Emerald Lake Village District

Asset Management Program

Chris Berg, Wright-Pierce

May 28, 2020

Page 2: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

What are Assets?

What is Asset Management?

Existing Infrastructure

Level of Service (LOS)

Analysis

Risk Prioritization

Recommendations

Next Steps

Presentation Overview

2

Page 3: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Distribution• Valves

• Water Main

• Hydrants

• Services

What are Assets?

3

An asset is a resource with economic value and the expectation that it will provide a future benefit.

Facilities• Storage tank

• Well pump stations

• Water treatment plant

Page 4: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

What is Asset Management?

4

Asset Management is a systematic process of operating, maintaining, upgrading and disposing of assets cost-effectively while maintaining a level of service that is acceptable to the customers.“

Page 5: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

What is Asset Management?

5

This is a continuous process that should be revisited annually.

Existing Infrastructure

Level of Service

Risk AnalysisRisk

Prioritization

Capital Improvement

Plan

This is a continuous

process that should be

revisited annually.

Page 6: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Existing Infrastructure - Summary

6

Asset Type Count

Bedrock Wells 8, (6 active)

Source Water Facilities 4

Storage Tanks 1

Distribution Main ~13 miles

Gate Valves 85

Hydrants 11

Zone Meters 4

Service Connections 538

Service Meters 0

>$15M

in assets!

Page 7: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

• District uses online tools like Google drive for record information storage and data collection

• Asset Inventory and condition assessment information on vertical assets included in ELVD CUPSS for asset inventory

• Distribution system assets and attributes included in GIS database

Asset Inventory & Condition Assessment

7

Page 8: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Level of Service

A Level of Service Agreement (LOS) defines

how the utility owners, managers, operators

and customers want the system to perform

over the long term.

8

The District chose to create a LOS that covers both vertical and distribution system assets

“Report Card” for the system

Page 9: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Level of Service

9

Goal Target LevelFrequency of

Measurement

All federal and state water quality regulations will be

met<MCL Annually

Unaccounted-for-Water less than 15% <15% Annually

The system will maintain a minimum pressure of 35

psi and a minimum operating pressure of 20 psi

under all flows

>35 psi Monthly

All customer complaints will be investigated within 1

business days of reporting the complaint.1 day Monthly

Breaks will be repaired within 24 hours of being

reported 95% of the time.> 95% Monthly

Contact the Board of Commissioners at least 48 hours

prior to water main shutdown in planned situations

and ASAP in emergency situations.

< 48 hrs Monthly

No adverse event will cause the customers to be

without water.0 events Monthly

Page 10: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

• Interconnection options with Hillsborough

and Henniker (6 options considered)

• Each includes a booster pump station and

meter building

• Water main extension lengths vary from

~10,000 ft to 15,000 ft

• 3 options include crossing Rt 202A

• Conceptual project costs vary from $3.9M

to $4.8M

Analysis – Interconnections

10

Page 11: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

• Supplement current

supply

• Installation of pressure

transducer and

increased monitoring at

existing wells

• Bedrock and sand and

gravel deposits

• Multiple sand and

gravel sites identified for

further investigation

Analysis – Source Water

11

Page 12: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

• Water main

replacements

o Breaks, age

• Storage tank

o Cleaning and inspections

• New zone meters

o Hemlock

o Turtle crossing bridge

• Customer meters

Analysis – Water Main & Storage

12

Page 13: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

• Temporary waiver from

service meter

installation

• Zone metering

o 5 meters

o 2 proposed

o ~90% of system covered after installation of add’l meters

• Service meters

recommended

Analysis – Metering

13

Page 14: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Factors

• Break History

• Asset Age

• Material Type

• Pressure

Likelihood of Failure – Water Mains

14

Street NameAsset Life

ConsumedMaterial Static Pressure Leak History

Condition Ranking

0.3 0.2 0.1 0.4 1-10

Old Lantern Road 7.5 7 7 10 8.4

Deerpoint Road 7.5 7 3 10 8.0

Winter Road 7.5 7 3 7 6.8

Moccasin Trail 7.5 7 7 5 6.4

Raccoon Alley 7.5 7 7 5 6.4

Raccoon Alley 7.5 7 7 5 6.4

Autumn Road 7.5 7 3 5 6.0

Gould Pond Road 7.5 5 7 5 6.0

Gould Pond Road 7.5 7 3 5 6.0

Gould Pond Road 7.5 7 3 5 6.0

Moccasin Trail 7.5 5 7 5 6.0

Beaver Glen Road 7.5 7 7 3 5.6

Bobolink Lane 7.5 7 7 3 5.6

Firefly Lane 7.5 7 7 3 5.6

Rainbows End 7.5 7 7 3 5.6

Red Fox Crossing 7.5 7 7 3 5.6

Gould Pond Road 7.5 5 3 5 5.6

Huntington Drive 7.5 7 3 3 5.2

Skyview Lane 7.5 7 3 3 5.2

Page 15: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Likelihood of Failure – Water Mains

15

Factors

• Break History

• Asset Age

• Material Type

• Pressure

Page 16: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Priority Recommendations

16

Improvement Description Purpose of Improvement Length (ft) Total Project Cost

Old Lantern Road Water Main Replacement Breaks, Age, Material 1,200 $252,000

Deerpoint Dr Water Main Replacement Breaks, Age, Material 1,800 $378,000

Well Transducer Installation Inadequate water source production - $35,000

Sand & Gravel Well Exploration Inadequate water source production - $40,000

Patten Hill Tank Recommendations NHDES Recommendation - $12,000

Patten Hill Control Building Recommendations NHDES Recommendation - $45,000

Meeting House WTP Recommendations NHDES Recommendation - $88,000

New gravel-packed well Inadequate Water Source Production/Water Quality - $280,000

Water Storage Tank Inspection Maintenance - $5,000

Zone Meters WCP Compliance - $20,000

SUBTOTAL $1,155,000

Page 17: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

If new source water development is successful,

interconnection may not be necessary or can be delayed.

Project costs should be transitioned to water main

replacement or service meter installation.

Secondary Recommendations

17

Improvement Description Purpose of Improvement Length (ft) Total Project Cost

Interconnection with Neighboring

Community**

Inadequate water source

production/water quality10,550 $3,934,000

Winter Road Water Main Replacement Breaks, Age 3,200 $672,000

Autumn Road Water Main Replacement Breaks, Age 2,800 $588,000

Water Storage Tank Inspection Maintenance - $5,000

SUBTOTAL 16,550 $5,199,000

Page 18: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Funding Options/Partners

18

NH Municipal Bond Bank

Private Loans

Cash

Grants and

Principle

Forgiveness

Available

Page 19: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Next Steps: Asset Management Maintenance Plan

19

Revise asset information as

inspections, rehabilitation and repair

projects are completed.

Continue collection of missing assets

and asset characteristics.

Add asset information assessment

information to GIS and CUPSS.

1

2

3

Revise CIP and FIP annually as

part of the budget development

process.

Provide training to staff members

who will be maintaining data sets

and coordinating with GIS and

CUPSS. (Use RCAP)

4

5

Page 20: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

Next Steps

20

This is a continuous process that should be revisited annually.

Existing Infrastructure

Level of Service

Risk AnalysisRisk

Prioritization

Capital Improvement

Plan

This is a continuous

process that should be

revisited annually.

Reapply for DW Grant

Program in December?

Page 21: Emerald Lake Village District Asset... · Emerald Lake Village District Asset Management Program Chris Berg, Wright-Pierce May 28, 2020. What are Assets? What is Asset Management?

THANK YOU

21