Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N S E W ELECTRICAL NOTES PV SYSTEM NOTES ELECTRICAL REQUIREMENTS MATERIALS AND METHODS AS BUILT DRAWINGS VC MJ 10/24/14 115 E. Dougherty St, Decatur, GA 30030 PV01 NOTES, SCHEDULE & CALCULATIONS NTS A 02/02/2015 NUMBER PV01 PV02 PV03a PV04a SHEET NAME NOTES, SCHEDULE AND CALCULATIONS LAYOUT LAYOUT WITH WIRING - DC SINGLE-LINE DIAGRAM AND ELECTRICAL PLAN PV05 PRODUCT SPECIFICATION PV06 BLANK PV04b SIGNAGE DETAILS DRAWING LIST REVISION HISTORY REVISION NUMBER DESCRIPTION PV03b LAYOUT WITH WIRING - AC PV07 BLANK PV08 DETAILS NUMBER SHEET NAME DRAWING LIST (CONT) COMMUNICATIONS LAYOUT PV09 - FOR CONSTRUCTION A AS BUILT

Upload: others

Post on 10-Mar-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

Site

Location Map - NTS

AGNES SCOTT SOCCER FIELD - SOLAR

115 E. Dougherty St, Decatur, GA 30030

Ground-Mounted Installation

18.585kW

N

S

E

W

ELECTRICAL NOTESPV SYSTEM NOTES

ELECTRICAL REQUIREMENTS

MATERIALS AND METHODS

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

30

PV01

NOTES,

SCHEDULE

&

CALCULATIONS

NTS

A 02/02/2015

NUMBER

PV01

PV02

PV03a

PV04a

SHEET NAME

NOTES, SCHEDULE AND CALCULATIONS

LAYOUT

LAYOUT WITH WIRING - DC

SINGLE-LINE DIAGRAM AND ELECTRICAL PLAN

PV05 PRODUCT SPECIFICATION

PV06 BLANK

PV04b SIGNAGE DETAILS

DRAWING LIST

REVISION HISTORY

REVISION

NUMBER

DESCRIPTION

PV03b LAYOUT WITH WIRING - AC

PV07 BLANK

PV08 DETAILS

NUMBER SHEET NAME

DRAWING LIST (CONT)

COMMUNICATIONS LAYOUTPV09

- FOR CONSTRUCTION

A AS BUILT

Page 2: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

GEORGIA POWER

SUBSTATION

AREA FOR INVERTERS

PV ARRAY:

64 RENESOLA

295W MODULES

106'-9"

OVERALL

11'-2 1/4"

BUILDING

TENNIS COURTS

SOCCER FIELD

PARKING

BRICK ELEVATED WALL

BRICK ELEVATED LEVEL

WALKING PATH

ACCESS GATE

GREEN AREA

EXISTING ELECTRICAL POST

(INTERCONNECTION POINT)

NEW

ELECTRICAL

POST

SOLAR UTILITY

DISCONNECT & METER

E. DOUGHERTY ST

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

30

PV02

LAYOUT

NTS

A 02/02/2015

SYSTEM LAYOUT

PLAN VIEW

A

NOTES:

1. LOCATIONS OF DISCONNECTS AND EQUIPMENT ARE APPROXIMATE;

THEY ARE SUBJECT TO ON-SITE REQUIREMENTS AND SHOWN HERE FOR

VISUAL CLARITY. INVERTERS AND AC COMBINER #1 ARE LOCATED NEXT

TO THE ARRAY TO THE EAST.

N

S

E

W

Project:

AGNES SCOTT SOCCER FIELD -

SOLAR

Address:

115 E. Dougherty St, Decatur, GA 30030

System Size:

18.585kW

MODULE: Renesola 295W

MODULE Qty:

63

Tilt: 45°

Azimuth: 180°

Mounting:

Ground-Mounted

Page 3: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

AREA FOR INVERTERS

SEE PV-03b/C

TENNIS COURTS

SOCCER FIELD

BRICK ELEVATED

LEVEL

WALKING PATH

A1-1A1-10

A2-1A2-10

B4-1B4-11

A3-1A3-10

B5-1B5-11

B6-1

B6-11

ABOVE GROUND IN

RIGID CONDUIT

UNDER GROUND IN

PVC-40 CONDUIT

SEE PV-08/H

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

30

PV03a

LAYOUT WITH

WIRING - DC

NTS

A 02/02/2015

LAYOUT WIRING - DCA

N

S

E

W

NOTES:

1. N/A

LEGEND:

DC HOME RUNS: STRINGS TO

COMBINER BOXES

DC STRINGS

Page 4: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

GEORGIA POWER

SUBSTATION

AREA FOR INVERTERS

SEE PV-03b/C

ACCESS GATE

GREEN AREA

EXISTING ELECTRICAL POST

(INTERCONNECTION POINT)

NEW

ELECTRICAL

POST

SOLAR UTILITY

DISCONNECT & METER

SEE DETAIL B

E. DOUGHERTY ST

ABOVE GROUND IN

RIGID CONDUIT

UNDER GROUND IN

PVC-40 CONDUIT

SEE PV-08/H

SOLAR PRODUCTION METER

MOUNTING UNISTRUT

FROM AC COMBINER AT ARRAY IN

1 1/2" PVC CONDUIT UNDERGROUND

UTILITY AC DISCONNECT

FROM DISCONNECT IN 1 1/2" PVC CONDUIT

TO NEW GEORGIA POWER

POST IN 2" PVC CONDUIT;

CONNECTED UNDERGROUND

GROUNDING ELECTRODE

CONDUCTOR TO ROD

1'-8"

BA

FROM MODULES' HOME RUNS

TO INVERTERS IN TWO 1 1/4"

LIQUIDTIGHT CONDUITS

INVERTER

INVERTER

AC COMBINER

FOR COMMUNICATIONS

1 1/4"LIQUIDTIGHT

BOX FOR COMMUNICATIONS

FROM INVERTER TO AC COMBINER

1" RIGID

FROM INVERTER TO AC COMBINER

1" RIGID

FROM AC COMBINER TO AC

DISCONNECT 1 1/2" RIGID ABOVE

GROUND, ATTACHED TO CONCRETE

SLAB UNTIL TRANSITION TO

UNDERGROUND IN PVC

1'-8"

1'-0" TYP

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

30

PV03b

LAYOUT WITH

WIRING - AC

NTS

A 02/02/2015

EQUIPMENT MOUNTING - AC

EAST OF SOLAR MODULES

C

LEGEND:

RUN FROM AC COMBINER

TO AC DISCONNECT

RUN FROM AC DISCONNECT TO NEW

ELECTRICAL POST - UNDERGROUND

RUN FROM NEW ELECTRICAL POST TO

EXISTING ELECTRICAL POST - OVERHEAD

LAYOUT WIRING - ACA

EQUIPMENT MOUNTING - AC

NEXT TO EXISTING SUB-STATION

B

Page 5: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

NO. ITEM PART NO. DESCRIPTION QTY

1 SOLAR MODULE JC295M-24/Abh RENESOLA 295W 63

2a DC DISCONNECT

SMA INTEGRAL

DC DISCONNECT

DC DISCONNECT; PART OF SMA INVERTER2

2b INVERTER

SMA SUNNYBOY

SB 7700-US-22

SMA 7.7KW - 1-PHASE INVERTER, 240V, NEMA 3R;

MPPT VOLTAGE RANGE OF 270V-480V.

2

3 AC COMBINER P1A18MC250A

SIEMENS, 240VAC,1Ø 250A OUTDOOR PANELBOARD

NEMA 3R; FUSED AT 100A MAIN BREAKER, WITH

GROUND KIT AND NEUTRAL KIT.

1

4 BREAKERS TBD TWO 2-POLE 40A BREAKERS 2

5 AC DISCONNECT HF223NR

SIEMENS HEAVY DUTY, 2-POLE, 240V, 100A; FUSED AT

100A ; NEMA 3R WITH NEUTRAL KIT AND GROUND KIT;

OR EQUIVALENT MANUFACTURER

1

6 METER TBD PRODUCTION METER 1

1 CONDUIT SCHEDULE

COMPONENT SCHEDULE

MODULE WATTAGE 295W

TOTAL NUMBER OF STRINGS IN PARALLEL 6

NUMBER OF MODULES IN SERIES 11 & 10

TOTAL NUMBER OF INVERTERS 2

TOTAL NUMBER OF MODULES 63

TOTAL SYSTEM POWER @ STC (DC)

18.585kW

SYSTEM SUMMARY

5

TO ELECTRICAL

POST /

TRANSFORMER

AC

DISCONNECT

6

5

LEGEND:

COMPONENT

CONDUCTOR/ CONDUIT

SIGN - SEE PV 04b

#

#

#

6

AT SITE OF SOLAR PANELS

ON FIELD

AT SUBSTATION

GEORGIA POWER

SOLAR PRODUCTION

METER

6

#8 CU

GRD

ROD

UFER CMP

PV MODULE ARRAY "TYPE A" - 1 INVERTER

10 MODULES PER STRING

3 STRINGS PER INVERTER

295W MODULES

1 2 10

1 2 10

STRING #1

TYP-1a

EGC FROM RACKING AND MODULES

TO INVERTER GROUNDING STUD

2b

2a

2 - TYP

ID

CONDUCTOR

TYPE AND SIZE

NUMBER OF

CONDUCTORS

NEUTRAL

SIZE

GROUND

SIZE

CONDUIT SIZE

CONDUIT

LOCATION

FROM TO

MAX

DISTANCE

(FT)

1

#10 AWG

PV WIRE CU

12

CONDUCTORS

- #6 CU

FREE AIR OR

1 1/4 " LIQUIDTIGHT

FREE AIR AND

CONDUIT

MODULES

SMA

DISCONNECT

100

2*

#8 AWG

PV WIRE CU

L1,L2,N &GND#8 CU #8 CU

N/A INSIDE OF

INVERTER

N/A

SMA

DISCONNECT

INVERTER 2

3 #8 THWN-2 CU

3-WIRE

(2+N+GND)

#8 CU #8 CU

(2) 1" RIGID

IN CONDUIT INVERTER AC COMBINER 15

4

#1 THWN-2

ALUM

3-WIRE

(2+N+GND)

#6 ALUM #6 ALUM

1

1

2

" RIGID ABOVE

GROUND, THEN 1

1

2

"

PVC-40 UNDER GROUND

TO DISCO

IN CONDUIT AC COMBINER

AC

DISCONNECT

250

5

#1 THWN-2

ALUM

L1 & L2 - -

1 1/2" PVC

ABOVE GROUND

IN CONDUIT

AC

DISCONNECT

METER 10

6*

#1 THWN-2

ALUM

L1 & L2 - -

2" PVC-40 APPROACH

FROM UNDERGROUND

IN CONDUIT METER

TRANSFORMER

CONNECTION

POINT

10

4

1 - TYP

TO

A

C C

OM

BIN

ER

L1

L2

N

G

3 - TYP

INVERTER A

1 2 10

STRING #2

STRING #3

AC COMBINER

3 4

PV MODULE ARRAY "TYPE B" - 1 INVERTER

11 MODULES PER STRING

3 STRINGS PER INVERTER

295W MODULES

1 2 11

1 2 11

STRING #1

TYP-1a

EGC FROM RACKING AND MODULES

TO INVERTER GROUNDING STUD

2b

2a

2 - TYP

1 - TYP

TO

A

C C

OM

BIN

ER

L1

L2

N

G

3 - TYP

INVERTER B

1 2 11

STRING #2

STRING #3

INVERTER A - L1

INVERTER A - L2

INVERTER B - L1

INVERTER B - L2

INVERTER A - N

INVERTER B - N

INVERTER A - GND

INVERTER B - GND

* PROVIDED BY OTHERS

1 & 3

1 & 3

4 & 5

7

MPPT1

MPPT2

2 2a

MPPT1

MPPT2

2 2b

END OF SIDEWALK

NEAR TENNIS COURTS

ABOVE GROUND IN

RIGID CONDUIT

UNDER GROUND IN

PVC-40 CONDUIT

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

30

PV04a

SINGLE LINE

NTS

A 02/02/2015

Page 6: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

EQUIPMENT NOTES:

1. RED LABELS WITH WHITE LETTERS. "WARNING" SHALL BE 3/8" TALL.

ALL OTHER LETTERS SHALL BE 1/4" TALL.

INTERACTIVE POWER FLOWING

THROUGH THIS PANEL

PANEL COMBINES THE AC OUTPUT FROM

INVERTERS A & B LOCATED NEAR THIS PANEL

MAX AC OUTPUT CURRENT = 64 A

NOMINAL AC VOLTAGE = 240 V

4. LOAD CENTER (AC COMBINERS #1) PER NEC 690.17 AND 690.54

QUANTITY: 1

INVERTER A

INVERTER B

PV SYSTEM

ELECTRICAL

PRODUCTION

METER

WARNING!

INVERTER OUTPUT CONNECTION

DO NOT RELOCATE THIS OVERCURRENT

DEVICE

5. BREAKER AT AC COMBINER PER SECTION 690.54, AND 705.12(D)(7)

WARNING!

DISCONNECT IS ENERGIZED FROM TWO

SOURCES: SOLAR SYSTEM AND UTILITY GRID

THE UTILITY DISCONNECTING MEANS FOR THIS

PHOTOVOLTAIC SYSTEM IS AT THE SOLAR DISCONNECT

LOCATED SOUTH OF THE POWER SUBSTATION BETWEEN

THE TENNIS COURTS AND EAST DOUGHERTY STREET.

3 AT INVERTER PER SECTION 690.56(B) AND 690.54

QUANTITY: 2

THIS SWITCH DISCONNECTS THE PHOTOVOLTAIC SYSTEM

LOCATED SOUTH OF THE TENNIS COURTS & E.DOUGHERTY

ST; THE DC SOLAR POWER DISCONNECT IS LOCATED NEXT

TO THE SOLAR MODULES AT INVERTERS A&B. THE

OUTPUTS FROM THE SOLAR INVERTERS ARE COMBINED

ON AC PANEL #1, WHICH IS ALSO NEAR THE MODULES.

6. AT SERVICE DISCONNECT PER SECTION 690.56(B)

MAX AC OUTPUT CURRENT = 32 A

NOMINAL AC VOLTAGE = 240 V

THIS PHOTOVOLTAIC SYSTEM INTERCONNECTS TO THE

ELECTRICAL GRID AT THE ELECTRICAL POST LOCATED

SOUTH OF THE POWER SUBSTATION BETWEEN THE

TENNIS COURTS AND EAST DOUGHERTY STREET.

WARNING!

ELECTRICAL SHOCK HAZARD

DEDICATED SOLAR PHOTOVOLTAIC COMBINING

PANELBOARD

PANELBOARD CONTAINS BACKFED CIRCUIT BREAKERS

THAT MAY BE ENERGIZED IN THE OPEN POSITION

DO NOT CONNECT ADDITIONAL LOADS !

7. AT PRODUCTION METER

AC DISCONNECT FOR

SOLAR PV SYSTEM

WARNING!

DC VOLTAGE IS ALWAYS PRESENT WHEN

MODULES ARE EXPOSED TO SUNLIGHT

MAXIMUM POWER-POINT CURRENT (Imp): 24.39A

MAXIMUM POWER-POINT VOLTAGE (Vmp): 399.3V

MAXIMUM SYSTEM VOLTAGE (Voc @Tmin): 544.8V

NEC MAXIMUM CURRENT (Isc x 1.25): 32.33A

WARNING

ELECTRIC SHOCK HAZARD

DO NOT TOUCH TERMINALS. TERMINALS ON

BOTH THE LINE AND LOAD SIDE MAY BE ENERGIZED

IN THE OPEN POSITION

2a LABEL PER SECTION 690.17(4), 690.53.

DC COMBINER A

TOTAL QUANTITY: 1

1 FOR INVERTERS "A" THOUGH "B".

2 TOTAL

AC DISCONNECT #1

AC COMBINER #1

MAX AC OUTPUT CURRENT = 64 A

NOMINAL AC VOLTAGE = 240 V

QUANTITY: 1

DC COMBINER A

2 FOR DC COMBINERS "A" THROUGH "B".

2 TOTAL

DC COMBINER B

WARNING!

DC VOLTAGE IS ALWAYS PRESENT WHEN

MODULES ARE EXPOSED TO SUNLIGHT

MAXIMUM POWER-POINT CURRENT (Imp): 24.39A

MAXIMUM POWER-POINT VOLTAGE (Vmp): 363.0V

MAXIMUM SYSTEM VOLTAGE (Voc @Tmin): 495.3V

NEC MAXIMUM CURRENT (Isc x 1.25): 32.33A

WARNING

ELECTRIC SHOCK HAZARD

DO NOT TOUCH TERMINALS. TERMINALS ON

BOTH THE LINE AND LOAD SIDE MAY BE ENERGIZED

IN THE OPEN POSITION

2b LABEL PER SECTION 690.17(4), 690.53.

DC COMBINER B

TOTAL QUANTITY: 1

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

30

PV04b

SIGNAGE

DETAILS

NTS

A 02/02/2015

Page 7: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

30

PV05

PRODUCT

SPECIFICATIONS

NTS

A 02/02/2015

Page 8: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

8' 3

11

16

"

MIN

SOUTH

RETAINING WALL:

7FT TALL TO LOWER TERRACE

EXISTING "SIDEWALK"

FENCE

TENNIS COURT FLOOR

2 RENESOLA 77" LENGTH MODULES

IN PORTRAIT

3" MIN

45°

FROM

AC COMBINER

TO

METER

L3

L2

L1

N

G

L1

L2

L3

TO GROUND

ROD

TO

METER

XXX

XXX

MODULES

SOLAR MODULE GROUNDING

WEEB LOCATION

SEE NOTE 1 & 3

RACKING

PURLINS

SOLAR MODULE GROUNDING

WEEB 11.5 LOCATION

SEE NOTE 2 & 3

RACK PURLIN

SOLAR MODULE FRAME

W

E

E

B

1

1

.

5

X

RACK GROUNDING

WEEB LUG LOCATION

SEE NOTE 3 & 4

RACKING PURLINS

WEEB LUG

FOR RACKING

BARE COPPER

GROUND WIRE FROM

RACK Z-PURLINS TO

INVERTER

SET SCREW

PLANE IN CONTACT

WITH RACK

NEGATIVE

CONDUCTOR

TOCOMBINER BOX

POSITIVE

CONDUCTOR

TOCOMBINER BOX

MODULES CONNECTED IN SERIES:

MALE TO FEMALE

SEE NOTE 5

AS BUILT

DRAWINGS

VC

MJ

10/24/14

40

1 E

. C

olle

ge

A

ve

., D

eca

tu

r, G

A 3

00

30

PV08

DETAILS

NTS

A 02/02/2015

RACKING

SIDE VIEW

GEQUIPMENT WIRING

UTILITY AC DISCONNECT

E

GROUNDING

MODULES

A GROUNDING

MODULE WEEB LOCATION

B GROUNDING

RACKING

C GROUNDING

WEEB LUG DETAIL

D

NOTES:

1. THE DEPLOYMENT OF THE WEEB 11.5 WASHERS IS ONE (1)

PER PV MODULE. INSTALL IN THE SAME MODULE LOCATION

FOR EACH MODULE.

2 WHEN INSTALLING THE WEEB-11.5 INTO THE ZEE PURLIN

MODULE HOLES, ORIENTATION IS CRITICAL. THE WEEB

MUST BE POSITIONED SO THAT A PERSON LOOKING AT THE

WEEB FACING THE RACK (FACING NORTH) CAN READ THE

TEXT ON THE FRONT OF THE WEEB.

3. READ RBI'S GROUND MOUNT SYSTEM MODEL GM-I

ASSEMBLY INSTRUCTIONS AND RBI'S SOLAR DRAWINGS

FOR THE MANUFACTURER'S INSTRUCTIONS ON RACKING

AND GROUNDING.

4. RACKING GROUNDING LUGS CAN BE PLACED AT THE END

OF EACH ZEE PURLIN OF A CONTINUOUS SUB-ARRAY ROW;

MOST PREFERABLY ON THE SIDE CLOSEST TO AN

INVERTER.

5. MODULES SHALL BE WIRED FROM POSITIVE TO NEGATIVE IN

SERIES, IN THE ORDER DEPICTED ON PV03a, AND WITH THE

APPROPRIATE WIRING METHODS AS STATED ON NEC 690

SECTION IV.

MODULE WIRING

SERIES WIRING METHOD

F

MODULE JUNCTION BOXES

ORIENTATION

H

Page 9: ELECTRICAL NOTES PV SYSTEM NOTES AGNES ......Site Location Map - NTS AGNES SCOTT SOCCER FIELD - SOLAR 115 E. Dougherty St, Decatur, GA 30030 Ground-Mounted Installation 18.585kW N

B

RS485

A

RS485

INTERNET

AS BUILT

DRAWINGS

VC

MJ

10/24/14

11

5 E

. D

ou

gh

erty S

t, D

eca

tu

r, G

A 3

00

3

PV09

COMMUNICATIONS

LAYOUT

NTS

A 01/22/15

COMMUNICATIONS

SCHEMATIC

A

NOTES:

1. INVERTER COMMUNICATION RS485 CABLES ARE CONNECTED IN

A DAISY-CHAIN CONFIGURATION.