electrical drawings volume 3: tender drawings€¦ · drawing title: project status: design:...

33
Scale: Drawn by: Date: Client: Project Title: Checked by: R B A Realini Bader Associates Limited Architects Engineers Planners 72 Wellington Street, Freetown Drawing Title: Sheet Size: Project status: Design: Tender: Contract / Construction: A3 MLY 25/11/2016 16:55:47 Rehabilitation / Completion and Outfitting Work for Office Building Sierra Leone Field Office of the African Dvelopment Bank (ADB) August, 2016 SL/ADB/E-CS Electrical Cover Sheet INY Y Regent Road, Hill Station, Freetown ELECTRICAL DRAWINGS Volume 3: Tender Drawings

Upload: others

Post on 20-Apr-2020

11 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Scale:

Drawn by:

Date:

Client: Project Title:

Checked by:

R BA

RealiniBaderAssociates Limited

ArchitectsEngineersPlanners72 Wellington Street, Freetown

Drawing Title:

Sheet Size:Project status: Design: Tender: Contract / Construction: A3

MLY

25/11/2016 16:55:47

Rehabilitation / Completion andOutfitting Work for OfficeBuilding

Sierra Leone Field Office ofthe African DvelopmentBank (ADB)

August, 2016

SL/ADB/E-CS

Electrical Cover Sheet

INY

Y

Regent Road, Hill Station, Freetown

ELECTRICAL DRAWINGS

Volume 3: Tender Drawings

Page 2: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

EARTH FILLLift

up

Ram

p

up

Stair-1

H

3

1

2

4

A B C D E F G I

duct

LegendWall Mounted Monitor Screen

13A Single Socket Mounted2000mm above Final Floor Finished

up

duct

female

male

Disable

up

Panelroom

up

1:100

Basement Floor

Screen Monitor Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-100

Page 3: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Lift

up

Stair-1

HA B C D E F G I

duct

duct

Legend

up

Stair-2

kitnette.

Mal

e

Jani

tor

photocopy

Archive

Terr

ace

Wall Mounted Monitor Screen

13A Single Socket Mounted2000mm above Final Floor Finished

3

1

2

4

1:100

Ground Floor Plan

Screen Monitor Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-102

Page 4: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Lift

Dwn.

dwn.

HA B C D E F G I

duct

duct

kitnette.

Mal

e

Fem

ale

F4Archive

LegendWall Mounted Monitor Screen

13A Single Socket Mounted2000mm above Final Floor Finished

3

1

2

4

Sla

b a

t G

roun

dLe

vel

1:100

First Floor Plan

Screen Monitor Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-103

Page 5: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

WaitingArea

SecurityPost

WC

DriversWaiting

Area

PorchLegend

Wall Mounted Monitor Screen

13A Single Socket Mounted 2000mmabove Final Floor Finished

Garden Tool Store

1:50

Security Post

Screen Monitor Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-104

Page 6: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

EntranceSliding Gate

2

7

8

5

7

2

4

7

9

0

6

0

7

1

2

6

3

8

0

3

7

8

3

4

2

0

0

8

4

2

7

8

8

9

1

6

0

6

1

3

8

9

1

2

0

2

Pede

strian

Gate

hand

rail

boom gate

1

2

3

4

5

6

7

8

10

9

hand

rail

807

HT Pole

HT70mm² Over Head(HT) Cable

Legend

70mm², 3-CoreUnderground (HT) Cable

OFFICE

BUILDING

SP.

Pede

strian

Gate Entran

ce

Sliding Gate

Pede

strian

Gate

handrail

boom gate

1:250

Site Plan

Utility HT Supply

Power Cable

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-201

Page 7: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

EntranceSliding Gate

2

7

8

5

7

2

4

7

9

0

6

0

7

1

2

6

3

8

0

3

7

8

3

4

2

0

0

8

4

2

7

8

8

9

1

6

0

6

1

3

8

9

1

2

0

2

Pede

strian

Gate

hand

rail

boom gate

1

2

3

4

5

6

7

8

10

9

hand

rail

807

Standalone CompoundSolar Led Lighting Pole

Legend

OFFICE

BUILDING

SP.

Pede

strian

Gate Entran

ce

Sliding Gate

Pede

strian

Gate

handrail

boom gate

1:250

Compound Solar

LED Lighting Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-202

Page 8: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

EARTH FILLLift

up

Ram

p

up

Stair-1

HA B C D E F G I

duct

Legend

600x600 40w Recessed LED Ceiling Panel Lighting-IP44

20w LED Ceiling Downlight

8 Watts Emergency Illuminated Exit Sign Box

3Hr Non-Maintained

BEGA TYPE no. 2743 impact resistance

Staircase Wall Light

10Amps 1gang 1way Light switch

10Amps 2gang 1way Light switch

18w LED Ceiling Downlight

10Amps 1gang 2way Light switch

600x600 40w Recessed LED Ceiling Panel Lighting-IP44

(emergency)

up

duct

female

male

Disable

up

Panelroom

up

2375

1070

1:100

Basement Floor Plan

Ceiling Light Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-203

Page 9: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

up

Lift

up

Stair-1

HA B C D E F G I

duct

duct

Legend

8 Watts Emergency Illuminated Exit Sign Box

3Hr Non-Maintained

BEGA TYPE no. 2743 impact resistance

Staircase Wall Light

10Amps 1gang 1way Light switch

1200mm 36w Weatherproof fluorescent Light Fittings

10Amps 2gang 1way Light switch

20 Amps Dawn to Dost photo cell light

Switch to be located at high level

600x600 40w Recessed LED Ceiling Panel Lighting-IP44

20w LED Ceiling Downlight

18w LED Ceiling Downlight

10Amps 3gang 2way Light switch

10Amps 1gang 2way Light switch

600x600 40w Recessed LED Ceiling Panel Lighting-IP44

(emergency)

up

up

kitnette.

Mal

e

1:100

Ground Floor Plan

Ceiling Light Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-204

Page 10: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Lift

Dwn.

dwn.

HA B C D E F G I

duct

duct

8 Watts Emergency Illuminated Exit Sign Box

3Hr Non-Maintained

BEGA TYPE no. 2743 impact resistance

Staircase Wall Light

10Amps 1gang 1way Light switch

10Amps 2gang 1way Light switch

600x600 40w Recessed LED Ceiling Panel Lighting-IP44

10Amps 1gang 2way Light switch

600x600 40w Recessed LED Ceiling Panel Lighting-IP44

(emergency)

kitnette.

Mal

e

Fem

ale

Archive

20w LED Ceiling Downlight

18w LED Ceiling Downlight

Sla

b a

t G

roun

dLe

vel

1:100

First Floor Plan

Ceiling Light Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-205

Page 11: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Legend20w LED Ceiling Downlight

18w LED Ceiling Downlight

WaitingArea

SecurityPostWC

DriversWaiting Area

Porch

10Amps 1gang 1way Light switch

10Amps 2gang 1way Light switch

20 Amps Dawn to Dust photo cell light

Switch to be located at high level

THORN AQUAFORCE II 1x18W

Garden Tool Store

1:50

Security Post

Ceiling Light Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-206

Page 12: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

SWITCHROOM

BULK FUEL TANK (1500x1500x1300)mm³

STORE

THORN AQUAFORCE II 1x36W T26 HF L840

10Amps 1gang 1way light switch

Legend

20 Amps Dawn to Dost photo cell light

Switch to be located at high level

THORN AQUAFORCE II 1x18W

1:50

Generator House

&

Battery Room

Ceiling Light Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-207

Page 13: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

BULK FUEL TANK (1500x1500x1300)mm³

Cable Trench300mm Wide

STORE

Legend

Incoming 11kVEDSA Supply

250A TP&N Fused Disconnect Switch

250A Automatic Transfer Switch-1

AT

S-1

AT

S-2 250A Automatic Transfer Switch-2

SWITCHROOM

1 : 50

Generator House

Cable Trench -

XLPE/PVC/SWA/PVC

Armored Cable Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-208

Page 14: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

THORN AQUAFORCE II 1x36W T26 HF L840

10Amps 1gang 1way light switch

Legend

13Amps Double Socket Outlet (Raw Power)

100A 6Way ABX 3-Phase Distribution Board

LandingU

p

metal

Ladder

Package WaterTreatment Plant

up

1 : 50

Water Treatment Lighting

and

Socket Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-209

Page 15: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

EntranceSliding Gate

2

7

8

5

7

2

4

7

9

0

6

0

7

1

2

6

3

8

0

3

7

8

3

4

2

0

0

8

4

2

7

8

8

9

1

6

0

6

1

3

8

9

1

2

0

2

Pede

strian

Gate

hand

rail

boom gate

1

2

3

4

5

6

7

8

10

9

hand

rail

807

45A Weatherproof Plug andReceptacles for Harsh Environments

Legend

OFFICE

BUILDING

SP.

Pede

strian

Gate Entran

ce

Sliding Gate

Pede

strian

Gate

handrail

boom gate

1:250

Site Plan

Small Power Requirement

Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-301

Page 16: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Legend

13Amps Double Socket outlet (Raw Power)

125Amps 8Way TP&N upsPower Distribution Board

100Amps TP&N FuseDisconnector Switch

13Amps Double Socket outlet (UPS Power)

Voice / Data Outlet

Hard Dryer

125A 8 Way TP&N UPS RawPower Distribution Board

250A 12-Way TP&N MCCB LVPanelboard

175kVA 3-PhaseVoltage Stabilizer

weatherproof Outdoor Power Socket

3 Compartment Dado Trunking

C2

C3C3

T4

C2

FC3 FC3

C3 C3

CT

3

C3

C3 C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

S7

S6

S5

S5

T8

T8

T9

C2

HA B C D E F G I

3

1

2

4

1:100

Basement

Small Power Requirement

Voice / Data Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-302

Page 17: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Legend

13Amps Double Socket outlet (Raw Power)

125A 8Way TP&N RawPower Distribution Board

13Amps Double Socket outlet (UPS Power)

Standard Modular Floor Box

Hard Dryer

45A Cooker Outlet

Voice / Data OutletC

2

T4

C2

T4

C2

T4

C2

T4

C2

FC4

FC

4

T4

C2

T4

C2

T4

C2

T4

C2

T4

C2

FC3

FC4FC4

C3C3

T4

C2

FC3 FC3

FC4 FC4

C2 C2 C2 C2 C2 C2 C2

C2

C2 C2 C2

C2

C2 C2 C2

C2

T7

C2

C2

C2 C2 C2 C2 C2 C2 C2 C2C2

C2 C2 C2 C2 C2 C2 C2

C2 C2 C2 C2 C2 C2 C2

C2 C2 C2

S8

S6

S2

S2

S2

S2

S4

3 Compartment Dado Trunking

HA B C D E F G I

3

1

2

4

1:100

Ground Floor

Small Power

Requirement Voice

/ Data Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-303

Page 18: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Legend

13Amps Double Socket outlet (Raw Power)

125A 4 Way TP&N RawPower Distribution Board

13Amps Double Socket outlet (UPS Power)

Hand Dryer

45A Cooker Outlet

Voice / Data Outlet

T1

C1

C3C3

T4

FC

4F

C4

C2

C2

T4

C2

T4

C2

T4

C2

T4

C2

T4

C2

T4

C2

FC4FC4

FC

4F

C4

FC4FC4FC4

FC

4

FC

4

CT2

FC

3F

C3

FC3 FC3

FC

3F

C3

C3C3

C3

C3

C3

C3

C3

T2

C3

C3 C3

C3

C3

C3

T3

C3

C3 C3

C3

C3

C3

C3

C3

FC

4

C3

C3C2

T5

C2

C2

C2

T6

C2C2

S5

S3

S3

S1

T5

3 Compartment Dado Trunking

HA B C D E F G I

3

1

2

4

Sla

b a

t G

roun

dLe

vel

C2

1:100

First Floor Plan

Small Power

Requirement Voice /

Data Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-304

Page 19: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

C3C3

CT

3

C3

C3

C3

C3

C3

C3

C3

C3

C3T9

C3 C3C3 C3

C2

T8

C2

L1

C3

C3

T8

weatherproof Outdoor Power Socket

Legend

13Amps Double Socket outlet (Raw Power)

13Amps Double Socket outlet (UPS Power)

Voice / Data Outlet

100A, 8way ABX-3-Phase Distribution Board

Garden Tool Store

Hand Dryer

1:50

Security Post

Small Power

Requirement Voice

/ Data Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-305

Page 20: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

TRANSFORMERROOM

125A 8Way TP&N RawPower Distribution Board

EDSA Prepaid Meter

1 : 50

Generator House

&

Battery Room

Small Power Requirement

Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-306

Page 21: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

EntranceSliding Gate

2

7

8

5

7

2

4

7

9

0

6

0

7

1

2

6

3

8

0

3

7

8

3

4

2

0

0

8

4

2

7

8

8

9

1

6

0

6

1

3

8

9

1

2

0

2

Pede

strian

Gate

hand

rail

boom gate

1500

1

2

3

4

5

6

7

8

10

9

hand

rail

807

LEGEND

70mm Bare Stranded copper conductor

2

50mm Bare Stranded copper cable

2

Clamp: connecting copper conductor to earth rod

cylindrical part,to be welded to steel structure or

Clamp: connecting copper conductor to copper conductor or

Y/G wire

foundation bars for using as connection point with cable shoe

Equipotentializing bonding bar EBB-X: EBB NAME

1800mm Pure Copper Earth Rod to BS6651

U-Bolt

Earth Pit

M

a

i

n

E

a

r

t

h

M

a

t

t

OFFICE

BUILDING

SP.

Pede

strian

Gate Entran

ce

Sliding Gate

Pede

strian

Gate

handrail

boom gate

1:250

Site Plan

Earthing & Bonding

Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-401

Page 22: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

wall

H I

A B D E F GC

Type A

TO SECURITY POST

LEGEND

70mm Bare Stranded copper conductor

2

50mm Bare Stranded copper cable

2

Clamp: connecting copper conductor to earth rod

cylindrical part,to be welded to steel structure or

Clamp: connecting copper conductor to copper conductor or

Y/G wire

foundation bars for using as connection point with cable shoe

Equipotentializing bonding bar EBB-X: EBB NAME

1800mm Pure Copper Earth Rod to BS6651

U-Bolt

Main Earth Matt

1:100

Basement Floor

Earthing & Bonding Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-402

Page 23: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

529

76

676

900

900

900

900

3000

1800

600

EARTH PIT

1:50

Earth Matt

and

Earth Pit

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-403

Page 24: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

TO BASEMENTEARTH RING

LEGEND

70mm Bare Stranded copper conductor

2

50mm Bare Stranded copper cable

2

Clamp: connecting copper conductor to earth rod

cylindrical part,to be welded to steel structure or

Clamp: connecting copper conductor to copper conductor or

Y/G wire

foundation bars for using as connection point with cable shoe

Equipotentializing bonding bar EBB-X: EBB NAME

1800mm Pure Copper Earth Rod to BS6651

U-Bolt

FROM GEN.HOUSE/ BATTERY ROOM

EARTH RING

1:50

Water Tower

Earthing & Bonding Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-404

Page 25: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Lift

Ladder

slab

below

Conc.

Slab

Sandcrete

blks

A

B

canopyslab

below

25x3mm Insulated Flat Copper Tape

To Lightning Conductor Earth Pit

Lightning Protection Device

Air Terminal

Air Terminal Base

25x3mm Insulated Flat Copper Tape

HA B C D E F G I

Conc.

Slab

below

1:100

Roof Plan

Lighting Protection System

Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-405

Page 26: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

FROM BASEMENTEARTH RING

LEGEND

70mm Bare Stranded copper conductor

2

50mm Bare Stranded copper cable

2

Clamp: connecting copper conductor to earth rod

cylindrical part,to be welded to steel structure or

Clamp: connecting copper conductor to copper conductor or

Y/G wire

foundation bars for using as connection point with cable shoe

Equipotentializing bonding bar EBB-X: EBB NAME

1800mm Pure Copper Earth Rod to BS6651

U-Bolt

1:50

Security Post

Earthing & Bonding Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-406

Page 27: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

LEGEND

70mm Bare Stranded copper conductor

2

50mm Bare Stranded copper cable

2

Clamp: connecting copper conductor to earth rod

cylindrical part,to be welded to steel structure or

Clamp: connecting copper conductor to copper conductor or

Y/G wire

foundation bars for using as connection point with cable shoe

Equipotentializing bonding bar EBB-X: EBB NAME

1800mm Pure Copper Earth Rod to BS6651

U-Bolt

1 : 100

Generator House

Earthing & Bonding Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-407

Page 28: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

4 13 25

25mm x 3mm Insulated FlatCopper Tape Conductor

Copper Air Terminal

Copper Air Terminal Base

DC Tape Fixing Clips

Test or Joint Clamp

50mm² Single Core insulated MultiStranded Green / Yellow Cable

Lightweight Inspection Box with Lid

Copper Rod Coupler

2 x 1800mm Threaded PureCopper Rods

1 : 100

Elevation

Lighten Protection System

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-408

Page 29: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

Lift

Conc.

Slab

Sandcrete

blks

9690 11980

21670

4340

5768

4542

1525

16175

3573 5517 12580

21670

canopyslab

below

Ladder

slop

e

HA B C D E F G I

Conc.

Slab

below

Ladder

slab

below

Conc.

Slab

Sandcrete

blks

duct

250W - 1650mm x 992mm x 40mmRoof Mounted Solar Panel

LEGEND

3

1

2

4

Maintenance Manhole

1:100

Main Building

Roof Plan

PV Solar Panel Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-501

Page 30: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

250W - 1650mm x 992mm x40mm Roof Mounted Solar Panel

LEGEND

Maintenance Manhole

1:50

Generator House

Roof Plan

PV Solar Panel Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-502

Page 31: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

GENERATORFLOOR PLAN

Meta

l G

rille

SWITCHROOM

BULK FUEL TANK (1500x1500x1300)mm³

STORE

Batteryroom

1:50

Battery Room

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-503

Page 32: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

LegendG1 - 175 kVA Main Generator SetG2 - 175 kVA Standby Generator Set

ATS 1 - 250Automatic Transfer Switch 1

ATS 1 - 250Automatic Transfer Switch 2

M 1 - Utility (EDSA) Monitory Meter

DB 1-7 - 125A, 8way TP&N Distribution Board (Raw Power)UPS DB 1-3 - 125A, 8way TP&N Distribution Board (UPS Power)

VS - Voltage Stabilizer

DB 4 - 125A, 8way TP&N Distribution Board

G1 G2

250AATS-1

250AATS-2

M1

EDSA-1

9 11

Utility Supply-1

200A TP&N FusedDisconnector Switch

250A, 12way MCCB Panellboard

1 122 3 4 5 6 7 8

VoltageStabilizer

1 2 3 4

UPS

DB-1 DB-2 DB-3 DB-4 DB-5 DB-6

UPS DB-1 UPS DB-2 UPS DB-3

LIFT VRV-1 VRV-2 VRV-3

10

125A, 4way MCCB Panellboard

PV

+ _

PV

+ _

PV

combiner

+_

PV

controller

+_

BAT +_

PV

controller

+_

BAT

3 3

340A

Battery bank

60A

340A

60A

DC

inverter

+_AC

in

AC

out

DC

inverter

+_AC

in

AC

out

DC

inverter

+_AC

in

AC

out

250A 250A

AC

in

AC

out

3

3

3

3

3

3

5

Inverter Output

Termination box

5250A

DB-7

VS

Sub

mers

ible

Pum

p

1:30

Block Schematic

Electrical Supply

and

Distribution Layout

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-504

Page 33: ELECTRICAL DRAWINGS Volume 3: Tender Drawings€¦ · Drawing Title: Project status: Design: Tender: Contract / Construction: Sheet Size: A3 MLY 25/11/2016 16:55:47 Rehabilitation

ChargeControl

Battery Inverter

BatteryCharger

TransferSwitch

140kWAC Generator

UPS & Lights

Solar Panels

Block Schematic for a "Hybrid" - Solar Electric,Generator & Utility Supply Combination System

Utility Supply

1:20

Block Schematic For a

"Hybrid" - Solar Electric,

Generator & Utility Supply

combination System

CG

INY A3

RealiniBaderAssociates Limited

ArchitectsEngineers

Planners

Scale: August, 2014Printed on:

Drawn by:

Date:

Rehabilitation / Completion and Outfitting Work for

Office Building at Regent Road, Hill Station, Freetown

For Sierra Leone Field Office of the African

Development Bank (ADB)

October, 2016

Project Title:

Checked by:

72 Wellington Street, Freetown

Drawing Title:

Sheet Size:

Drawing status: Design: Tender: Contract / Construction:

No. Description Date

1.0 Description dd-mm-yyyy

NOTES

R BA

SL/ADB/E-505