    Acts that regulated the electricitysector :

    IndianElectricity Act, 1910 Electricity supply act,1948

    Electricity Regulatory CommissionAct,1998

    The Electricity Act, 2003

    (with Amendment in 2003 & 2007)

    Electricity Related Acts

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    3/30

    The Indian Electricity Act, 1910 Provided basic framework for electric supply

    industry in India. Growth of the sector through private licensees.

    License provided by State Govt.

    Provision for licence for supply of electricity in a

    specified area. Legal framework for laying down of wires and other

    works.

    Legal framework for laying down of undergroundcables.

    For any digging work notice to be served one monthprior to any digging work

    Provisions laying down relationship betweenlicensee and consumer.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    4/30

    The Electricity (Supply) Act, 1948

    Power to Central Govt. to make rule by notification in the

    Official Gazette

    Mandated creation of SEBs.

    Formation of the Central Commission in case of inter-State

    transmission system and State Commission in case of intra-

    State transmission system to determine the charges payable

    to the Central Transmission Utility or State Transmission

    Utility for the use of transmission system by SEBs, its

    successor entity, generating company, licensee or any other

    person.

    Need for the State to step in (through SEBs) to extend

    electrification (so far limited to cities) all across the

    country.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    5/30

    The Electricity (Supply) Act, 1948

    Terms, conditions and tariff for sale of electricity byGenerating Company

    A generating company may enter into a contract for the

    sale of electricity generated by it with the Board

    constituted by the State (SEB) in which a generatingstation is located.

    Compliance of directions of the Regional Electricity

    Board, etc., by licensees or generating companies

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    6/30

    Main amendments to the existing Acts

    Amendment in 1975 to enable generation in Central

    sector (NTPC & NHPC) Amendment to bring in commercial viability in the

    functioning of SEBs

    Section 59 amended to make the earning of a

    minimum return of 3% on fixed assets a statutoryrequirement (w.e.f 1.4.1985)

    Amendment in 1991 to open generation to private sectorand establishment of RLDCs (WRLDC)

    Amendment in 1998 to provide private sectorparticipation in transmission, and also provision relatingto Transmission Utilities.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    7/30

    The ElectricityRegulatory

    Commissions Act,

    1998

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    8/30

    Need for TheRegulatory

    Commissions

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    9/30

    9

    Traditionally, electricity utilities were owned and managed by the government as

    vertically integrated monopolies

    Characteristics

    The existence of vertically integrated monopoliescould be in the form of

    Single monopoly as vertically integrated

    throughout generation, transmission and

    distribution

    There is no competition and no consumer choice

    The utility is tightly regulated through price control

    Existence of subsidies and cross-subsidies burden on

    Govt.

    Unable to identify the problem at which stage.

    Poor development in Power Sector

    No Pvt. Participation in Power sector

    Vertically Integrated Monopoly

    Logically developed to deal with rapid industrialisation and growth in supporting infrastructure

    Due to high marginal costs, technical and financial risks, private investment is not forthcoming

    Generation

    Transmission

    Distribution

    Customers

    Note: Single State Owned Entity

    Source: Project Disha Phase-1 reports

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    10/30

    Need for the new legislation

    Requirement of harmonizing and rationalizing the provisions inthe existing laws to

    Create competitive environment to enhance quality andreliability of service to consumer.

    Distancing regulatory responsibilities of Govt. Reform legislation by several States separately.

    Need for individual States to enact their own reform laws.

    Need for individual States to divide state power sector inthree part.

    Requirement of introducing newer concepts like powertrading, open access, Appellate Tribunal etc.

    Special provision for Electrification in the Rural areas.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    11/30

    Features of The Electricity Regulatory CommissionsAct, 1998

    Provision for setting up of Central / State ElectricityRegulatory Commission having powers to determinetariffs.

    Powers and function of the central commission

    to regulate the tariff of generating companies ownedor controlled by the Central Government and other than

    to regulate the inter-State transmission of energyincluding tariff of the transmission utilities

    to frame guidelines in matters relating to electricitytariff

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    12/30

    Features of The Electricity Regulatory CommissionsAct, 1998

    to arbitrate or adjudicate upon disputesinvolving generating companies ortransmission utilities in regard to matters

    connected

    to aid and advise the Central Government onany other matter referred to the Central

    Commission by that Government. Constitution of SERC optional for States.

    Distancing of Govt. from tariff determination.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    13/30

    13

    The Electricity

    Act, 2003

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    14/30

    Important Features of EA-2003 andtheir Sections & Sub Sections

    Section

    SubSection

    Matter

    31 National Electricity policy and Tariff policy.

    4National Electricity Plan.

    4-

    National policy on stand alone systems (notconnected with grid) for rural areas and nonconventional energy systems.

    5 -

    National policy on electrification and local

    distribution in rural areas.

    6 - Obligations to supply electricity to rural area.

    7 -Generating Company and requirement for setting up

    of generating station.

    8 - Hydro-Electric Generation.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    15/30

    Important Sections,Sub Sections of EA-2003

    Section

    SubSection

    Matter

    9

    - Captive Generation.

    2 Owner of CPP shall have the right to carryelectricity from his captive generating plant tothe destination of his use.

    12 -License required to transmit, distribute andundertake trading in electricity,

    13 -

    No License required for any local authority,Panchayat Institution, users association, co-operative societies, NGOs, or franchisees totransmit, distribute and undertake trading inelectricity.

    25 - Inter-State, regional and Inter-Regional

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    16/30

    Important Sections,Sub Sections of EA-2003

    Section

    SubSection

    Matter

    26 - Formation of National Load Dispatch Centre.

    27 - Formation of RLDC.

    42

    2 Empowering SERC to introduce Open Access in aphased manner.

    5Establish a forum for redressal of grievances of theconsumers.

    43

    1Duty of Distribution Licensee to supply on requestwithin one month.

    3 Penalty to Distribution Licensee for failing to supply.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    17/30

    Important Sections,Sub Sections of EA-2003

    Section

    SubSection

    Matter

    50 - The Electricity Supply Code.

    61

    - Tariff Regulation

    (a)Determination of Tariff to Generating &Transmission Licensee.

    (c)

    The factors which would encourage competition,efficiency, economical use of the resources, goodperformance and optimum investments

    (f) Multi Year Tariff.

    (g) To reduces and eliminates cross-subsidies.

    62 (1) ERCs shall determine the tariff.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    18/30

    Important Sections,Sub Sections of EA-2003

    Section

    SubSection

    Matter

    63 - Determination of Tariff by bidding process.

    66 - Development of Electricity Market.

    70 1 Constitution of CEA.

    76

    1 Constitution of CERC.

    5 One Chairman and three other members in CERC.

    77 1 Qualifications of CERC Chairman, members.

    78 1

    Constitution of selection Committee to

    recommend members of Appellate Tribunal,CERC.

    79 1 Functions of CERC.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    19/30

    Important Sections,Sub Sections of EA-2003

    Section

    SubSection

    Matter

    80 1 Establishment of Central Advisory Committee.

    81 - Objects of Central Advisory Committee.

    82 1 Establishment SERC.

    83 1 Constitution of Joint Commission.

    84 1Qualifications of Chairman & members Joint

    Commission.

    85 1 Constitution of selection Committee torecommend members of SERC.

    86 - Functions of SERC.

    87 Establishment of State Advisory Committee.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    20/30

    Important Sections,Sub Sections of EA-2003

    Section

    SubSection

    Matter

    135 - Theft of Electricity.

    136 - Theft of Electric Lines and Materials.

    166 Co-Ordination Forum.

    178 - Powers to CERC to make Regulations.

    179 -Rules and Regulations made by Central Govt.,CERC to be laid before Parliament.

    180 - Powers to State Govt. to make Rules.

    181 - Powers to SERC to make Regulations.

    182Rules and Regulations made by State Govt.,

    SERC to be laid before Legislative Assembly.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    21/30

    Role of Government

    Central Government to prepare (Section 3) -

    National Electricity Policy

    Tariff PolicyPolicy on development of non-

    conventional energy sources.

    Rural Electrification

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    22/30

    Features related to Generation

    Generation free from licensing. (Section 7)

    Requirement of (Techno Economic Clearance) TEC for non-hydrogeneration removed. (Section 7)

    Captive Generation is free from controls. Open access to Captive

    generating plants subject to availability of transmission facility.

    (Section 9)

    Clearance of CEA for hydro projects required due to concern of

    dam safety and inter-State issues. (Section 8)

    Generation from Non-Conventional Sources / Co-generation to bepromoted. Minimum percentage of purchase of power from

    renewable may be prescribed by Regulatory Commissions. (Section

    61(h),86 (1) (e))

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    23/30

    There would be Transmission Utility at the Centre and in the

    States to undertake planning & development of transmission

    system. (Sections 38 & 39)

    Load despatch to be in the hands of a govt company/organisation.

    Flexibility regarding keeping Transmission Utility and load

    despatch together or separate. (Sections 26, 27,31, 38, 39)

    Private transmission companies to be licensed by the Appropriate

    Commission after giving due consideration to the views of the

    Transmission Utility. (Sections 15 (5) (b))

    The Load Despatch Centre/Transmission Utility / Transmission

    Licensee not to trade in power. Facilitating genuine competition

    between generators. (Sections 27, 31, 38, 39,41)

    Features related to Transmission

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    24/30

    istribution :

    Distribtution to be licensed by SERCs.

    Distribution licensee free to take up generation & Generating co.

    free to take up distribution licence. This would facilitate private

    sector participation without Government guarantee/ Escrow.

    (Sections 7, 12)

    Retail tariff to be determined by the Regulatory Commission.

    (Section 62)

    Metering made mandatory. (Section 55)

    Provision for suspension/revocation of licence by Regulatory

    Commission as it is an essential service which can not be

    allowed to collapse. (Sections 19, 24)

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    25/30

    Features related to Open Access

    Open access to the transmission lines to be provided todistribution licensees & generating companies. (Sections 38-40)

    This would generate competitive pressures and lead to

    gradual cost reduction. Open access in distribution to be allowed by SERC in

    phases. (Sections 42)

    This would give choice to customer.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    26/30

    Trading/ Market development

    Trading distinct activity permitted with licencing. (Section

    12)

    Regulatory Commission may fix ceiling on trading margin to

    avoid artificial price volatility. (Sections 79 (2) (b) & 86 (2)(b))

    The Regulatory Commission to promote development of

    market including trading. (Section 66)

    R l C i i /A ll

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    27/30

    Regulatory Commissions/AppellateTribunal

    State Electricity Regulatory Commission to be constitutedwithin six months. (Section 82)

    Provision for Joint Commission by more than one State/UT.(Section 83) (WRPC)

    Provision for constitution of Appellate Tribunal consisting ofChairman and three Members. (Section 110, 112)

    Appellate Tribunal to hear appeals against the orders ofCERC/SERC, and also to exercise general supervision andcontrol over the Central/State Commissions. (Section 111)

    Appeal against the orders of Appellate Tribunal to lie beforethe Supreme Court. (Section 125)

    Appellate Tribunal considered necessary to-

    Reduce litigation and delay in decisions through High Court.

    Provide technical expertise in decision on appeals.

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    28/30

    CEA to continue as the main technical Advisor of theGovt. of India/ State Government with the responsibility of

    overall planning. (Section 70)

    CEA to specify the technical standards for electrical plants

    and electrical lines. (Section 73)

    CEA to be technical adviser to CERC as well as

    SERCs.(Section 73)

    CEA tospecify the safety standards. (Section 53)

    Central Electricity Authority

  • 7/31/2019 Electricity ACT & Role of ER Authorities

    29/30

    Tariff Principles Regulatory Commission to determine tariff for supply of electricity by

    generating co. on long/medium term contracts. (Section 62)

    No tariff fixation by regulatory commission if tariff is determined throughcompetitive bidding or where consumers, on being allowed open accessenter into agreement with generators/traders.

    Consumer tariff should progressively reduce cross subsidies and movetowards actual cost of supply. (Section61 (g))

    State Government may provide subsidy in advance through the budgetfor specified target groups if it requires the tariff to be lower than thatdetermined by the Regulatory Commission. (Section65)

    Regulatory Commissions may undertake regulation includingdetermination of multi-year tariff principles, which rewards efficiency andis based on commercial principles. (Section61 (e), (f))

    Regulatory Commission to look at the costs of generation, transmissionand distribution separately. (Section62 (2))