elton parker resume 04-06-2105 - full

15
Elton Lee Parker Jr. PO Box 338 Des Arc, AR 72040 (501) 773-0391 Email [email protected] Experience: September 2015 to November 2105 AMEC Foster Wheeler Atlanta, GA Prepared interface documents for the replacement of control and bench board panels. This was in conjunction with the conversion the conversion of boiler from caol fired to natural gas fired at the Southern Power electric generating station at Demopolis, Alabama. May 2014 to February 2015 Richard Design Services (RDS) Rosemount, MN 55068 Prepared plans for the installation of two instrumentation shelters for the Flare CEMS project at the Pine Bend Refinery in Rosemount, MN. Activities included design of the building electrical system, design of the primary and backup feeder to the building and design of the emergency generator system. Prepared plans for the installation of an electrical feeder to the new Coker #3 Bridge Crane at the Pine Bend Refinery in Rosemount, MN. Activities included sizing and routing of a 1

Upload: lee-parker

Post on 16-Apr-2017

74 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Elton Parker Resume 04-06-2105 - Full

Elton Lee Parker Jr. PO Box 338Des Arc, AR 72040(501) 773-0391Email [email protected]

Experience:

September 2015 to November 2105AMEC Foster WheelerAtlanta, GA

Prepared interface documents for the replacement of control and bench board panels. This was in conjunction with the conversion the conversion of boiler from caol fired to natural gas fired at the Southern Power electric generating station at Demopolis, Alabama.

May 2014 to February 2015Richard Design Services (RDS)Rosemount, MN 55068

Prepared plans for the installation of two instrumentation shelters for the Flare CEMS project at the Pine Bend Refinery in Rosemount, MN. Activities included design of the building electrical system, design of the primary and backup feeder to the building and design of the emergency generator system.

Prepared plans for the installation of an electrical feeder to the new Coker #3 Bridge Crane at the Pine Bend Refinery in Rosemount, MN. Activities included sizing and routing of a new 600 amp feeder from an existing substation to the new bridge crane.

Prepared plans for the installation of the electrical feeder and the hear trace system for Oily Water Sump Pump at the Waste Water Treatment Plant at the at the Pine Bend Refinery in Rosemount, MN. Activities included feeder sizing and routing from the MCC to the motor. Also included was calculation and design of heat tracing required on the pump discharge line.

1

Page 2: Elton Parker Resume 04-06-2105 - Full

August 2013 to March 2014Jacobs Engineering GroupBaton Rouge, LA 70898Senior Electrical Engineer

Prepared the ETAP model, report, and study for the Methenex methanol plant in Geismar, Louisiana.

Prepared the Relay Coordination and ARC Flash studies utilizing ETAP modeling software for the Methenex methanol plant in Geismar, LA.

Prepared the Electrical Equipment List for the Methanex methanol plant in Geismar, LA.

Prepared the Control and Power Cable Schedules for the Methanex methanol plant in Geismar, LA.

September 2012 to August 2013Weatherly IncorporatedAtlanta, GA 30309Senior Electrical Engineer

Prepared grounding plans for ammonium nitrate, nitric acid, and ammonia plants being built for US Nitrogen in Greenville, Tn.

Prepared plans for the refurbishment of connection boxes for two 4000 HP synchronous motors being installed at the US Nitrogen plant.

Analyzed the electrical system equipment for the US Nitrogen plant. An analysis of the load flow, short circuit and arc flash ratings was performed utilizing ETAP software.

Lead Electrical on Nitric Acid Plant under construction at the El Dorado Chemical facility in El Dorado, AR.

February 2012 to September 2012Bibb EngineersKansas City, MO 64111Senior Electrical Engineer

Prepared MCC one line diagrams and 15 kV switchgear interconnection diagrams for the new wood burning power plant being built in Plainfield, CT.

2

Page 3: Elton Parker Resume 04-06-2105 - Full

Prepared instrumentation location plans for the new wood burning power plant being built for the Northern Virginia Electric Cooperative Corporation.

Prepared underground duct bank plans, duct bank cable fills, specifications for medium voltage variable frequency drives, and technical evaluation of bids for 480V and medium voltage switchgear.

November 2011 to December 2011URS Engineering ConsultantsLittle Rock, ARSenior Electrical Engineer

Prepared preliminary electrical engineering study, including estimate, for the conversion of the extruders to tubular polyethylene at the Evergreen plants in Raleigh and Asheville North Carolina.

Prepared the electrical control and power systems modification plans for the Kady Mill project at the Evergreen plant in Pine Bluff, AR.

September 2011 to November 2011Marathon PetroleumFindlay, OHSenior Electrical Engineer

Converted ARC Flash Study for the Florette, PA terminal to ETAP Converted ARC Flash Study for the Benton, IN terminal to ETAP Provided training on ETAP for engineering personnel.

June 2011 to September 2011Pine Bluff Sand and GravelPine Bluff, ARSenior Electrical Engineer

Performed electrical survey of the Pine Bluff and Whitehall Redi-Mix plants, the Pine Bluff Hot Mix Asphalt plant, the Pine Bluff Cold Mix Asphalt plant and the Pine Bluff Material yard. These facilities are located at the Pine Bluff Sand and Gravel facility in Pine Bluff, AR.

Prepared the one-line diagram, arc flash analysis, and fault current analysis, utilizing ETAP software, for the Pine Bluff Redi-Mix plant electrical system.dditionally, these services were performed for the Pine Bluff Hot Mix Asphalt plant, and the Material Yard.

3

Page 4: Elton Parker Resume 04-06-2105 - Full

In the process of preparing the one-line diagram, arc flash analysis, and fault current analysis, utilizing ETAP software, for the Pine Bluff Cold Mix plant and the White Hall Redi-Mix plant.

March 2011 to June 2011GE EnergySalem, VASenior Electrical Engineer

Part of the team that configured the electrical system for testing the 2.75 Wind Turbine Converter. This system is a 4160 volt system whose function is to emulate the various electrical grid conditions that will be encountered by a wind turbine generator/converter combination.

Performed the calculations to determine the component values of the various capacitors and inductors in the test system

Performed the calculations to determine the wire sizes and component ratings for the various components in the system.

Wrote the specifications for various components of the system including 4160 volt switchgear and multi-tap inductors.

March 2010 to March 2011Washington River Protection ServicesRichland, WASenior Electrical Engineer

Performed the design required for the modification of the electrical system of the T farm complex at the Hanford Reservation. Project included refurbishment of the lighting system, installation of 120V and 480V power sources in the farm, installation of manual transfer switches at the Change Trailers, and a load study of each farm utilizing SKM Power Tools software.

Performed the design required for the modification of the electrical system of the B farm complex at the Hanford Reservation. Project included refurbishment of the lighting system, installation of 120V and 480V power sources in the farm, installation of manual transfer switches at the Change Trailers, and a load study of each farm utilizing SKM Power Tools software.

September 2008 to May 2009Middough Consulting EngineersSt Louis, MOSenior Electrical Engineer

Performed the conceptual design of the electrical system for the replacement of CFC based chillers with NH3 based chillers at the Hoffman-LaRoche plant in Florence, SC. Project included modification of existing 4160 volt and 480 volt distribution system, installation of motor control centers, and motor feeders, area lighting and installation of both 480 volt and 4160 volt variable frequency drives.

4

Page 5: Elton Parker Resume 04-06-2105 - Full

Determined the instrument layout and designed the instrument conduit and cabling for the new FCC Wet Gas Scrubber at the Sinclair Oil Refinery in Tulsa. OK.

Conceptual design and a 30% plus or minus estimate of the cost for the electrical system modifications required to upgrade the Alky unit cooling tower pumps at the Valero refinery in Memphis, TN. Project includes ETAP load study, motor feeder sizing and starter installation for three 1250 HP, 4160 volt pump motors and demolition of existing starter rack.

Arc Flash analysis of the electrical system of a chemical plant in Tulsa, OK.

April 2008 to September 2008United States Enrichment CorporationPaducah, KYElectrical Engineer

Designed the instrumentation system for the addition of oil temperature sensors on the Seal Exhaust and Wet Air Pumps at the Cascade Buildings. Project included temperature sensor selection, cable routing, and junction box placement, wiring into existing the scanner modules of the existing production monitoring system.

Designed the electrical system for an emergency HVAC system for the data center at the C-100 building. Project included the specification of the generator, wiring from the generator to the HVAC units, and control system design.

Provided engineering support for the repair of the pH monitoring system for the plant runoff water. Project includes repair or replacement of the pH correction equipment, assessment of the existing RTUs for the SCADA system, and replacement of the SCADA system alarming system.

November 2007 to April 2008CFW Associated EngineersLouisville, KYElectrical Engineer

Designed the electrical power and control system for the new dust collection system at the ESSROC concrete plant at Logansport, Indiana. Project included 4160 volt distribution system extension, 4160 volt AC drive installation, 480 volt power distribution system, instrument and sensor interface to the existing Allen-Bradley PLC-5 PLC system, and PLC panel and wiring diagram development.

Designed the electrical power and control system for the new dust collection system at the ESSROC concrete plant at Speed, Indiana. Project included 4160 volt distribution system extension, a 4160 volt starter, 480 volt power distribution system, instrument and sensor interface to the existing Allen-Bradley PLC-5 PLC system, and PLC panel and wiring diagram development.

5

Page 6: Elton Parker Resume 04-06-2105 - Full

Designed the electrical power and control for the modification of the 2D Roll Press at the ESSROC concrete plant at Speed, Indiana. The project included replacement of motor control center buckets, installation of variable speed drives, and integrating units into the existing Allen-Bradley PLC-5 control system.

May 2007 to November 2007C&I EngineeringLouisville, KYSenior Power & Controls Engineer

Designed the electrical control system for the emergency shutdown system for the isobutane rail car loading system at the Marathon Petroleum refinery at Canton, OH.

Designed the electrical power and control modifications required to replace the Tail Reactor Acid Pump in the Alky unit at the Marathon Petroleum refinery in Canton, OH.

March 2007 to May 2007Tesserlandro Kerley SystemsCarlsbad, NMInstrumentation & Controls Engineer

Responsible for the specification of the instrumentation system for a chemical process unit being built for Bechtel Corporation in Hanford WA

Designed the PLC I/O & communication structure system for the control of a chemical process unit being built for Bechtel Corporation in Hanford, WA.

Designed the PLC cabinets required for the control of a chemical process unit being built for Bechtel Corporation in Hanford, WA.

November 2006 to March 2007Bechtel Savannah River IncAiken, SCInstrumentation & Controls Engineer

Responsible for the creation and modification of the documents and drawings (utilizing Microstation) required for the installation of a valve stand in the HB Line at the Savannah River site.

Responsible for the creation of the documents and drawings required for the removal of existing control cabinets in the HB line control room. Also responsible for the documents and drawings required for the installation of new I/O system and wiring modification required for the integration of this system into the existing DCS.

May 2006 to November 2006

6

Page 7: Elton Parker Resume 04-06-2105 - Full

W. S. Nelson & AssociatesNew Orleans, LAInstrumentation Engineer

Responsible for the creation of the Instrument Loop, Interconnection, and Panel Modification Diagrams for Exxon Mobil Well Head Platform 112BC. Also responsible for the Safety Charts, Instrument Specifications and Instrument Plan Views.

Responsible for the creation of the Instrument Loop, Interconnection, and Panel Modifications for Exxon Mobil Production Platform 77B. Also responsible for theSafety Charts, Instrument Specifications and Instrument Plan Views.

February 2005 to May 2006Koehler EngineersLittle Rock, ARControls Engineer

Responsible for programming of Allen-Bradley PLC 2/30 PLC system to add laser measurement of the width and diameter of paper rolls being processed in the Wrapper Line at the Potlatch Corporation, McGehee, AR Paper Mill.

Responsible for various control modifications to the equipment utilized to manufacture steel pipe at the Ipsco Corporation pipe plant in Hickman, AR. Activities include modification of Allen-Bradley SlC-5/04 programs,

Modification and addition to Allen-Bradley PanelView Screens, and generation and modifications of Wonderware screens.

Responsible for the modifications and additions to the control system that controls the chemical feed system for the A2 Entangler water system at the Polymer Group Inc. plant in North Little Rock, AR. Activities included design of the Siemens S7-300 I/O system, integration of the instrumentation into the system, and the required PLC programming. Also, coordination with the MMI screen developer was included.

January 2002 to January 2004Norandal Inc, Newport Rolling MillNewport, ARElectrical Maintenance Engineer

Responsible for the electrical maintenance of an aluminum rolling mill. Responsible for the Six Sigma Project improvements for the mill

September 2000 to January 2002Jacobs Engineering (Direct September 2001 to January 2002)Westaff (Contracted to Jacobs Engineering September 2000 to September 2001)Los Alamos, NM Senior Electrical Engineer

7

Page 8: Elton Parker Resume 04-06-2105 - Full

Responsible for the design and implementation of the control system for the Power Plant boiler feed water system neutralization system at the Los Alamos National Laboratory (LANL) Power Plant. Activities included P&ID Diagram development, wiring diagrams. And control panel layout.

Responsible for the modification of the control system for the new Fire Water Tank at TA-53. Activities included the documentation of the existing system, preparation of new wiring diagrams for the required wiring modifications, and oversight of the new construction.

Responsible for the replacement of the existing Square D programmable controller system (PLC) system at the LANL Waste Water Treatment Plant.

Activities included documentation of the existing system, preparation of new wiring diagrams, coordination with the PLC Programmer, and coordination of the switchover from the old to new control system.

January 2000 to September 2000Polymer Group Inc (contracted with Oxford International)North Little Rock, ARElectrical Engineer

Responsible for the completion of the rebuild of the #2 Slitter. Activities included Siemens S7 PLC program modification, AC drive parameterization, modification of WinCC HMI screens, and interface with operating personnel for the optimization of the machine.

Responsible for the general electrical and control maintenance of the Thermobond production area. Activities included the trouble shooting and correction of control and electrical problems. Also responsible for the implementation of minor modifications to existing machinery.

August 1997 to January 2000United EngineeringNorth Little Rock, ARSenior Application engineer

Responsible for the sales of Pillar Uninterruptible Power Supply systems. Activities included sales presentations, preparation of sales quotations, and determination of customer needs.

Responsible for the sales of Mirus Harmonic Mitigation products. Activities included sales presentation, preparation of quotations and determination of customer needs.

October 1991 to August 1997Murco SystemsBaton Rouge, LASenior Application Engineer

8

Page 9: Elton Parker Resume 04-06-2105 - Full

Responsible for the design and startup of the control system for booster pumps for the East Baton Rouge Parish Waste Water System. Activities included the preparation of wiring and control diagrams, design of the control panels, programming of the Tesco PLCs and startup of the stations.

Responsible for the design and startup of the control system for the South Waste Water Treatment plant of the East Baton Rouge Parish Waste Water system. Activities included the preparation of the wiring and control diagrams, design of the control panels, programming of the Allen-Bradley PLC 5 PLC’s, generation of the HMI screens and startup of the system.

Responsible for the design and startup of the control system for various waste water lift stations. Activities included the preparation of wiring diagram, design of control panels, programming of the Allen-Bradley SLC-504 PLC’s, generation of HMI screens, and startup of the stations.

May 1986 to October 1991Parker Systems and ControlCarlisle, ARPresident

Responsible for the programming of the PLC 5 system of the Black LiquorSuperconcentrator at the Arkansas Kraft Paper mill. Activities includedInterfacing the Moore systems DCS with the PLC system and programming of the PLC system.

Responsible for the design, installation, and programming of the PLC system for the WP Line 3 at the Pine Bluff arsenal. Activities included production of wiring diagrams, PLC layout and wiring diagrams, and programming of the PLC-3 based control system for the assembly line.

Responsible for the programming of the Advisor MMI system for the Hydropulper at Arkansas Kraft Corporation. Activities included screen development, interface with the PLC-2 system and startup.

January 1981 to May 1986Curtis H Stout CoLittle Rock, ARArea Manager, Programmable Logic Controllers and Drives

Responsible for the sales, marketing and customer support of Allen-Bradley programmable controller products in a five state area.

Responsible for the sales, marketing and customer support of Allen-Bradley DC, AC, and servo drive products in a five state area.

January 1976 to January 1981Garver + Garver EngineersLittle Rock, ARElectrical Engineer

9

Page 10: Elton Parker Resume 04-06-2105 - Full

sponsible for the design of the electrical system for water and wastewater facilities.

Responsible for the electrical system for commercial and industrial.

Responsible for the design of airport runway systems

January 1970 to January 1976Oklahoma Gas & Electric CompanyOklahoma City, OKDistribution Engineer

Responsible for the extension of the electrical utility system as required to provide service to new customers.

Responsible for the maintenance engineering of the utility system

Initial training included two months with a substation maintenance crew. Some duties included routine maintenance of 138 KV transformers, oil circuit breakers, and isolation switches.

Education:

BS in Electrical Engineering, University of Arkansas, 1970

Other:

Licensed Professional Engineer, Electrical, Arkansas, #4296

10