,

dhoderi gangur

road, Bhadravati,

577246

Bhadravathi Shimoga

49 19.4 35 2.50 Khabik Keta

Existing City Roads connecting

SH-65 and move towards

Chennagiri

Use Exsiting VR Conncecting

Komarnahalli

Use this alternate road after

2.50 HoursVeerapura Bhadravathi Shimoga

50 10.4 36 2.55 Arlikoppa / Balemaranahalli

Existing VR Joining

Bommanakatte and Move

Towards NH -69

Existing VR Joining SH-65 Move

Towards Hunasekatte

Use this alternate road after

2.55Hours

Laxmipura

(Bhadrvathi) or

Hunasekatte

Bhadravathi Shimoga

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 3 Hours

12

Page 77: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

51 20.9 37 3.05Unnaemed Settlement 36

Gowdrahalli

Existing VR Conncecting SH-65

and move towards Chennagiri

Exsiting VR connceting SH 116 and

move towards Ubrani Road

Move Towards Arabilichi camp

by means of all connceting

roads

Arabilichi Bhadravathi Shimoga

52 21.8 38 3.10 Donabagatta / ThadasaExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move fron the village within 3

Hours and Stay Between

Shimoga Bhadravathi Highway

Machenahalli or

SadashivapuraShimoga Shimoga

53 14.6 39 3.05 Shivamogga/Near KarehalliExisting V R Via NH 69 Towards

Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 3.hoursTarikere City Bhadravathi Shimoga

54 14.8 40 3.05Sampigey Setti Layout/ New

Bullapura / NTB Layout

Existing VR Joining

Bommanakatte and Move

Towards NH -69

Existing VR Joining SH-65 Move

Towards Hunasekatte

Use this alternate road after 3

Hours

Laxmipura

(Bhadrvathi) or

Hunasekatte

Bhadravathi Shimoga

55 13.9 41 3.10 HUDCO Colony

Existing VR Joining

Bommanakatte and Move

Towards NH -69

Existing VR Joining SH-65 Move

Towards Hunasekatte

Use this alternate road after 3

5Hours

Laxmipura

(Bhadrvathi) or

Hunasekatte

Bhadravathi Shimoga

56 23.5 42 3.1 KagekodamaggeExisting VR Conncecting SH-65

and move towards Chennagiri

Exsiting VR connceting arabilachi

camp without using SH-65

Use alternate raod by means of

all connceting roads to

Arabilichi camp after 3 Hours

Arabilichi Bhadravathi Shimoga

57 16.2 43 3.10 KenchenaExisting V R Via NH 69 Towards

Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 3 hoursTarikere City Bhadravathi Shimoga

58 19.6 44 3.15Unnaemed Settlement 43-

HoleneralakereExisting VR Conncecting NH 69

Use all other alternate road

connecting NH -69

Stay Between Shimoga

Bhadravathi Highway and

move within 3 hours from the

village and use both roads at

the same time

Machenahalli Shimoga Shimoga

59 24.8 45 3.25 Thalli KatteExisting VR Conncecting SH-65

and Move towards Chennagiri

Existing VR Conncecting arabilichi

camp without using SH-65

Use alternate raod by means of

all connceting roads to

Arabilichi camp after 3.25

Hours

Arabilichi Bhadravathi Shimoga

60 20.2 46 3.30 Bhadra ColonyExisting VR Conncecting SH-65

and Move towards Chennagiri

Exsiting VR connceting SH 116 and

move towards ubrani

Move Towards Arabilichi camp

by means of all connceting

raods or use alternate road

after 3.30 hours

Arabilichi Bhadravathi Shimoga

61 14.4 47 3.35 Karehalli 1// kalinganahalliExisting V R connectinf NH 69

and Move Towards Tarikere

All other alternate roads will be

submerged

Move towards Tarikere using

NH -69 within 3.35 HoursTarikere City Bhadravathi Shimoga

62 11.3 48 3.40Unnamed Sttlement 14 Near

Hiriyur

Existing VR Connecting NH -69

and Move towards Shimoga

Existing VR Joining SH-65 Move

Towards Hunasekatte

Use this alternate road after

3.40 Hours

Laxmipura or

HunasekatteBhadravathi Shimoga

63 17.5 49 3.45 MavinakereExisting V R connectinf NH 69

and Move Towards Tarikere

Existing VR Connecting SH-115

towards Ubrani via Antaragange

Use Alternate raod after 3.45

Hours

ranganathapura,

dhoderi gangur

road, Bhadravati,

577245

Bhadravathi Shimoga

64 26.5 50 3.45 Nagathi BelagaluExisting VR Conncecting SH-65

and Move towards Chennagiri

Existing VR Conncecting arabilichi

camp without using SH-65

Use alternate raod by means of

all connceting roads to

Arabilichi camp after 3.45

Hours

Arabilichi Bhadravathi Shimoga

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 4 Hours

13

Page 78: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

65 18.8 51 3.55Unnamed Settlement 37-

HoleneralakereExisting VR Conncecting NH 69

Use all other alternate road

connecting NH -69

Move from the village within

3.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli Shimoga Shimoga

66 24.8 52 3.55 Malena HalliExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

3.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

67 29.8 53 4.00 BelagaluExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

3.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

68 30.1 54 4.10 Holebryanahalli

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Existing VR Conncecting SH-115

Joining SH -65 Move towards

Chennagiri

Use Alternate Road after 4

Hours

Agardahalli or

ArabilichiBhadravathi Shimoga

69 31.8 55 4.15 Holehonnur

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Existing VR Conncecting SH-115

Joining SH -65 Move towards

Chennagiri

Use Alternate Road after 4

Hours

Agardahalli or

Arabilichi campBhadravathi Shimoga

70 28.0 56 4.20 Aradotlu

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Existing VR Conncecting SH-115

Joining SH -65 Move towards

Chennagiri

Use Alternate Road after 4

Hours

Agardahalli or

Arabilichi campBhadravathi Shimoga

71 29.0 57 4.20 Dasara Kallahali 2

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Existing VR Conncecting SH-115

Joining SH -65 Move towards

Chennagiri

Use Alternate Road after 4

Hours

Agardahalli or

Arabilichi campBhadravathi Shimoga

72 33.1 58 4.20 Kudli

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Exisitng VR Connecting NH-69

Immediatly move towards

Chitradurga Using NH -369 or

use alternate roads after 4

hours

Agardahalli or

Arabilichi campBhadravathi Shimoga

73 30.5 59 4.35 Chikkudli

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Exisitng VR Connecting NH-69

Immediatly move towards

Chitradurga Using NH -369 or

use alternate roads after 4

hours

Agardahalli or

Arabilichi campBhadravathi Shimoga

74 33.8 60 4.45 Danayakpura

Existing VR Connecting

afterwards use NH 369 towards

chitradurga (Don’t Go Via Holehonnur)

Existing VR Conncecting SH-115

Joining SH -65 and move towards

chennagiri

Use Alternate Road after 4.45

Hours

Agardahalli or

Arabilichi campBhadravathi Shimoga

75 25.9 61 4.50 Shetti HalliExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

3.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 5 Hours

See Annexure 8

to 15 and Failure

Notification flow

chart

14

Page 79: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

76 27.1 62 4.50 Kati KereExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

3.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

77 35.3 63 4.55 Sidlipura

Existing VR Connecting NH 369

towards chitradurga (Don’t Go Via Holehonnur)

Existing VR Conncecting SH-115

Joining SH -65 and move towards

chennagiri

Use Alternate Road after

4.55Hours

Agardahalli or

Arabilichi campShimoga Shimoga

78 28.3 64 5.00 J Beeranahalli / B BeeranahalliExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

3.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

79 35.6 65 5.00 HolehattiExisting VR connecting

Suttukote Using SH 25

All VR connecting to suttukote

viilage

Move towards Suttkote village

within 5 Hours both road can

be used upto 5 hours

Suttukote 577216 Shimoga Shimoga

80 37.3 66 5.00 HolalurExisting VR connecting

Haramagatta Using SH 25

All VR connecting to Haramagatt

Village

Move towards

Haramagattawithin 5 Hours

both road can be used upto 5

hours

Haramagatta Shimoga Shimoga

81 33.8 67 5.05Unnamed Settlement 60 Near

Suguru

Existing VR connecting

Haramagatta Using SH 25

All VR connecting to Haramagatt

Village

Move towards

Haramagattawithin 5 Hours

both road can be used upto 5

hours

Haramagatta Shimoga Shimoga

82 31.3 68 5.10 Bhadrapura

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Exisitng VR Connecting NH-69

Immediatly move towards

Chitradurga Using NH -369 or

use alternate roads after 4

hours

Agardahalli or

Arabilichi camp

Bhadravathi/Shimo

gaShimoga

83 38.2 69 5.10 Madike Chiluru 1Existing VR connecting SH-115

towards Aneveri

Existing VR Connecting NH 369

Towards Chitradurga

Use Both Road to reach

Agardahalli move from the

village within 5 Hours

Agardahalli Shimoga Shimoga

84 39.8 70 5.25 Madike Chiluru 2Existing VR connecting

Haramagatta Using SH 25

Use all other VR connecting to

Haramagatt Village

Move towards Haramagatta

within 5 Hours both road can

be used upto 5.25 hours

Haramagatta Shimoga Shimoga

85 38.9 71 5.35 NagasamudraExisting VR connecting SH-115

towards Aneveri

Use all other VR connecting to VR

Connecting Agardahalli

Use Both Roads and move

from the village within 5 HoursAgardahalli Shimoga Shimoga

86 30.1 72 5.35 Koppa 1

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Existing VR Conncecting SH-115

Joining SH -65 towards chengiri

Use Alternate Road after 4

Hours and Move from the

village within 5.35 hours

Agaradahalli t or

Arabilichi camp

Bhadravathi/Shimo

gaShimoga

87 29.3 73 5.40Unnamed Setlement 12 Near

Melina Hansavadi

Existing VR Connecting SH 57

Via SH -25

All VR Connecting Rathnakar Nagar

Shimoga or Savalanga Road

Move Towrds Savalanga Road

Don’t Move towards Honnali or Sihimoga City

Rathnakar nagar

shimogaShimoga Shimoga

88 30.7 74 5.40 Bedara HosahalliExisting VR connecting

Suttukote Using SH 25

All other VR connecting to

suttukote viilage

Move from the village within

5.40 hours and use alternate

road after 5 Hours

Suttukote Shimoga Shimoga

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 6 Hours

15

Page 80: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

89 30.1 75 5.40Unnamed Settlement 11 Near

Javali

Existing VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

5.40 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

90 40.6 76 5.40 Vederapura Existing VR connecting

Haramagatta Using SH 25

Use Tunga Left Bank Canal Service

Road towards harmagatta or

Kunkuva

Use alternate road after 5

hours (Immediately move

towards Highway) and Move

from the village within 5.40

hours

Haramagatta or

KunkuvaShimoga Shimoga

91 39.8 77 5.45 Hadona HalliExisting VR connecting SH-115

towards Aneveri All VR Connecting Arahatotlupost

Use Both Road to reach

Arhatotlu Post and Move from

the village within 5.45 hours

Agaradahalli Shimoga Shimoga

92 41.0 78 5.50 Anaveri Existing VR Connecting Ittigehalli All VR Connecting Ittigehalli

Use Both Road to reach

IttigehalliMove from the village

within 5.50 hours

Ittigehalli Shimoga Shimoga

93 31.8 79 5.55 Mudalavittalapura

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Existing VR Conncecting SH-115

Joining SH -65 towards Chennagiri

Use Alternate Road after 4

Hours and from the village

within 5.55 hours

Agaradahalli or

Arabilichi camp

Bhadravathi/Shimo

gaShimoga

94 41.9 80 5.55 Nimbegondi 2 Existing VR Connecting Ittigehalli All other VR Connecting Ittigehalli

Use Both Road to reach

Ittigehalli and move from the

village within 5.55 hours

Ittigehalli Shimoga Shimoga

95 29.9 81 6.10 Hole Hanasavadi 2Existing VR Connecting SH 57

Via SH -25 towards savalanga

All VR Connecting Rathnakar Nagar

Shimoga or Savalanga Road

Move Towrds Savalanga Road

from the village withini 6 hours

Don’t Move towards Honnali or Sihimoga City

Rathnakar nagar

shimogaShimoga Shimoga

96 34.6 82 6.15Unnamed Settlment 62 Near

Kanasina Katte

Existing VR Connecting NH 369

towards chitradurga (Don’t Go Via Holehonnur)

Existing VR Conncecting SH-115

Joining SH -65 towards Chennagiri

Use alternate raod after 4

hours and move from the

village within 6 hours

Agardahalli or

Arabilichi camp

Bhadravathi/Shimo

gaShimoga

97 43.1 83 6.20 Hanagavadi 1Existing VR connecting

Haramagatta village Using SH 25

Use Tunga Left Bank Canal Service

Road towards harmagatta or

Kunkuva

Use alternate raod after 8 .35

hours and Move from the

village within 6.20 hours

Haramagatta or

KunkuvaShimoga Shimoga

98 26.1 84 6.30 GondichatnahalliExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

6.30 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

99 43.6 85 6.30 Hanagavadi 2Existing VR Connecting

Hunasagatta village via SH -115

All other VR Connecting

Hunasagatta

Move towards Hunasaghtaa

Village within 6.30 hours both

roads can be used

Hunasagatta,

577243Honnali Davanagere

100 32.4 86 6.35 Jambaraghatta

Existing VR Connecting

Holehonnur afterwards use NH

369 towards chitradurga

Existing VR Conncecting SH-115

Joining SH -65 towards Chennagiri

Use alternate road 6 hours and

move from the village within

6.35 hours

Agaradahalli or

Arabilichi camp

Bhadravathi/Shimo

gaShimoga

101 37.3 87 6.35Unnamed Settlement Near

Madike Chiluru

Existing VR Connecting NH-369

towards chennagiri

All alternate roads towards

Chennagiri

Move Towards agaradahalli

within 6.35 hours use both

roads

Agaradahalli Shimoga Shimoga

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 7 Hours

16

Page 81: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

102 26.8 88 6.40 PillangiriExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

6.40 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

103 44.7 89 6.40 ChilurExisting VR Joining SH-52

towards Nyamati

All other VR Connecting SH -52 to

Join Nyamthi

Both Roads can be used and

move from the village within

6.40 hours

Kunkuva,

Karnataka 577223Honnali Davanagere

104 27.3 90 6.55 Pillangiri 1Existing VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

6.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

105 45.3 91 7.10 HuralihalliExisting VR Connecting

Hunasagatta via SH -115

All other VR Connecting

Hunasagatta

Move towards Hunasaghtaa

Village within 7.10 hours from

submerging village both roads

can be used

Hunasagatta,

577243Honnali Davanagere

106 27.5 92 7.10 ChatnahalliExisting VR Connecting SH 57

Via SH -25

All VR Connecting Rathnakar Nagar

Shimoga or Savalanga Road

Move Towards Savalanga Road

(Don’t Move towards Honnali or Sihimoga City) and evacuate

village within 7 hours

Rathnakar nagar

shimogaShimoga Shimoga

107 28.3 93 7.10Gondichatnahalli / Melina

Hanasavadi

Existing VR Connecting SH 57

Via SH -25

All VR Connecting Rathnakar Nagar

Shimoga or Savalanga Road

Move Towards Savalanga Road

(Don’t Move towards Honnali or Sihimoga City) and evacuate

village within 7 hours

Rathnakar nagar

shimogaShimoga Shimoga

108 24.7 94 7.20 Shanthamma Layout/ Purle Existing VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within 7

Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

109 43.8 95 7.20 ThaggehalliExisting VR Joining SH-52

towards Nyamati

All other VR Connecting SH -52

towards Nyamthi

Don’t SH-25 after 7.20 and Move from the village within 7

hours

Kunkuva, 577223 Honnali Davanagere

110 47.5 96 7.25 Marigondanahalli 1Existing VR Joining SH-52

towards Nyamati using SH -25

All other VR Connecting SH -52

towards Nyamthi

Don’t SH-25 after 7.20 and Move from the village within 7

hours

Kunkuva, 577223 Honnali Davanagere

111 24.2 97 7.3Vinob Nagar / Gopal Gowda /

Shivamogga

Existing City Roads towards

Alokola Circle

All Conncecting road Towards Alkola

circle

Move Towards Sagara (Alokola

Circle) within 7 hoursAlokola Circle Shimoga Shimoga

112 47.4 98 7.30 Hosahalli 4Existing VR Connecting

Hunasagatta via SH -115

All other VR Connecting

Hunasagatta

Move from the village within 7

hours and both roads can be

used upto 7 hours

Hunasagatta,

577243Honnali Davanagere

113 44.1 99 7.45 Dodderi 3Existing VR Joining SH-52

towards Nyamati using SH-25

All othe VR Connecting SH -52 to

Join Nyamthi

Don’t use SH-25 after 7.20 and Move from the village within

7.45 hours

Kunkuva, 577223 Honnali Davanagere

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 8 Hours

17

Page 82: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

114 41.2 100 7.45 Tavaragopagondanahalli 2Existing VR connecting

Haramagatta Using SH 25

Use Tunga Left Bank Canal Service

Road towards harmagatta or

Kunkuva

Use alternate road after 7

hours evacuate village within

7.45 hours

Haramagatta or

KunkuvaHonnali Davanagere

115 22.8 101 7.50Harige / Sandal Colony /

Sandvidya Nagar

NH-69 Shimoga- Bhadravathi or

SH -57 Sringeri Road

Use alternate road to reach Sringeri

road or Bhadravathi Road

Move towards MRS shimoga

within 7.50 any mentioned

roads can be used

MRS Shimoga Shimoga

116 50.2 102 7.50 SasvehalliExisting VR Connecting

Daginaktte via SH -115All VR Connecting Daginakatte

Use alternate road after 8

hours and move from village

within 7.55 hours

Daginakatte Chennagiri Davanagere

117 28.7 103 7.55 JavalliExisting VR Conncecting

Sadshivapura

Use all other alternate road

connecting NH -69

Move from the village within

7.55 Hours and Stay Between

Shimoga Bhadravathi

Highway both roads can be

used at the same time

Machenahalli or

SadashivapuraShimoga Shimoga

118 48.0 104 7.55 Marigondanahalli 2Existing VR Joining SH-52

towards Nyamati using SH-25

All othe VR Connecting SH -52 to

Join Nyamthi

Don’t use SH-25 after 7.20 and Move from the village within

7.55 hours

Kunkuva, 577223 Honnali Davanagere

119 37.9 105 8.00Hanumanthapura /

Jangamarahalli / MydolaluNH-369 towards chennagiri

All alternate roads towards

Chennagiri

Use alternate road after 8

hours and Move Towards

agaradahalli within 8 hours

Agaradahalli Shimoga Shimoga

120 48.2 106 8.10 Bullapura 1Existing VR Joining SH-52

towards Nyamati using SH-25

All othe VR Connecting SH -52 to

Join Nyamthi

Don’t use SH-25 after 7.20 and Move from the village within 8

hours

Kunkuva, 577223 Honnali Davanagere

121 46.0 107 8.30 LingapuraExisting VR Connecting

Hunasagatta via SH -115All VR Connecting Hunasagatta

Move towards Hunasaghtaa

Village within 8 hoursand use

alternate road after 8 hours

Hunasagatta,

577243Honnali Davanagere

122 40.7 108 8.35 TavaragopagondanahalliExisting VR connecting

Haramagatta Using SH 25

Use Tunga Left Bank Canal Service

Road towards harmagatta or

Kunkuva

Use Alternate road after 8.35

hours

Haramagatta or

KunkuvaHonnali Davanagere

123 43.3 109 8.35 Dodderi 1Existing VR Joining SH-52

towards Nyamati using SH-25

All othe VR Connecting SH -52 to

Join Nyamthi

Don’t use SH-25 after 7.20 and Move from the village within

8.30 hours

Kunkuva, 577223 Honnali Davanagere

124 50.7 110 8.35 RampuraExisting VR Connecting

Daginaktte via SH -115

All other VR Connecting

Daginakatte

Use this alternate road after

8.35 hoursDaginakatte Chennagiri Davanagere

125 32.7 111 8.40 SuguruExisting VR Joining Aladahalli

via SH-25All other VR Joining Aladhalli

Use this alternate road after

8.40 hoursAlada Halli, 577216 Shimoga Shimoga

126 23.2 112 9.05 Lakshmi PuraNH-169 Towadrs Shimoga

Alokola Circle

Tunga Left Bank Canal Service Road

towards alkola circleUse alternate road after 9 hours

Alkola Circle

ShimogaShimoga Shimoga

127 21.1 113 9.35 HousahalliNH-169 Towadrs Shimoga

Alokola Circle

Tunga Left Bank Canal Service Road

towards alkola circleUse alternate road after 9 hours

Alkola Circle

ShimogaShimoga Shimoga

128 53.1 114 9.15 Basaveshwara NagarExisting VR Joining SH-52

towards Nyamati using SH-25

All othe VR Connecting SH -52 to

Join Nyamthi

Don’t use SH-25 after 7.20 and Move from the village within

9.15 hours

Kunkuva, 577223 Honnali Davanagere

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 9 Hours

Less Than 10 Hours

18

Page 83: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

129 51.1 115 9.10 HotyapruraExisting VR Connecting

Kyasinakere via SH -115

All VR Connecting Daginakatte via

SH-115Use this road after 9 hours

Daginakatte or

Kyasinakere, 577243

Honnali/Chennagir

i Bhadrvathi

Davanagere/

Shimoga

130 44.9 116 9.15 GovinakoviExisting VR Joining SH-52

towards Nyamati using SH-25

All othe VR Connecting SH -52 to

Join Nyamthi

Don’t use SH-25 after 7.20 and Move from the village within

9.15 hours

Basavanahalli,

577230Honnali Davanagere

131 47.3 117 9.20 Hosahalli 3

Existing VR Joining Hunasagatta

Via SH-115 Sasvehalli-anveri

Road

All other VR connecting Hunasagatta

Don’t move Towards Sasvehalli or Anveri Move Towards

Hunasghatta within 9.20 hours

Hunasagatta Honnali Davanagere

132 49.6 118 9.30 Haralahalli 1Exisiting VR Connecting SH-24

towards shikaripura

Existing VR connecting SH-52

Nyamti

Use this alternate road after 9

hours and Move towards

belgutti within 9.30 hours

Belagutti 577223 Honnali Davanagere

133 54.1 119 9.30 DidagurExisiting VR Connecting SH-24

towards shikaripura

Existing VR connecting SH-52

Nyamti

Use this alternate road after 9

hours and Move towards

belgutti within 9.30 hours

Soratur 577217 Honnali Davanagere

134 54.2 120 9.30 KulagatteExisting VR Connecting

Kyasinakere village via SH -115All other VR Connecting Kyasinkere

Use this alternate road after 8

hoursKyasinakere, 577243 Bhadrvathi Shimoga

135 55.5 121 9.30 HirebasuruExisting VR Connecting

Kyasinakere via SH -115

All VR Connecting Daginakatte via

SH-115

Use this alternate road after 9

hours

Daginakatte or

Kyasinakere,

577243

Honnali/Chennagir

i Bhadrvathi

Davanagere/

Shimoga

136 51.0 122 9.40 HanumanahalliExisting VR Connecting

Kyasinakere via SH -115All VR Connecting Daginakatte

Use this alternate road after 8

hours

Daginakatte or

Kyasinakere,

577243

Honnali/Chennagir

i Bhadrvathi

Davanagere/

Shimoga

137 56.6 123 9.50 BenakanahalliExisting VR Connecting

Daginkatte via SH -115All VR Connecting Daginakatte

Use this alternate road after

10.15 hoursDaginakatte Chennagiri Davanagere

138 50.4 124 10.05Unnamed Settlement 31 Near

sasvehalli

Existing VR Connecting

Kyasinakere via SH -115All VR Connecting Daginakatte

Use Alternate Road after 8

hours and Move from the

village within 10 hours

Daginakatte or

Kyasinakere,

577243

Honnali/Chennagir

i Bhadrvathi

Davanagere/

Shimoga

139 20.1 125 10.10 Mattur 1NH-169 Towadrs Shimoga

Alokola Circle

Existing VR Connecting SH-57

towards MRS Shimoga

Use alternate road after 10

hoursand evacuate village

within 10 hours

MRS Shimoga Shimoga Shimoga

140 56.5 126 10.10 DevarahonnalliExisting VR Connecting SH -25

towards Malebennur All other VR connecting Thaganahalli

Use alternate Roads after 10

hours towards Tharganahalli

and evacuate village within

10.10 hours

Tharaganahalli,

Karnataka 577217Honnali Davanagere

141 56.0 127 10.10 BidaragaddeExisiting VR Connecting SH-24

towards shikaripura

Existing VR connecting SH-52

Towards Nyamti

Use this alternate road after 9

hours and Move towards

belgutti within 10 hours

Belagutti 577223 Honnali Davanagere

142 58.9 128 10.15 ChikkabasuruExisting VR Connecting

Daginkatte via SH -115All other VR Connecting Daginakatte

Use this road after 10.15

hoursand evacuate village

within 10.15 hours

Daginakatte Chennagiri Davanagere

143 22.8 129 10.15 Sulebailu

Existing City Roads Connecting

SH-57 towards MRS Shimoga Via

NH -69

Existing VR Connecting SH-57

towards MRS Shimoga

Use Alternate Road Afteter 10

hours and evacuate village

within 10.15 hours

MRS Shimoga Shimoga Shimoga

144 58.1 130 10.35 KammaragatteExisting VR Connecting

Daginkatte via SH -115All other VR Connecting Daginakatte

Use this alternate road after

10.15 hoursand evacuate

village within 10.35 hours

Daginakatte Chennagiri Davanagere

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 11 Hours

19

Page 84: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

145 58.2 131 10.45

Anjanapura /

Devanayakanahalli / Honnali /

Honnali Rural

Exisiting VR Connecting SH-24

towards shikaripura

Existing VR towards soratur Via

Dadderahalli

Use this alternate road after

10.45 hours and evacuate

village within 10.45 hours

Soratur 577217 Honnali Davanagere

146 53.9 132 10.50 Ujjinipura 2Existing VR Connecting

Kyasinakere via SH -115

All other VR Connecting

Daginakatte via SH-115

Use this alternate road after 9

hours and evacuate village

within 10.50 hours

Daginakatte or

Kyasinakere,

577243

Honnali/Chennagir

i Bhadrvathi

Davanagere/

Shimoga

147 57.8 133 10.55 HolemadapuraExisiting VR Connecting SH-24

towards shikaripura

Existing VR connecting SH-52

Towards Nyamti

Use this road after 9 hours and

Move towards belgutti within

10.55 hours

Soratur 577217 Honnali Davanagere

148 61.4 134 11.00 Konayakanahalli

Exisiting VR Connecting

Gopagondanahalli via SH-52

Honnali shikaripura road

Use VR Connecting

Gopagondanahalli Via Tunga Left

Bank Canal

Use alternate road after 11

hours and evacuate village

within 11 hours

Gopagondanahalli,

577217Honnali Davanagere

149 59.1 135 11.05 ThakkanahalliExisting VR Connecting SH -25

Towards MalebennurAll other VR connecting Thaganahalli

Use alternate road after 10

hours and evcuate village

within 11 hours

Tharaganahalli,

577217Honnali Davanagere

150 59.7 136 11.20 GollerahalliExisting VR Connecting SH -25

Towards MalebennurAll other VR connecting Thaganahalli

Use alternate road after 10

hours and evcuate village

within 11.20hours

Tharaganahalli,

577217Honnali Davanagere

151 63.9 137 11.25 KotemalluruExisting VR Connecting SH -25

Towards MalebennurAll other VR connecting Thaganahalli

Use alternate road after 10

hours and evcuate village

within 11 .25 hours

Arakere-577217 Honnali Davanagere

152 63.5 138 11.30 Belleshwara

Exisiting VR Connecting

Gopagondanahalli via SH-52

Honnali shikaripura road

Use VR Connecting

Gopagondanahalli Via Tunga Left

Bank Canal after 11 Hours

Use alternate road after 11

hours and evacuate village

within 11.30 hours

Gopagondanahalli,

577217Honnali Davanagere

153 62.3 139 11.45 belimalluruExisting VR Connecting SH -25

Towards MalebennurAll other VR connecting Arakere

Use alternate road after 10

hours and evcuate village

within 11 .45 hours

Arakere-577217 Honnali Davanagere

154 66.6 140 11.55 HoleharalahalliExisiting VR Connecting

Tadakanahalli Via SH -52

All other VR Connecting

Thadakanahalli without using SH-52

Use alternate road after 12

hours and evcuate village

within 12 hours

Tadakanahalli,

581210Hirekerur Haveri

155 48.7 141 12.05Unnamed Settlement 30 Near

Bijogatte

Existing VR connecting SH-52

towards Nyamati

All other VR Connecting SH -52 to

Join Nyamthi

Use both roads and evcuate

village within 12 hoursKunkuva, 577223 Honnali Davanagere

156 66.7 142 12.25Unnamed Settlement 49 Near

Holeharnahalli

Exisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 12 .25 HoursKokkanur 577530 Harihara Davanagere

157 68.0 143 12.25 HiregonigereExisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 12 .25 HoursKokkanur 577530 Harihara Davanagere

158 69.7 144 12.30 Hallur 1Exisiting VR Connecting

Tadakanahalli Via SH -52

All other VR Connecting

Thadakanahalli without using SH-52

Use alternate road after 12

hours and evcuate village

within 12 .30hours

Tadakanahalli,

581210Hirekerur Haveri

159 63.6 145 12.35 Hanumasagara Thanda

Exisiting VR Connecting

Gopagondanahalli via SH-52

Honnali shikaripura road

Use VR Connecting

Gopagondanahalli Via Tunga Left

Bank Canal after 11 Hours

Use alternate road after 11

hours and evacuate village

within 12.35hours

Gopagondanahalli,

577217Honnali Davanagere

160 71.6 146 12.50 PuradakeriExisiting VR Connecting

Tadakanahalli Via SH -52

All other VR Connecting

Thadakanahalli without using SH-52

Use alternate road after 12

hours and evcuate village

within 12 .50hours

Tadakanahalli,

581210Hirekerur Haveri

161 64.0 147 12.50 Narasimhapura

Exisiting VR Connecting

Gopagondanahalli via SH-52

Honnali shikaripura road

Use VR Connecting

Gopagondanahalli Via Tunga Left

Bank Canal after 11 Hours

Use alternate road after 11

hours

Gopagondanahalli,

577217Honnali Davanagere

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 12 Hours

Less Than 13 Hours

See Annexure 8

to 15 and Failure

Notification flow

chart

20

Page 85: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

162 65.3 148 12.55 ChickagonigereExisting VR Connecting SH -25

Towards MalebennurAll other VR connecting Arakere

Use alternate road after 10

hours and evcuate village

within 12.55 hours

Arakere-577217 Honnali Davanagere

See Annexure 8

to 15 and Failure

Notification flow

chart

163 69.6 149 13.00 Haraganahalli 4Exisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 13 HoursKokkanur 577530 Harihara Davanagere

164 70.4 150 13.10 Haraganahalli 3Exisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 13 HoursKokkanur 577530 Harihara Davanagere

165 71.8 151 13.20 BalamuriExisiting VR Connecting

GopagondanahalliNo alternate Roads

Move Towards

Gopagondanahalli within 13.20

hours

Gopagondanahalli,

577217Honnali Davanagere

166 61.5 152 13.30 KonanathaleExisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 13.30 HoursKokkanur 577530 Harihara Davanagere

167 75.9 153 13.40 GovinahaluExisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 13.40 HoursKokkanur 577530 Harihara Davanagere

168 76.2 154 13.45Unnamed settlement 48 Near

Tumnminkatte

Exisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after 11

hours and evacuate village

within 13.45 hours

Bullapur, 581119 Hirekerur Haveri

169 56.6 155 14.10 SunkadakatteExisiting VR Connecting SH-24

towards shikaripura

Existing VR connecting SH-52

Towards Nyamti

Use this road after 9 hours and

Move towards belgutti within

14 hours

Soratur Honnali Davanagere

170 78.2 156 14.05Unnamed settlement 47 Near

NandigudiExisiting VR Connecting KN Halli

Use alternate VR to move directly

towards KN Halli

Use alternate road after 14

hours and evacuate village

within 14 hours

KN Halli, 577516 Hirekerur Haveri

171 78.3 157 14.05 KusagattiExisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after 11

hours and evacuate village

within 14hours

Bullapur, 581119 Hirekerur Haveri

172 81.8 158 14.10 FattepurExisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after 11

hours and evacuate village

within 14hours

Bullapur, 581119 Hirekerur Haveri

173 78.5 159 14.25Unnamed Settlement 54 Near

PalyaExisiting VR Connecting KN Halli

Use alternate VR to move directly

towards KN Halli

Use alternate road after 14

hours and evacuate village

within 14.25hours

KN Halli, 577516 Hirekerur Haveri

174 79.5 160 14.25Unnamed Settlement 53

Ukkadagatri

Exisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after 11

hours and evacuate village

within 14.25 hours

Bullapur, 581119 Hirekerur Haveri

175 81.0 161 14.55 Nandigudi Exisiting VR Connecting KN HalliUse alternate VR to move directly

towards KN Halli

Use alternate road after 14

hours and evacuate village

within 14.55hours

KN Halli, 577516 Hirekerur Haveri

176 63.8 162 15.05 Yalehole Exisiting VR Connecting KN HalliUse alternate VR to move directly

towards KN Halli

Use alternate road after 14

hours and evacuate village

within 15 hours

KN Halli, 577516 Hirekerur Haveri

177 73.1 163 15.10 BadabasapurExisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after 11

hours and evacuate village

within 15 hours

Bullapur,581119 Hirekerur Haveri

178 75.0 164 15.25 Hanumasgara

Exisiting VR Connecting

Gopagondanahalli via SH-52

Honnali shikaripura road

Use VR Connecting

Gopagondanahalli Via Tunga Left

Bank Canal after 11 Hours

Use alternate road after

15hours

Gopagondanahalli,

577217Honnali Davanagere

179 78.8 165 15.25 MuginagondhiExisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 15 .25 HoursKokkanur 577530 Harihara Davanagere

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 14 Hours

Less Than 15 Hours

Less Than 16 Hours

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

21

Page 86: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

180 81.6 166 15.25 Ingalagondi 2 Exisiting VR Connecting KN HalliUse alternate VR to move directly

towards KN Halli

Use alternate road after 14

hours and evacuate village

within 15 .25hours

KN Halli, 577516 Hirekerur Haveri

181 83.6 167 15.30 Holeanveri 1Existing VR Connecting Nittur

Via SH-52 By Crossing Kuppelur

All other VR Connecting Bullapur

without using SH-52

Move Towards Nittur Within 15

Hours Otherwise Move

Towards Bullapur and

evacuate village within 15.30

hours

Nittur,581119

Bullapur, 581119Hirekerur Haveri

182 84.2 168 15.35 Vasana Exisiting VR Connecting KN HalliUse alternate VR to move directly

towards KN Halli

Use alternate road after 14

hours and evacuate village

within 15 .35hours

KN Halli, 577516 Hirekerur Haveri

183 85.1 169 15.45Unnamed settlement 50 near

govinahalu

Exisiting VR Connecting

KokkanuruNo alternate Roads

Move towards Kokkanuru

within 15 .45 HoursKokkanur 577530 Harihara Davanagere

184 85.8 170 15.40 MadenurExisting VR Connecting NH-48

Towards Ranibennur

All other Alternate Roads Without

using NH-48

Use alternate road after 15

hours and evacuate village

within 15 .40hours

Chalageri 581145 Ranibennur Haveri

185 87.2 171 15.45 NitapalliExisting VR Connecting Nittur

Via SH-52 By Crossing Kuppelur

All other VR Connecting Bullapur

without using SH-52

Move Towards Nittur Within 15

Hours Otherwise Move

Towards Bullapur and

evacuate village within 15.45

hours

Nittur,581119

Bullapur, 581119Hirekerur Haveri

186 87.5 172 15.55 Kotihal 1Existing VR Connecting Nittur

Via SH-52 By Crossing Kuppelur

All other VR Connecting Bullapur

without using SH-52

Move Towards Nittur Within 15

Hours Otherwise Move

Towards Bullapur and

evacuate village within 15.55

hours

Nittur,581119

Bullapur, 581119Hirekerur Haveri

187 87.80 173 15.55 Ingalagondi 1 Exisiting VR Connecting KN HalliUse alternate VR to move directly

towards KN Halli

Use alternate road after 14

hours and evacuate village

within 15 .55hours

KN Halli, Karnataka

577516Hirekerur Haveri

188 80.7 174 16.10 NandigaviExisiting VR Connecting

kamalapura via Sirigere

Use alternate VR to move directly

towards Kamalapura

Use Both road for evacuation

within 16 hoursKamalapura 577516 Harihara Davanagere

189 84.5 175 16.20 MalanalkanahalliExisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after

16hours and evacuate village

within 16 hours

Bullapur,581119 Hirekerur Haveri

190 85.3 176 16.55 DhuleholeExisiting VR Connecting

kamalapura via Sirigere

Use alternate VR to move directly

towards Kamalapura

Use Both road for evacuation

within 16.55 hoursKamalapura 577516 Hirekerur Haveri

191 79.9 177 17.00 BilasanurExisiting VR Connecting

kamalapura via Sirigere

Use alternate VR to move directly

towards Kamalapura

Use Both road for evacuation

within 17 hoursKamalapura 577516 Hirekerur Haveri

192 87.0 178 17.00 TimmenahalliExisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after

16hours and evacuate village

within 17 hours

Bullapur,581119 Hirekerur Haveri

193 89.10 179 17.20 Malkanahalli Existing VR Connecting Itagi No Alternate RoadsMove Towards Itagi within 17

HoursItagi 581145 Ranibennur Haveri

194 89.50 180 17.20 Nagenahalli 2Existing VR Connecting NH-48

Towards Ranibennur

All other Alternate Roads Witout

using NH-48

Use Alternate road after 16

hours and evacuate village

within 17hours

Chalageri 581145 Ranibennur Haveri

195 89.60 181 17.25 Holeanveri 2 Existing VR Connecting Itagi No Alternate RoadsMove Towards Itagi within

17.25 HoursItagi 581145 Ranibennur Haveri

196 89.90 182 17.25 NegenahalliExisting VR Connecting NH-48

Towards Ranibennur

All other Alternate Roads Witout

using NH-48

Use Alternate road after 16

hours and evacuate village

within 17hours

Chalageri 581145 Ranibennur Haveri

197 90.00 183 17.30Kawalettu/Kumarapatnam/

Ranibennuru

Existing VR Connecting NH-48

Towards Ranibennur

All other Alternate Roads Witout

using NH-48

Use Alternate road after 16

hours and evacuate village

within 17.30 hours

Chalageri 581145 Ranibennur Haveri

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 18 Hours

22

Page 87: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

198 90.50 184 17.35 Holeanveri 3 Existing VR Connecting Itagi No Alternate RoadsMove Towards Itagi within

17.35 HoursItagi 581145 Ranibennur Haveri

199 91.30 185 17.30 Halasabalu NH-48 Towards DavangereExisiting VR Connecting

kamalapura via Sirigere

Use Both road for evacuation

within 17.30 hours

Kamalapura 577516

or Davanagere

Hirekerur/

Davanagere

Haveri/

Davanagere

200 88.40 186 17.40 Thimlapura NH-48 Towards DavangereExisiting VR Connecting

kamalapura via Sirigere

Use Both road for evacuation

within 17.30 hours

Kamalapura 577516

or Davanagere

Hirekerur/

Davanagere

Haveri/

Davanagere

201 89.80 187 18.00 Rajanahalli NH-48 Towards DavangereExisiting VR Connecting

kamalapura via Sirigere

Use Both road for evacuation

within 18 hours

Kamalapura 577516

or Davanagere

Hirekerur/

Davanagere

Haveri/

Davanagere

202 83.3 188 18.15Guttur/Anniger/Harihar/Vijaya

nagar Extension/Mahajenahalli

Existing City Roads connecting

SH -76 towards DavangereAlternate Road Not Required

Move Towards Davanagere

Within 18 HoursDavanagere Davanagere Davanagere

203 88.30 189 18.30 Lingadalli 1Existing VR Connecting

Antaravalli Use Kuppelur and kotihal road

Use Alternate Road after 18

Hours and stay between this

Road and evacuate village

within 18.30 hours

Antaravalli, 581208 Ranibennur Haveri

204 88.40 190 18.35 Lingadalli 3Existing VR Connecting

Antaravalli Existing VR Connecting Itagi

Use Both road for evacuation

within 18.35 hoursAntaravalli, 581208 Ranibennur Haveri

205 89.60 191 18.40 SannasangapurExisiting VR Connecting

Bullapur Via SH -52

All other VR Connecting Bullapur

without using SH-52

Use Alternate road after 17

hours and evacuate village

within 18.40 hours

Bullapur, 581119 Hirekerur Haveri

206 88.70 192 18.45 Haraganahalli 2 NH-48 Towards Davangere No Alternate RoadMove Towards Davanagere

Within 18 HoursDavanagere Davanagere Davanagere

207 88.60 193 19.00 Lingadalli 2Existing VR Connecting

Antaravalli Existing VR Connecting Itagi

Use Both road for evacuation

within 19 hoursAntaravalli, 581208 Ranibennur Haveri

208 88.90 194 19.00 Mustur Existing VR Connecting Itagi No Alternate RoadsMove Towards Itagi within 19

HoursItagi 581145 Ranibennur Haveri

209 90.60 195 19.10 Haraganahalli 1 NH-48 Towards DavangereExisiting VR Connecting

kamalapura via Sirigere

Use Both road for evacuation

within 19 hours

Kamalapura 577516

or Davanagere

Hirekerur/

Davanagere

Haveri/Davanagge

re

210 81.8 196 20.00 Hanagawadi 3 NH-48 Towards Davangere No Alternate RoadMove Towards Davanagere

Within 20 HoursDavanagere Davanagere Davanagere

211 86.3 197 20.05 Nagenahalli 1 NH-48 Towards DavangereExisiting VR Connecting

kamalapura via Sirigere

Use Both road for evacuation

within 20 hours

Kamalapura 577516

or Davanagere

Hirekerur/

Davanagere

Haveri/

Davanaggere

212 86.6 198 20.05 DheeturExisting VR Connecting Kondajji

Via SH-25

Use Alternate VR Diverting Near

Nera karalhalli camp bus stop

Use Both road for evacuation

within 20 hoursKondajji 577589 Davanagere Davanagere

213 87.3 199 20.10 Makanur 2Existing VR Connecting NH-48

Towards Ranibennur

All other Alternate Roads Without

using NH-48

Use alternate road after 17

hours and evacuate village

within 20 hours

Chalageri 581145 Ranibennur Haveri

214 87.4 200 20.15 KuppelurExisting VR Connecting Nittur

Via SH-52

Existing VR Connecting

Danginahalli Via SH-52

Move Towards Nittur within 20

hours or Move towards

Danoghihalli within 28 Hours

and evacuate village within 20

hours

Nittur,581119 or

Danoagihalli, 581208

Hirekerur/

RanibennurHaveri

215 91.40 201 20.20 HoleserigereExisiting VR Connecting

kamalapura

Use alternate VR to move directly

towards Kamalapura

Use Alternate Road after 20

hours and evacuate village at

the same time

Kamalapura 577516 Hirekerur Haveri

216 91.80 202 20.45 Krishnapur Existing VR Connecting Itagi No Alternate RoadsEvacuate village within 20.45

hoursItagi 581145 Ranibennur Haveri

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 19 Hours

Less Than 21 Hours

23

Page 88: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

217 84.8 203 20.45 RamathirthaExisiting VR Connecting

kamalapura

Use alternate VR to move directly

towards Kamalapura

Use Alternate Road after 20

hours and evacuate village at

the same time

Kamalapura 577516 Hirekerur Haveri

218 85.2 204 20.50 GodihalExisting VR Connecting Nittur

Via SH-52 Use SH-52 towards Halgeri

Use both Roads and evacuate

village within 20.50 hoursNittur, 581119 Hirekerur Haveri

219 96.8 205 20.50 BhyranahalliGanganarasi - Kakkaragolla Rd

Via SH-25 towards Kakkaragolla

Use Alternate VR (Don’t Use Ganganarasi - Kakkaragolla Rd)

Affter

Use alternate road after 23

Hours and evacuate village

within 20.50 hours

Kakkaragolla Davanagere Davanagere

220 98.6 206 20.50 AmaravathiSH -76 Connecting NH-48

Towards davanagere

Exsiting VR Connecting Davanagere

NH 48 Via Sathyanarayanapura

Camp

Use Alternate Road after 20

hours and evacuate village at

the same time

Davanagere Davanagere Davanagere

221 96.1 207 21.00 Sri Airani HolemattExisting VR Connecting

Aremallapur

Existing VR Connecting NH-48

Towards Ranibennur

Use Both roads for evacuation

within 21 Hours

Aremallapur,

581115 or Chalageri

581145

Ranibennur Haveri

222 100.4 208 21.25 NadiharalalliExisting VR Connecting NH-48

Towards RanibennurAlternate Road Not Suitable Evacuate village within 21 hours Chalageri 581145 Ranibennur Haveri

223 101.5 209 21.40 AiraniExisting VR Connecting

Aremallapur

Existing VR Connecting NH-48

Towards Ranibennur

Use Both roads for evacuation

within 21 Hours

Aremallapur,

581115 or Chalageri

581145

Ranibennur Haveri

224 104.4 210 21.50 HirebidariExisting VR Connecting

Aremallapur Alternate Road Not Suitable Evacuate village within 21 hours

Aremallapur,

Karnataka 581115Ranibennur Haveri

225 84.5 211 22.10 Makanur 1Existing VR Connecting NH-48

Towards RanibennurAlternate Road Not Suitable Evacuate village within 22hours Chalageri 581145 Ranibennur Haveri

226 81.9 212 22.15 SarathiExisting VR Connecting Kondajji

Via SH-25

Use Alternate VR Diverting Near

Nera karalhalli camp bus stop

Use Both road for evacuation

within 22hoursKondajji Davanagere Davanagere

227 81.7 213 22.20 RayapuraExisiting VR Connecting

kamalapura

Use alternate VR to move directly

towards Kamalapura

Use Alternate Road after 22

hours and evacuate village at

the same time

Kamalapura 577516 Hirekerur Haveri

228 85.3 214 22.25unnamed settlement 33 Near

gangnarsi

Ganganarasi - Kakkaragolla Rd

Via SH-25Alternate Road Not Required

Move towards Kakkaragolla

and evacuate within 22 HoursKakkaragolla Davanagere Davanagere

229 92.60 215 22.30 KadathiExisting VR Connecting Telagi

Via SH-25

Use all other alternate Roads

Connecting directly to telagi

Use alternate road after 22.30

hours and evacuate village at

he same time

Telagi Harapanhalli Davanagere

230 96.6 216 22.35 HiremaganurExisting VR Connecting

Danginahalli Via SH-52Existing VR Connecting Rattehalli

Use alternate road after 27

hours and evacuate village

within 22.35 hours

Danoagihalli, 581208 Ranibennur Haveri

231 103.6 217 22.35 KonanatambigiExisting VR Connecting

Aremallapur via yellapura medleriAlternate Road Not Suitable

Evacuate village within 22.45

hoursAremallapur, 581115 Ranibennur Haveri

232 101.4 218 22.45Unnamed Settlement 16 Near

Raypura

Exisiting VR Connecting

kamalapura

Use alternate VR to move directly

towards Kamalapura

Use Alternate Road after 22

hours and evacuate village at

the same time

Kamalapura 577516 Hirekerur Haveri

233 107.6 219 22.55 Belludi 1Existing VR Connecting Telagi

Via SH-25

Use all other alternate Roads

Connecting directly to telagi

Use alternate road after

22.55hours and evacuate

village at he same time

Telagi Harapanhalli Davanagere

234 108.8 220 22.55 ChikkamanganurExisting VR Connecting

Danginahalli Via SH-52Existing VR Connecting Rattehalli

Use alternate road after 27

hours and evacuate village

within 22.35 hours

Danoagihalli, 581208 Ranibennur Haveri

235 100.4 221 23.00 NitturExisting VR Connecting

Kunchuru Via HalavagaluAlternate Roads are Not suitable

Evacuate village within 23

hoursKunchuru 58313 Harpanhalli Davanagere

236 96.9 222 23.10 ChikkabidreExisting VR Connecting Telagi

Via SH-25

Use all other alternate Roads

Connecting SH-25 at the same Time

Use both roads for evacuation

within 23 hoursTelagi Harapanhalli Davanagere

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 23 Hours

Less Than 25 Hours

24

Page 89: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

237 103.9 223 23.15 NandyalaExisting VR Connecting

Kunchuru Via Halavagalu

Existing VR Connecting Telagi Via

SH-25 (Yerbalu Village Road)

Use alternate road after 23

hours and evacuate village at

he same time

Kunchuru 58313 Harpanhalli Davanagere

238 108.2 224 23.20 PamenahalliExisting VR Connecting Kondajji

Via SH-25

Use Alternate VR Diverting Near

Nera karalhalli camp bus stop

Use Both road for evacuation

within 23hoursKondajji Davanagere Davanagere

239 108.5 225 23.30 GanganarasiGanganarasi - Kakkaragolla Rd

Via SH-25 towards Kakkaragolla

Use Alternate VR (Don’t Use Ganganarasi - Kakkaragolla Rd)

Affter

Use alternate road after 23

Hours and evacuate village

within 23 hours

Kakkaragolla Davanagere Davanagere

240 109.1 226 23.30Unnamed settlement 23 Near

somlapaur

Existing VR Connecting

Aremallapur via yellapura medleriAlternate Road Not Suitable

Evacuate village within

23.30hours

Aremallapur,

581115Ranibennur Haveri

241 109.6 227 23.40 SomlapurExisting VR Connecting

Aremallapur via yellapura medleriAlternate Road Not Suitable

Evacuate village within

23.30hoursAremallapur, 581115 Ranibennur Haveri

242 109 228 24.35 Nittur BasapurExisting VR Connecting

Kunchuru Via HalavagaluAlternate Roads are Not suitable

Evacuate village within 24

hoursKunchuru 58313 Harpanhalli Davanagere

243 109.7 229 24.40 UdagattiExisting VR Connecting Gudgur

Via Doddpete Road (Ankasapura)

Existing VR Connecting Aremallapur

via yellapura medleri

Use alternate road after 23

Hours and evacuate village

within 24 hours

Gudgur 585115 Bellary Bellary

244 82.0 230 25.05 SalaganahalliExsiting VR Connecting

Davanagere NH 48 Via JarkatteAlternate Road Not Required

Move Towards Davanagere and

evacuate village Within 25

Hours

Davanagere Davanagere Davanagere

245 100.3 231 25.10 KaralahalliExisting VR Connecting Kondajji

Via SH-25

Use Alternate VR Diverting Near

Nera karalhalli camp bus stop

Use Both road for evacuation

within 23hours and move

towards kondajji

Kondajji Davanagere Davanagere

246 100.8 232 25.25 Kurubara HalliExisting VR Connecting Kondajji

Via SH-25Alternate Road Not Required

Move TowardsKondajji and

evacuate village Within 25

Hours

Kondajji Davanagere Davanagere

247 113.1 233 25.30 BelurExisting VR Connecting Gudgur

Via Kudrihal

Existing VR Connecting Gudgur Via

Ankasapura

Use Both road for evacuation

within 25 hours from the villageGudgur 585115 Bellary Bellary

248 103.5 234 26.00 JaalimaldiExisting VR Connecting

Aremallapur via Hirebidari

Existing VR Connecting

Aremallapura via Airani

Use regular road upto 26

hours or alternate road upto

21 hours and evacuate village

within 26 hours

Aremallapur, 581115 Ranibennur Haveri

249 106.3 235 26.45 GarbhagudiExisting VR Connecting

Kunchuru Alternate Roads are Not Required

Evacuate village within 26

hoursKunchuru 58313 Harpanhalli Davanagere

250 114.5 236 26.55 MedleriExisting VR Connecting

Ranibennur Via SH-57

Existing VR Connecting Aremallapur

via yellapura medleri

Evacuate and Move towards

Ranibennur Within 26 hours

or Stay at Aremallapur

Aremallapur, or

RanibennurRanibennur Haveri

251 110.9 237 27.10 KudapaliExisting VR Connecting

Danginahalli Via SH-52Existing VR Connecting Rattehalli

Use alternate road after 27

hours and evacuate village

within 27hours

Danoagihalli,

581208Ranibennur Haveri

252 82.5 238 27.25 TavaragundiExisting VR Connecting

Kunchuru Via HalavagaluAlternate Roads are Not suitable

Evacuate village within 27

hoursKunchuru 58313 Harpanhalli Davanagere

253 111.6 239 27.40 HalvagaluExisting VR Connecting

Kunchuru Alternate Roads are Not Required

Evacuate village within 27

hoursKunchuru 58313 Harpanhalli Davanagere

254 114.9 240 28.00 Haranagiri 3Existing VR Connecting Gudgur

Via KudrihalAlternate Road Not Suitable

Evacuate village within 28

hoursGudgur 583115 Bellary Bellary

255 111.8 241 29.15 YerbaluExisting VR Connecting

Kunchuru Alternate Roads are Not Required

Evacuate village within 29

hoursKunchuru 58313 Harpanhalli Davanagere

256 113.3 242 30.15 HariviExisting VR Connecting

Kunchuru

Exsiting VR Connecting SH-150

Hyrada after 30 hours via

Dambarahalli

Use alternate road for

evacuation after 30 hours

evacuate at the same time

Kunchuru 58313 or

Hyarada, Karnataka

583217

Hoovinahadagali/H

arpanhalli

Davanagere

/Bellary

257 114.2 243 30.40 Kudrihal 2Existing VR Connecting Gudgur

Via KudrihalAlternate Road Not Suitable

Evacuate village within 30

hoursGudgur 585115 Bellary Bellary

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 31 Hours

25

Page 90: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

258 113.8 244 31.20 Kudrihal 1Existing VR Connecting Gudgur

Via KudrihalAlternate Road Not Suitable

Evacuate village within 31

hoursGudgur 585115 Bellary Bellary

259 118.0 245 31.20Unnamed Settlement 26-Near

Lingnayakanhalli thanda

Exsiting VR Connecting SH-150

towards Hyrada via Harvibasapur

Existing VR Connecting SH-150

towards Hyrada after via

Dambarahalli

Use alternate road after 30

hours and evacuate village

within 31.20 hours

Hyarada, 583217 Hoovinahadagali Bellary

260 119.9 246 32.00Unnamed Settlement 25- Near

Kancharagatti

Existing VR Connecting SH -2

towards guttalAlternate Road Not Suitable

Evacuate village within 32

hoursGuttal Haveri Haveri

261 116.6 247 32.10 Chikk kuruvattiExisting VR Connecting SH -57

Via Chikka aralahali

Alternate VR Connecting SH -57 via

chandapur Road

Use both roads for evacuation

within 32HoursHonnhatti Ranibennur Haveri

262 111.3 248 31.20 KuruvattiExsiting VR Connecting SH-2

Connecting Guttal

Existing VR Connecting SH-150

towards Hyrada after via

Dambarahalli

Use alternate road after 30

hours and evacuate village

within 31.20 hours

Hyarada, Karnataka

583217 or Guttal

Hoovinahadagali/H

averiBellary/Haveri

263 118.8 249 31.45 Harivi BasapurExisting VR Connecting

Kunchuru

Exsiting VR Connecting SH-150

Hyrada via Dambarahalli

Use alternate road after 30

hours and evacuate village

within 31.45 hours

Kunchuru 58313 or

Hyarada, Karnataka

583217

Hoovinahadagali/H

arpanhalli

Davanagere

/Bellary

264 120.7 250 32.15 HeeladahalliExisting VR Connecting Gudgur

Via Kudrihal

Existing VR Connecting Gudgur Via

Doddpete Road

Use alternate road after 30

hours and evacuate village

within 31.20 hours

Gudgur 585115 Bellary Bellary

265 121.0 251 32.30 ChoudayyadanapurExisting VR Connecting SH -57

towards Honnahatti

Alternate VR Connecting SH -57 via

chandapur Road

Use alternate road after 30

hours and evacuate village

within 32 hours

Honntti -581115 Ranibennur Haveri

266 123.4 252 32.55 ChadapurExisting VR Connecting SH -57

towards HonnahattiAlternate Road Not Suitable

Evacuate village within 33

hoursHonntti -581115 Ranibennur Haveri

267 123.1 253 33.25 KancharagattiExisting VR Connecting SH -2

towards guttalAlternate Road Not Suitable

Evacuate village within 33

hoursGuttal Haveri Haveri

268 128.0 254 34.10 Shyakar

Existing VR Connecting SH-40

towards Hirhadagali connecting

near budanur

Alternate Roads are Not RequiredEvacuate village within 34

hours

Katebennuru,

Karnataka 583216Hoovinahadagali Bellary

269 128.9 255 34.15 Linganayakanahalli ThandaExsiting VR Connecting SH-150

Hyrada via Harvibasapur

Exsiting VR Connecting SH-150

Hyrada after 30 hours via

Dambarahalli

Use Alternate road after 30

hours evacuate village within

34 hours

Hyarada, Karnataka

583217Hoovinahadagali Bellary

270 118.0 256 34.55 Chikka Mylara / HavanurExisting VR Connecting SH -2

towards guttalAlternate Road Not Suitable

Evacuate village within 35

hoursGuttal Haveri Haveri

271 133.9 257 35.00 Hirabaniimatti 1Existing VR Connecting SH-40

towards HirehadagaliExisting VR Connecting Katebennur

Move Towards Hirehadagali

within 35 hours or stay at

Katebennur

Hirehadagali or

Katebennuru

583216

Hoovinahadagali Bellary

272 134.7 258 35.15 Galaganath 3Existing VR Connecting SH -57

towards NeglurAlternate Road Not Suitable

Move towards Honnahatti and

evacuate village within 35

Hours

Honntti -581115 Ranibennur Haveri

273 129.8 259 35.40 Hanushi

Existing VR Connecting SH-40

towards Hirhadagali connecting

near budanur

Alternate Roads are Not RequiredEvacuate village within 35

hours

Katebennuru,

Karnataka 583216Hoovinahadagali Bellary

274 125.5 260 36.45 Haralahalli 2Existing VR Connecting SH -2

towards guttalAlternate Road Not Suitable

Evacuate village within 36

hoursGuttal Haveri Haveri

275 125.7 261 36.55 HolaluExisting VR Connecting SH-40

towards Hirhadagali

Exsiting VR Connecting SH-150

towards Hyrada

Use both roads for evacution

within 37 hours from the village

Hyarada, 583217 or

Katebennuru,

Karnataka 583216

Hoovinahadagali Bellary

276 132.5 262 37.25 galaganath 1Existing VR Connecting SH -57

towards Neglur

Existing VR Connecting SH -2

towards guttal via Havanur

Use both roads for evacution

within 37 hours from the villageNeglur Haveri Haveri

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 35 Hours

Less Than 40 Hours

See Annexure 8

to 15 and Failure

Notification flow

chart

26

Page 91: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

277 136.7 263 38.10 Angoor 2Existing VR Connecting SH-40

towards HirehadagaliExisting VR Connecting Beerabbi

Move Towards Hirehadagali

within 38 hours or stay at

Berrabbi

Hirehadagali or

Beerabbi,583216Hoovinahadagali Bellary

278 137.4 264 38.40 ByalhunsiExisting VR Connecting SH-40

towards HirehadagaliExisting VR Connecting Katebennur

Move Towards Hirehadagali

within 38 hours or stay at

Katebennur

Katebennuru

583216Hoovinahadagali Bellary

279 137.5 265 38.50 Meundi Existing VR Connecting Kerikopp Alternate Road Not AvailableMove towards Kerikop and

evacuate within 39 hours

Kerikop, Karnataka

582112Shirahatti Gadag

280 137.9 266 38.55 Kotihal 2Existing VR Connecting SH-40

towards HirehadagaliExisting VR Connecting Katebennur

Move Towards Hirehadagali

within 38 hours or stay at

Katebennur

Hirehadagali or

Katebennuru

Karnataka 583216

Hoovinahadagali Bellary

281 138.7 267 39.20 Galaganath 2Existing VR Connecting SH -57

towards NeglurAlternate Road Not Suitable

Move towards Honnahatti and

evacuate within 39 HoursHonntti -581115 Ranibennur Haveri

282 134.2 268 39.20 BelavigiExisting VR Connecting SH -57

towards NeglurAlternate Road Not Suitable

Move towards Honnahatti and

evacuate within 39 HoursHonntti -581115 Ranibennur Haveri

283 138.8 269 39.20 ItagiExisting VR Connecting SH -136

Tagond

Existing VR Connecting SH -136

Tagond via Hebbal

Use both roads for evacuation

and Move Towards Tagond

and evacuate Within 39 hours

Tagond 582112 Shirahatti Gadag

284 139.8 270 39.20 SasalawadaExisting VR Connecting SH -136

Tagond Via Itagi

Existing VR Connecting SH -136

Tagond via Hebbal

Use both roads for evacuation

and Move Towards Tagond

and evacuate Within 39 hours

Tagond or Hebbal Shirahatti Gadag

285 134.5 271 39.40 Angoor1Existing VR Connecting SH-40

towards HirehadagaliExisting VR Connecting Beerabbi

Move Towards Hirehadagali

within 39 hours or stay at

Berrabbi

Hirehadagali or

Beerabbi, Karnataka

583216

Hoovinahadagali Bellary

286 136.6 272 41.05 GullagundiExisting VR Connecting Kerikopp

via Meundi

VR connecting Kerikopp Via

Neerlagi M Guttal

Use Alternate Road after 42

Hours and Move towards

Kerikop evacuate within 41

hours

Kerikop, Karnataka

582112Shirahatti Gadag

287 136.7 273 42.05 Chikk AralahalliExisting VR Connecting SH -57

towards HonnahattiExisting VR Connecting Yattinahalli

Use both roads for evacuation

and Move Towards Honnatti

and evacuate Within 42 hours

Honnatti -581115 Ranibennur Haveri

288 116.5 274 42.05Unnamed Settlement 27 Near

chikkakaralahalii

Existing VR Connecting SH -57

towards HonnahattiAlternate Road Not Suitable

Move towards Honnahatti and

evacuate within 42 HoursHonnatti -581115 Ranibennur Haveri

289 118.6 275 42.10 TaredahalliExisting VR Connecting SH 136

Tagond Via ItagiExisting VR Connecting Kerikopp

Use Alternate Road after 42

Hours and Move towards

Kerikop evacuate within 42

hours

Kerikop, Karnataka

582112Shirahatti Gadag

290 137.2 276 42.35Unnamed Settlement 22 Near

Bylahunsi

Existing VR Connecting SH-40

towards HirehadagaliExisting VR Connecting Katebennur

Move Towards Hirehadagali

within 40 hours or stay at

Katebennur and evacuate

within 42.35 hours

Hirehadgali or

Katebennuru

Karnataka 583216

Hoovinahadagali Bellary

291 145.8 277 42.50 Neeralagi-M-GuttalExisting VR Connecting SH-57

Towards Balehosur via Marol

Existing VR Connecting SH-136

Towards Balehosur via

Nagaramaduvu Rod

Use Alternate Road after 42

Hours and Move towards

Balehosur and evacuate within

42.50 hours

Balehosur Shirahatti Gadag

292 138.0 278 42.50 HalagiExisting VR Connecting SH-57

Towards Balehosur Alternate Road Not Suitable

Move towards balehosur and

evacuate within 42 HoursBalehosur Shirahatti Gadag

293 135.8 279 42.50 Bidarahalli SH -136 towards Mundavad Alternate Road Not Suitable

Move Towards Hebbal or

Mundavad and evacuate

Within 44 hours

Mundawad, 582118 Mundargi Gadag

Less Than 46 Hours

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

27

Page 92: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

294 136.0 280 43.30 Marol SH -57 towards Neglur Alternate Road Not SuitableMove towards Honnahatti and

evacuate within 43 HoursHonnatti -581115 Ranibennur Haveri

295 138.0 281 44.20 Angoor 3Existing VR Connecting SH-40

towards HirehadagaliExisting VR Connecting Beerabbi

Move Towards Hirehadagali or

stay at Berrabbi and evacuate

within 44 hours

Hirehadagali or

Beerabbi, Karnataka

583216

Hoovinahadagali Bellary

296 141.3 282 44.20 MagalaExisting VR Connecting SH-40

towards Hoovinahadagli

Existing VR Connecting SH-40

towards Hoovinahadagli nvia

tippapura

Use Both Road and move

towards hoovina hadagli and

evacuate Within 44 hours

Hoovinahadagli Hoovinahadagali Bellary

297 143.7 283 44.20 GudurExisting VR Connecting SH-57

Towards Balehosur via Halgi

Existing VR Connecting SH-136

Towards Balehosur via

Nagaramaduvu Rod

Use Alternate Road after 44

Hours and Move towards

balehosur evacaute viallage

within 44 hours

Balehosur Shirahatti Gadag

298 145.3 284 44.25 Vithalapur SH -136 towards Hebbal SH -136 towards MundavadUse both roads and evacuate

within 44 hours

Hebbal, 582112 or

Mundawad, 582118Mundargi Gadag

299 142.4 285 45.20Unnamed Settelement 21 Near

Singtalur

Using Singtaloor dam top road

Towards Hoovinahadagali

Exsiting VR Connecting SH -136

towards Jyalawadgi

Move Towards

Hoovinahadagali Within 45

hours or use alternate road

Jyalawadgi 582118

or HoovinahadagaliHoovinahadagali Bellary

300 150.5 286 45.25 KallaganurExisting VR Connecting SH -136

Hebbal Via tolali SH -136 towards Mundavad

Use both roads and evacuate

within 45 hours

Hebbal, 582112 or

Mundawad, 582118Mundargi Gadag

301 139.8 287 46.20 GudisalkoppaExisting VR Connecting SH-57

Towards Balehosur via Halgi

Existing VR Connecting SH-136

Towards Balehosur via

Nagaramaduvu Rod

Use Alternate Road after 46

Hours and Move towards

balehosur evacuate within 46

hours

Balehosur Shirahatti Gadag

302 149.8 288 46.25 Thimalapura 1Existing VR Connecting SH-40

towards Hirehadagali via Nowli

Existing VR Connecting SH-40

towards Hoovinahadagli near

tippapura

Use Both Road and move

towards hoovina hadagli

evacuate Within 46 hours

Hoovinahadagli Hoovinahadagali Bellary

303 147.6 289 46.25 HammigiUsing Singtaloor dam top road

Towards Hoovinahadagali

Exsiting VR Connecting SH -136

towards Mundavad

Move Towards

Hoovinahadagali evacuate

Within 48 hours or use

alternate road

Mundavad or

HoovinahadagaliHoovinahadagali Bellary

304 135.3 290 46.50 MaradurExisting VR Connecting SH-57

Towards Balehosur

Existing VR Connecting SH-136

Towards Balehosur

Use both roads and Move

towards balehosur evacuate

within 46 Hours

Balehosur Shirahatti Gadag

305 158.8 291 47.50 AkkurExisting VR Connecting Neglur

via Hosaritti neglur Road

Existing VR Connecting SH -57

towards Neglur via Kodbal

Use Both roads and Move

towards Honnahatti evacuate

within 47 Hours

Honnatti -581115 Ranibennur Haveri

306 133.8 292 47.55 Korlahalli Exsiting VR Connecting SH -45

Towards Mundargi Exsiting VR Connecting Kalkeri

Move Towards Mundargi

Within 47 hours or use

alternate road and evacuate

within 48 hours

Mundargi or Kalkeri Mundargi Gadag

307 148.8 293 48.05 ShingatalurUsing Singtaloor dam top road

Towards Hoovinahadagali Exsiting VR Connecting Kalkeri

Move Towards

Hoovinahadagali Within 45

hours or use alternate road

and evacute within 48 hours

Kalkeri, 582118

Hoovinahadagali

Mundargi/

HagaribommnahalliGadag/Bellary

308 152.5 294 48.15Unnamed Settlement 8 Near

Sheernahalli

Exsiting VR Connecting SH -45

Towards Mundargi Exsiting VR Connecting Kalkeri

Move Towards

Hoovinahadagali Within 45

hours or use alternate road

and evacute within 48 hours

Mundargi or Kalkeri Mundargi Gadag

309 131.7 295 48.25 Hosaritti SH 136 towards HaleritiiExisting VR Connecting SH -57

towards Neglur

Use both roads and evacuate

within 48 HoursHaleritti-581213 Haveri Haveri

Less Than 50 Hours

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

28

Page 93: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

310 152.8 296 48.25 Gumgol Exsiting VR Connecting SH -136

towards Mundavad

Exsiting VR Connecting SH -136

towards Jyalawadgi

Use both roads and evacuate

within 48 Hours

Mundavad or

JyalawadgiMundargi Gadag

311 158.0 297 48.45 Madalagatti Exsiting VR Connecting SH -45

Towards Mundargi via koorlahalli

Existing VR Connecting

Hiremallinakeri

Use Alternate Road after 47

Hours and evacuate within

48.45 hours

Mundargi or

Hiremallinakeri,

583214

Mundargi/

HagaribommnahalliGadag/Bellary

312 151.3 298 49.35 Nowli 1Existing VR Connecting SH-45

towards Hirehadagali

Existing VR Connecting SH-40

towards Hirehadagali

Use Both Road and move

towards hoovina hadagli and

evacuate Within 49 hours

Hoovinahadagli Hoovinahadagli Bellary

313 135.4 299 50.10 HandiganurExisting VR road Connecting

Ichangi (Ichangi Koradur road)

Existing alternate VR connecting

Icchangi

Use Alternate Road after 50

Hours and Move towards

Ichangi evacuate within 50

Hours

Ichangi 581118 Savanur Haveri

314 143.8 300 50.20 Kittur 2Existing VR Connecting SH-136

Towards Balehosur Alternate Road Not Available

Move towards balehosur

evacuate within 50 HoursBalehosur Shirahatti Gadag

315 148.7 301 50.35 Tolali SH -136 towards Hebbal SH -136 towards Mundavad

Use Both roads and Move

Towards Hebbal or Mundavad

evacuate Within 50 hours

Hebbal or Mundavad Mundargi Gadag

316 135.1 302 50.35Unnamed Settlement 7 near

madalgatti

Exsiting VR Connecting SH -45

Towards Mundargi via koorlahalli

Existing VR Connecting

Hiremallinakeri

Use Alternate Road after 47

Hours and move towards

Hiremalinkere evacate within

48 hours

Mundargi or

Hiremallinakeri,

583214

Mundargi/

HagaribommnahalliGadag/Bellary

317 157.9 303 50.55 Thimalapura 2Existing VR Connecting SH-40

towards Hirehadagali via NowliAlternate Road Not Available

Move towards hoovina hadagli

evacaute Within 50 hoursHoovinahadagli Hoovinahadagli Bellary

318 149.4 304 51.55 Nowli 2Existing VR Connecting SH-40

towards HirehadagaliAlternate Road Not Available

Move towards hoovina hadagli

evacaute Within 52 hoursHoovinahadagli Hoovinahadagli Bellary

319 150.5 305 52.25Unnamed Settlement 6 Near

Kombu

Existing VR Connecting SH-45

towards Hoovinahadagli

Existing VR Connecting

Hiremallinakeri

Use Alternate Road after 50

Hours and Move towards

hoovinahadagli evacuate

within 52Hours

Hoovinahadagali or

Hiremallinakeri,

583214

Hoovinahadagli/Ha

garibommanahalliBellary

320 155.0 306 52.30 KombliExisting VR Connecting SH-45

towards Hoovinahadagli

Existing VR Connecting

Hiremallinakeri

Use Alternate Road after 50

Hours towards Hiremalinkere

evacuate within 52 hours

Hoovinahadagali or

Hiremallinakeri,

583214

Hoovinahadagli/Ha

garibommanahalliBellary

321 155.5 307 52.35 Sheeranahalli Exsiting VR Connecting SH -45

Towards Mundargi Exsiting VR Connecting Kalkeri

Move Towards Mundargi

evacaute Within 52 hours or

use alternate road within 48

hours

Mundargi or Kalkeri Mundargi Gadag

322 148.5 308 52.40 KoradurExisting VR Connecting SH-136

Towards Balehosur Existing VR road Connecting Ichangi

Use Alternate Road after 52

Hours Move towards balehosur

evacuate within 53 Hours

Balehosur Shirahatti Gadag

323 156.4 309 52.50 Nowli 3Existing VR Connecting SH-40

towards Hirehadagali Alternate Road Not Available

Move towards hoovina hadagli

evacaute Within 52 hoursHoovinahadagli Hoovinahadagli Bellary

324 133.7 310 52.50 KotanakalExisting VR Connecting SH-45

towards Hirehadagali

Existing VR Connecting SH-40

towards Hirehadagali

Use Both Road and move

towards hoovina hadagli

evacaute Within 52 hours

Hoovinahadagli Hoovinahadagli Bellary

325 146.6 311 53.10Unnamed Settelement 9 Near

Bidarahalli SH -136 towards Mundavad Alternate Road Not Suitable

Move Towards Mundavad and

evacuate Within 53hoursMundavad Mundargi Gadag

326 155.9 312 54.35 Gangapur Exsiting VR Connecting SH -45

Towards Mundargi Exsiting VR Connecting Kalkeri

Move Towards Mundargi

evacaute Within 54hours or

use alternate road within 48

hours

Mundargi or Kalkeri Mundargi Gadag

327 134.0 313 54.50 KodabalExisting VR Connecting SH -57

towards NeglurAlternate Road Not Suitable

Move towards Honnahatti and

evacuate within 54 HoursHonnahatti Ranibennur Haveri

Less Than 55 Hours

See Annexure 8

to 15 and Failure

Notification flow

chart

See Annexure 8

to 15 and Failure

Notification flow

chart

29

Page 94: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl

No

DownstremDi

stance from

dam (km)

Order of

Priority

Evacuation

Time WindowName of Village Existing Route Alternative Evacuation Route Remarks

Shelter/Refuge

Area

Taluk authorities

Responible for

evacuation

District

authorities

Responible for

evacuation

Contact Details

328 160.9 314 55.25 Hesaur 2 Exsiting VR Connecting SH -129

Towards Mundargi Alternate Road Not Suitable

Move towards Mundargi and

evacaute Within 55 hoursMundargi Mundargi Gadag

329 162.1 315 55.30 Kakkur Exsiting VR Connecting SH -129

Towards Mundargi

Exsiting VR Connecting SH -45

Towards Mundargi

Use Both roads and Move

towards Mundargi evacuate

Within 55 hours

Mundargi Mundargi Gadag

330 159.7 316 55.30 SovinahalliExisting VR Connecting

HiremallinakeriAlternate Road Not Suitable

Move towards Hiremallinakeri

and evacuate Within 55 hours

Hiremallinakeri,

583214Hagaribommanahalli Bellary

331 134.5 317 55.35Unnamed Settlement 2

Sovinahalli

Existing VR Connecting

HiremallinakeriAlternate Road Not Suitable

Move towards Hiremallinakeri

and evacuate Within 55 hours

Hiremallinakeri,

583214Hagaribommanahalli Bellary

332 163.2 318 55.40 MannurExisting VR connecting Yelagchu

via shirmapuraAlternate Road Not Suitable

Move towards Hiremallinakeri

and evacuate Within 55 hoursYalagachu, 581213 Haveri Haveri

333 160.6 319 56.05 Hakandi 3Existing VR Connecting

HiremallinakeriAlternate Road Not Suitable

Move towards Hiremallinakeri

and evacuate Within 55 hours

Hiremallinakeri,

583214Hagaribommanahalli Bellary

334 163.6 320 66.20 Yenagi Basavapura 2Existing VR Connecting

G.Kodihalli,Alternate VR Connecting G.Kodihalli,

Move towards G.Kodihalli and

evacuate within 66 hoursG.Kodihalli, 583224 Hagaribommanahalli Bellary

See Annexure 8

to 15 and Failure

Notification flow

chart

Less Than 60 Hours

30

Page 95: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 5

31

Page 96: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of officer Designation Contact Numbers

1 Manjunath AEE 9448836749

2 M R Rajkumar AE 9742768098

3 Murali AE 9535554595

4 Satheesh JE 9986573897

5 Venktesh JE 7259672376

6 Sandhya JE 9886346780

7 Sathyanarayan JE(Electrical) 8105875466

8 Mukthaar ahmed FDA 9449132856

9 Office Number 08282/257235

1 Manju A V Gate operator 9916870445

2 Ramesh A V Gate operator 9916009379

3 Mani Gate operator 9916870445

4 Munna Gate operator 9980500458

5 Krishnamoorthy Gate operator 9901984673

6 Shanmuka Gate operator 8123783154

7 Ravi Electrician 9113936624

8 Rudresh Guage Reader 9449282151

9 Ganganni Watchman 9916279509

10 Mohammed Gouse Watchman 9741447440

11 Ramchandra Watchman 9945221517

12 Yousuf Watchman 9980125178

13 Ravikumar Watchman 9986577244

14 Kiran Watchman 8095396877

15 Shareef Watchman 7996352180

16 Kabeer Watchman 8722357895

17 Chndra Watchman 8095710014

18 Naveen b Watchman 7996352180

19 Anwar Dam Top IB Meti 9731147134

20 Acchyuth Dam top IB Watchman 9886076889

21 Krishnappa Dam top IB Watchman 9901027299

22 Giri Colony Electrician 9916009385

23 Kumar Colony Electrician 9742887223

24 Prakash Water supply operator 9916279511

25 Swamy dam office watchmen 7829742493

Officers and workers available at Bhadra dam site 24*7

Engineers

Workers in bhadra dam

ANNEXURE-5

32

Page 97: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 6

33

Page 98: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of officer Designation Contact Numbers Area

1 N. Uday Nayak EE(Oand M) 9449598814

2 Haseen K AEE (Electrical) 8867163912

3 Chitra H T AE(Industry) 8971981020

4 Venktesh R AE (Electrical) 9743296468

5 Prajwala S K AE(Mechanical) 7760032892

6 Sandhya L V AE (Electrical) 9482135636

7 Sarvamangala H S JE(Mechanical) 8073014985

8 Rekha N H JE(Electrical) 9448432828

9 Devraj T V JE(Mechanical) 9449968204

Kumar In Charge 9606934027 Saddle no 1

Sl No Name of officer Designation Contact Numbers Area

1 Veerendra H R EE(Oand M) 9480833032 Bhadravathi division office

2 Abdul munaf AEE (Electrical) 9448289507 Bhdravathi Rural Sub division office

3 Kirankumar m h AE(Industry) 9448289671 B R Project Section office

4 Jayanna AE (Electrical) 9448289560 Kadur Division office

5 Hussain Khan AE(Mechanical) 9448289515 Tarikere Sub division office

6 Kirankumar AE (Electrical) 9448289525 Lakkavalli Section office

ANNEXURE 6

Tarikere

Karnatak Electricity Board (KEB)

Bhadravathi

Karnataka Power Corporation Limited (Located Downstream of bhadra dam)

Engineers

Downstream of the masonry dam

Sai Deepthi Power Corporation limited

34

Page 99: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 7

35

Page 100: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Dam Designation Officer Name office Address Landline Number Phone Number Email Id Location

1 Lakhya Dam AGM (C & PC,Ic/ L and E) Manohar UKIOCL Limited Panamboor Manglore

575010

0824/2407422/2409681/24032

[email protected] Upstream dam

2 Executive Engineer R. Ravichandra.

Executive Engineer, KNNL

No:4,BRLBC Division Bhadravathi08282- 271063

96207-08211 [email protected]

3 Asistant executive Engineer Manjunath.R.B.

Assistant Executive Engineer KNNL

No.3 BRLBC sub.division.

Bhadravathi 08282-274437 99005-03701

4 Executive Engineer Shivakumar

Executive Engineer,

KNNL, UTP Division, Shimoga, Sagar

Road - 577201

08182-254832 /08182-257189 96207-08211 [email protected]

5 Asistant executive Engineer C.V Omkarappa

Assistant Executive Engineer, KNNL

UTP No.5 sub.dn. Gajanur -577202 08182-234212 9901120953

6 Executive Engineer M.H. Pawar

Executive Engineer

KNNL, Dandavathi Project Division,

Shikaripura 577427

08187-222206

81971-10007 [email protected]

7 Asistant executive Engineer M Shashidhar Naik

Assistant Executive Engineer

KNNL, No -5 Irrigation Sub Division,

Shikaripura 577427

08187-290260 94481-25907 [email protected]

Executive Engineer Rajendraprasad J.EExecutive Engineer, KNNL No:3,

Bhdra canal Division, Malebennur.08192-268754 9448218873 [email protected]

Asistant executive Engineer M. Gavisiddeshwara

Assistant Executive Engineer

KNNL, No.3 Bhadra canal Sub.dn.

Malebennur

9448262361

Executive Engineer Ravi M B

Executive Engineer,

KNNL, UTP Division, Ranebennur08373-267071 9886336403 [email protected]

Asistant executive EngineerLakshmappa, Assistant Executive Engineer KNNL

LIS sub.division, Hangal.Not Available 94488-92122

Executive Engineer NagbhushanExecutive engineer TB division

MunirabadNot Available 9448442911

[email protected]

Asistant executive Engineer BasavarajAsistant executive Engineer Head

Works Subdivision MunirabadNot Available 9480078931

Executive Engineer Malligwad Executive engineer No 1 Singataloor

Lift irrigation Division Mundargi

Not Available 9916146827 eescid [email protected]

Asistant executive Engineer I PrakashAssistant Executive engineer No 1

Singataloor Lift irrigation Division

Mundargi

Not Available9448391936/

9900421048

8

9

10

ANNEXURE-7

11

Downstream dam owners

Tungabhadra dam

Singataloor-Barrage

UTP Dam

Anjanapura Resrvior/Ambligola

Reservior

Gondi Anicut Same Catchment

Same Catchment

Same Catchment

Same Catchment

Same Catchment

Downstream Dam

Downstream Dam

Devarabelakere pick up

Madagamasur-Tank

36

Page 101: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 8

37

Page 102: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Office Fax Residence

1 Shivamogga K.Shivaramegowda 08182 223770 222233 222064 [email protected]

2 Chikkamagaluru S. Ashwathi 08262 220140 220094 230560

231260

ceo-

[email protected]

3 Davanagere H. Basavarajendra 08192 261485 261865 260250 [email protected]

4 Haveri K. Leelavathi 08375 249031 249037 249070 [email protected]

5 Gadag Manjunath.R.Chavan 08372 234375 230211 230599 [email protected]

6 Ballari Nitish K 0839 2267300 2267200 267400

267555

[email protected]

7 Koppal Peddappaiah R.S 08539 220002 220040 221261 [email protected]

ANNEXURE -8

ZP Chief Executive Officers

Sl.

No

District Name STD Phone Nos. Mobile e-mail

94808-71000

94808-76000

94808-60000

94808-63000

94808-68000

94808-65000

94808-55000

94835-47300

38

Page 103: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 9

39

Page 104: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

SL.NO Contact Number Office Email Id

1 9483869160 80-22032995 [email protected]

2 9686940969 8022032426 [email protected]

3 8971644479 080-22340676

4 9945218097 080-22340676

6 9448024073 080-22032582

8 9845136219 080-22032582

9 8694907152 080-22032582

Sl.

No.

Name of the

DistrictName of Head of DDMA Designation

Address, Email, Telephone and

Fax of Head of DDMA

Details (Name/Address

/Tele/Fax/Email) of Head of

DEOC

1 Shivamogga Dayanand K A Deputy Commissioner Deputy Commissioner Office

Shivamogga,

Mob: 9481492999,

Office No: 08182-271102,

Fax: 08182-277082,

Mail: [email protected]

Sri. Venkatesh Vittal. B. R

Deputy Commissioner Office

Shivamogga,

Mob: 9448639649

Office No: 08182-1077

2 Chikkamagalur Shri M.K.Srirangayya IAS Deputy Commissioner Office of the Deputy

Commissioner, Chikkamagaluru

District

Email: [email protected]

[email protected]

Tel: 08262230401

Fax: 08262235336

M.L.Vyshali, Additional Deputy

Commissioner, Chikkamagalur

District.

Email:

[email protected]

[email protected]

Tel: 08262230401

ANNEXURE-9

Toll Free Number-1070

State Disaster Management Authority

Toll Free Number -1070

Name

Shri. Gangaram Baderiya,IAS

Shri.K.Umapathy

Somashekar

Sudhakar Shetty

Prashanth Kumar

Dr.G.Vishwanath

Madhu.S

District Disaster Management Authority

40

Page 105: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

3 Davanagere Shri D.S.Ramesh IAS Deputy Commissioner Deputy Commissioner, Davanagere

District.

08192-234640

[email protected]

D.S.Ramesh,

Deputy Commissioner,

Davanagere District.

08192-234640

[email protected]

4 Haveri Dr.M.V.Venkatesh IAS Deputy Commissioner Haveri [email protected]

08375-249044 Fax:08375-249088

Dr. Venkatesh M.V.

Dy.Commissioner, Haveri

08375-249044

Fax:08375-249088

[email protected]

5 Gadag Shri Manoj Jain IAS Deputy Commissioner O/o Deputy Commissioner,

District Administration Complex,

Hubballi Road, GADAG 08372-

237300,

08372-232413,

[email protected],

[email protected]

Deputy Commissioner, Gadag.

08372-239177

[email protected]

[email protected]

6 Ballari Dr. V Ram Prasath

Manohar IAS

Deputy Commissioner Office of the Deputy Commissioner

Ballari Railway Station opposite

Ballari-583101

Fax-No:08392-272538 Phone-

No:08392-271202

E-mail: [email protected]

Office of the Deputy

Commissioner Ballari Railway

Station opposite Ballari-

583101Fax- No:08392-272538

Phone-No:08392-271202

E-mail: [email protected]

7 Koppal Smt.M.Kanagavalli IAS Deputy Commissioner District Administrative Building,

Hospect Road,

Koppal.

Email- [email protected]

Phone-08539-220844

Fax-08539-221235

District Administrative

Building, Hospect Road,

Koppal.

Email- [email protected]

Phone-08539-220844

Fax-08539-221235

41

Page 106: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Name Office Fax Mob. E.mail id

Secretary 011-26701710 011-26701716 [email protected]

Lt Gen (Retd) N C Marwah, PVSM, AVSM, Member 011-26701775 [email protected]

Dr. D N Sharma, Member 011-26701738 011-26701767   [email protected]

Shri Kamal Kishore, Member 011-26701740 011-26701754  9818143429   [email protected]

Dr. Pradeep Kumar, IAS, 011-26701780 011-26701795 [email protected]

JS (Mitigation) 011-26701720

Brig. Ajay Gangwar Advisor (Ops &

Communication)011-26701886 011-26701742

[email protected]

Dr. V.Thiruppugazh, Joint Secretary (Policy &

Plan)011-26701777

 011-26701816   [email protected]

Dr. Pradeep Kumar, IAS, 011-26701777

Project Director 011-26701791 (PPS)

011-26714321

Shri. Samir Kumar, BRES

Dy. Project Director

Shri Ashok Kumar Sarkar, Project Accountant

cum Admn. Officer011-26701744 [email protected]

Name Office Fax Mob. E.mail id

011-26701728 9868891801 [email protected],

011-1078 9868101885 [email protected],Control Room

011-26701729

ANNEXURE-9Natioanal Disater management Authority

MEMBERS

JOINT SECRETARIES

NCRMP

  [email protected]

011-26701792 [email protected]

NDMA CONTROL ROOM

42

Page 107: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 10

43

Page 108: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

slno District Subdivision AC name Designation Mobile no landphone emailid

1 Shimoga Shimoga Krishna Murthy AC 7760292048 8182222204 [email protected]

2 Chikmagalur Tarikere Sangappa AC 9902602220 8261222220 [email protected]

3 Davanagere Harapanahalli Najma G AC 9480712365 08398-280575 [email protected]

4 Haveri Haveri Lokesh P N AC 9986886348 08375-232468 [email protected]

5 Gadag Gadag P.S.Manjunath AC 9986647236 08372-238506 [email protected]

6 Bellary Bellary B T Kumarswamy AC 944928625 08392-277413 [email protected]

7 Koppal Koppal C.D. Geeta Incharge AC 9886660847 08539 220247 [email protected]

ANNEXURE-10Asistant Commissioner

44

Page 109: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 11

45

Page 110: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

slno District Taluk Tahsildar name Designation Mobile no landphone emailid

1 Shimoga Shimoga Manjegowda Tasildhar 9448401397 08182-279312 [email protected]

2 Shimoga Bhadravathi Nagaraj Tasildhar 9164058056 08282-267283 [email protected]

3 Chickmaglore Tarikere Dharmoji Rao Tahsildar 9449251389 8261222259 [email protected]

4 Davanagere Harihara Rheen Pasha Tahsildar 9845540868 08192-272959 [email protected]

5 Davanagere Harapanahalli Gurubaswaraj Tahsildar 9731289202 08398-280262 [email protected]

6 Davanagere Honnali Nagaraj N J Tahsildar 9900656699/

9448766570

08188-251025 [email protected]

7 Haveri Haveri G B Majjagi Tahsildar 9620972112 08375-232445 [email protected]

8 Haveri Ranebennur Ramamurthi Tahsildar 9448576124 08373-266450 [email protected]

9 Haveri Hirekerur A V Shiggavi Tahsildar 9448006853 08376-282231 [email protected]

10 Gadag Sirahatti Amaravadagi Tahasildar 9448412133 08487-242430 [email protected]

11 Gadag Mundaragi Bramaramba

Gubbishetti

Tahasildar 9741625229 08371-262237 [email protected]

12 Bellary HB Halli Vijayakumar Tahsilder 9980265830 08397-238255 [email protected]

13 Bellary Hadagali Raghavesndra

Rao

Tahsilder 8496859985 08399-240238 [email protected]

14 Koppal Koppal Gurubasavaraj Tahsildar 9880994147 08539 220381 [email protected]

ANNEXURE-11Tashildar

46

Page 111: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 12

47

Page 112: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl.

No.

District ULB / DUDC Project Director /

Commissioner / CO

Name

PD /

Commissioner

/CO Mobile

Number

PD/Commissioner/CO E-Mail ID

1 Shivamogga Shivamogga dudc H.R. Rajappa 9448525650 [email protected]

2 Shivamogga Bhadravathi CMC Sri Channe Gowda [email protected]

3 Chikkamagal

ur

Chikkamagaluru

DUDC

Pallavi K R 9591860887 [email protected]

4 Chikkamagal

ur

Chikkamagaluru CMC Nagaraj H S 9448816667 [email protected]

5 Chikkamagal

ur

Tarikere TMC Gireesh T S 8904038648 [email protected]

6 Davangere Davangere DUDC Prasanna RV(incharge) 8970146894 [email protected]

7 Davangere Davangere - CC Narayanappa B H 9449733799 [email protected]

8 Davangere Harihara - CMC Ningappa Kumannanavar 9886763509 [email protected]

9 Davangere Harapanahalli - TMC Basavaraj 9448393360 [email protected]

10 Davangere Honnali - TP Veerabadrayya 9036118534 [email protected]

11 Gadag Gadag-Betageri DUDC Shri. Ramesh Desai 9480487942 [email protected]

12 Gadag Gadag-Betageri CMC Mansoor Ali 7259181693 [email protected]

13 Gadag Shirahatti TP Uma S. Palegar 9481856181 [email protected]

14 Gadag Mundargi TMC Shoba Bellikoppa 9964243224 [email protected]

15 Haveri Haveri DUDC Vasanna R 9964262669 [email protected]

[email protected] Haveri Haveri CMC Munishyamappa 9448132612 [email protected]

17 Haveri Ranebennur CMC Raveendra Mallapur 9448476903 [email protected]

18 Haveri Hirekerur TP A Suresh 9036663167 [email protected]

19 Ballari Ballari DUDC B.B Saroja 9901771655 [email protected]

20 Ballari Ballari CC [email protected]

21 Ballari Hadagali TMC, Virupaksha Moorthi R 9448377655 [email protected]

22 Ballari Kottur TP, Pampa pati Naik 9902267565 [email protected]

23 Ballari Kudligi TP, Umesh Hiremath 9886308045 [email protected]

24 Koppal Koppal DUDC B S Ramesh 9972888445 [email protected]

25 Koppal Koppal CMC Ramesh Pattedar 9448136336 [email protected]

ANNEXURE-12

08539-221895

08539-230192

08182-226268

08282-266356

08391-226239

08391-220049

8262239010

8262232272

8261222233

08192-251168

08192-252899

08192-244266

08398-280258

08188-251021

08372-231877

MUNCIPALITY CONTACT DETAILS

PD / Commissioner

/ CO Office Phone

08392-273465

08392-273479

08399-240237

08373266444

08376282382

08372-259932

08487-242238

08371-262232 /

2626308375249097

08375266575

08375232444

48

Page 113: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 13

49

Page 114: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

SL No ZILLA PANCHAYAT TALUK PANCHAYAT STD CODE TELEPHONE

NUMBER

1 SHIVAMOGGA SHIVAMOGGA 08182 222299

2 SHIVAMOGGA BHADRAVATI 08282 266372

3 CHIKKAMAGALURU CHIKKAMAGALURU 08262 234017

4 CHIKKAMAGALURU TARIKERE 08261 222235

5 DAVANAGERE DAVANAGERE 08192 275812

6 DAVANAGERE HARAPPANAHALLI 08398 280226

7 DAVANAGERE HARIHARA 08189 229665

8 DAVANAGERE HONNALI 08188 2541420

9 HAVERI HAVERI 08379 232446

10 HAVERI RANEBENNUR 08375 266425

11 HAVERI HIREKERUR 08376 282223

12 GADAG GADAG 08372 278352

13 GADAG MUNDARAGI 08371 262278

14 GADAG SHIRAHATTI 08487 242421

15 BALLARI HAGARIBOMMANAHALLI 08397 238259

16 BALLARI HADAGALLI 08399 240239

17 KOPPAL KOPPAL 08539 220399

ALL TALUK EXECUTIVE OFFICERS DETAILS

ANNEXURE-13

[email protected]

e-mail id

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

50

Page 115: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 14

51

Page 116: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

SL.NO OFFICER NAME DESIGNATION OFFICE

NUMBER

MOBILE NUMBER

1 Mr.DAYANAND IPS IGP E/R 08192 237829 9480800028

2 Mr.Abhinva Ashok Khare Superitendent of Police 261400 9480803301

3 Mr.Muttu Raj Addl. Superitendent of Police 261401 9480803302

4 laksman AAO/GHA 259022

5 Chandrappa DSP ACB 222276 9480806230

6 Thippeswamy PI ACB 222276 9480806287

7 Saleem PI ACB 9480806288

8 Gangadharappa PI DCIB 9480803308

9 LAXMIKANTH PI DCRB 9480803309

10 Kumar PI CEN 261426 9480803383

11 Rehman PSI FPB 9480803310

12 Sathish kumar PI W C.ROOM 261413 9480800947

13 CONTROL ROOM 261413, 270521 9480803300

14 PSI COMPUTER 255277 9480803393

SL.NO OFFICER NAME DESIGNATION OFFICE

NUMBER

MOBILE NUMBER

1 OMAR NAIK DSP BHADRAVATHI 274252 9480803320

2 NAJAPPA CPI TOWN BDVT 266549 9480803334

3 PRAKASH PSI BDVT N T PS L&O 274313 9480803355

4 BHARATH PSI BDVT OT PS L&O 266343 9480803354

5 VISHWANATH PSI HOSAMANE PS 266022 9480803312

6 SMT KAVITA PSI TFC BDVT -2 9480205710

1 Ashok kumar CPI BDVT RURAL 272333 9480803335

2 Sunilkumar PSI BDVT RURAL L&O 266033 9480803357

3 RAGHAVENDRA PSI BDVT PT PS 270456 9480803358

4 MALLIKARJUNA PSI HOLEHONNUR PS 235494 9480803359

BHADRAVATHI SUB-DIVISION (08282)

Bhadravathi Rural Circle (08282)

SHIVAMOGGA POLICE PHONE DIRECTORY

DISTRICT POLICE OFFICE(08182)

52

Page 117: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Officer Name and address Phone Number Email id

1SP Chikkamagaluru 9480805101 [email protected]

2SP Chikkamagaluru 8262230403 [email protected]

3Additional Superintendent of Police 9480805102

4District Control Room 9480805100 [email protected]

5Deputy Superintendent of Police, Tarikere 9480805122

6Circle Inspector of Police, Tarikere Circle 9480805136

7Sub Inspector of Police, Lakkavalli PS 9480805162

8Deputy Superintendent of Police, Koppa 9480805121

9Circle Inspector of Police, Narasimarajapura Circle 9480805134

10Sub Inspector of Police, Narasimarajapura PS 9480805157

11Sub Inspector of Police, Balehonnur PS 9480805158

12Circle Inspector of Police, Kudremukha Circle 9480805135

13Sub Inspector of Police, Kudremukha PS 9480805159

14Sub Inspector of Police, Kalasa PS 9480805160

CHIKKAMAGLORE POLICE PHONE DIRECTORY-

53

Page 118: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl NO Police Station Land Line No. Mobile No. Email Address

1

SP Davangere 08192-253400 9480803201 [email protected] Kondajji Road, Devarajurs

Layout, "c" Block, Davanagere-

577006

2

Additional SP davangere 08192-232717 9480803202 [email protected] Kondajji Road, Devarajurs

Layout, "c" Block, Davanagere-

577006

3DySP Davangere Rural Sub

Division

08192-262550 9480803222 [email protected] Nittuvalli Circle, Hadadi road,

Davangere-577004

4CPI Davangere Rural Circle 08192-272014 9480803232 [email protected] Nittuvalli Circle, Hadadi road,

Davangere-577004

5Davanagere Rural PS 08192-262555 9480803256 [email protected] Nittuvalli Circle, Hadadi road,

Davangere-577002

6Mayakonda PS 08192-215922 9480803255 [email protected] Mayakonda post, Davangere

Taluk -577534

7Hadadi PS 08192-218405 9480803254 [email protected] Hadadi, Davangere taluk-

577252

8CPI Honnali Circle 08188-251282 9480803235 [email protected] Shivamogga Road, Honnali,

Davangere DIST Pin-577217

9Honnali PS 08188-251100 9480803263 [email protected] Shivamogga Road, Honnali,

Davangere DIST Pin-577217

10

Nyamathi PS 08188-265349 9480803264 [email protected] Nyamathi post, Honnali Taluk,

Davangere Dist.-577223

11

Malebennur PS 08192-268758 9480803259 [email protected] Malebennur, Harihara Taluk,

Davangere Dist-577530

12

Harihara Town PS 08192-272016 9480803257 [email protected] Harihara PS, Harihara Taluk ,

Davanagere Dist. Pin-577601

13

CPI Harihar Circle 08192-272016 9480803234 [email protected] Harihara circle , Harihara,

Davanagere Dist. Pin-577601

DAVANAGERE POLICE PHONE DIRECTORY

Harihara Taluk

Honnali Taluk

District police

Rural

54

Page 119: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

14

Harihara Rural PS 08192-272017 9480803258 [email protected] Guttur Colony, Harihara Taluk,

Davanagere Dist Pin-577601

15

Arasikere PS 08398-270033 9480803265 [email protected] Arasikere post , Harapanalli

Taluk, Davangere Dist.-583125

16

Chigateri PS 08398-274666 9480803266 [email protected] Chigterei Post, Harapanalli

taluk , Davangere dist - 583127

17

Halavagilu PS 08398-272033 9480803268 [email protected] Halwagulu post, Harapanalli

Taluk, Davangere Dist.-583213

18

Harapanahalli PS 08398-280333 9480803267 [email protected] Hospete Road, Harapnalli Taluk,

Davangere Dist-583131

19

DySP Harapanahalli Sub-

division

08398-280237 9480803221 [email protected] Hospete Road, Harapnalli Taluk,

Davangere Dist-583131

20

CPI Harapanahalli Circle 08398-280333 9480803236 [email protected] Hospete Road, Harapnalli Taluk,

Davangere Dist-583131

Harpanhalli

55

Page 120: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of officerPolice Station

DesignationMobile No. Land Line No.

1    Sri. K Parashuram Supdt. of Police District Police Office 9480804501 08375 44501

2    Sri. J A Jagadish Addl. Supdt. of Police District Police Office 9480804502 08375 44502

3    Sri. L Kumarappa Deputy. Supdt. of Police Haveri Sub – Division 9480804520 08375 42311

5 District Police Office 9480804500 08375 44500

6    Sri. (Vacant) Deputy. Supdt. of Police DCRB, DPO, Haveri 9480804509 08375 42309

7    Sri. M I Goudappagoudra Police Inspector Haveri Town PS 9480804545 08375 42321

8    Sri. U N Kulakarni Police Sub – Inspector (L&O) Haveir Town PS

9    Sri. D G Patil Police Sub – Inspector (Crime) Haveri Town PS

10    Sri. Basu Chavhan Circle Police Inspector Haveri Rural Circle 9480804530 837542314

11    Sri. U J Shashidhar Police Sub – Inspector Haveri Rural PS 9480804546 837542322

12    Sri. Hanumanthappa C Police Sub – Inspector Kaginele Police Station 9480804549 837542325

13    Sri. T V Suresh Deputy. Supdt. of Police Ranebennur Sub – Division 9480804521 837342312

14    Sri. Linganagouda Negalur Circle Police Inspector Ranebennur Town Circle 9480804532 837342316

15    Sri. T Manjanna Police Sub – Inspector (L&O) Ranebennur Town PS 9480804550 837342326

16    Smt. (Vacant) Police Sub – Inspector (Crime) Ranebennur Town PS

17    Sri. Jayappa Naik B L Police Sub – Inspector Traffic – 1 Ranebennur Traffic PS 9480804551 837342327

18    Sri. (Vacant) Police Sub – Inspector Traffic – 2 Ranebennur Traffic PS

19    Sri. Suresh Sagari Circle Police Inspector Ranebennur Rural Circle 9480804536 837342320

20    Sri. Sunilkumar H Police Sub – Inspector Ranebennur Rural PS 9480804552 837342328

21    Sri. Shrishail Chougula Police Sub – Inspector Halageri Police Station 9480804554 837342330

22    Sri. Manjunath Pandit Circle Police Inspector Hirekerur Circle 9480804533 837642317

23    Sri. Sandeep G S Police Sub – Inspector Hirekerur Police Station 9480804555 837642331

24    Sri. Aravind B S Police Sub – Inspector Rattihalli Police Station 9480804556 837642332

25    Sri. Hanumanthappa C Police Sub – Inspector Hansabhavi Police Station 9480804557 837642333

HAVERI POLICE PHONE DIRECTORY-

Haveri Dist. Control Room

Hirekerur

Ranibennur

56

Page 121: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Officer Name and address Phone Number Mobile Number

1 SP GADAG 08372-235066 9480804401

2 CONTROL ROOM 08372-238300 9480804400

3 DSP GADAG 08372-238704 9480804420

4 DSP DCRB GADAG 9480804409

5 AAO DPO GADAG

6 RPI DAR GADAG 9480804406

7 PI DSB GADAG 9480804407

8 PI DCIB GADAG 9480804408

9 PSI FPB GADAG 9480804410

10 CPI GADAG TOWN 9480804430

11 CPI BETAGERI 08372-245980 9480804432

12 GADAG RURAL CPI 08372-237193 9480804431

13 CPI SHIRAHATTI 08487-242419 9480804433

14 CPI RON 08381-267244 9480804434

15 PI MUNDARAGI 08371-262333 9480804455

16 PSI GADAG TOWN 9480804445

17 PSI GADAG RURAL 9480804447

18 PSI BETAGERI 9480804449

19 PSI EXTENSION 9480804450

20 PSI SHIRAHATTI 9480804451

GADAG POLICE PHONE DIRECTORY-

57

Page 122: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl NO Officer/Unit STD CODE Land line No. Mobile No. E-MAIL

1 S P Bellary 8392 258300 9480803001 [email protected]

2 Addl. S P Bellary 8392 258837 9480803002 [email protected]

3 DSP DCRB 8392 257966 9480803009 [email protected]

4 DSP DAR 8392 272966 9480803006 [email protected]

5 PI (W) C/ROOM 8392 258101 9480800948 [email protected]

6 PI DSB 8392 257886 9480803007 [email protected]

7 PI DCIB 8392 258313 9480803008 [email protected]

8 258100

9 258102 fax

10 PSI DSB 9480803014

11 PSI F.P.B -- -- 9480803012

12 DSP Hadagali 8399 240666 9480803024 [email protected]

13 CPI Hadagali 8399 240333 9480803030 [email protected]

14 CPI H B Halli- 8397 238333 9480803037 [email protected]

15 PSI H B Halli PS 8397 238333 9480803065 [email protected]

16 PSI T B Halli PS 8397 249205 9480803066 [email protected]

17 PSI Hadagali PS 8399 240333 9480803067 [email protected]

18 PSI H. Hadagali PS 8399 250213 9480803068 [email protected]

19 PSI Ittigi PS 8399 256405 9480803069 [email protected]

BELLARI POLICE PHONE DIRECTORY-

Control Room Bellary 8392 9480803000 [email protected]

58

Page 123: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of the Officer Designation Landline No. Mobile No.

1

Smt. Renuka K. Sukumar 

IPSSP Koppal 08539-230111 9480803701

2 S.M. Sandigawad DSP Koppal 08539-230342 9480803720

3 Bheemanna M Sori CPI Koppal Rural 08539-222433 9480803731

4Gururaj R Kattimani PSI Koppal Rural PS 08539-221333 9480803746

5 K. Rangayya PSI Munirabad PS 08539-270333 9480803748

6 Shivraj Ingle PSI Alwandi PS 08539-285233 9480803747

Koppal Sub Division

Koppal Rural Circle

KOPPAL POLICE PHONE DIRECTORY-

59

Page 124: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 15

60

Page 125: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

SL NO STATIONS Zone Range Number

1 101

2080 22971550 ,

080 22971600

3 080 22971571

4 22971500

5 DAVANGERE Bangalore West Davangere 08192 258101

6 HARAPANHALLI Bangalore West Davangere 08398 280433

7 HARIHARA Bangalore West Davangere 08192 242601

8 HONNALI Bangalore West Davangere 08188 251400

9 CHANNAGIRI Bangalore West Davangere 08189 229007

10 JAGALUR Bangalore West Davangere 08196 295101

11 HAVERI Bangalore West Davangere 08375 232666

12 RANEBENNUR Bangalore West Davangere 08373 269101

13 HANGAL Bangalore West Davangere 08379 262801

14 HIREKERUR Bangalore West Davangere 08376 282555

15 SHIMOGA Mangaluru Shimoga 08182 222888

16 BHADRAVATHI Mangaluru Shimoga 08282 270418

17 CHIKMAGLUR Mangaluru Shimoga 08262 229199

18 TARIKERE Mangaluru Shimoga 08261 223700

19 MUDIGERE Mangaluru Shimoga 08263 221101

20 BELLARY Kalburgi Bellary 08392 266001

21 HOOVINAHADAGALI Kalburgi Bellary 08399 240201

22 HAGARIBOMANAHALLI Kalburgi Bellary 08397 239600

23 KOPPAL Kalburgi Bellary 08539 221300

24 MUNDARGI Kalburgi Bellary 08371 262300

25 GADAG Kalburgi Bellary 08372 237444

Fire Station Details

FIRE & EMERGENCY SERVICE CONTROL ROOM

Toll Free Number

Control Room

Wireless Operator

61

Page 126: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Landline Numbers Mobile Number

1 25570733/22971501/ 22942108(Fax)

9483530733

225555388 25205544 22971567

22971559(F) 9448123234

3 25740453/ 22971505 9663260201

425540656/ 25585344/ 22971507/

22971508/ FAX 22971512 9880040848

525544042/ 26538167/ 22971509/

22971510 9342165994

6 25569900/ 22971504/ 22971524 9845155897

7SRI N.U.ERAPPA C.F.O. BANGALORE WEST

080 22971523/ 22971522/ 02 9448066101

8SRI J.H.RAVISHANKAR R.F.O. BANGALORE WEST

080 22971578/ 22971520 9448321212

9 SRI C.BASAVANNA R.F.O DAVANGERE 08192 254100/ 250375 9448978640

10 SRI H.S.PALAKSHAPPA, DFO, DAVANGERE 08192 258101 9986479879

11 SRI SHANKARAPPA D.F.O HAVERI 08375 232666 9741538926

12 SRI M.R.NARASIMHAMURTHY R.F.O BELLARY 08392 266933/ 213122 9980802048

13 SRI G.TIPPESWAMY, DFO BELLARY 08392 266001 9449549823

14 SRI SHASHIDHAR MURTHY KOPPAL 08539 221300 9449478178

15 SRI. RUDREGOWDA GADAG 08372 237444 9449428485

16 SRI SHIVAKUMAR R.F.O. SHIMOGA 08182/227328 /249120 9448233955

17 DFO SHIMOGA 08182 222888

18 H.B.BASAVARAJU, DFO CHIKKAMAGLUR 08262 220199 9945359233

SRI.N.SHIVAKUMAR, I.P.S INSPECTOR GENERAL OF

POLICE AND ADDL .DIRECTOR GENERAL, FIRE &

EMERGENCY SERVICES.

SRI.M.CHANDRASEKHAR DEPUTY.INSPECTOR

GENERAL FIRE & EMERGENCY SERVICES

SRI B.G.CHANGAPPA. DIRECTOR.

SRI B.K.HAMPAGOL DEPUTY DIRECTOR (TECH.)

SRI D.RASHEED DEPUTY DIRECTOR (ADMIN)

SRI OM PRAKASH,I.P.S DIRECTOR GENERAL OF

POLICE AND DIRECTOR GENERAL OF FIRE &

EMERGENCY SERVICES

Officers Name

62

Page 127: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 16

63

Page 128: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Office address Officer Name Phone number/Email Id

1 Executive Engineer , Shivamogga Division Y.N.JagadeeshaPhone No : 08182-

255042Byrasiddeshwara Nagar,2nd cross, A-Block, [email protected]

Sharavathi Nagar,Shivamogga-577201.

2 Assistant Executive Engineer I/C, Shikaripura Vasudeva H.M Phone No : 9448160630

1st Floor, PWD Compound, Shikaripura-5227427. [email protected]

3 Assistant Executive Engineer I/C, Hangal Ramappa Hangal Phone No : 9844536598

A.P.M.C Compound [email protected]

Hanagal-581104, Haveri Dist.

4 Assistant Executive Engineer I/C, Davanagere Mariswamy H.V Phone No : 08419-

262736/261139No 1229,K.O.No 207, 1st cross,1st Main Road,

Taralabalu Nagar,Vidhya Nagar, Davanagere-577001

5 Executive Engineer, Belagavi Division N.R BagalkotPhone No : 0831-

2461098No. 170, S.B. Havannavar Building, Club Road, [email protected]

Near Jyothi College, Belagavi-590 001.

6

Assistant Executive Engineer, Belgavi S.C. Nayak, Phone No : 0831-

2461098

No. 170, S.B. Havannavar Building, Club Road, [email protected]

Near Jyothi College, Belgavi-590 001.

7

Assistant Executive Engineer, Gokak B.B. Thirtha Phone No : 08332-

227665

Sri Veerabhadreshwara Krupa, [email protected]

Rani Channama Nagar, 1st Cross,

Gokak- 591307, Belgavi District.

8

Assistant Executive Engineer, Dharwad R. L. Kotekar Phone No : 0836-

2446484

Rajadeep Beside Satyanarayana Temple, [email protected]

Sadhanakeri Main Road, Dharwad- 580 001

ANNEXURE 16

National Higway department

64

Page 129: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 17

65

Page 130: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl.

No.

Designation STD Office Fax Residence Mobile

01 Kundaragi SE-Dharwad 0836 2748138 - 2777968

01 K.Shivanna EE-Haveri 08375 234725 - 23473002 Holeyannavar NK EE-Gadag 08372 538782 - 53808202 Shivayogi Hirematt SE-Bellary 08392 274775 - 277894

01 H.Ramesh EE-Bellary 08392 266123 - 26868802 Lashkar Nayak EE-Koppal 08539 2222318 231283 2215253 Ravikumar EE-H’Hadagali 08399 240143 - -3 Balakrishna S SE Shimoga 08182 270926/ 2225641 272366

1 Ramesh Banad I/c EE Shimoga 08182 274942 274942 2293992 Ramesh S EE Davanagere 08192 234951 2215301 2249533 Mallappa EE Spl.Shimoga 08182 222942 2270494 Chandrashekhar TJ SE-Hassan 08172 268385 261885 268243

1 K.Parameshwara EE-C’maglur 08262 234028 238109 230043

TELEPHONE NUMBERS OF SE'S/EE'S UNDER CE - C & B (NORTH)

Mahajar Javeed, Chief Engineer -94485 30950/ 0836-2447900/2748468/2791895

ANNEXURE -17

PUBLIC WORKS DEPARTMENT

66

Page 131: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 18

67

Page 132: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl.

No.HEAD OFFICE Name of the Officer Mobile No./ Office Phone No. Office e-mail ID

02 MANAGING DIRECTOR B.Venkatesh, I.F.S. 080-22879900 [email protected]

03 CHIEF ENGINEER (NORTH) H.P.Rangarama Naika 9449863024/9482705064

28015605

[email protected]

04 CHIEF ENGINEER (SOUTH) N.Lokesh 9482637053/28015603 [email protected]

05 CHIEF ENGINEER (CENTRAL) M.Mahadevaswamy 9449863029/28015604 [email protected]

Sl. No Zone/ Division/ Sub-division

Name/Office Address

Name of the Officer Sriyuths Desgn Mobile No. Office Phone No

M.Mahadev EE9449863085

944997346708262-220098

T.S.Yoganand AEE (T) 9448607027

2 CHIKKAMAGALURU SUB-DIVISION

ASST. EXE. ENGINEER KRIDL JYOTHI

NAGAR,

K.H.B.COLONY, KADUR ROAD,

CHIKKAMAGALURU-577 101.

[email protected]

K.C.Dakshina Murthy AEE 9449863078 08262-220098

B.Chandrashekhar EE 9449863051 08192-264726

M.S.Huragi AEE (T) 9449863058

4 DAVANAGERE SUB-DIVISION

ASST. EXE. ENGINEER

KRIDL, LOKIKERE ROAD, NEAR

PRASARABHARATHI, DAVANAGERE-577

005.

[email protected]

K.H.Lokaniranjan

AE

& AEE

(Addl. Charge)

9480828109

944824714408192-264725

5 DAVANAGERE-2 DIVISION

EXECUTIVE ENGINEER

KRIDL, LOKIKERE ROAD, NEAR

PRASARABHARATHI, DAVANAGERE-

577 005.

[email protected]

G.B.Devaraj EE 9972096720

ANNEXURE -18

1 CHIKKAMAGALURU DIVISION

EXECUTIVE ENGINEER KRIDL JYOTHI

NAGAR,

K.H.B.COLONY, KADUR ROAD,

CHIKKAMAGALURU-577 101.

[email protected]

3 DAVANAGERE DIVISION-1

EXECUTIVE ENGINEER

KRIDL, LOKIKERE ROAD, NEAR

PRASARABHARATHI, DAVANAGERE-577

005.

[email protected]

KARNATAKA RURAL INFRASTRUCTURE DEVELOPMENT LIMITED

68

Page 133: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

6 HARIHAR SUB-DIVISION

ASST. EXE. ENGINEER

KRIDL, MARULA SIDDESWARA NILAYA, 1ST

MAIN ROAD, ‘A’ BLOCK, VIDYA NAGAR,

HARIHAR-577 601

[email protected]

P.Shankar NaikAEE

(Addl Charge)9480828121 08192-242716

7 HARAPANAHALLI SUB-DIVISION

ASST. EXE. ENGINEER

KRIDL, MARULA SIDDESWARA NILAYA, 1ST

MAIN ROAD, ‘A’ BLOCK, VIDYA NAGAR,

HARIHAR-577 601

[email protected]

Veeranna Angadi AEE 9480828112

8 DAVANAGERE-3 DIVISION

EXECUTIVE ENGINEER

KRIDL, LOKIKERE ROAD, NEAR

PRASARABHARATHI, DAVANAGERE-

577 005.

[email protected]

S.A.Rangaraj EE 9449863056

9 HONNALI SUB-DIVISION

ASST. EXE. ENGINEER KRIDL, A.P.M.C.

COMPOUND, HONNALI-577217

[email protected] AEE 9449830566 08188-251069

10 SHIVAMOGGA DIVISION

EXECUTIVE ENGINEER

KRIDL, 1ST FLOOR, 100 FEET ROAD, OPP.

TO LIC OFFICE, GOPALA GOWDA

BADAVANE, SHIVAMOGGA-577 205.

[email protected]

B.P.Lingaraju EE (T) 9449863030 08182-225711

11 SHIVAMOGGA SUB-DIVISION

ASST. EXE. ENGINEER

KRIDL100 FEET ROAD, OPP. TO LIC

OFFICE, GOPALA GOWDA BADAVANE,

SHIVAMOGGA-577 201.

[email protected]

Md. Farooq Ahamed AEE9480826120,

944968510008182-225711

12 BALLARI DIVISION

EXECUTIVE ENGINEER KRIDL,

BHUSENA BHAVANA,

CONTONMENT AREA, BESIDE RTO

OFFICE, BALLARI-582 104.

[email protected]

B.L.Shetty EE 9480826121 08392-240794

13 HUVINA HADAGALI DIVISION

EXECUTIVE ENGINEER

KRIDL, MADALAGHATTA ROAD,

HUVINA HADAGALI-583 219

[email protected]

P.K.Mallikarjuna Swamy EE 9480826112 08399-241036

69

Page 134: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

14 HUVINA HADAGALI SUB-DIVISION

ASST. EXE. ENGINEER

KRIDL, MADALAGHATTA ROAD,

HUVINA HADAGALI-583 219

[email protected]

K.N.Shivakumar AEE 9449863049 08399-240317

15 HAGARIBOMMANAHALLI SUB-

DIVISION

ASST. EXE. ENGINEER KRIDL

HIREMAT COLONY,

HOSPET-HARIHAR MAIN ROAD,

HAGARIBOMMANAHALLI-583 212.

[email protected]

Jayanaik R. AEE 9743249779 08397-270138

16 GADAG DIVISION

EXECUTIVE ENGINEER KRIDL,

“PADMASRI” SIR M.VISWESHWARYA

NAGAR, KALASAPUR ROAD,

GADAG-582 101.

[email protected]

R.SrinivasEE

(Addl Charge)9448272290 08372-232177

17 GADAG SUB-DIVISION

ASST. EXE. ENGINEER KRIDL,

“PADMASRI” SIR M.VISWESHWARYA

NAGAR, KALASAPUR ROAD,

GADAG-582 101.

[email protected]

R.Srinivas AEE 9448272290 08372-232177

18 HAVERI DIVISION

EXECUTIVE ENGINEER KRIDL, 2ND

CROSS, SHIVASHAKTHI PALACE,

VIDAYNAGAR, HAVERI-581 110.

[email protected]

S.A.Patil EE 9449863095 08375-236084

19 HAVERI SUB-DIVISION

ASST. EXE. ENGINEER KRIDL, 2ND

CROSS, SHIVASHAKTHI PALACE,

VIDAYNAGAR, HAVERI-581 110.

[email protected]

J.Gopalappa AEE 9449863057 08375-236084

20 RANEBENNUR SUB-DIVISION

ASST. EXE. ENGINEER

KRIDL, H.S.MUDDEVANNANAVAR

COMPLEX, ASHOK NAGAR, 3RD CROSS,

MEDLERI ROAD, RANEBENNUR-581

115,

HAVERI DISTRICT

[email protected]

V.A.Mahendrakar AEE (T) 9449863090

70

Page 135: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

21 KOPPALA DIVISION

EXECUTIVE ENGINEER,KRIDL NEAR

RELIANCE PETROL BUNK, HOSPET

ROAD,KOPPAL-583331,

[email protected]

J.M.Korabu EE 9449863091/9448190261 08539-230206

22 KOPPAL SUB-DIVISION

ASST. EXE. ENGINEER D.Gururaj AEE (T) 9481085577

71

Page 136: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 19

72

Page 137: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Name of the officer Designation District Address Phone Numbers Email.id

1Director Banglore No. 17, Bhagawan Mahaveer (Infantry) Road,Bangalore-

560001Ph : 080-2202 8001, 2202 8002 080-22863794Fax - 22028041

[email protected] [email protected]

Department of Information and Public Relation, 9480841207No. 17, "Vartha Soudha", 080-22028107Bhagavan Mahaveer Road (Infantry Road),Bangalore-560 001.Office of Senior assistant director, 9480841222Department of Information and Public Relation, 08182-278638No. 595, Vartha Bhavana, Sowlanga Road, Shimogga -577201Office of Senior assistant director, 9480841246Department of Information and Public Relation, 08262-231249Vartha Bhavana,Chikkamangalore -577101Office of Senior assistant director, 9480841218Department of Information and Public Relation, 08192-254892Devaraju Arasu Layout,Davanegere -577001Office of assistant director, 9480841238Department of Information and Public Relation, 08375-233092Old District Panchayath Building,Vidyanagara, Haveri-581110Office of assistant director, 9480841237Department of Information and Public Relation, 08372-239452D.C. Office Building,Gadaga - 582101Office of Senior assistant director, 9480841243Department of Information and Public Relation, 08392-275198D.C. Office Compound, Ballery - 583101Office of assistant director, 9480841245Department of Information and Public Relation,D.C. Office Compound,Koppala - 583231

Department of Information and Public Relations(MEDIA)

2 Sri. D.P. Muralidhar Deputy Director (Press and News)

Banglore muralidhar[dot]dp[at]gov[dot]in

4 Sri Manje Gowda Assistant Director (Additional Charge)

Chikkamaglore [email protected]

3 Sri. Shafishaduddin Assistant Director Shimoga [email protected]

6 Sri. B.R. Ranganath Assistant Director (Additional Charge)

Haveri [email protected]

5 Sri. Ashokkumar D Senior Assistant Director Davanagere [email protected]

ANNEXURE-19

9 Sri. B.V. Thukaram Assistant Director(Additional

Charge)

Koppala [email protected]

7 Sri. Venkatesh V. Navile Assistant Director (Additional Charge)

Gadga [email protected]

8 Sri. Ramalingappa B.K. Senior Assistant Director Bellary [email protected]

73

Page 138: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No News Channels Name of the Reporter Phone NumbersJesu Das 7022596864Ashok 9880433080Nagraj 9632238578Mahesh 9483472826Basavraj 9980914153Raghu 9844964807Shashi 8884757201

4 Kastoori TV Bharath M C 99725701265 Amogha TV News Jagadeesh V 9448149635

Halaswamy 9448138183Satheesh 9844838507Yogeesh 9900024771Anthony Rajan 8762378118Rajesh kamath 9632201541Atheek 8095589252Nithyananda 9900257189Chirag 9945057997Naveen Puradal 8105877393Prashanth 9019941010

11 Doordarshan Nagesh 9449327817Prasanna V.C 9606445274Mahesh k a 9480592317Kiran kumar s .e 9986500902Bheema Nayak 9686406693Mohankrishna 9663753877V B Praveen 7022282769

Sl No News Papers Name of the Reporter Phone NumberChandrahaasa 9448470164Anilkumar 9538414151Chandrashekar S 9980889878Santhosh Kachinkatte 9341126340Suresh Bislahalli 9611168808Ganesh Tammdihalli 9663725542Shanthkumar 8884432255Arvind aklapura 8884432109Somshekar 9449422942

Media listFacebook Page:Bhadra dam authority

1 Praja TV

2 News 18 Kannada

3 TV 9 Kannada

6 Public TV

7 B TV

13 E TV bharath

14 Power TV

8 Suvana TV

9 Digvijaya TV

10 TV-5

ANNEXURE-19

1 Prajavaani

2 Vijayakarnataka

3 Vijayavani

12 1st News Kannada

74

Page 139: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Gopal 9448127845Vidya 7760009747

Udayavani Sharath 9845047413Hulimane Timmappa 9902008441Kavitha 9449738938

6 The Hindu Veerendra 98805209097 Deccan Herala Nrupatunga 99869820258 Indian Express Ramachandra Gunari 94480933629 The State Shashi sampalli 9902826056

Subhramanya 9341844208Sathyanarayan 9448628132

11 Press Trust Shimoga 9448612644

4 Kannadaprabha

5 Samyuktha karnataka

10 Hosadigantha

75

Page 140: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 20

76

Page 141: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl.No NAME & DESIGNATION ADDRESS PHONE NO/FAX EMAIL

1 Sri. Jawaid Akhtar.

IAS Principal Secretary to

Govt. of Karnataka,

Health & Family Welfare

Services

Principal Secretary to Govt. of Karnataka, Health &

Family Welfare Services, #105, I Floor, Vikas

Soudha,  Bangalore - 560 001

080-22255324, 080-22034234,

Fax:080-22353916, 080-

25356761(R)

[email protected]

2 Joint Secretary (Health &

Family Welfare Services)

Joint Secretary to Govt. of Karnataka, Health &

Family Welfare Services, #402, 4th Floor, Vikas

Soudha, Bangalore - 560 001

080-22353915,  [email protected]

3 Deputy Secretary (Health

& Family Welfare

Services)

Deputy Secretary to Govt. of Karnataka, Health &

Family Welfare Services, #101, 1st Floor, Vikas

Soudha, Bangalore - 560 001

080-22263744,080-22092573(D) [email protected]

SL.No District Name Address Phone no./ FAX Email address

1 SHIMOGA District Health Officer, SHIMOGA 9449843063,08182-222382 [email protected]

2 CHIKKAMAGALORE District Health Officer, CHIKKAMAGALORE 9449843045,08262-220429 [email protected]

3 DAVANGERE District Health Officer, DAVANGERE 9449843051,08192-237833 [email protected]

4 HAWERI District Health Officer, HAWERI 9449843054,08375-249066 [email protected]

5 GADAG District Health Officer, GADAG 9449843052,08372-233996 [email protected]

6 BELLARI District Health Officer, BELLARI 9449843042,08392-276250 [email protected]

7 KOPPAL District Health Officer, KOPPAL 9449843056,08539-221660 [email protected]

1 SHIMOGA District Surgeon, District Hospital,SHIMOGA 9449843178, 08182-222404,

Meggon: 271566,

[email protected]

2 CHIKKAMAGALORE District Surgeon, District

Hospital,CHIKKAMAGALORE

9449843164, 08262-231163 [email protected]

3 DAVANGERE District Surgeon, District Hospital,DAVANGERE 9449843168, 08192-

233743(O)/259050(H)

[email protected]

4 HAWERI District Surgeon, District Hospital,HAWERI 9449843171, 08375-234478,

233360, 234231

[email protected]

5 GADAG District Surgeon, District Hospital,GADAG 9449843169, 08372-297213 [email protected]

6 BELLARI District Surgeon, District Hospital,BELLARI 9449843161, 08392-

235409/272174

[email protected]

7 KOPPAL District Surgeon, District Hospital,KOPPAL 9449843173, 08539-

225022/225066

[email protected]

Deparment of Health

Principal Secretary's Office

District Health officer

District Surgeon

ANNEXURE-20

77

Page 142: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No DISTRICT

NAME

SUB DISTRICT Name of Village

1 Shimoga Bhadravathi AGARADAHALLI

2 Shimoga Bhadravathi ANTHARAGANGE (24X7)

3 Shimoga Bhadravathi AREBILACHI (24X7)

4 Shimoga Bhadravathi ASHWATHANAGARA UPHC

5 Shimoga Bhadravathi BHADRACOLONY

6 Shimoga Bhadravathi BRP

7 Shimoga Bhadravathi DONABHAGATTA A

8 Shimoga Bhadravathi JANNAPURA UPHC

9 Shimoga Bhadravathi MARSHETTYHALLI

10 Shimoga Bhadravathi MYDOLALU

11 Shimoga Bhadravathi NEHARUNAGARA UPHC

12 Shimoga Bhadravathi S K MAGGE

13 Shimoga Bhadravathi THALLIKATTE

14 Shimoga Bhadravathi UJJINIPURA UPHC

15 Shimoga Bhadravathi YADEHALLI

16 Chikmagalur Tharikere BALLAVARA

17 Chikmagalur Tharikere BETTADAHALLY

18 Chikmagalur Tharikere BUKKAMBUDI (24X7)

19 Chikmagalur Tharikere CHIRANAHALLI

20 Chikmagalur Tharikere GADIHALLY

21 Chikmagalur Tharikere HOUNSAGATA

22 Chikmagalur Tharikere KARAKUCHI

23 Chikmagalur Tharikere KUDLUR

24 Chikmagalur Tharikere LAKKAVALLI 24X7

25 Chikmagalur Tharikere LINGADAHALLI (24X7)

26 Chikmagalur Tharikere M.C.HALLI (24X7)

27 Chikmagalur Tharikere MUDUGODU 24X7

28 Chikmagalur Tharikere NERALEKERE

29 Chikmagalur Tharikere SANTHAVERI

30 Chikmagalur Tharikere SHIVANI 24X7

31 Chikmagalur Tharikere SOLLAPURA

32 Davanagere Harihara BELLODI

33 Davanagere Harihara BHANUVALLI

34 Davanagere Harihara BILASANUR

35 Davanagere Harihara DEVARABELAKERE (24X7)

36 Davanagere Harihara HOLESIRIGERE (24X7)

37 Davanagere Harihara K BEVINHALLI (24X7)

38 Davanagere Harihara KOKKANOORU

39 Davanagere Harihara KONDAJI (24X7)

40 Davanagere Harihara NANDIGUDI (24X7)

41 Davanagere Harihara UKKADAGATHRI

42 Davanagere Harrapanahalli ALAGILAWADA 24X7

43 Davanagere Harrapanahalli BAGALI

44 Davanagere Harrapanahalli BENNIHALLI 24X7

Primary Health Centres

ANNEXURE-20

78

Page 143: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

45 Davanagere Harrapanahalli CHIGTERI (24X7)

46 Davanagere Harrapanahalli GUNDAGATTI (24X7)

47 Davanagere Harrapanahalli HALVAGILU (24X7)

48 Davanagere Harrapanahalli HARKNAL (24X7)

49 Davanagere Harrapanahalli HIREMEGALAGERE 24X7

50 Davanagere Harrapanahalli KAMMATTHAHALLI

51 Davanagere Harrapanahalli KANCHIKERE 24X7

52 Davanagere Harrapanahalli MADHIHALLI 24X7

53 Davanagere Harrapanahalli MATTIHALLI (24X7)

54 Davanagere Harrapanahalli NANDHIBEVOORU 24X7

55 Davanagere Harrapanahalli NEELAGUNDA 24X7

56 Davanagere Harrapanahalli PUNABAGATTA

57 Davanagere Harrapanahalli SASVIHALLI

58 Davanagere Harrapanahalli UNCHANGIDURGA (24X7)

59 Davanagere Honnali ARABAGATTE

60 Davanagere Honnali BELAGUTHI 24X7

61 Davanagere Honnali BENAKANAHALLI

62 Davanagere Honnali CHILURU 24X7

63 Davanagere Honnali GOVINAKOVI

64 Davanagere Honnali KATHIGE

65 Davanagere Honnali KULAMBI (24X7)

66 Davanagere Honnali KYASINAKERE

67 Davanagere Honnali ODEYARA HATHURU

68 Davanagere Honnali SASVEHALLI (24X7)

69 Davanagere Honnali SAVALANGA

70 Haveri Haveri AGADI

71 Haveri Haveri DEVAGIRI

72 Haveri Haveri DEVIHOSUR

73 Haveri Haveri HANDIGANUR

74 Haveri Haveri HAVANUR 24X7

75 Haveri Haveri Haveri UPHC

76 Haveri Haveri HOSARITTI 24X7

77 Haveri Haveri KABBUR (24X7)

78 Haveri Haveri KARJGI

79 Haveri Haveri KATENAHALLI (24X7)

80 Haveri Haveri KURUBAGONDA

81 Haveri Haveri MEVUNDI

82 Haveri Haveri NEGALUR 24X7

83 Haveri Hirekerur ALADAGERE

84 Haveri Hirekerur CHIKKERUR (24X7)

85 Haveri Hirekerur HALLURA (24X7)

86 Haveri Hirekerur HAUNSABHAVI 24X7

87 Haveri Hirekerur HOSAVEERAPURA

88 Haveri Hirekerur KADUR

89 Haveri Hirekerur KODA (24X7)

90 Haveri Hirekerur KUDAPALI (24X7)

91 Haveri Hirekerur MADLURU

92 Haveri Hirekerur MEDUR

79

Page 144: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

93 Haveri Hirekerur TADAKANAHALLI (24X7)

94 Haveri Ranibennur AREMALLAPURA (24X7)

95 Haveri Ranibennur DEVARAGUDDA (24X7)

96 Haveri Ranibennur HALAGERI

97 Haveri Ranibennur HARANAGIRI

98 Haveri Ranibennur HONNATHI (24X7)

99 Haveri Ranibennur IRANI

100 Haveri Ranibennur ITAGI

101 Haveri Ranibennur KAJJARI

102 Haveri Ranibennur KARUR

103 Haveri Ranibennur KUPPELUR (24X7)

104 Haveri Ranibennur MAKANUR

105 Haveri Ranibennur MEDLERI

106 Haveri Ranibennur METARANATY HOSPITAL

CHALAGERI UPHC

107 Haveri Ranibennur Ranebennur UPHC

108 Haveri Ranibennur SUNAKALBIDARI (24X7)

109 Haveri Ranibennur TUMMINAKATTI (24X7)

110 Gadag Mundargi BAGEWADI 24X7

111 Gadag Mundargi DAMBALA (24X7)

112 Gadag Mundargi HAMMAGI

113 Gadag Mundargi HIREWADDATTI 24X7

114 Gadag Mundargi JANTHLISHIRUR

115 Gadag Mundargi KADHAMPURA

116 Gadag Mundargi KALAKERI

117 Gadag Naragund CHIKKANARAGUND

118 Gadag Naragund JAGAPUR (24X7)

119 Gadag Naragund SHIROL (24X7)

120 Gadag Shirahatti BALEHOSUR

121 Gadag Shirahatti BELLATTI (24X7)

122 Gadag Shirahatti HEBBAL (24X7)

123 Gadag Shirahatti SHIGLI (24X7)

124 Gadag Shirahatti SURANGI (24X7)

125 Gadag Shirahatti YALAWATTI 24X7

126 Bellary Hadagali HAKKANDI 24X7

127 Bellary Hadagali HIREHADAGALI (24X7)

128 Bellary Hadagali HOLAGUNDI (24X7)

129 Bellary Hadagali HOLALU 24X7

130 Bellary Hadagali K AYANAHALLI (24X7)

131 Bellary Hadagali KATHEBENNURU (24X7)

132 Bellary Hadagali M.M.WADA (24X7)

133 Bellary Hadagali MAGALA (24X7)

134 Bellary Hadagali MAILAR

135 Bellary Hadagali NAGATHI BASAPUR (24X7)

136 Bellary Hadagali SOGI (24X7)

137 Bellary Hagaribommanahalli ALABURU (24X7)

138 Bellary Hagaribommanahalli B.G.HALLI (24X7)

139 Bellary Hagaribommanahalli BENNEKALLU (24X7)

80

Page 145: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

140 Bellary Hagaribommanahalli HANASI 24X7

141 Bellary Hagaribommanahalli KOGALI (24X7)

142 Bellary Hagaribommanahalli MAGIMAVINAHALLI 24X7

143 Bellary Hagaribommanahalli MORIGERI (24X7)

144 Bellary Hagaribommanahalli TAMBRAHALLI (24X7)

145 Koppal Koppal ALAVANDI (24X7)

146 Koppal Koppal BETAGERI (24X7)

147 Koppal Koppal BHAGYANAGAR 24X7

148 Koppal Koppal GINAGERA (24X7)

149 Koppal Koppal GONDABAL (24X7)

150 Koppal Koppal H.BOMMANAL (24X7)

151 Koppal Koppal HITNAL (24X7)

152 Koppal Koppal HULAGI 24X7

153 Koppal Koppal INDARGI (24X7)

154 Koppal Koppal IRAKALGADA (24X7)

155 Koppal Koppal KAVALOOR (24X7)

156 Koppal Koppal KINNAL (24X7)

157 Koppal Koppal Koppal UPHC

158 Koppal Koppal KUKANAPALLI (24X7)

81

Page 146: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No DISTRICT NAME SUB DISTRICT Hospital Details

1 Shimoga Shimoga SHIMOGA DISTRICT HOSPITAL

2 Chikmagalur Chickmagalur CHICKMAGALUR DISTRICT HOSPITAL

3 Davanagere Davangere DAVANAGERE DISTRICT HOSPITAL

4 Davanagere Davangere DAVANGERE WOMEN AND CHILDREN DH

5 Haveri Haveri HAVERI DISTRICT HOSPITAL

6 Gadag Gadag GADAG DISTRICT HOSPITAL

7 Bellary Bellary BELLARY DISTRICT HOSPITAL

8 Bellary Bellary VIMS Bellary Medical College

9 Koppal Koppal KOPPAL DISTRICT HOSPITAL

1 Bellary Hadagali ADAGALI TALUK HOSPITAL

2 BellaryHagaribommanahalli HAGRIBOMMANAHALLI TALUK

HOSPITAL

3 Chikmagalur Tharikere TARIKERE TALUKA HOSPITAL

4 Davanagere Harihara HARIHARA TALUK HOSPITAL

5 Davanagere Harrapanahalli HARPANAHALLI TALUK HOSPITAL

6 Davanagere Honnali HONNAL TALUK HOSPITAL

7 Gadag Mundargi MUNDARGI TALUK HOSPITAL

8 Gadag Shirahatti SHIRAHATTI TALUK HOSPITAL

9 Haveri Hirekerur HIREKERUR TALUK HOSPITAL

10 Haveri Ranibennur RANIBENNUR TALUK HOSPITAL

11 Shimoga Bhadravathi BHADRAVATHI TALUK HOSPITAL

1 Shimoga Bhadravathi HOLEHONNUR

2 Shimoga Shimoga AYANUR

3 Shimoga Shimoga HOLALURU

4 Chikmagalur Tharikere AJJAMPURA

5 Davanagere Harihara MALEBENNUR

6 Davanagere Harrapanahalli ARASIKERE

7 Davanagere Harrapanahalli TELAGI

8 Davanagere Honnali NYAMATHI

9 Haveri Hanagal (FRU) AKKIALUR

10 Haveri Haveri GUTTAL

11 Haveri Hirekerur MASUR

12 Haveri Hirekerur RATTIHALLI

13 Gadag Shirahatti FRU LAKSHMESWAR

14 Bellary Hadagali ITAGI

15 Bellary Hagaribommanahalli HAMPASAGARA

16 Koppal Koppal FRU HIRESINDOGI

17 Koppal Koppal MUNIRABAD

ANNEXURE-20

HOSPITAL LISTS

District Hospital list as per HMIS

Taluk Hospital list as per HMIS

Community Health Centres

82

Page 147: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl No Disrtrict Taluk Name of Village

1 Shimoga Bhadravathi AGARADAHALLI

2 Shimoga Bhadravathi ANTHARAGANGE

3 Shimoga Bhadravathi ANVERI

4 Shimoga Bhadravathi ARAHATOLALU

5 Shimoga Bhadravathi ARAKERE

6 Shimoga Bhadravathi ARALIHALLI

7 Shimoga Bhadravathi AREBILACHI

8 Shimoga Bhadravathi ASHWATH NAGARA C

9 Shimoga Bhadravathi ASHWATH NAGARA D

10 Shimoga Bhadravathi ASHWATHANAGARA A

11 Shimoga Bhadravathi ASHWATHANAGARA B

12 Shimoga Bhadravathi BALEMARANAHALLI

13 Shimoga Bhadravathi BARANDOORU

14 Shimoga Bhadravathi BHADRACOLONY

15 Shimoga Bhadravathi BRP

16 Shimoga Bhadravathi DEVARAHALLI

17 Shimoga Bhadravathi DODDERI

18 Shimoga Bhadravathi DONABHAGATTA-A

19 Shimoga Bhadravathi DONBHAGATTA-B

20 Shimoga Bhadravathi GONIBEEDU

21 Shimoga Bhadravathi H K JUNCTION

22 Shimoga Bhadravathi HIRIYUR

23 Shimoga Bhadravathi HOLEHONNURU

24 Shimoga Bhadravathi HOSASIDDAPURA

25 Shimoga Bhadravathi Jannapura A

26 Shimoga Bhadravathi Jannapura B

27 Shimoga Bhadravathi Jannapura C

28 Shimoga Bhadravathi Jannapura D

29 Shimoga Bhadravathi Jannapura E

30 Shimoga Bhadravathi KODLIGERE

31 Shimoga Bhadravathi MARASHETTYHALLI

32 Shimoga Bhadravathi MAVINAKERE

33 Shimoga Bhadravathi MYDOLALU

34 Shimoga Bhadravathi NAGATHIBELAGALU

35 Shimoga Bhadravathi NEHARU NAGARA C

36 Shimoga Bhadravathi NEHARU NAGARA D

37 Shimoga Bhadravathi NEHARUNAGARA A

38 Shimoga Bhadravathi NEHARUNAGARA B

39 Shimoga Bhadravathi NIMBEGUNDI

40 Shimoga Bhadravathi S K MAGGE

41 Shimoga Bhadravathi SEEGEBAGI

42 Shimoga Bhadravathi TADASA

SUB CENTRE HOSPITAL LIST

ANNEXURE-20

83

Page 148: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

43 Shimoga Bhadravathi TADASA -D

44 Shimoga Bhadravathi THASHKANT NAGARA

45 Shimoga Bhadravathi UJJINIPURA A

46 Shimoga Bhadravathi UJJINIPURA C

47 Shimoga Bhadravathi UJJINIPURA D

48 Shimoga Bhadravathi UJJINIPURA E

49 Shimoga Bhadravathi UJJNIPURA B

50 Shimoga Bhadravathi UKKUNDA

51 Shimoga Bhadravathi YADEHALLI

52 Chikmagalur Tharikere AJJAMPURA-A

53 Chikmagalur Tharikere AJJAMPURA-B

54 Chikmagalur Tharikere ANNE

55 Chikmagalur Tharikere BARAGENAHALLI

56 Chikmagalur Tharikere BAVIKERE

57 Chikmagalur Tharikere BEGUR

58 Chikmagalur Tharikere BELENAHALLI

59 Chikmagalur Tharikere BETTADAHALLI

60 Chikmagalur Tharikere BUKKAMBUDI

61 Chikmagalur Tharikere CHENNAPURA

62 Chikmagalur Tharikere CHIKKANAVANGALA

63 Chikmagalur Tharikere DANAYARPURA

64 Chikmagalur Tharikere DANDUR

65 Chikmagalur Tharikere DORNALU

66 Chikmagalur Tharikere DUGLAPURA

67 Chikmagalur Tharikere GADIHALLI

68 Chikmagalur Tharikere GARAGADAHALLI

69 Chikmagalur Tharikere GOPALACOLONY

84

Page 149: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

70 Chikmagalur Tharikere HADHIKERE

71 Chikmagalur Tharikere HALIYUR

72 Chikmagalur Tharikere HANUVANAHALLI

73 Chikmagalur Tharikere HOSAMANE

74 Chikmagalur Tharikere HUNASAGHATTA-A

75 Chikmagalur Tharikere HUNASAGHATTA-B

76 Chikmagalur Tharikere ITTIGE

77 Chikmagalur Tharikere K.HOSUR

78 Chikmagalur Tharikere KALLATHIPURA

79 Chikmagalur Tharikere KALLENAHALLI

80 Chikmagalur Tharikere KARAKUCHI-A

81 Chikmagalur Tharikere KARAKUCHI-B

82 Chikmagalur Tharikere KATIGANERE

83 Chikmagalur Tharikere KEMMANGUNDI

84 Chikmagalur Tharikere KENCHAPURA

85 Chikmagalur Tharikere KESARUKOPPA

86 Chikmagalur Tharikere KESHANAVARTI

87 Chikmagalur Tharikere KODICAMP

88 Chikmagalur Tharikere KORANAHALLI

89 Chikmagalur Tharikere KOTECAMP

90 Chikmagalur Tharikere KUDULUR-A

91 Chikmagalur Tharikere KUDULUR-B

85

Page 150: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

92 Chikmagalur Tharikere KUNTINAMADU

93 Chikmagalur Tharikere LAKKAVALLI

94 Chikmagalur Tharikere LINGADAHALLI

95 Chikmagalur Tharikere M.C.HALLI

96 Chikmagalur Tharikere MACHENAHALLI

97 Chikmagalur Tharikere MAKANAHALLI

98 Chikmagalur Tharikere MALLENAHALLI

99 Chikmagalur Tharikere MARIDIBBA

100 Chikmagalur Tharikere MUDUGODU

101 Chikmagalur Tharikere NARAYANPURA

102 Chikmagalur Tharikere NERALEKERE

103 Chikmagalur Tharikere SANTHAVERI

104 Chikmagalur Tharikere SHIVANE-A

105 Chikmagalur Tharikere SHIVANE-B

106 Chikmagalur Tharikere SHIVANESTATION

107 Chikmagalur Tharikere SOKKE

108 Chikmagalur Tharikere SOLLAPURA

109 Chikmagalur Tharikere TALIGEBYLU

110 Chikmagalur Tharikere THYAGADAKATTE

111 Chikmagalur Tharikere UDEVU

112 Chikmagalur Tharikere VADDARACAMP

113 Davanagere Harihara BANNIKODU

114 Davanagere Harihara BANUVALLI-A

115 Davanagere Harihara BANUVALLI-B

86

Page 151: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

116 Davanagere Harihara BELLUDI

117 Davanagere Harihara BILASANUR

118 Davanagere Harihara DEETUR

119 Davanagere Harihara DEVARABELAKERE-A

120 Davanagere Harihara ELEHOLE

121 Davanagere Harihara GUDDADAHALLI

122 Davanagere Harihara GUTTUR

123 Davanagere Harihara HALIVANA

124 Davanagere Harihara HALLIHALA

125 Davanagere Harihara HANGAVADI

126 Davanagere Harihara HARIHARA 1

127 Davanagere Harihara HARIHARA 2

128 Davanagere Harihara HARIHARA 3

129 Davanagere Harihara HARIHARA 4

130 Davanagere Harihara HARIHARA 5

131 Davanagere Harihara HARIHARA 6

132 Davanagere Harihara HARIHARA(R)

133 Davanagere Harihara HIMDASAGHATTA

134 Davanagere Harihara HOLESIRIGERE

135 Davanagere Harihara HOSAHALLI

136 Davanagere Harihara K.BEVINAHALLI

137Davanagere Harihara

KADARANAYAKONNAHAL

LI

138 Davanagere Harihara KOKKANUR

139 Davanagere Harihara KONDAJJI-A

140 Davanagere Harihara KONDAJJI-B

141 Davanagere Harihara KUNIBELAKERE

142 Davanagere Harihara MALEBENNUR-A

143 Davanagere Harihara MALEBENNUR-B

144 Davanagere Harihara MITLAKATTE

145 Davanagere Harihara NAGENAHALLI

146 Davanagere Harihara NANDIGAVE

147 Davanagere Harihara NANDIGUDI

148 Davanagere Harihara NITTUR

149 Davanagere Harihara RAJANAHALLI

150 Davanagere Harihara SARATHI

151 Davanagere Harihara SHAMSIPUR

152 Davanagere Harihara THIMLAPURA

153 Davanagere Harihara UKKADAGATHRI

154 Davanagere Harihara YELAVATTI

155 Davanagere Harrapanahalli ALAGILAVADA

156 Davanagere Harrapanahalli ARASANAHAL

157 Davanagere Harrapanahalli ARASIKERE

158 Davanagere Harrapanahalli BAGALI

159 Davanagere Harrapanahalli BANDRI

87

Page 152: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

160 Davanagere Harrapanahalli BENNIHALLI

161 Davanagere Harrapanahalli CHIGATERI

162 Davanagere Harrapanahalli CHIKKAMYAGALAGERE

163 Davanagere Harrapanahalli CHIRASTAHALLI

164 Davanagere Harrapanahalli DUGGAVATHI

165 Davanagere Harrapanahalli GARBAGUDI

166 Davanagere Harrapanahalli GOWRIHALLI

167 Davanagere Harrapanahalli GOWRIPURA

168 Davanagere Harrapanahalli GUNDGATHI

169 Davanagere Harrapanahalli HAGARIGAJAPURA

170 Davanagere Harrapanahalli HAGARIGUDIHALLI

171 Davanagere Harrapanahalli HALVAGALU-A

172 Davanagere Harrapanahalli HALVAGALU-B

173 Davanagere Harrapanahalli HARAKANAHAL

174 Davanagere Harrapanahalli HARAPANAHALLI A

175 Davanagere Harrapanahalli HARAPANAHALLI B

176 Davanagere Harrapanahalli HEREMYAGALAGERE

177 Davanagere Harrapanahalli HOSAKOTE

178 Davanagere Harrapanahalli HULIKATTE

179 Davanagere Harrapanahalli JANGAMATHUMBIGERI

180 Davanagere Harrapanahalli KADABAGERE

181 Davanagere Harrapanahalli KADATHI

182 Davanagere Harrapanahalli KALLAHALLI

183 Davanagere Harrapanahalli KAMMATHALLI

184 Davanagere Harrapanahalli KANCHIKERE

185 Davanagere Harrapanahalli KOOLAHALLI

186 Davanagere Harrapanahalli KUNCHUR

187 Davanagere Harrapanahalli KYRAKATTE

188 Davanagere Harrapanahalli MACHIHALLI

189 Davanagere Harrapanahalli MADIHALLI

190 Davanagere Harrapanahalli MADLAGERE

191 Davanagere Harrapanahalli MATTIHALLI

192 Davanagere Harrapanahalli MYDURU

193 Davanagere Harrapanahalli NANDIBEHOOR

194 Davanagere Harrapanahalli NEELAGUNDA

195 Davanagere Harrapanahalli NICHAPURA

196 Davanagere Harrapanahalli NICHHAVANAHALLI

197 Davanagere Harrapanahalli NITTUR

198 Davanagere Harrapanahalli PUNABAGATTA

199 Davanagere Harrapanahalli RAGIMASALVADA

200 Davanagere Harrapanahalli RAMAGHATTA

201 Davanagere Harrapanahalli SASVIHALLI

202 Davanagere Harrapanahalli SATHUR

203 Davanagere Harrapanahalli SINGRIHALLI

204 Davanagere Harrapanahalli SIRAGANAHALLI

88

Page 153: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

205 Davanagere Harrapanahalli TAVARAGUNDHI

206 Davanagere Harrapanahalli TELAGI A

207 Davanagere Harrapanahalli TELAGI B

208 Davanagere Harrapanahalli THODOOR

209 Davanagere Harrapanahalli U.KALLAHALLI

210 Davanagere Harrapanahalli UCCHANGIDURGA

211 Davanagere Harrapanahalli UDAGATTA.D.THADA

212 Davanagere Honnali ARABAGATTE

213 Davanagere Honnali ARAKERE

214 Davanagere Honnali AREHALLI

215 Davanagere Honnali ARUNDI

216 Davanagere Honnali BEERAGONDANAHALLI

217 Davanagere Honnali BELAGUTHI

218 Davanagere Honnali BENAKANAHALLI

219 Davanagere Honnali CHATNAHALLI

220 Davanagere Honnali CHILURU

221 Davanagere Honnali CHILURU-KADADAKATTE

222 Davanagere Honnali CHINNIKATTE

223 Davanagere Honnali DIDAGURU

224 Davanagere Honnali DODDERAHALLI

225 Davanagere Honnali GOVINAKOVI

226 Davanagere Honnali H.GOPAGONDANAHALLI

227 Davanagere Honnali HANUMANAHALLI

228 Davanagere Honnali HIREGONIGERE

229 Davanagere Honnali HOLEHARALAHALLI

230 Davanagere Honnali HONNAL

231 Davanagere Honnali HONNALI

232 Davanagere Honnali HONNALI C

233 Davanagere Honnali HOSAHALLI

234 Davanagere Honnali KAMMARAGATTE

235 Davanagere Honnali KATTIGE

236 Davanagere Honnali KOTEMALLUR

237 Davanagere Honnali KULAMBI

238 Davanagere Honnali KUMBALUR

239 Davanagere Honnali KUNDUR

240 Davanagere Honnali KUNKOVA

241 Davanagere Honnali KYASINAKERE

242 Davanagere Honnali LINGAPUR

243 Davanagere Honnali MADANABAVI

244 Davanagere Honnali MUKTHENAHALLI

245 Davanagere Honnali NYAMATHI-A

246 Davanagere Honnali NYAMATHI-B

247 Davanagere Honnali ODEYARAHATTURU

248 Davanagere Honnali SASVEHALLI

249 Davanagere Honnali SAVALANGA

89

Page 154: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

250 Davanagere Honnali SORATUR

251 Davanagere Honnali SURAHONNE

252 Davanagere Honnali T.GOPAGONDANAHALLI

253 Haveri Haveri AGADI-A

254 Haveri Haveri AGADI-B

255 Haveri Haveri ALADAKATTI

256 Haveri Haveri BASAPURA

257 Haveri Haveri BELAVIGI

258 Haveri Haveri BUDAGATTI

259 Haveri Haveri CHIKKALINGADAHALLI

260 Haveri Haveri DEVAGIRI A

261 Haveri Haveri DEVAGIRI B

262 Haveri Haveri DEVIHOSUR-A

263 Haveri Haveri DEVIHOSUR-B

264 Haveri Haveri GALAGANATHA

265 Haveri Haveri Guttal C

266 Haveri Haveri GUTTALA-A

267 Haveri Haveri GUTTALA-B

268 Haveri Haveri HALAGI

269 Haveri Haveri HANDIGANUR

270 Haveri Haveri HAVANUR

271 Haveri Haveri HOMBARADI

272 Haveri Haveri HOSARITTI

273 Haveri Haveri Hosaritti B

274 Haveri Haveri KABBUR-A

275 Haveri Haveri KABBUR-B

276 Haveri Haveri KALLIHAL

277 Haveri Haveri KANAKAPURA

278 Haveri Haveri KANAVALLI

279 Haveri Haveri Kanavalli B

280 Haveri Haveri KANCHARGATTI

281 Haveri Haveri KARJGI-A

282 Haveri Haveri KARJGI-B

283 Haveri Haveri KATENAHALLI-A

284 Haveri Haveri KITTUR

285 Haveri Haveri KOLUR

286 Haveri Haveri KONANATAMBAGI

287 Haveri Haveri KORADUR

288 Haveri Haveri KULENUR

289 Haveri Haveri KURBAGONDA

290 Haveri Haveri KURGUND

291 Haveri Haveri MAROL

292 Haveri Haveri NAGANUR

293 Haveri Haveri NEGALUR-A

294 Haveri Haveri NEGALUR-B

90

Page 155: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

295 Haveri Haveri NIRALAGI

296 Haveri Haveri SANGUR

297 Haveri Haveri Sub Centre A

298 Haveri Haveri Sub Centre B

299 Haveri Haveri Sub Centre C

300 Haveri Haveri YALAGACHHA

301 Haveri Haveri Yattinahalli

302 Haveri Hirekerur ALADAGERI

303 Haveri Hirekerur ANAJI

304 Haveri Hirekerur ARALIKATTI

305 Haveri Hirekerur ARIKATTI

306 Haveri Hirekerur BOGAVI

307 Haveri Hirekerur CHANNAHALLI

308 Haveri Hirekerur CHIKKABBARA

309 Haveri Hirekerur CHIKKAYADACHI

310 Haveri Hirekerur CHIKKERUR-A

311 Haveri Hirekerur CHIKKERUR-B

312 Haveri Hirekerur CHINNAMULAGUNDA

313 Haveri Hirekerur DODDAGUBBI

314 Haveri Hirekerur DUDIHALLI

315 Haveri Hirekerur HADRIHALLI

316 Haveri Hirekerur HALLUR

317 Haveri Hirekerur HAUNSABHAVI A

318 Haveri Hirekerur HAUNSABHAVI B

319 Haveri Hirekerur HIREBUDIHAL

320 Haveri Hirekerur HIREKABBARA

321 Haveri Hirekerur HIREKERUR-A

322 Haveri Hirekerur HIREKERUR-B

323 Haveri Hirekerur HIREKONATHI

324 Haveri Hirekerur HIREMORAB

325 Haveri Hirekerur HOLABIKONDA

326 Haveri Hirekerur HOSAVEERAPURA

327 Haveri Hirekerur HULLATTI

328 Haveri Hirekerur KACHAVI

329 Haveri Hirekerur KADUR

330 Haveri Hirekerur KANVISIDDAGERI

331 Haveri Hirekerur KIRIGERI

332 Haveri Hirekerur KODA-A

333 Haveri Hirekerur KODA-B

334 Haveri Hirekerur KODAMAGGI

335 Haveri Hirekerur KUDAPALI

336 Haveri Hirekerur KUNCHUR

337 Haveri Hirekerur MADLUR

338 Haveri Hirekerur MAKARI

339 Haveri Hirekerur MASUR-A

91

Page 156: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

340 Haveri Hirekerur MASUR-B

341 Haveri Hirekerur MEDUR

342 Haveri Hirekerur NAGAVANDA

343 Haveri Hirekerur NESVI

344 Haveri Hirekerur NIDANEGILU

345 Haveri Hirekerur NULAGERI

346 Haveri Hirekerur RATTIHALLI-A

347 Haveri Hirekerur RATTIHALLI-B

348 Haveri Hirekerur SATENAHALLI

349 Haveri Hirekerur SHIRAGAMBI

350 Haveri Hirekerur SRIRAMANAKOPPA

351 Haveri Hirekerur SUTTAKOTTI

352 Haveri Hirekerur TADAKANAHALLI

353 Haveri Hirekerur TAVARAGI

354 Haveri Hirekerur YALIVALA

355 Haveri Hirekerur YETTINAHALLI

356 Haveri Ranibennur ANKASAPURA

357 Haveri Ranibennur ANTHARAVALLI

358 Haveri Ranibennur AREMALLAPURA

359 Haveri Ranibennur ASUNDI

360 Haveri Ranibennur BELUR

361 Haveri Ranibennur BENAKANAKONDA

362 Haveri Ranibennur BILLAHALLI

363 Haveri Ranibennur CHALAGERI A

364 Haveri Ranibennur CHALAGERI B

365 Haveri Ranibennur CHIKKAKURAVATHI

366 Haveri Ranibennur CHOWDADANAPURA

367 Haveri Ranibennur DEVARAGUDDA

368 Haveri Ranibennur GANGAJALA

369 Haveri Ranibennur GUDAGUR

370 Haveri Ranibennur HALAGERI-A

371 Haveri Ranibennur HALAGERI-B

372 Haveri Ranibennur HANUMAPUR

373 Haveri Ranibennur HARANAGIRI

374 Haveri Ranibennur HIREBIDARI

375 Haveri Ranibennur HIREMAGANURU

376 Haveri Ranibennur HONNATHI A

377 Haveri Ranibennur HONNATHI B

378 Haveri Ranibennur HULIHALLI

379 Haveri Ranibennur HULIKATTI

380 Haveri Ranibennur HULLATTI

381 Haveri Ranibennur IRANI

382 Haveri Ranibennur ITAGI-A

383 Haveri Ranibennur ITAGI-B

384 Haveri Ranibennur JOIYESARAHARALAHALLI

92

Page 157: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

385 Haveri Ranibennur KAJJARI

386 Haveri Ranibennur KAKOL

387 Haveri Ranibennur KAMADODA

388 Haveri Ranibennur KARUR-A

389 Haveri Ranibennur KARUR-B

390 Haveri Ranibennur KAVALETTU

391 Haveri Ranibennur KODIYALAHOSPETE A

392 Haveri Ranibennur KODIYALAHOSPETE B

393 Haveri Ranibennur KOTIHALA

394 Haveri Ranibennur KUPPELUR

395 Haveri Ranibennur KUSAGUR

396 Haveri Ranibennur LINGADAHALLI

397 Haveri Ranibennur MAKANUR-A

398 Haveri Ranibennur MAKANUR-B

399 Haveri Ranibennur MALANAYAKANAHALLI

400 Haveri Ranibennur MEDLERI-A

401 Haveri Ranibennur MEDLERI-B

402 Haveri Ranibennur MUDENUR

403 Haveri Ranibennur NADIHALLALLI

404 Haveri Ranibennur NITTUR

405 Haveri Ranibennur NUKAPURA

406 Haveri Ranibennur RAHUTANAKATTI

407 Haveri Ranibennur Sub Centre A

408 Haveri Ranibennur Sub Centre B

409 Haveri Ranibennur Sub Centre C

410 Haveri Ranibennur SUNNAKALLABIDADI-A

411 Haveri Ranibennur SUNNAKALLABIDADI-B

412 Haveri Ranibennur TUMINAKATTI-A

413 Haveri Ranibennur TUMINAKATTI-B

414 Haveri Ranibennur UKUNDA

415 Gadag Mundargi BAGEWADI

416 Gadag Mundargi BIDANALA

417 Gadag Mundargi BIDARALLI

418 Gadag Mundargi CHIKKAWADDATTI

419 Gadag Mundargi DAMBALA-A

420 Gadag Mundargi DAMBALA-B

421 Gadag Mundargi DONI

422 Gadag Mundargi HALLIGUDI

423 Gadag Mundargi HALLIKERI

424 Gadag Mundargi HAMMIGI

425 Gadag Mundargi HAROGERI

426 Gadag Mundargi HESARUR

427 Gadag Mundargi HIREWADDATTI-A

428 Gadag Mundargi HIREWADDATTI-B

429 Gadag Mundargi JANTHLISHIRUR

93

Page 158: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

430 Gadag Mundargi KADAMPURA

431 Gadag Mundargi KALAKERI-A

432 Gadag Mundargi KALAKERI-B

433 Gadag Mundargi KORLALLI

434 Gadag Mundargi MEVUNDI

435 Gadag Mundargi MUNDARGI-A

436 Gadag Mundargi MUNDARGI-B

437 Gadag Mundargi MUNDARGI-C

438 Gadag Mundargi MUNDAVADA

439 Gadag Mundargi PETALUR

440 Gadag Mundargi SHINGATALUR

441 Gadag Mundargi VENKATAPURA

442 Gadag Mundargi YEKALASAPURA

443 Gadag Shirahatti ADARAKATTI

444 Gadag Shirahatti BALEHOSUR

445 Gadag Shirahatti BANNIKOPPA

446 Gadag Shirahatti BATTUR

447 Gadag Shirahatti BELLATTI A

448 Gadag Shirahatti BELLATTI B

449 Gadag Shirahatti CHABBI

450 Gadag Shirahatti DEVIHAL

451 Gadag Shirahatti DODDUR

452 Gadag Shirahatti F BADNI

453 Gadag Shirahatti GOJANUR

454 Gadag Shirahatti H.ITAGI

455 Gadag Shirahatti HEBBAL-A

456 Gadag Shirahatti HEBBAL-B

457 Gadag Shirahatti HULLUR

458 Gadag Shirahatti KADAKOLA

459 Gadag Shirahatti KOGANUR

460 Gadag Shirahatti KONCHIGERI

461 Gadag Shirahatti KUNDRALLI

462 Gadag Shirahatti LAKSHMESHWAR-A

463 Gadag Shirahatti LAKSHMESHWAR-B

464 Gadag Shirahatti LAKSHMESHWAR-C

465 Gadag Shirahatti LAXMESHWAR URBAN

466 Gadag Shirahatti MACHENAHALLI

467 Gadag Shirahatti MADALLI

468 Gadag Shirahatti MAGADI-A

469 Gadag Shirahatti MAGADI-B

470 Gadag Shirahatti RAMGIRI

471 Gadag Shirahatti SHIGLI-A

472 Gadag Shirahatti SHIGLI-B

473 Gadag Shirahatti SHIRAHATTI D

474 Gadag Shirahatti SHIRAHATTI-A

94

Page 159: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

475 Gadag Shirahatti SHIRAHATTI-B

476 Gadag Shirahatti SHIRAHATTI-C

477 Gadag Shirahatti SURANGI

478 Gadag Shirahatti TARIKOPPA

479 Gadag Shirahatti VADAVI

480 Gadag Shirahatti YALAVATTI

481 Bellary Hadagali ALLIPURA

482 Bellary Hadagali BUDANURU

483 Bellary Hadagali DASANAHALLI

484 Bellary Hadagali DASARAHALLI TANDA

485 Bellary Hadagali HADAGALI A

486 Bellary Hadagali HADAGALI B

487 Bellary Hadagali HAGARANURU

488 Bellary Hadagali HAKKANDI

489 Bellary Hadagali HARAVI

490 Bellary Hadagali HIREBANNIMATTA

491 Bellary Hadagali HIREHADAGALI A

492 Bellary Hadagali HIREHADAGALI B

493 Bellary Hadagali HIREKOLACHI

494 Bellary Hadagali HIREMALLNAKERI

495 Bellary Hadagali HOLALU A

496 Bellary Hadagali HOLALU B

497 Bellary Hadagali HOLGUNDI A

498 Bellary Hadagali HOLGUNDI B

499 Bellary Hadagali HOSAHALLI

500 Bellary Hadagali HYARADA

501 Bellary Hadagali ITTIGI A

502 Bellary Hadagali ITTIGI B

503 Bellary Hadagali K AYYANAHALLI

504 Bellary Hadagali KAGGALAKATTITANDA

505 Bellary Hadagali KALVITANDA

506 Bellary Hadagali KATTEBENNURU

507 Bellary Hadagali KOMBALI

508 Bellary Hadagali KUMARANAHALLITANDA

509 Bellary Hadagali KURVATHI

510 Bellary Hadagali M KALLAHALLI

511 Bellary Hadagali M.M.WADA

512 Bellary Hadagali MAGALA

513 Bellary Hadagali MAKARABBI

514 Bellary Hadagali MIRAKORNAHALLI

515 Bellary Hadagali MUDENURU

516 Bellary Hadagali NAGATI BASAPURA

517 Bellary Hadagali NAVALI

518 Bellary Hadagali SHIVLINGANAHALLI

519 Bellary Hadagali SOGI

95

Page 160: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

520 Bellary Hadagali SOVENAHALLI

521 Bellary Hadagali TALAKALLU

522 Bellary Hadagali TIPPAPURA

523 Bellary Hadagali UTTANGI

524 Bellary Hadagali VARAKANAHALLI

525 Bellary Hagaribommanahalli ALABURU

526 Bellary Hagaribommanahalli AMBALI

527 Bellary Hagaribommanahalli BACHIGONDANAHALLI

528 Bellary Hagaribommanahalli BALLAHUNASI

529 Bellary Hagaribommanahalli BANNIGOLA

530 Bellary Hagaribommanahalli BASARAKODU

531 Bellary Hagaribommanahalli BENNEKALLU

532 Bellary Hagaribommanahalli BYASIGIDERI

533 Bellary Hagaribommanahalli CHINTRAPALLI

534 Bellary Hagaribommanahalli DASHMAPURA

535 Bellary Hagaribommanahalli ENAGI

536 Bellary Hagaribommanahalli G KODIHALLI

537 Bellary Hagaribommanahalli GADDIKERI

538 Bellary Hagaribommanahalli HAMPAPATNA

539 Bellary Hagaribommanahalli HAMPASAGAR-II

540 Bellary Hagaribommanahalli HANSI

541 Bellary Hagaribommanahalli K.K.THANDA

542 Bellary Hagaribommanahalli KADLABALU

543 Bellary Hagaribommanahalli KOGALI

544 Bellary Hagaribommanahalli MAGIMAVINAHALLI

545 Bellary Hagaribommanahalli MALVI

546 Bellary Hagaribommanahalli MARABBIHALU

547 Bellary Hagaribommanahalli MORIGERI

548 Bellary Hagaribommanahalli MUTKURU

549 Bellary Hagaribommanahalli NELLUKUDRI

550 Bellary Hagaribommanahalli OLD H.B.HALLI

551 Bellary Hagaribommanahalli RAMANAGAR-1

552 Bellary Hagaribommanahalli RAMANAGAR-2

553 Bellary Hagaribommanahalli SONNA

554 Bellary Hagaribommanahalli TAMBRAHALLI

555 Bellary Hagaribommanahalli TELIGOLI

556 Bellary Hagaribommanahalli ULAVATTI

557 Bellary Hagaribommanahalli UPANAYAKANAHALLI

558 Bellary Hagaribommanahalli VALLABHAPURA

559 Bellary Hagaribommanahalli VARADAPURA

560 Bellary Hagaribommanahalli VATTAMMANAHALLI

561 Bellary Hagaribommanahalli YADRAMNAHALLI

562 Koppal Koppal AGALIKERA

563 Koppal Koppal ALAVANDI

564 Koppal Koppal B.BANDA

96

Page 161: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

565 Koppal Koppal BASAPURA

566 Koppal Koppal BELAGATTA

567 Koppal Koppal BETAGERI

568 Koppal Koppal BHAGYANAGAR

569 Koppal Koppal BISARALLI

570 Koppal Koppal BOCHNAHALLI

571 Koppal Koppal BUDAGUMPA

572 Koppal Koppal CHIKKABOMMANAL

573 Koppal Koppal GINIGERA 1

574 Koppal Koppal GINIGERA 2

575 Koppal Koppal GONDABALA

576 Koppal Koppal GUDADAHALLI

577 Koppal Koppal HALAGERA

578 Koppal Koppal HASAGAL

579 Koppal Koppal HATTI

580 Koppal Koppal HIRESINDOGI A

581 Koppal Koppal HIRESINDOGI B

582 Koppal Koppal HITNAL

583 Koppal Koppal HOLEMUDLAPURA

584 Koppal Koppal HOSAHALLI

585 Koppal Koppal HOSALINGAPURA

586 Koppal Koppal HULAGI

587 Koppal Koppal INDARGI

588 Koppal Koppal IRAKALGADA

589 Koppal Koppal KALKERA

590 Koppal Koppal KARKIHALLI

591 Koppal Koppal KATARAKI

592 Koppal Koppal KAVALOOR A

593 Koppal Koppal KAVALOOR B

594 Koppal Koppal KINNAL

595 Koppal Koppal KOLURA

596 Koppal Koppal KUKANAPALLI

597 Koppal Koppal KUNAKERI

598 Koppal Koppal LEBAGERA

599 Koppal Koppal MADINUR

600 Koppal Koppal MAINALLI

601 Koppal Koppal MUNIRABAD

602 Koppal Koppal N B HARLAPURA

603 Koppal Koppal NELOGIPURA

604 Koppal Koppal SHAHPUR

605 Koppal Koppal SHIVAPURA

606 Koppal Koppal TIGARI

97

Page 162: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 21

98

Page 163: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl. No Designation Dist/Block Name Land Line Mobile

1 DDPI Shimoga 08182-223851Nodal Officer Shankarappa.T 08182-223851 9448188955Case worker Udayasingh 08182-223851

Toll Free number 1800-425-11030BEO Shimoga 08182-223102

Nodal officer Nayak 9844129374Case worker Prasad 08182-223102

BEO Bhadravathi 08282-266156Nodal officer Maheswarappa 08282-266156 9686930742Case worker Sreenivasa 08282-266156 9611410597

2 BEO Chikmagalur 08262-235960Nodal officer Mahesha 08262-235960 9449413970Case worker 08262-235960

BEO Tarikere 08261-222227Nodal officer Chandrappa.T 08261-222227 9902202232Case worker Devaraj 08261-222227 944913160

3 DDPI Davanagere 08192-231607Nodal officer Krishnamurthy Eo 08192-231607 9686559676Case worker Manjunath 08192-231607

Toll Free number 1800-425-11018BEO Davanagere North 08192-250650

Nodal officer Nagarathnamma 08192-250650 8970897949Case worker Venkatesh 08192-250650 9972675808

BEO Davanagere South 08192-250932Nodal officer Gopal.Y 08192-250932 9481360009Case worker Nagashayana 08192-250932 8197092025

BEO Harihara 08192-242572Nodal officer Saraswathi(TPEo) 08192-242572 9980262569Case worker Zeenath 08192-242572 9535055713

LIST OF DDPI`s ,BEO`s of Education DepartmentANNEXURE-21

99

Page 164: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

BEO Honnali 08188-251273Nodal officer Benakappachar Eco 08188-251273 9980193638Case worker Alimullakhan 08188-251273 9902204538

BEO Harapanahally 08398-280754Nodal officer Manjunath Naik 08398-280271 9945252525Case worker Kumaraswamy 08398-280271 9980429863

4 DDPI Haveri 08375-23443508375-249232

Nodal Officer A.Y.Mulla 08375-234435 9480093796Case worker Baligar 9741761549

Toll FreeNumber 1800-425-11023BEO Haveri 08375-232580

Nodal officer Niichchangi 08375-232580 9448236291Case worker R.K Kulkarni 9448822138

BEO Ranebennur 08373-266671Nodal officer Gejjhan.L.K & 08373-266671 9620378660

S.V DemanthiCase worker Hanumareddy 9620378660

BEO Hirekerur 08376-282215Nodal officer Kurubar.A.D 08376-282215 9008695987Case worker Mallikarjuna.C.G 08376-282215 9741565332

5 DDPI Koppal 08539-221303Nodal officerCase worker

Toll FreeNumber 1800-425-11025BEO Koppal

Nodal officerCase worker

6 DDPI Bellary 08392-268239Nodal officerCase worker

Bellary Toll FreeNumber 1800-425-11009BEO Bellary West

100

Page 165: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

7 DDPI Gadaga 08372-234644Nodal officer 08372-220644 8453833365Case worker Benanl 08372-220644 9483051590

Toll FreeNumber 1800-425-11021BEO Gadag-Urban 08372-278786

Nodal officer Kale.A.B 08372-278786 9880052827Case worker Smt V.B. Hobballi 08372-278786 9945144382

BEO Gadag-Rural Shankaralinga 08372-228184 9480695197Nodal officer Banad.V.B ,Eco 08372-228184 9916844237Case worker Beleri.S.M 08372-228184 9742812739

BEO Mundaragi 08371-262207Nodal officer Joshi 08371-262207 888494765Case worker Kesari 08371-262207 8123791329

BEO Shirahatti 08487-262217Nodal officer 08487-262217Case worker Bammanahalli 08487-262217 9916008981

101

Page 166: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

ANNEXURE 22

102

Page 167: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

Sl NO Name of Expert Area of Expertize Designation1  Dr.Y.K.Murthy,

Central WaterCommission,Champa D-44,Gulmoharpark, New Delhi-110 049.         

2 Sr.B.M.Rame Gowda,             Member

Former Joint Director C.W.P.R.S.Pune, 392/2,Sakhunivias, Gokhale Nagar Road,  Pune-411 016.

3 Sri.D.S.Rama MurthyChief Engineer (Retd).Central Water Commission,  2708,1stMain, V.V.Mohalla,

4 Sri.Kamble Y.S. Chief Engineer (Retd)Sharnakutir,No.1760, Karadi, Bageecha,Bijapur-586 101.

5Sri.M.B.Parappa Goudar,      Engineer-in-Chief (Retd)BasavaKrupa, Shivagiri,Jayanagar,Dharawad-580 007.

Earthdam                  Member

6 Sri.S.B.Koimbattur,

Superintending Engineer  (Retd), Koimattur Lalyout,   Behind

CanaraBank,Narayyanapur,Dharwad-580 008

7 Sri.S.Venkataramana,  Director (Retd),    K.E.R.S. Spillways of Dams. Member8

Director,K.E.R.S.K.R.Sagar. Permanent Invitee

9 Superintending Engineer, Monitoring & Evaluation,Basava Bhavan, Basaveshwara  Road,Bangalore-1.

ANNEXURE-22

Engineering Geology  Geo-

technical    (Foundation Engineering).

Convenor

Dam safety review panel

Dam Safety Surveillance,Mas

onty/ConcreteDam.Member

Dam Construction Engineering

and Management.Chairman

Gates &  Hoist Member

Water Resources & Engineering Member

103

Page 168: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

NARASHIMHA RAJAPURA

MUTTODI

SO

MA

VA

HIN

I HA

LL

A

SUKALA MATTI

BHADRA DAM

TANAGEBAILTANAGEBAIL

JAMABADA HALLA

LINGADA HALLI

TARIKERE

BHADRA

BHADRA ANICUT

RIGHT BANKCHANNEL

CH

IKK

A M

AG

AL

OR

E D

IST

RIC

TSH

IMO

GA

DIS

TR

ICT

LINGADA HALLI

BIRUR

KADUR

TO BANGALORE

TO BANGALORE

TO CHIKKA MAGALORE

AJJAMPURA

TO KADURSHIVANI

KA

GE

HA

LL

A

RIGHT BANK CHANNEL

BANK

BHADRA LEFT

LEFT BANK CHANNEL BHADRAVATHI

BHADRA RIVER

D.B. HALLI

AGARADAHALLI

REGULATER-1Q=150/300 G/S

CHANNAGIRI

MAVINAHOLE TANK

TUNNEL

CHANNEL

UMBLIBAIL

TUNGA ANICUT

GAJANUR

TUNGA RIVER

TO S

AG

AR

SHIMOGA

T.L.B.C

T.R.B.C

TO

HO

LA

LK

ER

E

HODIGERE SANTHE BENNUR

SHY

AG

AL

HA

LLA

DAVANAGERE BRANCH

TO BANGALORE

TO

CH

ITR

AD

UR

GA

CHANNEL

HIRMADALU

ANVERY PICK - UP

REGULATOR NO 2

BASAVAPATNA

Q=150/300 C/SA=15615 AC

ANVERY

ANVERY

HOSAHALLI

KULAGATTA

UJJANIPURA

HONNALI

BRANCHCHANNEL

NALLUR SHAN-TISA

GAR

KUNDUR

HALE BENNUR BRANCH CHANNEL

Q=600 C/SA=5820 AC

BASAVANALA

HARIDRA RIVER

Q=1150 C/SA=1,11587 AC

NALKUNDRE

KEMPANAHALLIKOGALUR

NAVALKAL

DODDAGATTA THYAVANGE

MATHIHONNAMARADI

HUVINAMADULOKIKERE

A.K.COLONY

MALALKERE

Q=350C/S

SHIM

OG

A D

ISTR

ICT

CHIT

RA

DU

RG

A D

ISTR

ICT

HADADI

KATAL GERE

NELAHONNE D.B.KERE PICK - UP

KAVALITANK

EKKANAHALLIBANNIKODI

TO S

AG

AR

SASUVEHALLI

RAMPURA

KOTEMALLUR

TO S

HIK

AR

IPU

RA

SHIM

OG

A D

IST

RIC

T

KH

AR

WA

RD

IST

RIC

T

TUNGA BHADRA RIVER

JIGALI

MALEBENNUR

BELLODI

DEVARABELIKERE

HA

RIH

AR

A B

RA

NC

H

CHANNEL

KUNDAVADA

SYABANUR

R3 Q=250C/S

ANAGODU

TO

JA

GA

LU

R

CH

ITR

AD

UR

GA

DIS

T

BE

LL

AR

Y D

IST

HARAPANAHALLI DISTRIBUTRY

DAVANAGERE

OBAJJIHALLI

HALLIKERE TANK

SINGRAHALLI

KONDAJJI

TO HOSPET

SARATI

TO H

UBLI

TO HUBLI

HARIHARA

TO S

AG

AR

DAM SITE

CHANNELS

BHADRA ATCHKAT

SUBMERSION AREA

DISTRICT BOUNDARY

RIVER & VALLEY

ROADS, RAILWAY LINE

CIRCLE, DIVISION, & SUB-DIVISION,HEADQUARTER

Q=335C/SR=17314RB

KU

MU

DV

ATH

I RIV

ER

INDEX

KARNATAKA NEERAVARI NIGAM LIMITED

BHADRA RESERVOIR PROJECTINDEX MAP OF

BHADRA RESERVOIR PROJECTDRG.No. SCALE : -

Section OfficerAsst., Engineer No-1,

BRLBC Sub-Division, B.R.P

Assistant Executive EngineerKNNL, No-1, BRLBC, Sub-Division,

B.R.Project

ExecutiveEngineerKNNL, No-4, BRLBC,Division, Bhadravathi.

Superintending EngineerKNNL, Bhadra Project Circle,

B.R.ProjectChief Engineer

KNNL, UTP Zone, Shimoga

Page 169: Emergency Action Plan for Bhadra Damwaterresources.kar.nic.in/EAP Report- Bhadra.pdf · 2019. 5. 4. · Emergency Action Plan -Bhadra Dam Contents 1 Notification Flowchart (Watch

MASONARYRETAINING WALL

1360

1220

1148

1108

1077

1059

1022

962

1052

892

882

822

818

752

729

708

688

639

594

514

475

RB COMPOSITE DAM

RB SLUICE SECTION

MAIN GATE(101

2'X20')

10'DIAR PEN STOCKPIPES 2 NO'S AT+112

MAIN GATE(101

2'X20')

IRRIGATION SLUICE 2NO'S OF 8'X15' AT+100

RIGHT BANKPOWER HOUSE

WIN

G W

AL

L

RE

PNR

BA

Y

KL 204600TAIL RACE

SLO

PE 1

:4

STIL

LIN

G B

ASI

N

APP

RO

CH

RO

AD

+96RL 2067.00

6' D

AIR

PE

NST

OC

K P

IPE

ST

O D

ISC

HA

RG

E T

AIL

RA

CE

WA

TE

R

SKEW BRIDGE

RIGHT

BANK

CHANNEL

2190

2170

2160

2150

2140

2130

2120

2110

2100

20902080

20702060

2050

2000

2020

2040

2 SL

UIC

ES

OF

6'X

15' A

T+

45R

L 2

017.

00

10'D

IAR

PE

N S

TO

CK

PIP

E 2

NO

'S A

T+

60(R

L 2

032.

00)

6' D

IAR

PE

N S

TO

CK

PIP

EA

T+

60(R

L 2

032.

00)

+36

IR

RIG

AT

ION

SL

UIC

E LEFT BANKPOWER HOUSE

OUT DOOR SWITCH YARD

BATTERYROOM

PASS

AG

E

TAIL RACE

APP

RO

AC

HR

OA

D

LEFT

BA

NK

CH

AN

NE

L

2040

2050

2060

2070

208020

90

2100

2110

2120

2130

2140

2150

2160

21602150

2110

2100

2090

2080

2070

2060

2050

2040

2120

2130

2140

GAUGE

WALL 3' DIAR

MASONRY RETAINING

WALL

CHAINAGE45

0

360

230

0

130'

-0"

DRAINAGE GALLERY 5X7 12 @RL1992.00

+194 RL 1952.00

RCC FLOOR

RC

C D

IVID

ING

WA

LL

LE

FT

BA

NK

RIV

ER

RL

199

4.00

STILLING BASIN

RCC TOE WALL

MASONRY TOE WALLSLOPING APRON 1 IN 6

RL 1955.00RL 1963.00RL 1952.00

SIZE STONE REVETMENT

OV

ER

FL

OW

WE

IR R

L 1

994.

00

P.B

.RIV

ER

TR

AIN

NIN

G W

AL

L

47'-0"

270'-0"

250'

-0"

42'-0

"60

'-0"

L.B.SLUICE SECTION SPILLWAY SECTION

MAIN GATEEMERGENCY

GATE 12'22MAIN GATE

MAIN GATE(1012'X20')

EMERGENCYGATE (12'22)

MAIN GATE(812'X17') 10'-0"

GRAVITY SECTION

L.B.COMPOSITE DAM

MASONRY RETAINING WALL

GRAVITY SECTION

L B SLUICE SECTION

PROPOSED LOCATION OFNX SIZE CORE DRILL

RIV

ER

BH

AD

RA

BEAM 2141.00

(812'X11')

8'-0"

10'-0"

20'-0

"

KARNATAKA NEERAVARI NIGAM LIMITED

BHADRA RESERVOIR PROJECT

LAYOUT OF HEAD WORKS

DRG.No. SCALE : -

Section OfficerAsst., Engineer No-1,

BRLBC Sub-Division, B.R.P

Assistant Executive EngineerKNNL, No-1, BRLBC, Sub-Division,

B.R.Project

ExecutiveEngineerKNNL, No-4, BRLBC,Division, Bhadravathi.

Superintending EngineerKNNL, Bhadra Project Circle,

B.R.ProjectChief Engineer