em2 - infrastructure.planninginspectorate.gov.uk... · em2 em3 em4 m4 junctions 3 to 12 smart...
TRANSCRIPT
CUTL
INE
CUTL
INE
CONT
INUED
ON S
HEET
01
CUTLINE
CUTLINE
CONTINUED ON SHEET 03
EM2Height 2.5m
EM3Height 2.5m
EM4Height 2.5m
EM1Height 2.5m 5680
0
5690
0
5700
0
5710
0
5720
0
5730
0
5740
0
5750
0
5760
0
5770
0
5780
0
5790
0
5800
0
5810
0
5820
0
5830
0
5840
0
5850
0
5860
0
5870
0
5880
0
5890
0
5900
0
5910
0
5920
0
5930
0
5940
0
5950
0
5960
0
5970
0
5980
0
5990
0
6000
0
6010
06020
06030
06040
06050
06060
06070
06080
0
EM2
EM3
EM4
M4 JUNCTIONS 3 TO 12SMART MOTORWAY
ENHANCEDNOISE MITIGATION DETAILS
SHEET 2 OF 15
Drawing Title
Job Title
0 250 500125Metres
KEY PLAN
SCALE 1:10,000
DRAWING 2Drawing Number
Alliance Document Reference1:10,000
Rev Scale at A3
Appr'dReviewCheckDrawnRevision DetailsRevision DateRev #
This map is reproduced from Ordnance Survey material with permission ofOrdnance Survey on behalf of the Controller of Her Majesty's Stationery Office© Crown Copyright.Unauthorized reproduction infringes Crown Copyright and may lead toprosecution or civil proceedings. Highways Agency 100030649 2014
All lanes will be provided with low noise surface along the completelength of the Scheme for opening.
NOTESNo dimensions are to be scaled from this drawing
J12
J11
J8/9J7
J6J5 J4b J4 J3
J10
READING
WOKINGHAM
BRACKNELL
MAIDENHEAD SLOUGH
WINDSOR
The Cube199 Wharfside StreetBirminghamB1 1RN
SWAMAHBBFirst Draft9/12/150DSWAMAHBBIssued for Review22/12/151RSWAMAHBBSubmitted23/12/152F
3F
Highways England
514451-MUH-00-ZZ-RP-EN-400158
SWAMAHBBRevision15/2/20163F