Please note: InfoMine USA’s subscription fees are charged on a per user basis. Unauthorized redistribution of InfoMine USA information, including the forwarding of email publications to third parties and the copying of printed publications, is prohibited without prior written authorization of InfoMine USA, Inc. If you wish to add users to your subscription please contact us. After your company has purchased its first subscription to Mining Cost Service, second and third users at the same location receive their subscriptions at a 50% discount. Four or more subscribers receive a 75% discount, and 10 or more added subscribers are eligible for special bulk rates. For information on discounts for other company locations, please contact us. Tel: 509-328-8023 Fax: 509-328-2028 Email: [email protected] InfoMine USA, Inc. 1120 North Mullan Rd., Suite 100 Spokane Valley, WA 99206 USA 509-328-8023 FAX 509-328-2028 LEGAL COPYRIGHT NOTICE © 2009 InfoMine USA, Inc. LEGAL COPYRIGHT NOTICE © 2009 InfoMine USA, Inc.

Upload: losthighway7777

Post on 28-Nov-2014

64 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Electric Power - United States 2008

Please note: InfoMine USA’s subscription fees are chargedon a per user basis. Unauthorized redistributionof InfoMine USA information, including theforwarding of email publications to third partiesand the copying of printed publications, isprohibited without prior written authorizationof InfoMine USA, Inc.

If you wish to add users to your subscription please contact us.After your company has purchased its first subscription to MiningCost Service, second and third users at the same location receivetheir subscriptions at a 50% discount. Four or more subscribersreceive a 75% discount, and 10 or more added subscribers areeligible for special bulk rates. For information on discounts forother company locations, please contact us.

Tel: 509-328-8023Fax: 509-328-2028Email: [email protected]

InfoMine USA, Inc.1120 North Mullan Rd., Suite 100Spokane Valley, WA 99206 USA

509-328-8023 FAX 509-328-2028

LEGAL COPYRIGHT NOTICE© 2009 InfoMine USA, Inc.

LEGAL COPYRIGHT NOTICE© 2009 InfoMine USA, Inc.

Page 2: Electric Power - United States 2008

EP- U.S.Copyright © 2008 InfoMine USA, Inc. 1

Mining Cost Service

Section EPElectric Power - United States

CONTENTS Compiled by Jerry Olson

United StatesPage

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1Rate Schedule Summaries - Western U.S.

Alaska . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Arizona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5California . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Colorado . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Idaho . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20Minnesota . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23Montana . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31Nevada . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35New Mexico . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

PageRate Schedule Summaries - Western U.S.

North Dakota . . . . . . . . . . . . . . . . . . . . . . . . . . 41Oregon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45South Dakota . . . . . . . . . . . . . . . . . . . . . . . . . . 51Utah . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56Washington . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Wisconsin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66Wyoming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74

Estimator’s Guide to Industrial Electric power Rates- All U.S. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78

INTRODUCTION

Electric Power Service Rate Schedule Summaries - Western U. S.

The rate schedule tables contain summaries of electricpower schedules for companies serving the majority ofthe western U.S. land area. Companies servingmunicipalities only have not been included. The statemaps show approximate service area boundaries foreach utility as determined through a variety ofgovernment and industry sources.

Some companies have many different rateschedules for a variety of purposes. Only thoseschedules considered most applicable to the miningindustry are included here. Many of these schedulesare very complex. Space limitations prevent inclusionof any information other than that necessary for costestimating purposes. The power company should beconsulted when more specific details are needed.Some of these companies presently have no industrialcustomers and therefore no appropriate rate schedulesestablished. Often special contracts are written tocover such circumstances.

All charges listed in these schedules are monthlyunless stated otherwise. A typical monthly power billconsists of a fixed customer charge, plus a demandcharge based on the maximum 15 minute energy draw,and an energy charge calculated from the total KWH

consumed in the billing period. Many schedulesprovide for rate adjustments for the varying cost ofpower or fuel which must be purchased by the powercompany. Where these adjustments are identifiable inthe schedules provided, they have either been includedin the energy charges or listed under "remarks".Adjustments in parenthesis are negative, i.e. creditedto the customer. Adjustments for varying local taxesare not included in this summary.

Some utilities offer discounts ranging from 2% to10% to customers taking delivery of power at primaryor transmission voltages. In these cases, the customermust maintain his own transformers and relatedequipment. Where these discounts could be identifiedfrom the rate schedules provided, they are listed under"remarks".

Charges sometimes vary according to time of day,day of week, and season of year. These are usuallylisted as "on-peak", "mid-peak" and "off-peak" rates.On-peak rates apply when the utility load iscustomarily greatest. Off-peak rates apply when theload is customarily least. Where detailed informationis required, the power company should be consulted.

Page 3: Electric Power - United States 2008

EP - U.S.2 Copyright © 2008 InfoMine USA, Inc.

INTRODUCTION (continued)

Estimator's Guide To Industrial Electric Power Rates - All U.S.

Following the western U.S. rate schedule table is theEstimator's Guide to Electric Power Rates. This tableprovides approximate prices per KWH for industrialpower at 9 demand levels, each with 2 monthlyconsumption rates, for power companies throughoutthe U.S. The prices are computed from data reportedin "Typical Bills and Average Rates Report, Winter2008" published by the Edison Electric Institute.Demand charges and base or customer charges areincluded with energy charges in the computed dollarsper KWH listed in the table. For this reason thevalues are accurate only at the stated demand andconsumption levels. Use of the data for estimatingelectric power costs at other demand or consumptionlevels should be done with considerable caution.

Fuel adjustments, commodity adjustments, and taxadjustments where the tax is imposed on the utility andnot on the customer, and other similar adjustments,have been included in the computations whereapplicable. Not included are sales taxes not coveredby the rate schedule, which are computed separately asprovided by law.

DefinitionsApparent power The mathematical product of thevolts and amperes of a circuit. The product is usuallydivided by 1,000 and designated in kilovolt amperes(KVA). It comprises both real and reactive power.

Connected load The sum of the capacities or ratingsof the electric power consuming equipment connectedto the supplying system, usually measured inhorsepower (HP).

Demand The rate at which electrical energy isdelivered, usually expressed in kilowatts (KW). Forbilling purposes, the peak demand for any 15, 30, or60 minute interval is usually used. The peak demandfrom a previous billing period, a contract amount, or apercentage of the connected load may also be used.

Energy As commonly used in the electric utilityindustry, energy means the amount of electric energymeasured in kilowatt hours (KWH).

Horsepower One horsepower (HP) is approximatelyequivalent to .746 kilowatt (KW).

Kilovoltampere (KVA) 1,000 voltamperes

Kilowatt (KW) 1,000 watts

Megawatt (MW) 1,000 kilowatts (1,000,000 watts)

Reactive power The portion of apparent power thatdoes no work. Reactive power must be supplied tomost types of magnetic equipment, such as motors.

Real power The energy or work producing part ofapparent power. It is the rate of supply of energy,measured commercially in kilowatts (KW). Theproduct of real power and length of time is energy,measured in kilowatt hours (KWH).

Voltampere The basic unit of apparent power. Thevoltamperes of an electric circuit are the mathematicalproduct of the volts and amperes of the circuit.

Watt The electrical unit of power or rate of doingwork. The rate of energy transfer equivalent to oneampere flowing under a pressure of one volt at unitypower factor.

Page 4: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

3

ALASKASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Alaska Electric 24 Large November - May: 11.53/KW November - May: 4.930/KWH 50 KW Customer charge: $99.24/mo. Light & Power Commercial June - October: 7.35/KW June - October: 4.620/KWH Power cost adjustment of

w/demand $(0.028778)/KWH. Regulator cost metering adjustment $0.000362/KWH,

effective 10/2008.

41 Manufacturing November - May: 9.20/KW November - May: 5.300/KWH Customer charge: $99.24/mo.& Processing June - October: 7.35/KW June -October: 4.810/KWH Continuous during months of June

through October, interruptible duringNovember through May. Power costadjustment of $(0.028778)/KWH. Regulator cost adjustment $0.000362/KWH, effective 10/2008.

Alaska Village GS-2 Small First 700 KWH/mo: 32.000/KWH Cost of fuel adjustment varies from Electric Cooperative Commercial All additional: 22.000/KWH $0.1135 to $0.5505/KWH.

2008 rate.

Barrow Utilities & B Commercial & No charge All usage: 9.560/KWH Customer charge: Electric Cooperative Large Power-Three-Phase Three-Phase $89.67/mo.

Chugach Electric Large General All demand: 10.80/KW All usage: 8.7742/KWH 20 KW Customer charge: $61.44/mo. Association Service Includes fuel & purchased power

cost adjustment factor and aregulatory cost charge.

Copper Valley Copper River Basin All demand: 12.00/KW 200 KW demand or less: 50 KW Customer charge: $100.00/mo. Large 0 to 10,000 KWH/mo.: 6.800/KWH Subject to cost of power adjustment Commercial Over 10,000 KWH/mo.: 2.910/KWH factor which changes quarterly,

currently $0.1724/KWH, 12/2008.>200 KW demand:0 to 10,000 KWH/mo.: 7.540/KWHOver 10,000 KWH/mo.: 5.910/KWH

Valdez District All demand: 12.00/KW 0 to 25,000 KWH/mo.: 5.620/KWH 50 KW Customer charge: $100.00/mo. Large Over 25,000 KWH/mo.: 1.720/KWH Subject to cost of power adjustment Commercial factor which changes quarterly,

currently $0.1724/KWH, 12/2008.

Cordova Electric 800 Large Power 8.40/KW First 5,000 KWH/mo.: 20.770/KWH 20 KW Base charge: $60.00/mo. Cooperative Next 20,000 KWH/mo.: 18.430/KWH Subject to fuel cost adjustment

All additional: 16.070/KWH factor. Minimum charge: $100.00/mo.

Page 5: Electric Power - United States 2008

EP - U.S.

4C

opyright © 2008 InfoM

ine USA

, Inc.

ALASKASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Glacier Highway Purchased by Alaska Electric Electric Association Light & Power.

Golden Valley GS-2 General All demand: 9.98/KW First 15,000 KWH: 16.448/KWH 25 KW Customer charge: $100.00/mo. Electric Association Service All additional: 15.409/KWH Energy charges include fuel cost Association adjustment.

Homer Electric 4 Commercial All demand: 7.1683/KW 10.333/KWH 50 KVA Customer charge: $150.00/mo. Association Demand to Subject to wholesale power cost

Metered 5,000 KVA adjustment and regulatory clauses.7/2008.

Inside Passage GS-2 Large All demand: 11.39/KW All usage: 37.490/KWH 10 KW Customer charge: $50.00/mo.Electric Cooperative, Inc. Commercial Subject to a purchased power

adjustment of $0.1945/KWH,effective 9/2008.

Kodiak Electric LP Large Power All demand: 5.67/KW First 20,000 KWH: 12.700/KWH 50 KW Customer charge: $50.00/mo. Association All additional: 11.380/KWH Subject to cost of power adjustment

of $0.043274/KWH effective10/2008.

Kotzebue Electric A Large All demand: 2.53/KW First 20,000 KWH: 21.240/KWH Subject to fuel cost rate adjustment Association Commercial All additional: 19.590/KWH clause: $0.0829/KWH effective

Power Service 8/06. 2006 rate

Matanuska Electric Three-Phase All demand: 5.00/KW All usage: 11.0362/KWH Facility charge: $13.37/mo. Association Service Subject to monthly power cost

adjustment. An experimentalinterruptible service is available byspecial contract.

Metlakatla Small/Large All demand: 7.00/KW All usage: 9.200/KWH $10.00 minimum charge per mo. Power and Light Commercial Subject to fuel cost adjustment.

2006 rate.

Naknek Electric LP Large Power All demand: 10.00/KW All usage: 15.000/KWH 25 KVA Consumer charge: $100.00/mo.Association Subject to fuel cost adjustment

charge. Minimum charge: $100.00/mo.

Page 6: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

5

ALASKASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Nushagak Cooperative Large All demand: 8.50/KW All usage: 24.360/KWH 20 KW Customer charge: $75.00/mo.Commercial Subject to a fuel cost adjustment

of $0.2352/KWH. 2008 Rate.

Sitka General First 25KW No charge First 500 KWH: 14.170/KWH Minimum charge $21.25/mo. City & Borough Service All additional 3.90/KW 500 - 10,000 KWH: 9.030/KWH Electric Department 10,001 - 100,000 KWH: 8.500/KWH

Over 100,000 KWH: 7.500/KWH

Interruptible All usage: 0.317 times price per gal 100 KW Basic customer charge: $100.00/mo.Service for #2 heating oil Only applicable during off peak time.

Unalakleet Valley Commercial Over 10 KW: 4.90/KW All usage: 30.800/KWH Subject to fuel cost adjustment. Electric Association Rate Regulatory charge: 0.0039/KWH Minimum charge: $15.32/mo.

2006 rate.

ARIZONASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Ajo Improvement General All demand: No charge All usage: 11.564/KWH Customer charge: $5.20/mo. Company Electric Service Purchased power cost adjustment

included.

Arizona Public E-32 General Over 20 KW: All demand: Secondary: May - October Nov. - April Daily basic charge:Service Company Secondary: First 100 KW: 8.477/KW First 5,000 KWH: 11.438/KWH 9.929/KWH Self contained meter: $0.575

All additional: 4.509/KW All additional: 6.254/KWH 4.745/KWH Primary voltage: $2.926 Primary: First 100 KW: 7.865/KW Transmission voltage: $22.422

All additional: 3.897/KW Primary: Subject to a purchased power and Transmission: First 100 KW: 6.132/KW First 5,000 KWH: 11.160/KWH 9.651/KWH fuel cost adjustment factor.

All additional: 2.164/KW All additional: 5.976/KWH 4.467/KWH

(continued next page)

Page 7: Electric Power - United States 2008

EP - U.S.

6C

opyright © 2008 InfoM

ine USA

, Inc.

ARIZONASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Arizona Public E-34 Extra Large All demand: All usage: 3.715/KWH 3,000 KW Daily basic charge:Service Company General Service Secondary: 15.297/KW Self contained meter: $0.575

- Bundled Primary: 14.507/KW Primary voltage: $2.926(continued) Transmission: 10.577/KW Transmission voltage: $22.422

Subject to a purchased powerand fuel cost adjustment factor. Unbundled service also available.

E-35 Extra Large All demand: All usage: 3,000 KW Daily basic charge:General Service On-Peak: On-Peak: 4.141/KWH Self contained meter: $0.608Time-of-Use Secondary: 13.313/KW Off-Peak* 3.114/KWH Primary voltage: $2.926

Primary: 12.653/KW Transmission voltage: $22.422 Transmission: 9.248/KW Subject to a purchased power

fuel cost adjustment.Off Peak: Secondary: 2.412/KW *Off-Peak demand is only charged Primary: 2.346/KW for off-peak demand that is Transmission: 2.005/KW greater than on-peak demand.

Columbus Electric 5 Large Power All demand: 12.00/KW All usage: 5.200/KWH 50 KVA Customer charge: $35.00/mo. Cooperative Service to Subject to cost of fuel and

350 KVA purchased power adjustment.

5 Large Power Peak: 13.50/KW Peak* 5.925/KWH 50 KVA Customer charge: $50.00/mo.Time-of-Use Non-Peak: No charge Non-Peak: 5.000/KWH to Subject to cost of fuel and

350 KVA purchased power adjustment.

*Peak: 6:00 A.M. - 9:00 P.M.

6 Industrial All demand: 12.50/KW All usage: 4.410/KWH 350 KVA Customer charge: $35.00/mo.Service Subject to cost of fuel and purchased

power adjustment.

Page 8: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

7

ARIZONASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Continental Divide LPS Large Power Utility owned All usage: 4.180/KWH 50 KVA Customer charge: $40.00/mo. Electric Cooperative Service substation: 14.00/KVA Subject to fuel and purchased power

Consumer owned cost adjustment. substation: 13.75/KVA

Dixie Escalante Large All demand: 8.00/KW All usage: 2.200/KWH 50 KW Customer charge: $30.00/mo. Rural Electric Commercial to Over 500KW available by special Cooperative Service 500 KW contract. 2005 rate.

Duncan Valley TPD Three-Phase First 15KW: No charge All usage: 5.966/KWH 15 KVA System charge: $40.00/mo. Electric Cooperative Demand Service Additional: 10.00/KW Fuel cost adjustment applies.

2006 rate.

Garkane Power General All demand: 6.37/KW All usage: 6.115/KWH 50 KW Base rate: $20.00/mo. Subject Association Service 2 to cost of purchased power

adjustment.

Graham County B General Service & Bundled All usage: 10.969/KWH Up to Customer charge: $15.00/mo. Electric Cooperative Small Commercial Commodity 300 KVA Subject to a fuel cost adjustment of

Charge $0.015/KWH, effective 6/2006.2006 rate.

C Large Commercial Bundled All usage: 9.876/KWH 350 KVA Customer charge: $50.00/mo.Commodity Subject to a fuel cost adjustment ofCharge $0.015/KWH, effective 6/2006.

2006 rate.

Mohave Electric L Large All demand: 9.75/KW All usage: 4.558/KWH 100 KW Customer charge: $70.00/mo. Cooperative Commercial Subject to a cost of purchased

& Industrial power adjustment of $0.006/KWH and environmental charge of$0.000875/KWH.

Morenci Water & General All demand: No charge All usage: 10.150/KWH Customer charge: $5.50/mo. Electric Company Service Subject to a fuel cost adjustment of

$(0.019)/KWH, effective 8/06.Environmental surcharge:$0.000875/KWH. 2006 rate.

Industrial Customer service charge:Special Contract $500.00/mo. Other details

negotiated. 2006 rate.

Page 9: Electric Power - United States 2008

EP - U.S.

8C

opyright © 2008 InfoM

ine USA

, Inc.

ARIZONASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Navopache Electric B Commercial On-Peak* 7.25/KW All usage: 2.747/KWH 50 KVA Customer charge: Secondary Cooperative & Industrial Off-Peak: 7.20/KW Voltage - $155.00/mo.; Primary

Service - Voltage - $244.00/mo. 7% discountTime-of-Use for delivery at 14.4KV and above.

Subject to a power cost adjustment.

On-Peak*: 6.00 A.M. - 9:00 P.M.

A Commercial All demand: 8.70/KW First 300 KWH/KW: 5.197/KWH 50 KVA Customer charge: Secondary& Industrial All additional: 2.747/KWH Voltage - $120.00/mo.; PrimaryService Voltage - $244.00/mo. 7% discount

for delivery at 14.4KV and above.Subject to a power cost adjustment.

Salt River Project E-36 General Winter Summer Winter Summer Customer charge: $12.47/mo.Service Over 5 KW: 2.34/KW 4.05/KW First 350 KWH/KW: 7.090/KWH 8.240/KWH Subject to a cost of fuel and

Next 180 KWH/KW: 7.090/KWH 8.240/KWH purchased power adjustment.Next 155 KWH/KW: 6.370/KWH 7.210/KWHAll additional: 4.800/KWH 5.180/KWH

E-32 Time-of-use All demand: Winter Summer All usage: Winter Summer Customer charge: $15.04/mo.General On-Peak: 3.82/KW 4.88/KW On-Peak: 12.270/KWH 13.420/KWH Subject to a cost of fuel andService Shoulder-Peak: 0.31/KW 0.45/KW Shoulder-Peak: 8.920/KWH 9.180/KWH purchased power adjustment.

Off-Peak: 4.630/KWH 4.640/KWHWinter - May 1 to October 31.Summer - November 1 to April 30.

*Peak: Winter 5:00 A.M. to 9:00 A.M. Monday - FridaySummer 2:00 P.M. to 7:00 A.M. Monday - Friday

**Shoulder-Peak Winter 5:00 A.M. to 9:00 A.M. Monday - FridaySummer 11:00 A.M. to 2:00 P.M. Monday - Friday

Page 10: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

9

ARIZONASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Sierra Southwest Wholesale producer which provides Services, Inc. power to co-ops and other utilities.

Rates subject to purchased powercost adjustment.

Sulphur Springs P General All demand: All usage: 6.210/KWH 50 KVA Customer charge: $42.00/mo. Valley Electric Power Cooperative's Transformers 6.50/KVA to Subject to a wholesale power rate Cooperative Service Customer's Transformers 5.50/KVA 1,000 KVA adjustment. 2006 rate.

Tohono O'odham 050 Large All demand: 6.50/KW All usage: 8.400/KWH Subject to a power cost adjustment. Utility Authority Commercial 2006 rate.

Service

Trico Electric GS-2 General > 10KW: 4.00/KW All usage: 11.397/KWH 10 KW Customer charge: $23.00/mo. Cooperative Service to Subject to a power cost adjustment.

200 KW

GS-3 General Over 10KW: 15.88/KW All usage: 6.157/KWH 10 KW Customer charge: $23.00/mo.Service to Subject to a power cost adjustment.

11,999 KW

Tucson Electric 10 General All demand: No charge May - October: Customer charge: $13.24/mo. Power Company Service First 3,400 KWH: 11.3695/KWH Time-of-use and unbundled rates

All additional: 10.0343/KWH also available.

November - April:First 3,400 KWH: 11.3695/KWHAll additional: 9.3772/KWH

13 Large First 200 KW: 1,675.88/mo. May - October: 6.3744/KWH 200 KW Customer owned transformersGeneral All additional: 6.52/KW November - April: 6.0566/KWH $0.206 discount on demand. Service Time-of-use and unbundled rates

also available.

14 Large Light All demand: 9.97/KW May - October: 4.6001/KWH 3,000 KW Delivered at primary voltage of 46KV and Power November - April: 4.3701/KWH or higher. Time-of-use and

unbundled rates

Page 11: Electric Power - United States 2008

EP - U.S.

10C

opyright © 2008 InfoM

ine USA

, Inc.

ARIZONASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Unisource Energy LGS Large All demand: 10.71/KW All usage: 6.7062/KWH 5 KW Customer charge: $15.50/mo. Services General to 1 year contract required. Rates

Service 1,000 KW include a purchased power cost (Formerly Citizens Utilities Co.) adjustment.

LPS Large All demand: All usage: 5.326/KWH 500 W Customer charge: for service lessPower Service Service < 69 /KV 17.895/KW than 69kv, $365.00/mo., greater

Service > 69 /KV 11.61/KW than or equal to 69kv, $400.00/mo. Rates include a purchased powercost adjustment.

Wellton-Mohawk B General All demand: 3.00/KW First 3,000 KWH: $238.92 10 KW Subject to a purchased power and Irrigation & Service Next 147 KWH/KW: 7.604/KWH fuel cost adjustments. Drainage Company Commercial & Next 150 KWH/KW: 6.958/KWH 2005 rate.

Industrial All additional: 6.499/KWH

CALIFORNIASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Lassen Municipal 1025 General All demand: 6.00/KW All usage: 13.000/KWH Customer charge: $25.00/mo. Utility District Service Demand per meter.

1070 General All demand: 7.00/KW All usage: 12.500/KWH 500 KW Service charge: $230.00/mo.Power Service Discount for customer ownedTime-Metered transformers taking service at 69KV

or higher: $.15/KVA for 1st1,000KVA; $.10/KVA for all additionalKVA.

Page 12: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

11

CALIFORNIASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Department of Water A-2 General June - October: 13.78/KW All usage: 2.181/KWH 30 KW Service Charge: $25.00/mo. and Power, City of Service November - May: 12.62/KW Rate subject to energy cost and Los Angeles Primary - Rate A Facilities charge: 2.25/KW energy subsidy adjustment.

A-3 Large Facilities charge: 1.65/KW High Peak: 2.800/KWH 500 KW Service Charge: $50.00/mo.General June - October: Low Peak: 2.772/KWH Rate subject to energy cost and Service High Peak: 8.52/KW Base Period: 1.585/KWH energy subsidy adjustment.Rate A Low Peak: 4.10/KW(Subtrans.) Base Period: 0.80/KW High Peak Period: Monday -Friday

November - May: 1:00 P.M. - 4:59 P.M. High Peak: 7.80/KW Low Peak: 3.76/KW Low Peak Period: Monday -Friday Base Period: 0.80/KW 11:00 A.M. - 12:59 P.M.

5:00 P.M. - 6:59 P.M.

Base Period: All other time.

Pacific Gas and A-10 Medium Secondary voltage: Secondary voltage: 50 KW Customer charge: $3.94251/day. Electric Company General Winter: 5.01/KW Winter: 9.934/KWH Optional meter data access charge

Demand Summer: 9.11/KW Summer: 13.107/KWH $0.98563/meter/day. Substantial Metered Primary voltage: Primary voltage: savings available for interruptibleService Winter: 4.60/KW Winter: 9.459/KWH options to this schedule. Rates

Summer: 8.62/KW Summer: 12.497/KWH include all energy rate adjustments.Transmission voltage: Transmission voltage: Maximum demand 500 KW. Winter: 2.93/KW Winter: 8.447/KWH Summer: 6.51/KW Summer: 11.010/KWH

E-19 Commercial Maximum demand: 6.90/KW Summer: 500 KW Substantial savings available for Time-of-use On-Peak* 14.380/KWH interruptible options to this schedule.

Secondary Summer Peak* 12.30/KW Partial Peak** 9.873/KWH Rates include all energy rateVoltage Summer Partial Peak** 2.80/KW Off-Peak*** 8.029/KWH adjustments.

Winter Partial Peak** 1.00/KW Winter: Customer base charge: Partial-Peak** 8.791/KWH $13.55236/meter/day plus an Off-Peak*** 7.748/KWH additional negotiated rate of

Summer: $3.97799 to $4.11992/meter/day.*Peak 12:00 P.M. - 6:00 P.M. Monday - Friday**Partial Peak 8:30 A.M. - 12:00 P.M.; 6:00 P.M. - 9:30 P.M. Monday - Friday***Off-Peak 9:30 P.M. - 8:30 A.M. Monday - Friday plus Saturday, Sunday & Holidays

Winter:**Partial Peak 8:30 A.M. - 9:30 P.M. Monday - Friday ***Off-Peak 9:30 P.M. - 8:30 A.M. Monday - Friday plus Saturday, Sunday, & Holidays

Continued next page

Page 13: Electric Power - United States 2008

EP - U.S.

12C

opyright © 2008 InfoM

ine USA

, Inc.

CALIFORNIASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Pacific Gas and E-20S Commercial Maximum demand: 7.14/KW Summer: 1,000 KW Customer Charge: $24.64066/day. Electric Company Industrial On-Peak* 13.717/KWH Substantial discounts available (continued) Secondary Summer partial Peak** 2.64/KW Partial Peak** 9.488/KWH for interruptible service. Rates

Non-firm Summer Peak: 11.95/KW Off-Peak*** 7.740/KWH include all energy rate adjustments.Meter data access charge:

Winter partial Peak** 1.00/KW Winter: $0.98563/meter/day. Partial Peak** 8.476/KWH Off-Peak*** 7.476/KWH

E20P Commercial/ Maximum demand: 5.85/KW Summer: 1,000 KW Customer Charge: $32.85421/day.Industrial On-Peak* 14.081/KWH Substantial discounts availablePrimary Partial Peak** 2.63/KW Partial Peak** 9.525/KWH for interruptible service. Rates

Summer Peak* 11.43/KW Off-Peak: 7.554/KWH include all energy rate adjustments.

Winter: Meter data access charge:Winter partial Peak** 0.64/KW Partial Peak** 8.176/KWH $0.98563/meter/day.

Off-Peak*** 7.178/KWH

Pacific Power A-32 General All demand: 20 KW Rates include all energy rate & Light Company Service Distribution: 1.29/KW 7.264/KWH adjustments. Basic charge:

Generation & Single -phase - $10.35/mo.;Transmission: 0.88/KW Three-Phase - $14.22/mo.

AT-48 Large Generation & Transmission All usage: 3.947/KWH 500 KW Rates Include all energy rateGeneral On-Peak* adjustments. Basic charge:Service November - April: 2.28/KW $372.39/mo. Discount of 1.0%Metered May - October: 1.22/KW for metering at primary voltage. Time-of-Use Distribution: 1.60/KW If delivery is at primary voltage,

distribution demand charges will bereduced by 30%.

*Peak: Monday - Friday, 6:00 A.M. - 10:00 P.M.

Plumas-Sierra 300 Medium Power All demand: 10.22/KW All usage: 9.550/KWH 50 KW Membership fee: $5.00. Rural Electric Cooperative Service Load cannot be greater than 250KW.

2006 rate.

310 Large Power All demand: 10.22/KW All usage: 8.700/KWH 250 KW Membership fee: $5.00Service 2006 rate.>250 KVA

Page 14: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

13

CALIFORNIASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Sacramento Municipal GS General Over 20 KW First 7,300 KWH: 21 KW Customer charge: $18.00/mo. Utility District Service Winter: 6.00/KW Winter: 10.090/KWH to Energy surcharge applies to all

Demand Summer: 6.00/KW Summer: 11.130/KWH 299 KW energy consumed.Secondary

All additional: Winter: 8.040/KWH Summer: 8.580/KWH

GS - General Super-Peak: 30 KW Customer charge: $85.00/mo.TOU 3 Service Summer: 15.010/KWH to Plus facilities charge of $2.70/KW

Time-of-use 499 KW installed capacity. Energy surchargePrimary On-Peak: applies.

Winter: 7.740/KWH Summer: 10.390/KWH

Off-Peak Winter: 6.150/KWH Summer: 8.160/KWH

Super-Peak: June 1 - September 30: 2:00 P.M. - 8:00 P.M.

On-Peak: October 1 - May 31: 12:00 P.M. - 10:00 P.M.June 1 - September 30: 12:00 P.M. - 2:00 P.M. & 8:00 P.M. - 10:00 P.M.

Off-Peak: All other times

San Diego Gas and AL- General (dollars) 20 KW Rates include all adjustments. Electric Company TOU Service Secondary Summer: Winter: Secondary Summer: Winter: to Service charge: $58.22/mo.

Large -Time Peak: 4.39/KW 3.59/KW Peak: 0.11906/KWH 0.11594/KWH 12,000 KW per meter for less than 500 KW Metered Off-Peak: 11.18/KW 11.18/KW Semi-Peak: 0.0954/KWH 0.10545 /KWH demand. $232.87 per meter per

Off-Peak: 0.7284/KWH 0.07967/KWH month for greater than 500 KWdemand.

Primary Primary Peak: 5.53/KW 3.78/KW Peak: 0.11437/KWH 0.11179/KWH

Off-Peak: 10.91/KW 10.91/KW Semi-Peak: 0.09228/KWH 0.10217/KWH Off-Peak: 0.07022/KWH 0.07692/KWH

On-Peak: Summer - 11:00 A.M. - 6:00 P.M. Monday - Friday Winter - 5:00 P.M. - 8:00 P.M. Monday - Friday

Semi-Peak: Summer - 6:00 A.M. - 11:00 A.M. & 6:00 P.M. - 10:00 P.M. Monday - FridayWinter - 6:00 A.M. - 5:00 P.M. & 8:00 P.M. - 10:00 P.M. Monday - Friday

Page 15: Electric Power - United States 2008

EP - U.S.

14C

opyright © 2008 InfoM

ine USA

, Inc.

CALIFORNIASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

NV Energy A-2 Medium All demand: 6.67/KW All usage: 50 KW Customer charge: $100.00/mo.General Summer: 12.305/KWH to Rates include all energy rate

(Formerly Sierra Pacific Power) Service Winter: 9.626/KWH 200 KW adjustment. Discounts for primary distribution or transmissionvoltage delivery.

A-3 Large Winter: Summer: Winter: Summer: 200 KW Customer charge: $550.00/mo.General On-Peak* 2.62/KW 11.69/KW On-Peak:* 8.851/KWH 9.682/KWHService Mid-Peak** 1.49/KW 0.00/KW Mid-Peak:** 8.643/KWH

Off-Peak: 7.444/KWH 7.821/KWHMaximum: 5.46/KW

On-Peak*: Summer: 5:00 P.M. - 10:00 P.M. Winter: 10:00 A.M. - 10:00 P.M.

**Mid-Peak: Summer: 7:00 A.M. - 5:00 P.M.

***Off-Peak: All other hours

Southern California GS-2 General All demand: 9.54/KW All use: Customer charge: $94.65/mo. Edison Company Service Summer: 6.279/KWH Minimum charge: $1.00 per KW

Demand Winter: 5.235/KWH of contract demand. Energy ratesinclude all adjustment factors.

*KWH per KW of max demand Discounts may apply.

TOU-8 General Facilities: 10.77/KW 500 KW Customer charge: $458.04/mo.Service -Large Summer: Winter: Summer: Winter:

On-Peak* 15.23/KW 0.00/KW On-Peak:* 9.865/KWH N/AMid-Peak** 5.14/KW 0.00/KW Mid-Peak:** 7.142/KWH 7.417/KWHOff-Peak*** 0.00/KW 0.00/KW Off-Peak:*** 3.574/KWH 3.948/KWH

On-Peak*: Summer: Monday - Friday 12:00 P.M. - 6:00 P.M. Winter: Monday - Friday 5:00 P.M. - 9:00 P.M.

**Mid-Peak: Summer: Monday - Friday 8:00 A.M. - 12:00 P.M.; 6:00 P.M. - 11:00 P.M.Winter: Monday - Friday 8:00 A.M. - 5:00 P.M.

***Off-Peak: All other hours

Page 16: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

15

CALIFORNIASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Surprise Valley A Large Power All demand: 5.14/KW All usage: 4.040/KWH 50 KVA Basic customer charge: $10.00/mo. Electrification Service Subject to wholesale power cost Corporation adjustments.

Turlock Irrigation ID Industrial Winter: 8.92/KW All usage: 35 KW Customer charge: $82.00/mo. District Service Summer: 10.70/KW Winter: 5.370/KWH 2.5% discount applied to energy

Demand Summer: 7.070/KWH charge for delivery at 12,000 volts.Metered 6% discount applied to energy

charge for delivery at 69,000 volts. Power factor charge per KVA orportion thereof $1.10.

HT Large Winter: 7.99/KW Winter: Summer: 500 KW Customer Charge: $250.00/mo.Industrial Summer: 8.85/KW On-Peak* 5.920/KWH 8.540/KWH 2.5% discount applied to energyService - Off-Peak: 3.760/KWH 5.210/KWH charge for delivery at 12,000 volts.Time-of-Use 6% discount applied to energy

charge for delivery at 69,000 volts. Power factor charge per KVA or

On-Peak* Monday - Friday 12:00 P.M. - 9:00 P.M. portion thereof $1.10.

COLORADOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Delta-Montrose 3 Large All demand: 10.62/KW All usage: 5.788/KWH 50 KW Basic charge: $130.00/mo. Electric Association Commercial

4 & 5 Industrial System Peak: All usage: Subject to cost of power adjustment. Distribution voltage: 24.18/KVA Distribution voltage: 2.995/KWH Transmission voltage is greater Transmission voltage: 20.56/KVA Transmission voltage: 3.290/KWH than 46KV.

Empire Electric LP Large Power All demand: 5.85/KW First 200 KWH/KW: 9.210/KWH 37.5 KVA Facilities charge: $182.25/mo. Association Service Next 200 KWH/KW: 6.760/KWH

All additional: 3.611/KWH

Page 17: Electric Power - United States 2008

EP - U.S.

16C

opyright © 2008 InfoM

ine USA

, Inc.

COLORADOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Grand Valley LP-1 Large Power All demand: 4.55/KW First 200 KWH/KW: 8.293/KWH 50 KW Customer charge: $50.00/mo. Power Service Next 200 KWH/KW: 6.520/KWH 2% discount for service at primary

All additional: 4.556/KWH distribution voltage. Subject to purchased cost adjustment$0.0023143/KWH, effective 1/2008.

Gunnison County 043 Large Power All demand: 16.86/KW All usage: 3.735/KWH 50 KVA Customer charge: $122.00/mo. Electric Association

Highline Electric LP Large Power All demand: 16.13/KW All usage: 2.940/KWH Discount for delivery at 7.27KV Association Service or 12.47KV. Minimum charge:

$56.00. Subject to wholesale cost ofpower adjustment. Service charge:$36.00 per meter per month.

High West LP Large Power All demand: 12.32/KW First 50 KWH/KW: 8.517/KWH 37.5 KVA Facility charge: $26.00/mo. Energy, Inc. Next 100 KWH/KW: 5.804/KWH 5% demand discount for delivery

Next 100 KWH/KW: 4.456/KWH at primary voltage if customerAll additional: 4.061/KWH owns and maintains transformers.

2006 rate.

Holy Cross Electric 63/64 General All demand: 6.54/KW All usage: 4.442/KWH Customer charge: $26.00/mo. Association Services/Large

66/67 Large Power Maximum demand: 6.54/KW All usage: 2.972/KWH 50 KW Customer charge: $162.00/mo. Time-of-use Peak demand: 10.31/KW

Intermountain Rural P Large Power All demand: 8.40/KW All usage: 2.767/KWH 50 KVA Service charge: $100.00/mo. Electric Association Service 2006 rate.

Page 18: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

17

COLORADOSched. Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

KC Electric 0005 Small First 10,000 KWH: 10.650/KWH Three-phase monthly minimum: Association Commercial All additional: 8.650/KWH $30.00.

0006 Large All demand: 5.50/KW First 10,000 KWH: 7.800/KWH 800 KVA Facilities charge: $40.00/mo.Power All additional: 6.800/KWH

La Plata Electric LP-30 Commercial All demand: 13.25/KW All usage: 5.800/KWH 50 KW Association Large

LP-31 Commercial All demand: 10.50/KW All usage: 4.820/KWH 50 KW Facilities charge: $450.00/mo.Large - Primary

Moon Lake Electric LP Large Power All demand: 11.00/KW All usage: 3.720/KWH 50 KVA Minimum charge: $29.00/mo. Association Service

IS-2 Industrial All demand: 11.00/KW All usage: 3.140/KWH Delivery at primary voltageService - 2 Customer charge: $2,198.00/mo.

Morgan County Rural Large Power All demand: 14.50/KW All usage: 4.8803/KWH 40 KW Monthly facility charge: $70.00 Electric Association Service 2006 rate.

Mountain Parks LP Large Power All demand: 4.35/KW First 200 KWH/KW: 8.700/KWH 50 KW Service charge: $88.40/mo. Electric Association Service Next 200 KWH/KW: 5.900/KWH

All Additional: 3.400/KWH

Mountain View 60 Large Power All demand: 17.89/KVA All usage: 3.849/KWH 25 KVA Consumer charge: $25.00/mo. Electric Association Subject to cost of purchased power

adjustment.

Page 19: Electric Power - United States 2008

EP - U.S.

18C

opyright © 2008 InfoM

ine USA

, Inc.

COLORADOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Poudre Valley LP-08 Large Power All demand: 17.00/KW All usage: 5.410/KWH 37.5 KW Facility charge: $66.00/mo. Rural Electric Service Subject to cost of purchased Association power adjustment. Minimum charge:

$1.50/KVA of installed transformercapacity.

LPP-08 Large Power All demand: 16.15/KW All usage: 4.750/KWH 500 KW Facilities charge: $66.00/mo.Service - Subject to cost of purchasedPrimary Meter power adjustment. Minimum charge

$1.50/KVA of installed transformercapacity.

San Isabel Electric C2 Commercial All demand: 14.50/KW All usage: 8.3898/KWH 50 KW 5% discount for primary delivery. Association & Industrial Customer charge: $100.00/mo.

C3 Large All demand: 14.37/KW All usage: 7.5088/KWH 1,500 KW For delivery at 69KV or 44KW.Commercial Customer charge: $450.00/mo.

San Luis Valley LP-A Large Power All demand: 5.10/KW First 200 KWH/KW: 10.100/KWH 45 KW Customer charge: $75.00/mo. Rural Electric General Service Next 200 KWH/KW: 6.600/KWH to Association All additional: 3.700/KWH 500 KW

LP-B Large Power All demand: 9.00/KW First 200 KWH: 7.360/KWH 500 KW Customer charge: $364.00/mo.Service - Next 200 KWH: 5.710/KWHSecondary All additional: 3.410/KWH

LP-B Large Power All demand: 8.73/KW First 200 KWH: 7.770/KWH 500 KW Customer charge: $364.00/mo.Service - Next 200 KWH: 5.540/KWHPrimary All additional: 3.310/KWH

Page 20: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

19

COLORADOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

San Miguel Power 3 General Service All demand: 19.05/KW All usage: 5.8676/KWH 50 KW Customer charge: $29.86/mo. Association Three-Phase to 2008 rate.

Service 1,000 KW

Sangre de Cristo 3 Three-Phase All demand: 25.00/KW All usage: 5.078/KWH 50 KVA Consumer charge: $84.26/mo. Electric Association & Large

Power Service

Southeast Colorado LP Large Power All demand: 17.85/KW All usage: 5.153/KWH 50 KVA Service charge: $136.00/mo. Power Association Service Large loads are negotiated.

LT Large Power On-Peak: 18.50/KW All usage: 5.467/KWH 50 KVA Service charge: $163.35/mo.Time-of-Day Off-Peak: 0.00/KW 1,500KVA. Service charge basedDemand on cost of facilities.

United Power, Inc. IPDRI Industrial All demand: 14.05/KW All usage: 3.807/KWH 100 KVA Charge for Three-Phase service:Primary $40.20/mo. Subject to wholesale

(Formerly Union REA) Voltage power cost adjustment. 2008 rate.

IPTDI Industrial On-Peak: 12.25/KW All usage: 2.262/KWH 100 KVA Service charge: $45.20/mo.Time-of-Day Facility Demand: 7.20/KW Subject to wholesale power costPrimary Voltage 2006 rate.

White River Electric LP-S Large Power All demand: No charge All usage: 9.461/KWH 50 KVA Service charge: 50.00/mo. Association Service to Subject to purchased power

1,000 KVA adjustment. 2008 rate.

LP- Large Power All demand: 27.10/KW All usage: 3.535/KWH 1,000 KVA Service charge: 50.00/mo.PRIM Primary Service to Subject to purchased power

5,000 KVA adjustment. 2008 rate.

Yampa Valley 12 Large All demand: No charge All usage: 8.424/KWH 50 KVA Minimum charge: $105.00.Electric Power

Y-W Electric 50 Commercial & All demand: 3.94/KW All usage: 10 KW Service charge: $50.00 per meter Association 53 Industrial First 200 KWH/KW: 8.3465/KWH per month. If transformers are

Power Next 200 KWH/KW: 5.7831/KWH customer owned there is a All additional: 4.0124/KWH $0.50/KW demand discount.

2008 rate.

Page 21: Electric Power - United States 2008

EP - U.S.

20C

opyright © 2008 InfoM

ine USA

, Inc.

COLORADOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

XCEL Energy SG Secondary All demand: All usage: 0.288/KWH Up to Facilities charge: $25.00/mo.General Winter: 8.40/KW 4,000 KW Subject to electric cost adjustment.Service Summer: 9.58/KW

(Formerly Public Service Company of Colorado)

PG Primary All demand: All usage: 0.282/KWH Up to Delivery at primary distribution General Winter: 7.21/KW 4,000 KW voltage.

Service Summer: 8.39/KW Service charge: $130.00/mo.Subject to electric cost adjustment.

TG Transmission All demand: All usage: 0.276/KWH Delivery at primary distributionGeneral Winter: 4.47/KW voltage. Service charge varies.Service Summer: 5.63/KW Subject to electric cost adjustment.

IDAHOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Avista Utilities 21 Large First 50 KW: 275.00/mo. First 250,000 KWH: 5.384/KWH 50 KW $0.20/KW discount for delivery atGeneral All additional: 3.50/KW All additional: 4.594/KWH primary voltage of 11KV or higher.Service Minimum charge $250.00/mo.

25 Extra Large First 3000 KVA: 10,000.00/mo. First 500,000 KWH: 4.411/KWH 2,500 KVA $.20/KW discount for delivery at General All additional: 3.25/KW All additional: 3.736/KWH primary voltage of 11KV or higher. Service Minimum charge: $571,460/yr.

Citizens Utilities Company Purchased by Avista Utilities.

Clearwater Power 2-5 General Over 50 KW: 5.68/KW First 15,000 KWH: 5.677/KWH 15 KVA Facilities charge: $15.00/mo. Company Service Large All additional: 4.350/KWH 12/2007 rate.

Commercial

Fall River Rural 03 General Over 10 KW: 7.65/KW All usage: 4.605/KWH Customer charge: $45.00/mo. Electric Cooperative Service

Page 22: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

21

IDAHOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Idaho County LP Large Power & First 50 KW: No charge First 100,000 KWH: 7.750/KWH Service Charge: $50.00/mo. Light and Power Lighting Service All additional: 5.00/KW All additional: 7.250/KWH 2/2008 rate.

Idaho Power Company 9 Large General Summer: Summer: Up to Customer charge: Transmission Service Secondary Service: 3.85/KW Secondary Service: 750 KW or primary service: $210.00/mo.

Primary Service: 3.80/KW First 2,000 KWH 7.303/KWH Secondary service: $12.00/mo. Transmission Service: 3.73/KW All additional: 3.1288/KWH

Power cost adjustment Primary Service: 2.848/KWH $0.002419/KWH, effective 6/1/2007.Transmission Service: 2.7789/KWH

Basic load demand charge ofNon-Summer: Winter $0.67/KW secondary service, Secondary Service: 3.18/KW Secondary Service: $0.95/KW for primary service and Primary Service: 3.17/KW First 2,000 KWH: 6.5153/KWH $0.50/KW for transmission service Transmission Service: 3.10/KW All additional: 2.7910/KWH also apply.

Non-Summer: Primary Service: 2.5505/KWH Transmission Service: 2.5017/KWH

19 Large Power Summer: Summer On-Peak: 1,000 KW Customer charge: Transmission Service Secondary Service: 3.41/KW Secondary Service: 3.4034/KWH to or primary service: $210.00/mo.

Primary Service: 3.36/KW Primary Service: 2.9111/KWH 25,000 KW Secondary service: $12.50/mo. Transmission Service: 3.29/KW Transmission Service: 2.8808/KWH

Facilities charge: 1.7% x companyNon-Summer: Summer Mid-Peak: investment in company owned Secondary Service: 3.18/KW Secondary Service: 3.2335/KWH facilities beyond point of delivery. Primary Service: 3.17/KW Primary Service: 2.6280/KWH Transmission Service: 3.10/KW Transmission Service: 2.600/KWH Power cost adjustment

$0.2419/KWH, effective 6/1/2007.Summer Off-Peak: Secondary Service: 3.0138/KW Basic load demand charge of Primary Service: 2.4493/KW $0.67/KW secondary service, Transmission Service: 2.4234/KW $0.95/KW for primary service and

$0.46/KW for transmission serviceNon-Summer Mid-Peak: also apply. Secondary Service: 2.9091/KW Primary Service: 2.3773/KW Transmission Service: 2.3475/KW

Non-Summer Off-Peak: Secondary Service: 2.7775/KW Primary Service: 2.2681/KW Transmission Service: 2.2397/KW

Inland Power and Large Over 50 KW: 2.80/KW All usage: 4.560/KWH 50 KW Basic charge: $246.40/mo. Light Company Commercial to 5% primary voltage discount.

3,000 KW Subject to power cost adjustment. 5 year contract required.

Page 23: Electric Power - United States 2008

EP - U.S.

22C

opyright © 2008 InfoM

ine USA

, Inc.

IDAHOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Kootenai Electric 6 Large First 50KW: 0.00 All usage: 4.900/KWH 51 KW Facility charge: $200.00/mo. Cooperative Commercial All additional: 2.75/KW to Discount of $.10/KW on demand

1,000 KW charge for delivery at primaryvoltage.

7 Industrial All demand: 4.63/KW All usage: 3.250/KWH 1,000 KW Base charge: $7,500.00/mo.Service Primary service.

Lost River Electric LP Large Power All demand: 5.51/KW All usage: 5.550/KWH 50 KW Facility charge: $14.56/mo. Cooperative Service 7% discount for delivery at primary

voltage. Subject to a fuel costadjustment charge. 2008 rate.

Lower Valley Energy C-2 Commercial All demand: 6.48/KW All usage: 3.271/KWH 50 KW Minimum bill: $10.00/mo.

Missoula Electric Large 10.19/KW All usage: 4.100/KWH 50 KVA Customer charge: $42.23/mo. Cooperative Commercial

Industrial All usage: 3.750/KWH Customer charge: $88.75/mo.

Northern Lights 2 Large All demand: 5.50/KVA All usage: 5.030/KWH 100 KVA Basic charge: $50.00/mo. Electric Commercial Development rate available. Voltage

Secondary rate Subject to a power costadjustment of $0.00/KWH, effective4/2007.

3 Large Power All demand: 5.25/KVA All usage: 4.030/KWH 300 KVA Basic charge: $80.00/mo.Primary Subject to a power cost adjustment.

Voltage Rate currently $0.00/KWH,effective 4/2007.

Page 24: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

23

IDAHOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Rocky Mountain Power 9 General May - October: 7.40/KW All usage: 3.0561/KWH 80 KW Customer charge: $282.89/mo.Service November - April: 5.60/KW to Delivery at 44KV or 69KV or greater.

(Formerly Pacific Corp.) High Voltage 15,000 KW

6 General May - October: 10.68/KW All usage: 2.9564/KWH Customer charge: $87.51/mo. primaryService November - April: 8.79/KW voltage, $29.17/mo. secondary voltage.Large Power Primary Voltage discount of $0.53/KW for

customer taking service at 2,300 volts orhigher; owns & maintains alltransformers & other equipment.

Prairie Power Cooperative Sold to Idaho Power Co.

Raft River Rural B Large All demand: 4.00/KW All usage: 3.600/KWH 50 KVA Minimum charge: $60.00/mo. Electric Coop. General Service

Salmon River Medium All demand: 1.52/KW All usage: 3.500/KWH 30 KW Customer charge: $581.00/mo. Electric Cooperative Commercial Discount available for delivery at

Service primary voltage. Subject to fuel costadjustment.

Large All demand: 2.76/KW All usage: 3.710/KWH 800 KW Customer charge: $10,595.42/mo.Commercial Service

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Agralite Small N/A All usage: Winter: 8.220/KWH <150 KVA Service charge: $45.00/mo. Cooperative Commercial Summer: 9.520/KWH

Multi-phase Service

LP Large Power All demand: 7.25/KW All usage: 4.130/KWH 150 KVA Service charge: $70.00/mo.Service

Alexandria Light CP Large All demand: 6.12/KVA All usage: 4.260/KWH 50 KVA Service charge: $22.40/mo. and Power Commercial Rate subject to a purchased power

Power cost adjustment.

Page 25: Electric Power - United States 2008

EP - U.S.

24C

opyright © 2008 InfoM

ine USA

, Inc.

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Alliant Energy General Winter: Summer: All usage: On-Peak: Off Peak: 20,000 KW Service First 200 KW: 9.98/KW 15.75/KW June - September: 1.935/KWH 1.235/KWH

Next 800 KW: 9.43/KW 15.66/KW October - May: 1.235/KWH 0.535/KWHNext 9,000 KW: 8.93/KW 15.48/KW

(Formerly Interstate Power Company) Next 20,000 KW: 8.80/KW 15.41/KWNext 30,000 KW: 7.46/KW 13.16/KW

Arrowhead Electric LP Large Power All demand: First 200 KWH/KW: 6.440/KWH 50 KW Minimum charge: $37.50/mo. Cooperative, Inc. Three-Phase June - August: 9.75/KW All additional: 4.440/KWH

September - May: 6.75/KW

TOD-LP Large Power Peak* 10.35/KW 3.100/KWH Minimum charge: $37.50/mo.Time-of-Day Off-Peak: 4.70/KW

*Peak: 6:00 P.M. - 10:00 P.M.

Benco Cooperative 06 Industrial All demand: 7.50/KW All usage: 3.300/KWH 25 KVA Customer charge: $125.00/mo.$.50/KW discount for service atprimary voltage. Subject topurchased power cost adjustment.

Beltrami Electric GS-6 General Service All demand: 7.25/KW All usage: 5.000/KWH 50 KW Customer charge: $68.00/mo. Cooperative Three-Phase Minimum charge: $136.00

2008 rate.

Brown County REA LP Large Power All demand: 7.20/KW All usage: 4.200/KWH 50 KW Service charge: $52.00/mo.Subject to power cost adjustment.Purchased cost adjustment$0.00/KWH, effective 12/2008.

Clearwater-Polk 5 Large Power All demand: 6.19/KWH All usage: 3.800/KWH 250 KVA Customer charge: $315.50 plus Electric Coop. $1.25/KVA greater than 45 KVA.

Customer is given prior notificationof demand period and can reduceload to zero to eliminate All demand:charges.

Page 26: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

25

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Connexus 2-2 General June - September: 10.80/KW First 200 KWH/KW: 5.230/KWH 25 KVA Basic service charge: $25.00/mo. Energy Commercial October - May : 6.85/KW Next 200 KWH/KW: 3.920/KWH $.15/KVA discount for delivery plus

Phase Service All additional: 3.380/KWH 1% discount for metering at primaryvoltage.

Cooperative Light & LP Large Power All demand: First 100 KWH/KW: 8.350/KWH 50 KVA $1.50 credit per KWH for all Power Assn. of Lake County June - August: 7.45/KW All additional: 6.050/KWH KWH used over 62,500.

September - May: 4.90/KW 2008 rate.

Crow Wing Coop. LP Large Power-30 All demand: 7.30/KW All usage: 4.300/KWH 50 KW Subject to purchased power cost Power & Light adjustment. New development credit

available, effective 10/2007.

Dakota Electric 46 General Service June - August: 9.15/KW First 200 KWH/KW: 4.930/KWH Facility charge: $25.00/mo. Association September - May: 6.05/KW Next 200 KWH/KW: 3.930/KWH Subject to purchased power cost

All Additional: 2.930/KWH adjustment.

54 General Service Peak demand: All usage: 3.100/KWH Fixed charge: $30.00/mo.Time-of-Day June - August: 16.45/KW $.15/KW discount for deliveryRate December - February: 10.15/KW plus 2% discount for metering at

March - April - May: 7.00/KW primary voltage. Subject toMaximum Demand: 4.20/KW purchased power cost adjustment.

*Peak: 4:00 P.M. - 11:00 P.M

East Central GS General Service All demand: First 400 KWH/KW: 4.600/KWH 50 KVA Service charge: $55.00/mo. Energy Association Service December - February: 11.00/KW All additional: 3.700/KWH to 2008 rate.

Three-Phase March - May: 8.00/KW 500 KVAJune - August: 18.00/KWSeptember - November: 8.00/KW

C & I Interruptible Peak* All usage: 3.600/KWH 200 KVA Facility charge: $90.00/mo. December - February: 14.40/KW 2008 rate.

March - May: 9.90/KWJune - August: 18.80/KWSeptember-November: 9.90/KWExcess demand: 3.90/KWBase demand: 5.00/KW

*Peak: 5:00 P.M. - 10:00 P.M

Federated REA 10 Multi-Phase All demand: 3.75/KW First 200 KWH/KW: 4.850/KWH 50 KVA Customer charge: $30.00/mo. Large Power All additional: 4.250/KWH to Energy charge increased by 5.5

500 KVA mills. Subject to purchased powercost adjustment.

Page 27: Electric Power - United States 2008

EP - U.S.

26C

opyright © 2008 InfoM

ine USA

, Inc.

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Freeborn-Mower 5 Three-Phase All demand: 5.10/KW All usage: 5.720/KWH 125 KVA Subject to cost of purchased power Electric Cooperative Large Service adjustment. Customer charge:

$60.00/mo. Peak alert scheduleavailable. 2006 rate.

Goodhue Company Large Power All demand: All usage: 6.000/KWH 50 KVA Facility charge: $35.00/mo. Coop. Electric Assn June - August: 9.20/KW Subject to purchased power cost

September - May: 7.00/KW adjustment. 2006 rate.

Itasca-Mantrap LP Large Power All demand: 5.25/KW First 100 KWH/KW: 7.600/KWH 7% discount of both demand and Cooperative All additional: 6.200/KWH energy charge at primary distribution Electrical Association voltage.

IS Industrial Coincidental demand: All usage: 1,000 KVA Consumer charge negotiated.

Service Summer: 17.76/KW On-Peak: 4.485/KWH Summer: June - August Winter: 13.58/KW Off-Peak: 2.927/KWH Winter: December - February Other months: 9.40/KW Other: September - November,

March - May.Non-coincidental demand: First 2,000 KW/mo. 3.20/KW All additional: 2.15/KW

LPIS Large Power Coincidental demand: All usage: 3.000/KWH 50 KW Fixed monthly charge: $1,080.00/yr. Interruptible Summer: 19.00/KW

Industrial Winter: 14.50/KWService Other months: 10.00/KW Summer: June - August

Winter: December - FebruaryNon-coincidental Other: September - November, demand: 4.00/KW March - May.

Kandiyohi Cooperative 20 Commercial All demand: All usage: 6.000/KWH 50 KVA Access charge: $42.00/mo. Electric Power Assn. Large June - August 13.65/KW Minimum monthly charge:

September - May 7.65/KW $41.00/mo. plus $0.75/KW greaterthan 50KW demand. 2006 rate.

Page 28: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

27

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Lake Country 45 Commercial All demand: 9.75/KW All usage: 4.700/KWH 50 KVA Fixed charge: $70.00/mo. Power Demand Service Maximum demand 1,000 KVA.

46 Commercial Peak: 11.00/KVA All usage: 4.700/KWH 50 KVA Fixed charge: $70.00/mo.Time-of-Day Off-Peak: 6.00/KVA Maximum demand 1,000 KVA.

Larger demand by contract.

Lake Region Electric General All demand: All usage: 25 KVA Customer Charge: $35.00/mo. Cooperative, Inc. Three-Phase Summer: 7.240/KWH Subject go power cost adjustment.

Winter:First 800 KWH: 6.140/KWHOver 800 KWH: 5.540/KWH

Lyon-Lincoln Electric 5 Commercial & All demand: 11.25/KW All usage: 4.400/KWH 50 KVA Customer charge: $45.00/mo. Cooperative, Inc. Industrial Subject to power cost adjustment.

2006 rate.

McLeod Cooperative 19 Large Power All demand: All usage: 5.150/KWH 75 KW Fixed charge: $120.00 Power Association June - August 9.60/KW to

September - May 6.50/KW 500 KW

Mille Lacs Electric LP Large Power All demand: 9.50/KW All usage: 3.620/KWH 75 KW Fixed charge: $50.00/mo. Cooperative Non-summer: 10.53/KW Subject to purchased power cost

Summer: 15.69/KW adjustment. Minimum charge:$50.00/mo. Primary voltage discount:$.15/KVA and 2% discount forprimary metering. 2006 rate.

Large Power Winter: All usage: 3.630/KWH 2,000 KW Fixed charge: $60.00/mo.Time-of-day December - February 13.16/KW Peak demand is demand coincident

Shoulder: with Great River Energy’s peak March - May demand. Maximum demand is the September - November 7.00/KW highest demand in the monthSummer: 2006 rate. June - August 17.26/KW

Maximum: 3.42/KW

Page 29: Electric Power - United States 2008

EP - U.S.

28C

opyright © 2008 InfoM

ine USA

, Inc.

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Minnesota Valley Coop B Three-Phase All demand: 5.30/KW Summer: 25 KW Service charge: $18.80/mo.Service First 2,000 KWH: 8.300/KWH 3% discount for delivery at primary

All additional: 7.500/KWH voltage.

Winter: Summer: June - SeptemberFirst 2,000 KWH: 7.600/KWH Winter: October - MayAll additional: 6.800/KWH

Large Power Rate 1,000 KVA Negotiated on an individual basis.

North Itasca TOD Large Power All demand: 14.36/KW All usage: 5.000/KWH 350 KVA Minimum charge: $1.00/KVA Electric Coop. LP TOD installed.

B Commercial Over 10 KW: 3.00/KW Summer: Monthly charge: $25.00/mo. and Industrial First 700 KWH: 9.200/KWH

Lighting & Power All additional: 8.200/KWH Summer: June - August

Winter:First 700 KWH: 8.200/KWHAll additional: 7.200/KWH

North Star Electric C Industrial & All demand: 7.81/KW First 100 KWH/KW: 8.000/KWH 50 KVA Customer charge: $57.78/mo. Cooperative Large Power All additional: 6.300/KWH Subject to power cost adjustment.

Otter Tail Power 602 Large General Secondary service: Secondary service: 50 KW Three year contract required. Company 603 Service First 100 KW: 8.65/KW First 360 KWH/KW: 3.066/KWH Subject to cost of energy

632 All additional: 7.30/KW All additional: 2.792/KWH adjustment.

Primary service: Primary service:First 100 KW: 8.20/KW First 360 KWH/KW: 3.004/KWHAll additional: 6.95/KW All additional: 2.737/KWH

Transmission service: Transmission service:First 100 KW: 7.80/KW First 360 KWH/KW: 2.944/KWHAll additional: 6.60/KW All additional: 2.682/KWH

People's Cooperative C Large All demand: All usage: 5.900/KWH 70 KVA Service charge: $55.00/mo. Power Association Commercial November - April 6.50/KW to Loads in excess of 300 KVA

and Industrial May - October 10.75/KW 300 KVAnegotiated individually.

Page 30: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

29

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

P.K.M. Electric 4 Large Power All demand: No charge* All usage: 6.300/KWH Oover Facility charge: $27.00/mo. Cooperative Service 150 KVA * In lieu of metered demand charges,

Three-Phase a monthly capacity charge of 1/12of 12% of the total investment inelectrical facilities will be billed. 2008 rate.

Red Lake Electric 2 Single & 3-Phase All demand: First 35,000 KWH: 75 KVA Facilities charge: $38.00/mo. Cooperative Service January - March: 8.00/KW January - March: 4.400/KWH

April - December: 5.00/KW April - December: 4.200/KWH

All additional:January - March: 4.100/KWHApril - December: 3.900/KWH

Renville-Sibley B Three-Phase All usage: 7.700/KWH Up to Customer charge: $35.00/mo. Cooperative Power Small 350 KVA Subject to purchased power cost Association Commercial Service adjustment. 2006 rate.

B-1 Three-Phase All demand: 8.90/KW All usage: 4.250/KWH 350 KVA Customer charge: $40.00/mo.Large Subject to purchased power cost

Commercial Service adjustment. 2006 rate.

Roseau Electric Class Large Demand: 5.75/KW All usage: 6.000/KWH 51 KVA Industrial rates available for Cooperative IV Commercial Plus installed KVA: 0.50/KVA to customers requiring more than

or Large Power 999 KVA 1,000 KVA.

Runestone Electric LP3 Large Power All demand: All usage: 4.900/KWH 50 KVA Subject to purchased power cost Association Service September -May: 6.10/KW adjustment. Three-Phase fixed

June - August: 9.50/KW charge: $21.00/mo. 2006 rate.

Sioux Valley - LP5 Large Power All demand: 7.30/KW First 450 KWH/KW: 3.800/KWH 50 KW Customer charge: $1.20/mo. Energy Service All additional: 3.800/KWH installed KVA.

South Central 7 Large Power All demand: 6.00/KW All usage: 5.700/KWH 37.5 KVA Service charge: $57.50/mo. Electric Association Service Subject to a power cost adjustment.

Multi-Phase

Stearns Electric 2 General Power Demand: All usage: Fixed charge: $35.00/mo. Association Three-Phase Summer: 10.00/KW Summer: 4.900/KWH Subject to purchased power

Other: 7.85/KW Other: 4.700/KWH adjustment clause.

Page 31: Electric Power - United States 2008

EP - U.S.

30C

opyright © 2008 InfoM

ine USA

, Inc.

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Steele-Waseca TP-03 Large Power All demand: 12.50/KW All usage: 5.10/KWH 100 KW Service charge: $85.00/mo. Cooperative Electric Rate Subject to purchased power cost

adjustment. 2008 rate.

Todd-Wadena LP Large Power All demand: 8.09/KW All usage: 4.900/KWH 50 KVA Facility charge: $63.00/mo. Electric Cooperative Service 2% discount available for metering at

primary voltage. Power costadjustment $0.00224/KWH. 2008 rate.

Traverse Electric D Multi-Phase & All demand: 11.55/KW All usage: 5.250/KWH Service charge: $42.00/mo. Cooperative Large Single Phase

Tri County Electric Small All demand: 6.00/KW All usage: 50 KVA Facility charge: $75.00/mo. plus Cooperative Commercial June - August: 7.250/KWH $5.50/10KVA greater than 50 KVA.

September - May: 6.500/KWH Demand based on lesser of KWHusage/40 or actual demand.

Industrial All demand: 9.00/KW All usage: 100 KVA Facility charge: $130.00/mo. plusJune - August: 5.000/KWH $5.50/10KVA greater than 100 KVA.September - May: 4.500/KWH

Wild Rice Electric L-P Large Power All demand: 6.50/KW Peak: 4.500/KWH Up to Facility charge: $28.50 per 50 KVA Cooperative Service Off-Peak: 350 KVA installed. Subject to cost of

Long Term: 3.500/KWH purchased power adjustment.Short Term: 4.800/KWH 2006 rate.

Wright-Hennepin CI Commercial All demand: First 400 KWH/KW: 4.200/KWH 25 KW Basic charge: $21.25/mo. Cooperative & Industrial June - September: 9.50/KW All additional: 3.400/KWH $.15/KW discount for service at Electric Assn. November - May 6.50/KW primary voltage. Subject to a power

cost adjustment.

Page 32: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

31

MINNESOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

XCEL Energy A14 General Secondary voltage: Customer charge: $22.00/mo.Service October - May: 6.81/KW All usage: 2.169/KWH Secondary voltage 208V - 2.4KV,

June - September: 10.15/KW Energy charge credit: 0.900/KWH primary voltage 2.4KV - 69KV, (Applies to all KWH > 400 KWH/KW) transmission transformed voltage

(Formerly Northern States Power) 2.4 - 69KV with company ownedVoltage discounts: Voltage discounts: transformers. Primary: 0.90/KW Primary: 0.070/KWHTransmission: 1.65/KW Transmission: 0.110/KWH Rates subject to fuel cost charge.

Currently $0.02103/KWH, effectiveTransformed Transferred 11/2007.transmission: 2.20/KW transmission: 0.160/KWH

A15 General Winter Summer All usage: 100 KW Customer charge: $25.00/mo. Time-of-Day Secondary voltage: 6.81/KW 10.15/KW On-Peak: 2.871/KWH Secondary voltage: 480V or higher.

Service Off-Peak: 2.20/KW 2.20/KW Off-Peak: 1.712/KWH Primary voltage: 2.4KV or higher.

Voltage discounts: Energy Discounts: Rates subject to a fuel cost Primary 0.90/KW 0.90/KW Primary: 0.070/KWH adjustment.Transmission 2.20/KW 2.20/KW Transmission: 0.160/KWHTransformed Transformed transmission: 1.65/KW 1.65/KW transmission: 0.110/KWH

MONTANASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Beartooth Electric Small All usage: 7.875/KWH 25 KVA Monthly charge: $26.25/mo. Cooperative Commercial

Large All demand: 8.35/KW All usage: 5.040/KWH Monthly charge varies.Commercial

Big Flat Electric GS General First 100 KW: 9.75/KW All usage: 6.400/KWH 50 KVA Base rate: $40.00/mo. Cooperative Service All additional: 14.00/KW 2006 rate.

Big Horn CI Commercial All demand: 5.25/KW First 200 KWH/KW: 10.066/KWH 45 KW Basic charge: $90.00/mo. plus Rural Electric Co. and Industrial Next 200 KWH/KW: 8.066/KWH $1.00/KVA.

All additional: 2.926/KWH

Page 33: Electric Power - United States 2008

EP - U.S.

32C

opyright © 2008 InfoM

ine USA

, Inc.

MONTANASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Fall River Rural 03 General Over 10 KW: 7.65/KW All usage: 4.605/KWH Customer charge: $45.00/mo. Electric Cooperative Service

Fergus Electric 50 Commercial Over 8 KW: 12.00/KW First 2,000 KWH: 7.355/KWH Base charge: $60.00/mo. Cooperative Large Power & Over 2,000 KWH: 5.355/KWH 2008 rate.

Multi-Phase Service

Flathead Electric 25 Large First 20 KW: 1.23/KW First 5,,000 KWH: 8.330/KWH 20 KW Basic charge: $72.00/mo. plus Cooperative General Next 80 KW: 2.90/KW Next 145,000 KWH: 7.900/KWH $1.23/KW demand. Applies to

Service All additional: 2.58/KW All additional: 6.800/KWH southern Montana service areas.(Border Loads Service Area)

45 Large All demand: 2.58/KW All usage: 6.550/KWH 20 KW Basic charge: $387.00/mo. plusIndustrial $1.23/KW. 1.5% discount forService metering at primary voltage.

$.15/KW discount for delivery atprimary voltage.

Flathead Electric 22 Large General All demand: 2.94/KW First 150,000 KWH: 4.400/KWH 100 KW Basic charge: $72.00/mo. plus Cooperative Service All additional: 3.700/KWH $1.23/KW. 1.5% discount for

metering at primary voltage. (Northwest Service Area) primary voltage.

48 Large All demand: 2.94/KW All usage: 3.600/KWH 1,000 KW Basic charge: $387.00/mo. plusIndustrial $1.23/KW load size. 1.5% discount Service for metering at primary voltage.

$.15/KW discount for delivery at primary voltage.

Glacier Electric 3 Small All demand: 1.25/KW First 10,000 KWH: 6.300/KWH Facilities charge: $20.00/mo. Cooperative Commercial All additional: 5.600/KWH Demand greater than 1,000 KW is

negotiated. 2007 rate.

Goldenwest Electric P-03 Three-Phase All demand: 12.50/KW All usage: 5.250/KWH 50 KVA 2008 rate. Cooperative

Page 34: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

33

MONTANASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Lincoln Electric D Large All demand: 5.26/KW All usage: 4.320/KWH 50 KVA Base charge: $37.00/mo. Cooperative Commercial Energy charge includes line and

Service transmission charges.

E Industrial All demand: 5.26/KW All usage: 4.320/KWH 1,000 KVA Base charge: $210.00/mo.Service Energy charge includes line and

transmission charges.

Marias River 3-96 General Over 10KW: 5.25/KW First 3,500 KWH: 5.500/KWH Base rate: $8.50/mo. Electric Cooperative Service All additional: 4.740/KWH

6-96 Large Power All demand: 6.25/KW All usage: 3.650/KWH 350 KW Minimum billing $1.00/demand of Service installed transformer KVA unless

negotiated otherwise.

McCone Electric B-3 Three-Phase Over 10 KW: 13.05/KW First 15,000 KWH: 4.700/KWH Base charge: $40.00/mo. Cooperative All additional: 3.750/KWH 5% discount for delivery at primary

voltage.

Mid-Yellowstone GS-3 Three-Phase All demand: No Charge First 1,500 KWH: 9.800/KWH Minimum charge: $47.00/mo. Electric Coop. General Service Next 3,500 KWH: 7.900/KWH

All additional: 7.200/KWH

Mission Valley General All demand: 4.10/KW All usage: 3.946/KWH 25 KW Basic charge: $42.50/mo. Power Services with Demand 2008 rate.

Large All demand: 5.00/KW All usage: 3.295/KWH 3,000 KW Basic charge: $127.50/mo.Commercial 2006 rate.

Missoula Electric Large Over 50 KW: 8.86/KW All usage: 3.570/KWH 50 KVA Customer charge: $37.10/mo. Cooperative Commercial

Industrial All demand: 7.77/KW All usage: 3.260/KWH 1,000 KVA Customer charge: $77.18/mo.Service

Montana-Dakota 30 Large All demand: At primary voltage: 50 KW Base rate: $25.00/mo. Utilities Company General At primary voltage: Summer: 5.248/KWH Primary voltage customers provide

Electric Summer: 6.00/KW Winter: 3.368/KWH own transformers at 2.4KV or Service Winter: 5.00/KW higher. Subject to fuel cost

At secondary voltage: At secondary voltage: adjustment. Summer: 6.15/KW Summer: 5.319/KWH Winter: 5.15/KW Winter: 3.439/KWH

Page 35: Electric Power - United States 2008

EP - U.S.

34C

opyright © 2008 InfoM

ine USA

, Inc.

MONTANASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Northern Electric B-2 Three-Phase All demand: 4.68/KW All usage: 7.500/KWH Service charge: $20.00/mo. Cooperative Service

B-3 Three-Phase All demand: 10.00/KW First 100,000 KWH: 9.000/KWH 300 KVA Basic charge: $30.00/mo.Large Power Service All additional: 7.300/KWH

Northern Lights 2 Large All demand: 5.50/KVA All usage: 5.030/KWH 300 KVA Basic charge: $50.00/mo. Commercial Economic development rate

Secondary available. Subject to power costadjustment, currently $0.00/KWH,effective 4/2007.

3 Large Power 5.25/KVA All usage: 4.030/KWH 300 KVA Basic charge: $80.00/mo.Primary Voltage Rate Subject to a power cost adjustment

of $0.00/KWH, effective 4/2007.

Northwestern 2 General Service All demand: 1.117357/KW All usage: 5.4447/KWH 50 KVA Service charge: $1,365.10/mo. Energy Transmission Level

2 General Service All demand: 1.572398/KW All usage: 5.4779/KWH 50 KVA Service charge: $210.95/mo. Substation Level

Park Electric Three-Phase First 3,000 KWH: 8.000/KWH Base rate: $24.50/mo.Cooperative, Inc. Commercial and Industrial All additional: 5.200/KWH

Ravalli County Three-Phase Over 35 KW: 4.60/KW First 10,700 KWH: 5.360/KWH Fixed charge: $41.50/mo. Electric Cooperative Service All additional: 3.860/KWH

Southeast Electric GS Commercial & All usage: 7.900/KWH Facility charge: $30.00/mo. Cooperative Industrial Service

Sun River Electric GS-2 Large First 20 KW: 0.00/KW All usage: 5.180/KWH 50 KVA Base rate: $24.00/mo. Cooperative Commercial All additional: 5.62/KW

GS-3 General All demand: 8.02473/KW All usage: 4.012/KWH Base rate: $1,000.00/mo. Service

(Transmission)

Tongue River LP Large Power All demand: 12.8413/KW First 50 KWH: 5.270/KWH 30 KW Minimum charge: $385.24/mo. Electric Cooperative Service All additional: 2.760/KWH

Page 36: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

35

MONTANASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Vigilante Electric GS Industrial All demand: 3.00/KW First 1,000 KWH: 5.500/KWH Transformer charge at $0.90/KVA Cooperative Three-Phase Next 19,000 KWH: 4.300/KWH but not less than $21.00/mo. or

Service All additional: 4.000/KWH greater than $90.00/mo. applies.2006 rate.

Yellowstone Valley Large All demand: 7.75/KW First 10,000 KWH: 6.300/KWH 50 KVA Monthly base charge: $50.00/mo. Electric Cooperative Commercial Next 25,000 KWH: 5.600/KWH

All additional: 5.120/KWH

NEVADASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Harney Electric Cooperative *Consult utility for current rates.

Lincoln County CI-I Commercial & All demand: 6.90/KW All usage: 2.780/KWH 50 KVA Customer charge: $26.00/mo. Power District #1 Industrial to

1,000 KVA

Mt. Wheeler Power LGS-C Large All demand: 6.50/KW All usage: 5.344/KWH 50 KVA Customer charge: $45.00/mo.General Service Peak schedule also available.

LGS-OP Industrial All demand: No charge All usage: 5.344/KWH 50 KVA Customer charge: $45.00/mo.for off peak usage.

Page 37: Electric Power - United States 2008

EP - U.S.

36C

opyright © 2008 InfoM

ine USA

, Inc.

NEVADASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Nevada Power LGS-2 Large Secondary voltage: Secondary voltage: 300 KW Customer charge: $162.80/mo. Company General Summer On-peak* 7.23/KW Summer On-peak* 10.895/KWH plus facilities charge of $2.85/KW -

Service Summer Mid-Peak: 0.53/KW Summer Mid-Peak: 9.456/KWH secondary, $255.80/mo. plus Summer Off-Peak: 0.00/KW Summer Off-Peak: 6.431/KWH $2.30/KW - primary, and Rest of year: 0.25/KW Rest of year: 6.919/KWH transmission voltage, $267.10/mo.

plus $0.44/KW. Subject to energy Primary voltage: Primary voltage: cost adjustment. Summer On-Peak* 7.75/KW Summer On-Peak* 10.110/KWH Summer Mid-Peak: 0.53/KW Summer Mid-Peak: 8.751/KWH Summer Off-Peak: 0.00/KW Summer Off-Peak: 6.386/KWH On-Peak*: June - September Rest of year: 0.24/KW Rest of year: 6.559/KWH 10:00 A.M.-7:00P.M.

Transmission voltage: Transmission voltage: Summer On-Peak* 7.75/KW Summer On-Peak* 9.740/KWH Mid-Peak: June - September Summer Mid-Peak: 0.53/KW Summer Mid-Peak: 8.468/KWH 10:00 A.M. - 1:00 P.M. and Summer Off-Peak: 0.00/KW Summer Off-Peak: 6.386/KWH 7:00 P.M. - 10:00 P.M. Rest of year: 0.24/KW Rest of year: 6.437/KWH

Deferred Charge: 0.000/KWHGreen Power: 0.071/KWH

LGS-1 Large All demand: All usage: 8.043/KWH Customer charge: $18.00/mo.General Facility charge: 3.54/KW Deferred charge: 0.000/KWH Subject to energy cost adjustment.Service-1 Demand charge: 2.00/KW Green Power: 0.071/KWH

Overton Power 8 Large All demand: 8.62/KW All usage: 6.300/KWH Customer charge: $22.00/mo. District No. 5 General Service 2006 rate.

Raft River Rural B Large All demand: 5.60/KW All usage: 2.700/KWH 50 KW Customer charge: $60.00/mo. Electric Cooperative General Service

Sierra Pacific GS-2 Medium All demand: 3.15/KW All usage: 10.103/KWH* 50 KW Customer charge: $18.00/mo. Power Company General to 1.25% - 2.5% discount for

Service 500 KW primary distribution. 5% - 10%discount for transmission voltagedelivery.

*Rate includes all adjustments. Facilities charge per KW of maximumdemand $6.03/mo.

GS-3 Large On-Peak* Summer: 7.03/KW Winter: Summer: 1,000 KW Customer charge: $495.00/mo.General Winter: 2.13/KW On-Peak: 10.777/KWH 10.652/KWH 1.25% - 2.5% discount for primaryService Mid-Peak** Winter: 1.61/KW Mid-Peak: 10.220/KWH N/A distribution. 5% - 10% discount for

Off-Peak: 7.207/KWH 7.208/KWH transmission voltage delivery.On-Peak*: Winter 5:01 P.M.-10:00 P.M. Facilities charge per KW of

Summer 10:01 A.M.-10:00 P.M. maximum demand $6.79/mo.

**Mid-Peak: 7:00 A.M.- 5:00 P.M. (Winter only)

Page 38: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

37

NEVADASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Valley Electric GS General All demand: 1.90/KW All usage: 6.703/KW 50 KW Facilities charge: $30.00/mo. Association Service Power cost adjustment of

$0.01908/KWH, effective 2/2006.

GS-TOD General All demand: 6.50/KW Summer: May - September 50 KW Facility charge: $30.00/mo., plus Service Summer On-Peak 7.703/KWH a $6.50 overhead charge. Power Time-of-Day Summer Off-Peak: 5.703/KWH cost adjustment of $0.01908/KWH,

effective 2/2006.Winter: October - April

Winter On-Peak: 7.703/KWH Summer Peak: 11:00 A.M.-8:00 P.M. Winter Off-Peak: 5.703/KWH Winter Peak: 6:00 A.M.-6:00 P.M.

Wells Rural 6 Large Power All demand: 6.00/KW All usage: 5.267/KWH 50 KVA Facility charge: $25.00/mo. Electric Service to Company 1,000 KVA

8 Commercial All demand: 5.50/KW All usage: 4.491/KWH 1,000 KVA Facility charge: $500.00/mo.Power Service to

5,000 KVA

NEW MEXICOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Central New Mexico 2 Commercial All demand: 18.32/KW All usage: 6.500/KWH 50 KVA System charge: $30.00/mo. Electric Cooperative Service Subject to fuel and purchased

power cost adjustment.

28 Industrial All demand: 16.66/KW All usage: 2.994/KWH System charge $100.00/mo.Service 2006 rate.

Central Valley 7 Large Power All demand: 3.00/KW First 150 KWH/KW: 4.175KWH 50 HP Minimum charge: $150.00/mo. Electric Cooperative Service All additional: 4.112KWH Subject to a cost of fuel adjustment.

Mega All demand: 4.00/KW All usage: 3.716/KWH 1,000 KW Minimum charge: $400.00/mo.

Page 39: Electric Power - United States 2008

EP - U.S.

38C

opyright © 2008 InfoM

ine USA

, Inc.

NEW MEXICOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Columbus Electric 5 Large Power All demand: 12.00/KW All usage: 5.200/KWH 50KVA Customer charge: $35.00/mo. Cooperative Service to Subject to cost of fuel and

350KVA purchased power adjustment.

Large Power Peak:* 13.50/KW Peak* 5.925/KWH 50 KVA Customer charge: $50.00/mo.Time-of-Use Non-Peak: No charge Non-Peak: 0.500/KWH to Subject to cost of fuel and

350 KVA purchased power adjustment.*Peak: 6:00 A.M. - 9:00 P.M.

6 Industrial All demand: 12.50/KW All usage: 4.441/KWH 350 KVA Customer charge: $35.00/mo.Service Subject to cost of fuel and

purchased power adjustment.

Continental Divide LPS Large Power Utility owned sub.: 14.00/KVA All usage: 4.180/KWH 50 KVA Customer charge: $40.00/mo. Electric Cooperative Service Consumer owned sub: 13.75/KVA Subject to fuel and purchased

power cost adjustment.

Duncan Valley Three-Phase First 15 KW: No charge All usage: 5.966/KWH 15 KVA System charge: $40.00/mo. Electric Cooperative Demand All additional: 10.00/KW

Service

Farmers Electric Large Power All demand: 5.60/KW First 300 KWH: 8.3957KWH 50 KVA Customer charge: $125.00/mo. Cooperative Service *All additional: 6.6295/KWH *Plus power cost recovery

$0.01/HWH.

Jemez Mountains 3 Large Power All demand: 11.50/KW All usage: 5.500/KWH 50 KVA Facilities charge: $85.00/mo. Electric Cooperative Service Energy charge is increased 5%

for service at secondary voltage.2006 rate.

Kit Carson Electric 4 Power Secondary service: 15.50/KW All usage: 3.560/KWH 50 KVA System charge: $30.00/mo. Cooperative Service Primary service: 15.00/KW Subject to purchased power cost

adjustment. 2006 rate.

IP Industrial 3,000 KVA Power costs determined by Power Service negotiated contract.

16 TOU On Peak: All usage: 3.580/KWH System charge: $46.67/mo.Power Service Primary service: 18.92/KW 2006 rate.

Secondary service: 19.42/KWOff-Peak: Primary service: 5.85/KW Secondary service: 6.35/KW

Page 40: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

39

NEW MEXICOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Lea County Electric 23 Petroleum & All demand: 4.40/KW All usage: 5.924/KWH 75 KW Customer charge: $100.00/mo. Electric Cooperative Industrial Monthly fixed charge: $30.17/mo.

for 7.2 KV primary voltage and$32.33/mo. for 14.4 KV primaryvoltage. Primary service delivery. Subject to a fuel and purchasedpower cost adjustment.

Mora-San Miguel 404 Power All demand: 12.00/KW All usage: 5.700/KWH 50 KVA System charge: $20.00/mo. Electric Cooperative Service Subject to a cost of purchased

power adjustment.

Navopache Electric B Commercial On-Peak* 7.25/KW All usage: 2.747/KWH 50 KVA Customer charge: Secondary Cooperative & Industrial Off-Peak: 7.20/KW Voltage - $155.00/mo.; Primary

Service - Voltage - $244.00/mo. 7% discountTime-of-Use for delivery at 14.4 KV and above.

Subject to a power cost adjustment.

On-Peak*: 6.00 A.M. - 9:00 P.M.

A Commercial All demand: 8.70/KW First 300 KWH/KW: 5.197/KWH 50 KVA Customer charge: Secondary& Industrial All additional: 2.747/KWH Voltage - $120.00/mo.; PrimaryService Voltage - $244.00/mo. 7% discount

for delivery at 14.4 KV and above.Subject to a power cost adjustment.

Northern Rio Arriba 05 Power All demand: 14.50/KW All usage: 3.100/KWH 50 KVA Customer charge: $30.00/mo. Electric Cooperative Service Subject to a purchased power cost

adjustment. 2006 rate.

Otero County Large All usage: Customer charge: $85.00/mo. Electric Cooperative Commercial On-Peak: 11.00/KW On-Peak: 7.000/KWH 50 KVA Subject to a fuel purchased power

Off-Peak: 5.25/KW Off-Peak: 5.979/KWH cost adjustment clause.

Plains Electric Generation Sells wholesale to members only, & Transmission Cooperative therefore has no rates.

Page 41: Electric Power - United States 2008

EP - U.S.

40C

opyright © 2008 InfoM

ine USA

, Inc.

NEW MEXICOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Public Service 3B General On-Peak: On-Peak* 50 KW Customer charge: $200.00/mo. or Company of Power Over 50 KW: 4.00/KW Summer - June - August: 11.923/KWH $232.50/mo. for summer use. New Mexico Service Summer: 4.65/KW Other - September - May: 9.388/KWH $.30/KW credit for consumer owned

Time-of-Use substation.(Bernalillo County, Off-Peak:Clayton, Deming, All usage: On-Peak*: Monday - FridayLas Vegas, Sandoval Summer- June - August: 3.747/KWH 8:00 A.M.-8:00 P.M. County, Santa Fe Other - September - May: 3.747/KWH County, ValenciaCounty)

4B Large Power On-Peak: On-Peak* 500 KW Customer charge: $5,090.00/mo. Service Over 500 KW: 10.18/KW Summer - June - August: 51.439/KWH to or $5,900.00/mo. for summer use.Time-of-Use Summer: 11.80/KW Other - September - May: 44.378/KWH 10,000 KW Seven year commitment required for

mine/mill operations. IncentivesOff-Peak: available for new economicAll usage: development. Summer - June - August: 29.585/KWH Other - September - May: 29.585/KWH On-Peak*: Monday - Friday 8:00 A.M.- 8:00 P.M.

5B Large On-Peak: On-Peak* 8,000 KW Customer charge: $57,840.00/mo. Service for Over 8,000 KW: 8.48/KW Summer - June - August: 50.721/KWH or $67,840.00/mo. for summer use. Mining Other - September - May: 43.204/KWH One year commitment required.

Customers Delivery at 12 KV or higher. Off-Peak: Incentives available for new All usage: economic development. Summer- June - August: 29.826/KWH Other - September - May: 29.826/KWH On-Peak*: Monday - Friday

8:00 A.M.- 8:00 P.M.

Roosevelt County 4 Demand Energy All demand: 7.75/KW All usage: 5.9476/KWH 37 KVA Subject to a fuel and purchased Electric Cooperative Service power cost adjustment. 2008 rate.

Sierra Electric Large Power All demand: 12.00/KW All usage: 5.360/KWH Service charge: $50.00/mo. Cooperative, Inc.

Socorro Electric LGE Large All demand: 12.00/KVA All usage: 5.560/KWH 50 KVA Subject to a fuel and purchased Cooperative Commercial power cost adjustment. Economic

dev. rates available. Customercharge: $35.00/mo.

Springer Electric 3 Large All demand: 8.00/KW All usage: 7.750/KWH 50 KVA Customer charge: $75.00/mo.Commercial Subject to a purchased power costService adjustment.

Large Industrial Industrial rates negotiated.

Page 42: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

41

NEW MEXICOSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Public Service Company 3 Large First 50 KW: 1,256.35/mo. First 300 KWH/KW: 5.502/KWH Subject to a fuel and purchased of New Mexico General All additional: 14.88/KW All additional: 4.758/KWH power cost adjustment. $1.25/KW

discount for primary service.(Alamogordo, Bayard,Lordsburg, Ruidoso,Silver City)

9 Industrial First 2,000 KVA: 13,400/mo. All usage: 7.440/KWH Delivery at 69 KV or above.Power All additional: 5.95/KVA Subject to a power cost adjustment.Service

Xcel Energy 614 General First 1000 KWH* 7.824/KWH Service charge: $10.00/mo.Service Next 6000 KWH: 4.018/KWH *Add 150 KWH for each KW

Next 6000 KWH: 2.905/KWH demand in excess of 10KW to this (Southwestern Public Service Company) All additional: 2.451/KWH block. Subject to a fuel cost

adjustment of $0.029544/KWH, effective 12/2007.

703 Large First 200 KW: 1,654.00/mo. First 230 KWH/KW: 2.505/KWH 1.5% discount for delivery at General All additional: 7.76/KW Next 230 KWH/KW: 2.205/KWH 12 KV or greater. Subject to a fuelService All additional: 2.095/KWH cost adjustment of $0.029544/KWH,

effective 12/2007.

NORTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Burke-Divide B1 Commercial First 10KW: No charge First 1,000 KWH: 9.700/KWH Subject to a cost of purchased Electric Coop. & Industrial All additional: 8.10/KW All additional: 5.400/KWH power adjustment. Base rate:

Lighting and Power $43.20/mo.

Capital Electric UC-2 Urban Over 10 KW: 6.50/KW First 2,000 KWH: 6.000/KWH 50 KW Customer charge: $23.00/mo. Cooperative, Inc. Commercial Next 8,000 KWH: 5.000/KWH Large loads are negotiable.

Att additional: 4.400/KWH 2005 rate.

Cass County 310 General All demand: 9.95/KW First 250 KWH/KW: 4.150/KWH 50 KW Subject to a cost of power Electric Service All additional: 2.950/KWH adjustment. Facility charge: Cooperative Three-Phase $100.00/mo. Time-of-use schedule

available.

Page 43: Electric Power - United States 2008

EP - U.S.

42C

opyright © 2008 InfoM

ine USA

, Inc.

NORTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Cavalier Rural All demand: 6.75/KW* First 1,500 KWH/KW: 0.000/KWH 50 KW *If load can be controlled over Electric Cooperative Next 200 KWH/KW: 5.100/KWH the system Peaks not to exceed

All additional: 4.700/KWH 400 hrs/yr, demand charge will beeliminated. Cost of poweradjustment of $0.0016/KWH,effective 7/2006.

Dakota Valley Three-Phase All demand: 6.73/KW First 150 KWH/KW: 5.510/KWH 51 KW 7% primary service discount. Electric Cooperative General Next 150 KWH/KW: 4.590/KWH Customer charge: $34.00/mo.

Service Rural All additional: 3.980/KWH Incentive rate available.

Three-Phase All demand: 8.61/KW First 150 KWH/KW: 4.640/KWH 151 KW Basic charge: $34.00/mo.Large Next 150 KWH/KW: 4.230/KWH Subject to a purchased power costCommercial Service All additional: 3.520/KWH adjustment.

Goldenwest Electric P-03 Three-Phase All demand: 12.50/KW All usage: 5.250/KWH 50 KVA Minimum charge $1.00/KVA or as Cooperative Service negotiated. 2006 rate.

KEM Electric T Multi-Phase All demand: 8.70/KW First 1,000 KWH: 7.100/KWH 50 KW 8% discount for delivery at primary Cooperative Service Next 2,000 KWH: 6.000/KWH voltage. Customer charge:

Next 2,000 KWH: 4.300/KWH $28.00/mo.All additional: 3.800/KWH

McLean Electric 50 General Over 15KW: 11.00/KW First 1500 KWH: 8.250/KWH Transformer capacity-over 15 KVA; Cooperative Service Next 1000 KWH: 6.600/KWH $.75 KVA/mo. 10% discount for

All additional: 4.840/KWH delivery at primary voltage. Customer charge: $31.00/mo.2006 rate.

Montana-Dakota 30 Large Primary: All usage: 50 KW 5% discount for delivery and Utilities Company General October - May 5.254/KW Primary: 3.255/KWH metering at primary voltages of

Electric June - September 8.254/KW Secondary: 3.336/KWH 2.4 KV or greater. Subject to a costService Secondary: of fuel adjustment $0.00842/KWH,

October - May 8.224/KW effective 10/06. Base rate: June - September 11.224/KW primary $90.00/mo.; secondary

$35.00/mo. Subject to a cost of fueladjustment of $0.0155/KW, effective10/2007.

39 Interruptible All demand: 2.25/KW All usage: 2.900/KWH 500 KW Base rate: negotiated. Subject to aLarge Power cost of fuel adjustment of

$0.0155/KWH, effective 10/2007.

Page 44: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

43

NORTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

MOR-GRAN-SOU 5 Large All demand: 7.05/KW First 3,000 KW: 6.700/KWH 50 KVA Base charge: $81.00/mo. Electric Cooperative Commercial Rate All additional: 5.000/KWH to

1,000 KVA

Mountrail-Williams C2 Large All demand: 11.00/KW All usage: 4.600/KWH 50 KW 2% discount on KWH for delivery at Electric Cooperative Commercial primary voltage of 7.2 KV or above.

& Industrial Base charge: $50.00/mo. for aninvestment by the Cooperative up to$3,750.00 or 50 KVA of transformercapacity, plus 15% per year foradditional investment. Subject to apurchased power adjustment. Williams and Mountrail cooperativesmerged.

Nodak Rural Electric 501-2 Commercial Coincidental demand charge Distribution Delivery: Distribution base rate: $97.00/mo. Cooperative Industrial Winter: 15.00/KW First 360 KWH/KW: 4.200/KWH for new loads. Substation

Summer: 9.75/KW All additional: 3.300/KWH negotiated.

Substation Delivery:All usage: 3.100/KWH

North Central C Large First 100 KWH: 14.000/KWH 25 KVA Discount for delivery at primary Electric Commercial Next 900 KWH: 7.700/KWH voltage. 2006 rate. Cooperative All additional: 6.300/KWH

Northern Plains Electric LP Large Power First 100 KW: 8.70/KW First 360 KWH/KW: 3.953/KWH 75 KW Facility charge: $22.00/mo.Service - All additional: 7.10/KW All additional: 3.066/KWH Northern Plains Electric was formedThree-Phase by the merger of Baker Electric and

Tri -County Electric.

Oliver-Mercer B Large Power Over 10 KW: 5.00/KW First 1,000 KWH: 5.800/KWH 50 KVA Base charge: $20.00/mo. Electric Cooperative All additional: 4.600/KWH Discount may apply if service

furnished at primary voltage.

Otter Tail Power 602 Large Secondary service First 700,000 KWH: 3.784/KWH 80 KW Three year contract required Company 603 General First 100 KW: 8.33/KW Excess up to 360 KWH/KW: 2.979/KWH Subject to a cost of energy

632 Service All additional: 6.80/KW All additional: 2.935/KWH adjustment.

Primary service First 100 KW: 8.04/KW All additional: 6.51/KW

Transmission service First 100 KW: 7.23/KW All additional: 5.65/KW

Page 45: Electric Power - United States 2008

EP - U.S.

44C

opyright © 2008 InfoM

ine USA

, Inc.

NORTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Sheyenne Valley Purchased by Nodak Electric. Electric Cooperative

Slope Electric LCR Large All demand: 9.00/KW First 200 KWH/KW: 5.900/KWH 25 KVA Base rate: first 75 KVA/mo., Cooperative Commercial-Rural All additional: 4.500/KWH $1.00/KVA, next 75 KVA/mo.,

$0.50/KVA, all additional $0.25/KVA.

Verendrye C1 Three-Phase All demand: 8.00/KW First 1,500 KWH: 7.100/KWH 50 KVA Service charge: $15.00/mo. Electric Coop. Service over 20KW: All additional: 4.500/KWH 2006 rate.

S1 Small Industrial All demand: 8.00/KW First 100 KWH/KW: 4.500/KWH 500 KVA Service charge: $25.00/mo.All additional: 3.000/KWH 2006 rate

West Plains Large Power Rates determined on a case by case Electric Corp. basis.

Williams Electric Merged with Mountrail Electric Cooperative Cooperative, see Mountrail-Williams.

Xcel Energy General Secondary voltage: All usage: 2.890/KWH* Customer charge: $15.40/mo.Service Winter: 6.62/KW Rates Subject to a fuel cost

(Northern States Power Company) Summer: 8.93/KW adjustment of $0.01720/KWH,effective 11/2007.

Voltage Discount/mo.Primary voltage: Winter: 0.55/KW Summer: 0.05/KWTransmission voltage: Winter: 1.65/KW Summer: 0.09/KW

Page 46: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

45

OREGONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Blachly-Lane County LP- Industrial Distribution demand: 2.77/KW All usage: 100 KVA Service charge: $550.00/mo. Coop. Electric Assn. 1-2002 101-1,000 KVA Power demand: 3.11/KW April - June: 2.350/KWH 6% discount for delivery at primary

July - March: 3.400/KWH voltage. Distribution and power Administrative: 0.390/KWH charges are added to determine

total electricity charges.

LP2-2002 Industrial Distribution demand: 3.52/KW All usage: 1,000 KVA Service charge: $2,000.00/mo. 1,000 KVA Power demand: 3.11/KW April - June: 2.350/KWH 6% adjustment for delivery at

July - March: 3.400/KWH primary voltage. 5/2006Administrative: 0.380/KWH

Central Electric B General First 15 KW: No charge First 15,000 KWH: 5.250/KWH 50 KW Customer charge: $65.00/mo. Cooperative Service All additional: 4.00/KW All additional: 4.550/KWH Subject to a fuel cost adjustment

factor. Use less than 350KW.

F Industrial First 15 KW: No charge First 15,000 KWH: 5.110/KWH Facility charge: $65.00/mo. Service All additional: 3.00/KW Next 385,000 KWH: 3.650/KWH 350 KW

All additional: 3.150/KWH

Central Lincoln PUD 300 Commercial All demand: 7.73/KW Summer: 2.693/KWH Basic charge: $90.96/mo.& Industrial Service Winter: 3.444/KWH 2006 rate.

350 Commercial All demand: 7.59/KW Summer: 2.380/KWH Basic charge: $446.73/mo.& Industrial Service Winter: 3.280/KWH At some points a delivery charge ofHigh Voltage $0.45/KWH is also levied. 2006 rate.

Clearwater Power 2-5 General Over 50 KW 5.68/KW First 15,000 KWH: 5.677/KWH 15 KVA Facilities charge: $15.00/mo. Company Service, Over 15,000 KWH: 4.350/KWH

Large Commercial

Columbia Basin 3 General All demand: 4.55/KW All usage: 3.124/KWH 30 KW Service charge: $67.00/mo. Electric Cooperative Service or Subject to a purchased power cost

Demand 9,000 KW adjustment clause. 2006 rate.

4 Primary All demand: 4.55/KW All usage: 3.90/KWH Delivery at 69 KV or above.Service 2006 rate.

Columbia Power Large All demand: 4.90/KW All usage: 5.600/KWH 50 KW Three-Phase power minimum Cooperative Commercial charge: $23.50/mo. per meter.

Page 47: Electric Power - United States 2008

EP - U.S.

46C

opyright © 2008 InfoM

ine USA

, Inc.

OREGONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Columbia Rural 3 General General First 10,000 KWH: 6.650/KWH 5% discount for delivery Electric Assn. Service Over 30KW: 4.90/KW All additional: at primary voltage. Subject

Three-Phase Time-of-day April - May: 4.220/KWH to cost of energy adjustment. Peak: 4.90/KW June: 3.900/KWH Basic charge: $35.00/mo. Off-Peak: 1.93/KW July: 4.000/KWH

August: 4.220/KWH For qualifying loads over 250KWSeptember - March: 4.320/KWH alternate Time-of-Day metering,

demand: On-Peak: 4.90/KWOff-Peak: 1.93/KW

Consumers Power 46 General Service All demand: 4.60/KW All usage: 4.948/KWH 100 KW Basic charge: $60.00/mo.Large Discount of $.0043/KWH for allThree-Phase KWH above 50% load factor.

All demand greater than 4,500KWrates negotiated.

Coos-Curry Electric 45-05 General All demand: 7.19/KW All usage: 4.280/KWH 30 KW Consumer charge: $83.00/mo. Cooperative 46-07 Demand Service Minimum charge of $3.890/KVA of

48-08 Three-Phase required transformer capacity. 5% discount for primary distributionwhere customer maintains and ownsfacilities.

Douglas Electric 2 General Service Over 30 KW: 5.75/KW First 100 KWH/KW: 7.450/KWH Multi-Phase Customer charge: Cooperative Next 250 KWH/KW: 7.100/KWH $25.00/mo.

All additional: 6.100/KWH

5 Commercial & All demand: 5.75/KW First 100 KWH/KW: 6.800/KWH 500 KVA Minimum charge: $2.20/KVA.Industrial Power Next 275 KWH/KW: 5.550/KWH

All additional: 5.400/KWH

6 Large All demand: 5.75/KW First 250 KWH/KW: 6.500/KWH 1,000 KVA Minimum charge: $2.20/KVA.Industrial All additional: 5.500/KWH

Emerald People's 25T General All demand: 3.39/KW All usage: 2.270/KWH 50 KW Basic charge: $28.00/mo. Utility District Service Distribution: 3.630/KWH to Subject to a power cost adjustment

Poly-Phase 1,000 KW factor.

48T Industrial Demand: Energy Basic charge: $85.00/mo.Service October: 3.07/KW October: 2.214/KW 1,000 KW + Demand is determined monthly,

November - January: 3.44/KW November - January: 2.829/KW Energy and distribution cost vary by February - June: 2.95/KW February - June: 2.091/KW customer. Subject to a BPA July - September: 3.44/KW July - September: 3.198/KW adjustment.

Distribution Customer 1: 2.030/KWH Customer 2: 4.210/KWH

Page 48: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

47

OREGONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Eugene Municipal G-2 Medium Primary Service: 5.85/KW All usage: 31 KW Basic charge: 28.25/mo. for Utilities Water General Secondary Service: 6.00/KW Primary: 4.090/KWH secondary and $1,725.00 for primary & Electric Board Service Secondary: 4.164/KWH service.

G-3 Large Primary Service: All usage: 501 KW Basic charge: $2,150.00/mo. forGeneral Service First 300 KW: 0.00/KW Primary: 3.432/KWH secondary and $2,086.00/mo. for

Over 300 KW: 6.25/KW Secondary: 3.511/KWH primary service. Energy chargeSecondary Service: includes BPA surcharge. First 300 KW: 0.00/KW Over 300 KW: 6.45/KW

Harney Electric Cooperative *Consult utility for current rates.

Hood River Electric 2 Commercial & All demand: 4.80/KW All usage: 3.54/KWH 50 KVA Energy and demand 5% discount Cooperative Industrial Power for delivery at primary voltage.

Idaho Power Company 9 Large General All demand: All usage: 30 KW Customer charge: Service Secondary: Secondary: Secondary Service:

Summer: 4.51/KW Summer: 3.2306/KWH $15.00/mo. plus $0.38/KW. Non-Summer: 4.12/KW Non-Summer: 2.9232/KWH

Primary Service:Primary: Primary: $125.00 plus $0.78/KW. Summer: 4.26/KW Summer: 2.2917/KWH Non-Summer: 3.86/KW Non-Summer: 2.0646/KWH Transmission Service:

$125.00 plus $0.41/KW. Transmission: Transmission: Summer: 4.12/KW Summer 2.2406/KWH Power cost adjustment of Non-Summer: 3.74/KW Non-Summer: 2.0186/KWH $0.004116/KWH, effective 8/8/2005.

19 Large All demand: All usage: On-peak: Mid-Peak Off-Peak 1,000 KW Discount for service taken at 44 KV General Service Secondary: Secondary: to or above. Customer charge:

Summer: 4.01/KW Summer: 3.3657/KWH 3.1978/KWH 2.9805/KWH 25,000 KW Winter: 3.96/KW Winter: --- 3.1187/KWH 2.7836/KWH Secondary Service:

$125.00/mo. plus $0.38/KW.Primary: Primary: Summer: 3.90/KW Summer: 2.4567/KWH 2.2175/KWH 2.0667/KWH Primary Service: Winter: 3.86/KW Winter: --- 2.0530/KWH 1.9587/KWH $125.00 plus $0.78/KW.

Transmission: Transmission: Transmission Service: Summer: 3.52/KW Summer 2.4131/KWH 2.1780/KWH 2.0300/KWH $125.00 plus $0.41/KW. Winter: 3.76/KW Winter: --- 2.0092/KWH 1.9169/KWH

Power cost adjustment $0.004116/KWH, effective 8/8/2005.

Page 49: Electric Power - United States 2008

EP - U.S.

48C

opyright © 2008 InfoM

ine USA

, Inc.

OREGONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Lane Electric GS-3 General Over 50 KW: 5.05/KW All usage: 2.750/KWH 50 KW Basic charge: $60.00/mo. 7% Cooperative Service Distribution: discount for service at primary

Three-Phase First 10,000 KWH 4.910/KWH voltage. 2006 rate. Next 50,000 KWH 2.710/KWH All additional: 1.400/KWH

Midstate Electric Commercial Over 25 KW: 5.75/KW First 5,000 KWH: 5.080/KWH 5% discount for service at primary Cooperative All additional: 4.270/KWH voltage. Facility charge: $48.00/mo.

Northern Wasco 250 Demand All demand: 3.96/KW First 50,000 KWH: 3.430/KWH 50 KW Facilities charge: $50.00/mo. County PUD Rate All additional: 3.214/KWH Primary service discount available.

300 Primary All demand: 3.84/KW First 50,000 KWH: 3.200/KWH 50 KW Facilities charge: $50.00/mo.All additional: 3.139/KWH

Oregon Trail G2 Large All demand: 4.25/KW All usage: 4.610/KWH 50 KVA Customer charge: $32.00/mo. Electric Commercial Subject to a BPA cost recovery

adjustment of $(0.00170)KWH,effective 10/2008.

LP Large All demand: 4.25/KW All usage: 3.947/KWH 1,000 KVA Customer charge: $32.00/mo.Power Service Subject to a BPA cost recovery

adjustment of $(0.00170)KWH,effective 10/2008.

Pacific Power 28 General All demand: Secondary: 0.259/KWH Up to Basic charge: Service Secondary: 2.21/KW Primary: 0.044/KWH 1,000 KW Secondary:

Primary: 2.87/KW 51-100KW $22.00/mo. 101-300KW $52.00/mo.

Load size charge: Transmission charge: greater than 300KW $75.00/mo. Secondary: Secondary: 1.250/KWH 51-100 KW: 0.60/KW Primary: 1.230/KWH Primary: 101-300 KW: 0.35/KW 51-100KW $28.00/mo. > 300 KW: 0.25/KW 101-300KW $66.00/mo.

greater than 300KW $94.00/mo. Primary: 51 - 100 KW 0.75/KW 101-300 KW: 0.40/KW > 300 KW: 0.25/KW

(continued next page)

Page 50: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

49

OREGONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Pacific Power 48 Large General All demand: Transmission & Ancillary 1,000 KW Basic charge: (continued) Service Secondary: 1.31/KW On-peak: Facility capacity less than 4,000KW Primary: 1.43/KW Secondary: 1.510/KWH Secondary: $310.00/mo.

Transmissions: 0.78/KW Primary: 1.590/KWH Primary: $270.00/mo. Transmissions: 1.940/KWH Transmission: $260.00/mo.

Facility charge: Reactive Power Charge Facility capacity greater than 4,000KWCapacity greater than 4,000KW Secondary: 0.650/KVAR Secondary: $580.00/mo. Secondary: $1.60KW Primary: 0.600/KVAR Primary: $480.00/mo. Primary: $0.80KW Transmissions: 0.550/KVAR Transmission: $480.00/mo. Transmission: $0.45KW

Capacity less than 4,000KW Secondary: $1.75KW Primary: $0.85KW Transmission: $0.45KW

Portland General 89-S Large Distribution: All usage: 1,000 KW Basic charge: $130.00/mo. Electric Company Non-residential First 1,000 KW: 1.86/KW System charge: 0.420/KWH Alternative pricing plans available

Secondary All additional: 0.37/KW On-Peak 6.071/KWH based on daily, monthly, or annualVoltage Transmission: 0.66/KW Off-Peak: 5.021/KWH energy costs.

89-P Large Distribution: All usage: 1,000 KW Customer charge: $230.00/mo.Non-residential First 1,000 KW: 1.73/KW System charge: 0.352/KWH Alternative pricing plans availablePrimary voltage All additional: 0.24/KW On-Peak 5.832/KWH based on daily, monthly, or annual

Transmission: 0.66/KW Off-Peak: 4.833/KWH energy costs.

89-T Large Distribution: All usage: 1,000 KW Basic charge $1,000.00 Non-residential First 1,000 KW: 1.73/KW System charge: 0.325/KWH Alternative pricing plans availableSub-transmission All additional: 0.24/KW On-Peak: 5.732/KWH based on daily, monthly, or annual

Transmission: 0.66/KW Off-Peak: 4.754/KWH energy costs.

83 Large Transmission: 0.66/KW All usage: Customer charge:Non-residential Distribution: Energy charge: 5.665/KWH 30 KW Secondary: $25.00/mo.Standard Secondary: System charge: 0.431/KWH Primary: $90.00/mo.

First 30 KW: 3.53/KW All additional: 4.82/KW

Primary: Transmission: 0.66/KW All usage: 5.454/KWH Distribution: 4.08/KW System charge: 0.364/KWH

Page 51: Electric Power - United States 2008

EP - U.S.

50C

opyright © 2008 InfoM

ine USA

, Inc.

OREGONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Surprise Valley A Large Power All demand: 5.14/KW All usage: 4.040/KWH 50 KVA Subject to wholesale power cost Electrification Service adjustments. Basic customer Corporation charge $10.00/mo.

Tillamook G-2 General Over 50 KW: 3.80/KW First 12,000 KWH: 6.350/KWH Basic charge: $35.00/mo. People’s Utility District Service All additional: 4.100/KWH 10% discount for months

October - April.

LP-3 Large Power Primary Secondary All usage: 1,000 KVA Minimum charge: $3,000/mo.Service Heavy Load: 4.70/KW 4.90/KW Primary: 3.530/KWH

Intermediate: 2.70/KW 2.90/KW Secondary: 3.590/KWH Heavy Load:Light Load: 1.00/KW 1.20/KW Monday - Saturday

7:00 A.M. - 10:00 P.M.

Intermediate Load: Monday - Saturday7:00 A.M. - 10:00 P.M.2006 rate.

Umatilla Electric 4 Large Over 20 KW: 4.50/KW All usage: 100 KW Time-of-day metering is available. Cooperative Commercial On-Peak: 4.370/KWH Customer charge: $35.00/mo.

Night-time: 4.300/KWH An availability charge is also levied$0.76/KW of max demand in last 18months.

5 Industrial High Load All usage: 1,000 KW Availability charge: $0.68/KW Service Hour demand: 4.50/KW On-Peak: 3.950/KWH demand included.

Night-time: 3.880/KWH Basic charge: $200.00/mo.High load hour demand is between4am to 9pm. M - Sat.

Wasco Electric Small Over 15 KW: 6.90/KW All usage: 6.500/KWH Basic charge: $20.00/mo. Cooperative Commercial 2006 rate.

Industrial All demand: 6.50/KW All usage: 4.000/KWH 100 KW 2006 rate.Service

West Oregon Electrical 3 Large 0 - 25 KW: 0.00/KW First 30,000 KWH: 8.450/KWH Facility charge: $75.00/mo. Cooperative Commercial & All additional: 5.50/KW All additional: 5.500/KWH

Industrial Service

Page 52: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

51

SOUTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Black Hills Electric 2 General - All demand: 6.75/KW First 4000 KWH: 7.500/KWH 50 KVA Customer charge: $40.00/mo. Cooperative Three-Phase Next 4000 KWH: 4.200/KWH Subject to cost of purchased power

All additional: 3.900/KWH adjustment factor. 5% primary service discount.

Black Hills Power GS-15 Commercial & First 5 KW: No Charge First 1,000 KWH: 9.330/KWH Service charge: $10.00/mo. & Light Company Industrial Next 45 KW: 5.41/KW Next 2,000 KWH: 8.080/KWH

General All additional: 5.10/KW Next 12,000 KWH: 7.150/KWHService All additional: 5.850/KWH

GL-14 General On-Peak: First 50,000 KWH: 4.720/KWH 125 KVA Substation ownership discount:Service First 125 KVA: 970.00/mo. Next 450,000 KWH: 4.610/KWH $.25/KVA for transmissionLarge All additional: 6.20/KVA All additional: 4.250/KWH voltage; $.15/KVA for primary

voltage. Subject to energy costOff-Peak: adjustment.All additional: No charge

IC-15 Industrial On-Peak: All usage: 500 KVA Transmission service charges applyContract Transmission: 5.45/KVA Transmission: 3.658/KWH when power delivered at 69 KV,Service Distribution: 5.78/KVA Distribution: 3.910/KWH distribution charges apply when

power is delivered at less thanOff-Peak: 69 KV.All additional: No charge

Bon Homme Yankton 50-8 Industrial Non-coincidental: 12.60/KW Standard: 4.000/KWH 350 KVA Subject to purchased power cost Electric adjustment. Association

Butte Electric 50 Large All demand: 9.00/KW 100 KWH/KW: 8.800/KWH 50 KW Subject to wholesale power Cooperative Commercial All additional: 5.400/KWH adjustment. 2008 rate.

Three-Phase

Cam Wal Electric A-P Three-Phase 8.50/KW All usage: 4.800/KWH Basic charge: $59.20/mo. Cooperative Service Subject to cost of purchased power

adjustment factor.

Central Electric General All demand: No charge First 600 KWH: 9.900/KWH 50 KW Facilities charge: $12.00/mo.Service Next 600 KWH: 8.600/KWH 2006 rate.

(Formerly Intercounty All additional: 5.410/KWH Electric Association)

Commercial Coincidental: 12.00/KW First 600 KWH: 9.900/KWH 500 KW Basic charge: $36.00/mo.Three-Phase Non-coincidental: 9.00/KW Next 600 KWH: 8.600/KWH 2006 rate.

All additional: 5.400/KWH

Page 53: Electric Power - United States 2008

EP - U.S.

52C

opyright © 2008 InfoM

ine USA

, Inc.

SOUTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Charles Mix E-10 Three-Phase All demand: 11.00/KW First 150 KWH/KW: 6.900/KWH Non-coincident rates are available. Electric Association Large Commercial All additional: 4.500/KWH 2008 rate.

& Industrial

Cherry-Todd Electric GS-1 Three-Phase All demand: 7.00/KW 1st 40,000 KWH: 3.700/KWH 100 KW 6% discount for delivery at primary Cooperative Commercial All additional: 3.600/KWH voltage. Subject to cost of

& Industrial purchased power adjustment.Minimum charge: $32.50/mo.

Clay-Union Electric L-CD Large Power Coincidental KW: 12.80/KW First 100 KWH/KW: 6.500/KWH 50 KVA 5% discount for delivery at primaryService All additional: 2.600/KWH voltage. Facilities charge:Coincidental $60.00/mo. 2006 rate.Demand

Dakota Electric 46 General All demand: First 200 KWH: 4.930/KWH Fixed charge: $25.00 Association Service June - August: 9.15/KW Next 200 KWH: 3.930/KWH Discount of $0.15/KW of Billing

Other months: 6.05/KW Over 400 KWH: 2.930/KWH Demand when service taken by theconsumer at the available primaryvoltage. Also additional discount forprimary metering.

Douglas Electric 2A Commercial & All demand: 9.25/KW First 200 KWH/KW: 6.000/KWH Minimum charge: $1.65/KVA Cooperative Industrial All additional: 4.600/KWH demand/mo.

Off-Peak option Peak: 9.25/KW First 200 KWH/KW: 6.000/KWH Minimum charge: $1.65/KVA Off-Peak: 6.00/KW All additional: 4.600/KWH demand/mo.

FEM Electric Assn Large Over 10 KW: 7.50/KW First 100 KWH: 19.590/KWH 10 KW Subject to purchased powerCommercial Next 900 KWH: 8.430/KWH adjustment clause. 2006 rate.Three-Phase All additional: 5.000/KWH

Grand Electric *Consult utility for current rates. Cooperative

H-D Electric 4 Commercial & All demand: 8.50/KW First 2,000 KWH: 6.400/KWH Customer charge: $30.00/mo. Coop., Inc. Industrial Lighting All additional: 5.750/KWH 2006 rate.

and Power

Kingsbury Electric Commercial First 2,000 KWH: 7.100/KWH Service charge: $50.00/mo. Cooperative & Industrial All additional: 5.900/KWH

Page 54: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

53

SOUTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

LaCreek LP Large All above 10KW 7.00/KW First 100 KWH/KW: 6.500/KWH Customer charge: $32.50/mo. Electric Power Next 200 KWH/KW: 5.100/KWH Subject to purchased power Association All additional: 4.500/KWH adjustment charge. 2008 rate.

Lake Region Electric 3 Large All demand: 11.50/KW First 100 KWH/KW: 5.800/KWH 50 KVA Subject to purchased power Association Three- Phase All additional: 3.750/KWH adjustment clause. Customer

charge: $36.00/mo.

Southeastern Electric 6 Large Power All demand: 7.50/KW First 100 KWH/KW: 4.700/KWH 100 KW Merged with Southeast Electric. Cooperative Service All additional: 2.900/KWH McCook has separate rate schedules

for now. 2006 rate.

Montana-Dakota 30 Large General All demand: 5.00/KW First 2,000 KWH: 6.262/KWH 50 KW Base rate: $15.00/mo. Utilities Company Electric Next 8,000 KWH: 4.937/KWH 5% discount for primary service.

Service All additional: 4.467/KWH Fuel cost adjustment of$0.00917/KWH, effective 10/2007.

33 Large General Primary Voltage Primary Voltage 50KW Base rate: $17.00/mo. Electric Service On-Peak: 4.75/KW On-Peak: 6.296/KWH Purchased fuel cost adjustment

Optional Off-Peak: 1.80/KW Off-Peak: 2.032/KWH cost adjustment. $0.009171/KWH, Time-of-Day effective 10/2007.

Secondary Voltage Secondary Voltage On-Peak: 5.00/KW On-Peak: 7.007/KWH *Peak: Off-Peak: 1.90/KW Off-Peak: 2.269/KWH Monday - Friday

8:00 A.M. - 10:00 P.M.

Moreau-Grand LC Large All demand: 3.20/KW First 200 KWH/KW: 6.000/KWH 50 KW Customer charge, three-phase: Electric Cooperative Commercial Next 200 KWH/KW: 4.000/KWH $50.00/mo.

All additional: 3.000/KWH

Niobrara Electric LP Large Power All demand: 20.20/KW All usage: 4.071/KWH 50 KVA 7% discount for delivery at primary Association Service voltage. Facilities charge:

$237.00/mo. Special contracts forinterruptible power available. 2006 rate.

Northern Electric 23C-1 Commercial All demand: 9.00/KW First 300 KWH: 6.600/KWH 30 KW Subject to cost of power adjustment. Cooperative All additional: 3.800/KWH 2006 rate.

25C-2 Large All demand: 10.00/KW First 10,000 KWH: 3.700/KWH 100 KW Subject to cost of power adjustment.Commercial All additional: 2.800/KWH Demand is measured during “Peak”

hours only. 2006 rate.

On-Peak*: 7:00 A.M.- 9:00 P.M.

Page 55: Electric Power - United States 2008

EP - U.S.

54C

opyright © 2008 InfoM

ine USA

, Inc.

SOUTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Northern States E15 General All demand: All usage: 3.090/KWH Customer charge: $15.25/mo. Power Company Service October - May: 6.74/KW A credit of $0.0055/KWH applies to (Xcel Energy) June - September: 9.35/KW all usage greater than 360 times

demand. Current fuel clauseVoltage discounts: Discounts: adjustment of $0.01236/KWH, Primary: 0.80/KW Primary: 0.060/KWH effective 11/2007.Transmission Transformed: 1.50/KW Transmission Transformed: 0.090/KWHTransmission: 2.05/KW Transmission: 0.120/KWH

E16 General October - May: All usage: Customer charge: $18.25/mo.Time-of-Day On-Peak: 6.74/KW On-Peak: 3.56/KWH Discounts available for receiving

Off-Peak: 2.05/KW Off-Peak: 2.67/KWH power at primary voltage. A creditof $0.0055/KWH applies to all usage

June - September: greater than 360 times demand. On-Peak: 9.35/KW Current fuel clause adjustment Off-Peak: 2.05/KW $0.01236/KWH, effective 11/2007.

Voltage discounts: Discounts:Primary: 0.80/KW Primary: 0.060/KWHTransmission Transformed 1.50/KW Transmission Transformed: 0.090/KWHTransmission: 2.05/KW Transmission: 0.120/KWH

Northwestern Public 34 Large First 100 KW: 6.13/KW First 100 KWH/KW 3.258/KWH 2% discount for metering at primary Service Company Commercial Next 400 KW: 5.43/KW Next 300 KWH/KW 1.558/KWH voltage. Rider to this schedule

& Industrial All additional: 4.73/KW Next 100 KWH/KW 1.058/KWH available for new loads of 5KW orService All additional: 0.558/KWH above, giving a 30% discount on

demand plus bonus discounts of20%, 30%, 40%, and 50% basedupon achieved load factors of 50%,60%, 70%, and 80% respectively.

Oahe Electric C-50 Large All demand: 8.00/KW First 150 KWH/KW: 5.400/KWH 50 KVA Subject to power cost adjustment Cooperative Commercial All additional KWH/KW: 4.300/KWH factor. Monthly minimum:

$1.00/KVA.

Otter Tail Power 602 Large Secondary service: Secondary Service: Customer charge: $25.50/mo. Company 603 General First 100 KW: 7.05/KW First 360 KWH/KW: 3.415/KWH Subject to cost of fuel adjustment.

Service All additional: 5.15/KW All additional: 2.498/KWH

Primary service: Primary Service: First 100 KW: 6.75/KW First 360 KWH/KW: 3.362/KWH All additional: 4.85/KW All additional: 2.449/KWH

Rosebud Electric LP Large Power All demand: 5.00KW All usage: 3.000/KWH 150 KVA Capacity charge: $2.00 per installedKVA. 2006 rate.

Page 56: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

55

SOUTH DAKOTASched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Sioux Valley LP Large Power Over 50 KW: 7.30/KW First 450 KWH/KW: 3.800/KWH 50 KW Facility charge: $1.20/mo. Installed Southwestern Service All additional: 2.800/KWH KVA. $.0005/KWH discount for

service at primary distribution voltage. Subject to cost of wholesalepower adjustment.

Southeastern Electric GS- General Service 8.50/KW First 200 KWH/KW: 3.900/KWH 40 KW Facility charge: $50.00/mo. Cooperation, Inc. 3LP Subject to a purchased power cost

adjustment. 2006 rate.

OPS- Off-Peak Service All usage: 2.800/KWH 40 KW Facility charge: $70.00/mo3LP Three-Phase Coincidental demand: 13.50/KW Special metering charge: $20.00/mo.

Large Power Maximum demand 1.60/KW 2006 rate.

Union County Multi-Phase Coincidental demand: 14.80/KW First 100 KWH: 6.500/KWH Facilities charge: $150.00/mo. Electric Cooperative Service All additional: 2.600/KWH

West Central 3 Commercial First 150 KWH: 20.000/KWH 2006 rate. Electric Cooperative Next 2,350 KWH: 9.200/KWH

All additional KWH: 6.000/KWH

7 Large Commercial First 150 KWH: 20.000/KWH Large loads are negotiated.Next 2,350 KWH: 9.000/KWH 2006 rate.Next 2,500 KWH: 7.500/KWHAll additional: 6.000/KWH

West River Electric A General Over 25 KW: 7.50/KW First 650 KWH: 9.600/KWH 50 KVA Subject to cost of purchased Association Service Next 9,350 KWH: 6.900/KWH power adjustment. $36.00/mo.

Commercial & Industrial Next 30,000 KWH: 5.900/KWH for service over 50 KVA to 250 KVA,All additional: 4.300/KWH $60.00/mo. for service over

250 KVA.

Whetstone Valley Multi-Phase Coincidental demand: 7.00/KW First 3,000 KWH: 7.000/KWH 50 KVA Base charge: $50.00/mo. Electric Cooperative Next KWH; up to 2008 rate.

200 x non-coincidental 5.000/KWHAll additional: 3.700/KWH

Page 57: Electric Power - United States 2008

EP - U.S.

56C

opyright © 2008 InfoM

ine USA

, Inc.

UTAHSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Bridger Valley LP Large Power All demand: 11.85/KW All usage: 2.7862/KWH up to Customer charge: $70.00/mo. Electric Association 350 KW 2008 rate.

LPS Large Power All demand: 12.85/KW All usage: 2.7363/KWH 350 KW Customer charge: $130.00/mo. to 2008 rate.2,000 KW

LP2000 Large Power All demand: 10.13/KW All usage: 2.3139/KWH 2,000 KVA Customer charge: negotiated.2008 rate.

Dixie Escalante Large All demand: 8.00/KW All usage: 2.200/KWH 50 KW Customer charge: $30.00/mo. Rural Electric Commercial to Over 500KW available by special Cooperative 500 KW contract. 2005 rate.

Empire Electric LP Large Power All demand: 5.85/KW First 200 KWH/KW: 9.210/KWH 37.5 KW Monthly charge: $182.25/mo. Association Service Next 200 KWH/KW: 6.760/KWH

All additional: 3.611/KWH

LP Coincidental demand: 5.85/KW All usage: 3.442//KWH $23.56 demand charge per KW/mo.Peak billing demand.

Garkane Power General All demand: 5.50/KW All usage: 1,000 KW Base rate: $15.00/mo. Association Service No. 1 First 5,000 KWH: 5.500/KWH Subject to a cost of purchased

Over 5,000 KWH: 4.500/KWH power adjustment.

General Over 5 KW: 5.50/KW All usage: 5.500/KWH 50 KVA Base rate: $30.00/mo.Service - No. 2 to Subject to a cost of purchased

1,000 KVA power adjustment.

Moon Lake Electric LP Large Power All demand: 11.00/KW All usage: 3.720/KWH 50 KVA Customer charge: $29.00/mo. Association Service

IS-2 Industrial All demand: 11.00/KW All usage: 3.140/KWH 50 KVA Customer charge: $2,198/mo.Service Delivery at primary voltage of

4.16 KV, 12.5 KV, or 24.9 KV.

Mt. Wheeler Power LGS-C Large All demand: 6.50/KW All usage: 5.344/KWH 50 KVA Customer charge: $45.00General per meter per month.

Page 58: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

57

UTAHSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Pacific Corp. 6 General All demand: All usage: Up to Customer charge: $25.00/mo. (Rocky Mountain Power) Service May - September 13.91/KW May - September: 2.9271/KWH 1,000 KW $0.72/KW discount for service at

Distribution October - April 11.16/KWOctober - April: 2.7000/KWH 2.3 KV or higher if customer ownsVoltage transformers.

8 Large On-Peak: On-Peak: Customer charge: $25.00/mo.General May - September: 11.34/KW May - September: 3.683/KWH 1,000 KW Voltage discount $0.83/KW forService October - April: 8.18/KW October - April: 2.833/KWH service at 2350 KV through customer

transformers.Off Peak: Off-Peak: May - September: 0.00/KW May - September: 2.483/KWH On-Peak*: October - April: 0.00/KW October - April: 2.483/KWH Monday - Friday

May - September 1:00 P.M. - 9:00 P.M.

*Off-Peak:Monday - Friday

October - April 7:00 A.M. - 11:00 P.M.

9 General Service Facility charge: 1.54/KW On-Peak: Customer charge: $170.00/mo.High Voltage Demand: May - September: 3.2247/KWH

On-Peak: October - April: 2.4247/KWH On-Peak*: May - September: 9.68/KW Monday - Friday October - April: 6.56/KW Off-Peak: May - September Off Peak: 0.00/KW May - September: 2.0247/KWH 1:00 P.M. - 9:00 P.M.

October - April: 2.0247/KWH*Off-Peak:Monday - Friday

October - April 7:00 A.M. - 11:00 P.M.

Raft River Rural B Large General All demand: 5.60/KW All usage: 2.700/KWH 50 KW Customer charge: $60.00/mo. Electric Coop. Service

Wells Rural 6 Large Power All demand: 6.00/KW All usage: 5.267/KWH 50 KVA Facility charge: $25.00/mo. Electric Service to Company 50 to 1,000 KVA 1,000 KVA

8 Industrial All demand: 5.50/KW All usage: 4.4491/KWH 1,000 KVA Facility charge: $500.00/mo.Power Service to

5,000 KVA

Page 59: Electric Power - United States 2008

EP - U.S.

58C

opyright © 2008 InfoM

ine USA

, Inc.

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Avista Utilities 21 Large First 50 KW: 250.00/mo. First 250,000 KWH: 5.720/KWH $.20/KW discount for delivery at General All additional: 3.00/KW Over 250,000 KWH: 5.110/KWH primary voltage of 11 KV or higher.

Service

25 Extra Large First 3,000 KVA: 9,000.00/mo. All usage: 3,000 KVA $0.80/KW at 60 KV and $1.00/KWGeneral All additional: 2.75/KVA First 500,000 KWH: 4.416/KWH at 115 KV. $.20/KW discount Service Next 550,000 KWH: 3.973/KWH for delivery at primary voltage of

Over 6,000,000 KWH: 3.832/KWH 11 KV or higher. Annual minimumcharge: $571,610.00 effective,1/2008.

Benton County 22 Medium General First 50 KW: 0.00/KW April - Aug. Sept. - March Monthly charge: PUD #1 Service Over 50 KW: 6.60/KW First 20,000 KWH: 4.460/KWH 5.240/KWH Single-Phase: $13.20/mo.

All additional: 2.740/KWH 3.330/KWH Multi-Phase: $19.80/mo..

On-Peak*: Monday - Saturday 7:00 A.M. - 10:00 P.M.

23 Large General First 50 KW: 0.00/KW April - Aug. Sept. - March Monthly customer charge:Service Over 50 KW: 5.60/KW First 20,000 KWH: 4.330/KWH 4.720/KWH $17.40/mo.

All additional: 2.890/KWH 3.560/KWH

Benton Rural 10 General Over 50 KW: First 20,000 KWH: 5.480/KWH Customer charge: $13.00/mo. plus Electric Association Service Peak* 4.68/KW All additional: 2.930/KWH $.15 times the highest monthly

Off-Peak: 0.66/KW Plus BPA cost adjustment: 1.000/KWH billing demand in 12 months over50KW. BPA cost adjustment appliesto all energy used. 2006 rate.

On-Peak*: Monday - Saturday 7:00 A.M. - 10:00 P.M.

80 Large Industrial All demand: All usage: 1,000 KW BPA cost adjustment applies to allPower January 4.14/KW January 2.090/KWH energy used. 2006 rate.

February 4.01/KW February 2.650/KWHMarch 3.80/KW March 2.480/KWHApril 3.43/KW April 2.160/KWHMay 3.41/KW May 2.090/KWHJune 3.77/KW June 2.350/KWHJuly 4.29/KW July 2.900/KWHAugust 4.29/KW August 3.650/KWHSeptember 4.29/KW September 3.140/KWHOctober 3.74/KW October 2.460/KWHNovember 4.29/KW November 3.040/KWHDecember 4.29/KW December 3.070/KWH

Plus BPA cost adjustment: 1.000/KWH

Page 60: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

59

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Big Bend General Over 50 KW: 6.00/KW First 20,000 KWH: 4.760/KWH Facility charge: $20.00/mo. Electric Coop Service All additional: 2.860/KWH Three-Phase service.

Chelan County PUD 2 General Over 40 KW: 2.31/KW All usage: 2.440/KWH 40 KW Customer charge: $15.25/mo.Three-Phase service. Minimum monthly charge: $26.95.

3 Industrial All demand: 3.23/KW All usage: 1.260/KWH 1,000 KW Customer charge: $62.10/mo.Service to Applies only to new loads. Existing

50,000 KW loads serviced at lower rates.

Clallam County E-5 Large Power All demand: 4.86/KW All usage: 3.610/KWH 100 KW Basic charge: $7.00 per day. PUD #1 Service

Clark Public 34 General All demand: 30 KW Customer charge: $36.00/mo. Utilities Secondary: 6.44/KW September - March: 4.510/KWH Discount available for off-peak

Primary: 5.66/KW April - May: 4.000/KWH demand.

85 Industrial All demand: 1,500 KW Customer charge: $120.00/mo.Service Primary: 5.66/KW September - March: :4.510/KWH Discount available for off-peak

Transmission 4.37/KW April - August: 4.000/KWH demand.

* On-Peak: Monday - Saturday7:00 A.M. - 10:00 P.M.

Clearwater Power 2-5 General Over 50 KW 5.68/KW First 15,000 KWH: 5.677/KWH 15 KVA Facilities charge: $15.00/mo. Company Service Over 15,000 KWH: 4.350/KWH

LargeCommercial

Columbia Rural 3 General General 5% discount for delivery at primary Electric Assn. Service Over 40 KW: 4.90/KW First 10,000 KWH: 6.650/KWH voltage. Subject to cost of energy

Three-Phase Time-of-day All additional: adjustment. Basic charge: Peak: 4.90/KW April - May: 4.220/KWH $35.00/mo. 10/2008 rate. Off-Peak: 1.93/KW June: 3.900/KWH

July: 4.000/KWH August: 4.220/KWH September - March 4.320/KWH

Page 61: Electric Power - United States 2008

EP - U.S.

60C

opyright © 2008 InfoM

ine USA

, Inc.

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Cowlitz County 5 General All demand: 5.23/KW All usage: 4.260/KWH 50 KW Customer charge: $25.00/mo. Public Utility Service - District Primary Voltage

8/9 Large All demand: All usage: 1,000 KW Customer charge: $50.00/mo.Commercial Primary voltage: 5.49/KW Primary voltage: 4.230/KWH Customer owned transformers.& Industrial Transmission voltage: 4.81/KW Transmission voltage 3.810/KWH Schedule 8 is for primary serviceService and schedule 9 is for transmission

level delivery service.

Douglas County 1 General Over 50 KW: 1.00/KW All usage: 1.850/KWH Up to Customer charge: $0.263/day. Public Utility Service 2,500 KW Contractual service is available District #1 to new power loads over 3,000KW.

Minimum charge: $7.00/mo. plus$3.00/KW of demand in excess of30KW. 2006 rate.

Ferry County 400 Large Power Up to 50 KW: $250.00/mo. All usage: 5.009/KWH 50 KW Minimum charge: $250.00/mo. Public Utility Service Over 50 KW: 3.57/KW to 2008 rate. District #1 500 KW

500 Primary Up to 500 KW: $2,500.00/mo. All usage: 4.226/KWH 500 KW Minimum charge: $2,500.00/mo.Industrial All additional: 3.28/KW

Franklin County 2.1 Medium All demand: 7.15/KW All usage: Customer charge: $44.96/mo. Public Utility General Service April - August: 3.160/KWH Primary service discount:$0.25/KW. District Sept. - March: 3.990/KWH 2008 rate.

2.2 Large All demand: 7.31/KW All usage: Customer charge: $161.78/mo.General Service April - August: 3.070/KWH Primary service discount $0.25/KW

Sept. - March: 3.830/KWH demand. 2008 rate.

2.3 Industrial All demand: 7.51/KW All usage: Customer charge: $421.67/mo.Service April - August: 3.150/KWH Primary service discount $0.25/KW

Sept. - March: 3.960/KWH demand. 2008 rate.

Page 62: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

61

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Grant County PUD 2 General First 8,000 KWH: 3.9000/KWH Up to Basic charge: $0.62/day for Public Utility District Service All additional: 2.340/KWH 500 KW Three-Phase service.

7 Large All demand: 4.10/KW First 50,000 KWH: 1.835/KWH 200 KW Basic charge: $110.00/mo.General Service All additional: 1.040/KWH to

5,000 KW

14 Industrial All demand: 4.00/KW First 7,300,000 KWH: 1.014/KWH 5,000 KW Basic charge: $200.00/mo.Service All additional: 2.500/KWH to

15,000 KW

Grays Harbor County 55 Medium All demand: 7.04/KW All usage: 4.220/KWH 50 KW Customer charge: $22.04/mo. Public Utility General Service Subject to power cost adjustment. District

82 Primary All demand: 6.97/KW All usage: 3.950/KWH 500 KW Customer charge: $64.77/mo.Metered to Minimum 5 year contract required.Service 2,500 KW Subject to power cost adjustment.

84 Primary All demand: 6.34/KW All usage: 3.830/KWH up to Customer charge: $74.09/mo.Metered 7,500 KW Minimum 5 year contract required.Transmission Subject to power cost adjustment.

Inland Power and C2 Large Over 50 KW: 2.80/KW All demand: 4.560/KWH 50 KW Basic charge: $246.40/hp/mo. Light Company Commercial to 5% primary voltage discount.

3,000 KW

Kittitas County General Over 50 KW: First 5,000 KWH: 7.200/KWH Three-Phase facility charge: Public Utility Three-Phase Primary: 4.65/KW Next 15,000 KWH: 6.600/KWH $21.00/mo. Over 20,000 KWH District #1 Service Secondary: 3.70/KW All additional: 3.700/KWH available to primary service only.

2006 rate.

Page 63: Electric Power - United States 2008

EP - U.S.

62C

opyright © 2008 InfoM

ine USA

, Inc.

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Klickitat County 3A7 Large General All demand: All usage: Basic charge: $38.00/mo. Public Utility Service March - June: 4.06/KW March - June: 2.320/KWH Use must exceed 180,000KWH/A. District July - February: 5.51/KW July - February: 4.180/KWH

3A8 Industrial All demand: All usage: 2,500 KW Basic charge: $110.00/mo. plusOff-Peak: $0.50/KW. Service at primary

January 5.67/KW January 2.640/KWH voltage.February 5.45/KW February 2.480/KWHMarch 5.10/KW March 2.190/KWH On-Peak:April 4.48/KW April 1.750/KWH Daily: 6:00 A.M. - 10:00 P.M.May 4.44/KW May 1.480/KWHJune 5.05/KW June 1.750/KWHJuly 5.93/KW July 2.750/KWHAugust 5.93/KW August 3.290/KWHSeptember 5.93/KW September 3.430/KWHOctober 5.00/KW October 2.250/KWHNovember 5.93/KW November 3.260/KWHDecember 5.93/KW December 3.200/KWH

On-Peak:January 3.510/KWHFebruary 3.400/KWHMarch 3.110/KWHApril 2.480/KWHMay 2.480/KWHJune 3.040/KWHJuly 3.920/KWHAugust 5.680/KWHSeptember 4.140/KWHOctober 3.020/KWHNovember 3.980/KWHDecember 4.090/KWH

Lewis County 20 Lighting & Over 50 KW: 4.40/KW First 15,000 KWH: 4.270/KWH Basic charge: $0.73/day for Public Utility Power Service All additional: 2.770/KWH Three-Phase service. District #1

31 Primary On-Peak* 4.20/KW All usage: 2.630/KWH 1,000 KW Minimum charge: $450.00/mo. Power Service Off-Peak: 2.47/KW to

10,000 KW * On-Peak: Monday - Saturday 7:00 A.M. - 10:00 P.M.

Lincoln Electric *See Inland Power & Light Cooperative

Mason County PUD #1 General All usage: 6.600/KWH Customer charge: $30.90/mo. Three-Phase service.

Page 64: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

63

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Mason County 21 General All demand: 6.56/KW All usage: 4.010/KWH 50 KVA Customer charge: $1.94/day. Public Utility Service $0.40/KW of demand discount District #3 with Demand customers who receive power at

primary voltage and furnish owntransformer.

Nespelem Valley B General or Over 50 KW 5.50/KW First 15,000 KWH: 6.300/KWH 50 KVA Facility charge: $23.00/mo. Electric Cooperative Three-Phase Service All additional: 3.500/KWH 2006 rate.

Northern Lights 2 Large Power All demand: 5.50/KVA All usage: 5.030/KWH 300 KVA Basic charge: $50.00/mo. Secondary Voltage Rate Economic development rate

available. Power cost adjustment$0.00/KWH, effective 4/2007.

3 Large Power All demand: 5.25/KVA All usage: 4.030/KWH 300 KVA Basic charge: $80.00/mo.Primary Voltage Rate Power cost adjustment of

$0.00/KWH, effective 4/2007.

Okanogan County L Large Commercial No charge All usage: 5.200/KWH 50 KVA Customer charge: $100.00/mo. Electric Cooperative Service Primary metering charge: 5.040/KWH 3% primary voltage discount of

energy costs.

Okanogan County 3 General Over 50 KW: 2.00/KW First 15,000 KWH: 5.300/KWH Basic charge: $12.00/mo. Public Utility Service All additional: 4.800/KWH District #1

4 Primary All demand: 2.25/KW All usage: 3.750/KWH 1,000 KW Basic charge: $760.00/mo.Industrial Service

Orcas Power & Light GS-08 Commercial All over 20KW 1.61/KW First 5,000 KWH: 6.840/KWH Basic charge: $31.25/mo. Company Service All additional: 5.580/KWH Subject to power cost adjustment.

Pacific County Primary All demand: 5.90/KW All usage: 4.630/KWH 50 KW Basic charge: $28.00/mo. Public Utility Metered Subject to a 3% power cost District #2 Commercial adjustment, effective 1/2007.

Large All demand: 5.50/KW All usage: 3.010/KWH 5,000 KW Basic charge: $50.00/mo.Industrial Rate Subject to a 3% power cost

adjustment, effective 1/2007.

Page 65: Electric Power - United States 2008

EP - U.S.

64C

opyright © 2008 InfoM

ine USA

, Inc.

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Pacific Power and 36 Large All demand: 3.75/KW First 40,000 KWH: 4.357/KWH Up to Basic charge: Up to 100 KW, Light Company General All additional: 3.993/KWH 999 KW $225.00/mo.; 101 KW - 300 KW,

Service - Optional $83.00 + $1.47/KW; Over ,(Pacific Corp) 300 KW $166.00 + $1.20/KW. Service Area Discounts: 1% for primary metering;

$.30/KW for delivery.

48T Large On-Peak* All usage: 3.499/KWH 1,000 KW Basic charge: Up to 3,000 KW,General All demand: 6.03/KW $1,205.00 + $0.91/KW; OverService 3,000 KW, $1,450.00 + $0.83/KW.Metered Discounts: 1% for primaryTime-of-Use * On-Peak: Monday - Friday metering; $.30/KW for delivery

6:00 A.M. - 10:00 P.M. at primary voltage.

Pend Oreille County Industrial All demand: 2.50/KW All usage: 2.500/KWH 500 KW Public Utility District Service

Commercial All demand: 2.50/KW All usage: 3.100/KWH Basic charge: $35.00/mo.Service Three-Phase Service.

Usage can not exceed 500KW.

Peninsula Light General All usage: 5.984/KWH Customer charge: $19.37/mo. Company Service Three-Phase service.

Commercial All demand: 6.36/KW All usage: 3.821/KWH Basic charge: $26.50/mo.

Puget Sound Energy 25 Small demand: Over 50 KW: First 20,000 KWH: 50 KW Basic charge: $50.00/mo.General Service October - March: 8.72/KW October - March: 8.8276/KWH April - September: 5.81/KW April - September: 8.0402/KWH

All additional: October - March: 6.3589/KWH April - September 6.3589/KWH

26 Large Demand October - March: 8.52/KW All usage: 6.0996/KWH 350 KW Subject to energy cost adjustmentGeneral Service April - September: 5.68/KW clause. Basic charge: $100.00/mo.

Skamania County Industrial Rate Over 35 KW: 4.36/KW First 15,000 KWH: 4.700/KWH Facilities charge: $25.00/mo. Public Utility (Demand meter) Next 85,000 KWH: 2.870/KWH BPA adjustment of $0.0112/KWH. District All additional: 2.810/KWH

Page 66: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

65

WASHINGTONSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Snohomish County 20 General Over 100 KW: 3.62/KW Winter Summer Up to Customer charge: $0.29/day. Public Utility Service First 30,000 KWH: 7.520/KWH 6.730/KWH 10,000 KW 5% discount for customer owned District #1 All additional: 6.050/KWH 5.170/KWH distribution system, metered at

primary voltage.

36 Large Primary All demand: 2.77/KW Winter: 4.860/KWH 5,000 KW Minimum charge: $7,345.00/mo.Service Summer: 4.980/KWH

Tanner Electric A-15C Commercial Over 40 KW: 5.00/KW First 20,000 KWH: 7.000/KWH 150 KW Customer charge: $24.00/mo. Cooperative Rate All additional: 6.000/KWH Industrial accounts over 300 KW

require special contracts.

Wahkiakum County 3 General All demand: 3.25/KW All usage: 6.500/KWH 20 KW Basic charge: $16.00/mo. PUD #1 Service Contract required for voltages

over 1,000 KVA. 2006 rate.

Page 67: Electric Power - United States 2008

EP - U.S.

66C

opyright © 2008 InfoM

ine USA

, Inc.

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Alliant Cg-2 Commercial Maximum demand: All usage: 75 KW Customer charge: $0.9205/day.Service -Standard June - September: 9.23/KW June - September: 5.950/KWH Monthly charges the greater of

October - May: 7.88/KW October - May: 4.872/KWH customer demand plus maximum (Formerly Wisconsin Power & Light Company) Customer demand: 2.00/KW Maximum charge: 13.691/KWH energy charge or the total of

customer and maximum demandplus the standard energy charge. Customer demand is the greatestdemand in the previous 11 monthperiod.

Cp-1 Industrial Maximum demand 14 hr: June - September 200 KW Customer charge: $7.6700/day.Power at June - September: 11.23KW 14hr option - On-Peak: 6.251/KWH 2.5% discount on KWH and On-PeakPrimary or October - May: 9.87/KW 14hr option - Off-Peak: 3.593/KWH KW, and $0.22/KW of customerSecondary Customer demand: 2.00/KW 12hr option - On-Peak: 6.564/KWH demand discount at primary voltage.Voltage 12hr option - Off-Peak: 3.593/KWH An interruptible rider is also

Maximum demand 12hr: available. Subject to cost of fuel June - September: 11.79/KW October - May adjustment. Customer demand is October - May: 10.36/KW 14hr option - On-Peak: 5.341/KWH greatest demand in the previous Customer demand: 2.00/KW 14hr option - Off-Peak: 3.593/KWH month period.

12hr option - On-Peak: 5.608/KWH 12hr option - Off-Peak: 3.593/KWHMaximum charge: 13.691/KWH

Cp-2 Industrial On-Peak demand: 5,000 KW Customer charge: $18.411/day.Power at June - September June - September Subject to cost of fuel adjustment.Transmission 14hr - On-Peak: 10.67/KW 14hr option - On-Peak: 5.937/KWH An interruptible rider is available.Voltage 12hr - On-Peak: 11.20/KW 14hr option - Off-Peak: 3.413/KWH Customer demand is based on

12hr option - On-Peak: 6.234/KWH previous months high. 12hr option - Off-Peak: 3.413/KWH

October - May 14hr - On-Peak: 9.37/KW October - May 14hr - On-Peak: 9.84/KW 14hr option - On-Peak: 5.073/KWH

14hr option - Off-Peak: 3.413/KWHCustomer charge: 1.00/KW 12hr option - On-Peak: 5.327/KWH

12hr option - Off-Peak: 3.413/KWH

Adams-Columbia LP Large All demand: 11.65/KW All usage: 5.300/KWH* 50 KVA Facility charge: $65.00/mo. Electric Power Service to Previously Adams/Marquette. Cooperative Three-Phase 1,000 KVA 2% discount for delivery at primary

voltage of 12.5 KV & coop-ownedtransformers. 5% discount for primary voltage delivery. Subject tocost of fuel and purchased poweradjustment.

Page 68: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

67

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Bayfield Electric 5 General All demand: 0.00/KW All usage: 9.600KWH 50 KVA Facility charge: $50.00/mo. Cooperative Three-Phase Subject to cost of fuel and

Service purchased power adjustment.2006 rate.

Central Wisconsin P Large All demand: 11.00/KW All usage: 4.200/KWH 50 KVA Service charge: $50.00/mo. Electric Cooperative General Service Subject to a power cost adjustment.

Chippewa Valley X Large Power All demand: 8.70/KW All usage: 6.200/KWH 25 KVA Facility charge: $50.00/mo. Electric Cooperative Subject to a power cost adjustment.

Z Peak Alert On-Peak: All usage: 5.000/KWH 150 KVA Facility charge: $90.00/mo. Time-of-Day Winter: 25.67/KW Subject to a power cost adjustment.

Summer: 47.20/KWPlus monthlyMaximum demand: 6.00/KW

Clark Electric LP Larger Power On-Peak* 8.50/KW All usage: 5.350/KWH 25 KW Fixed charge: $70.00/mo. Cooperative Service Off-Peak* 1.30/KW Five year contract is required.

Three-Phase Subject to a purchased powercost adjustment.

On-Peak*: 5:30 P.M. - 8:30 P.M.

Consolidated Water CP-1 Large Power All demand: 5.00/KW All usage: 3.950/KWH 100 KVA Monthly minimum $1.00/KW Power Company Service 2006 rate.

Dahlberg Light & CP-1 Small Power All demand: 7.50/KW All usage: 5.590/KWH 50 KW Customer charge: $30.00/mo. Power Company Service + $1.50/KVA demand. Subject to

power cost adjustment clause.Currently $0.01147/KWH. 2006 rate.

Dunn Energy 12,22 Large Power All demand: 6.75/KW First 150 KWH x KW demand: 5.400/KWH 50 KW Facility charge: $50.00/mo., for Cooperative Service All additional: 4.000/KWH >500 KVA, $60.00/mo.

For demand >500 KVA 3.000/KWH Fixed charge: $1.00/KVA of installed transformer capacity for the first 500 KVA. Subject to power costadjustment Interruptible rate subjectto 10 minute notice. 2002 rate.

*Consult utility for current rates.

Page 69: Electric Power - United States 2008

EP - U.S.

68C

opyright © 2008 InfoM

ine USA

, Inc.

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

East Central GS General All demand: First 400 KWH/KW: 4.600/KWH Service charge: $55.00/mo. Electric Association Service December - February: 11.00/KW All additional: 3.700/KWH 2008 rate.

March - May: 8.00/KW June - August: 18.00/KW September - November: 8.00/KW

TD Time-of-Day Peak: All usage: 3.300/KWH Facility charge: $90.00/mo.Service December - February: 13.65/KW 2006 rate.

March - May: 9.80/KW June - August: 21.30/KW On-Peak: Daily September - November: 9.80/KW 5:00 P.M. - 10:00 P.M. Base demand: 3.50/KW

Eau Claire Q Large Power On-Peak: All usage: 6.030/KWH 50 KVA Service charge: $50.00/mo. Electric Cooperative Winter 5.85/KW Administrative Credit: 0.750/KWH Installed load must be <500 KVA. Time-of-Use Summer: 8.65/KW Subject to energy cost adjustment.

Administrative credit applies to allOff-Peak: 3.70/KW usage greater than 400 hours of theCustomer demand: 1.67/KW billing demand. On-peak fixed at Transmission charge: 2.20/KW highest demand in month as defined

below.

On-Peak*: 5:00 P.M. - 9:00 P.M.

Head of Lakes Electric See East Central Electric Association Cooperative

Jackson Electric LP Large Power All demand: All usage: 5.100/KWH 50 KVA Facility charge: $70.00/mo. Cooperative September - May: 7.50/KW to Subject to purchased power cost

June - August: 9.50/KW 500 KVA adjustment. 2006 rate.

Jump River 11Q Large Power 4.50/KW All usage: 4.900/KWH 50 KVA Facility charge: $100.00/mo. Electric Cooperative Peak Alert Reactive demand $2.40/KVAR/yr.

A second demand charge is leviedequal to Jump River demand costtimes 1.08.

Lake Superior Merged with Northern States District Power Company Power Co, - WI, effective 1/1/1987.

See Northern States for rates.

Page 70: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

69

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Madison Gas and Cg-1B Commercial Winter: 6.855/KW Winter: 6.470/KWH 75 KW Customer charge: $1.1672/day. Electric Company & Industrial Summer: 8.388/KW Summer: 7.534/KWH to An optional time-of-use rate for

Lighting & Power Distribution 3.75/KW 200 KW customers in this demand range Power is available.

Cg-2 Commercial Winter: 6.86/KW Off-Peak: 4.527/KWH 200 KW Customer charge: $5.2274/day.& Industrial Summer: 8.388/KW On-Peak:Lighting & Power Distribution: 4.99/KW Winter: 7.702/KWH On-Peak*: Monday - FridayTime-of-Use Summer: 8.534/KWH 10:00 A.M. - 9:00 P.M.

North Central Cp-1 Small Power All demand: 5.25/KW All usage: 8.700/KWH 20 KW Customer charge: $35.00/mo. Power Company Service Distribution: 1.00/KW Subject to cost of power adjustment

factor.

Cp-3 Large Power All usage: 150KW Customer charge: $70.00/mo. Service On-Peak: 5.40/KW On-Peak: 7.660/KWH Subject to cost of power adjustmentTime-of-Day Off-Peak: 0.00/KW Off-Peak: 6.260/KWH factor.Option 1 Distribution: 1.00/KW

Northwestern Cp-1 Small Power All demand: 6.00/KW All usage: 7.650/KWH 20 KW Customer charge: $30.00/mo. Wisconsin Electric Co. Service Distribution: 1.50/KW to Subject to cost of purchased

200 KW and produced power adjustment.2008 rate.

Cp-3 Large Power On-Peak demand: 6.00/KW On-Peak: 7.900/KWH 200 KW Customer charge: $60.00/mo.Time-of-Day Distribution: 1.50/KW Off-Peak: 5.810/KWH Subject to cost of purchased

and produced power adjustment.2008 rate.

*Peak determined by customer options. Monday - Friday9:00 A.M. - 9:00 P.M. or 8:00 A.M. - 8:00 P.M.

Oakdale Electric Commercial All demand: 13.00/KW All usage: 5.500/KWH 60 KW Facility charge: $31.00/mo. Cooperative Power Purchased power adjustment of

$0.00/KW, effective 8/2005.

Page 71: Electric Power - United States 2008

EP - U.S.

70C

opyright © 2008 InfoM

ine USA

, Inc.

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Oconto Electric 0003 Large Power All demand: 22.57/KW On-Peak: 5.200/KWH 50 KW Facility charge: $45.00/mo. Cooperative & Time-of-Use Off-Peak: 3.500/KWH

0103 On-Peak*: Monday - Friday8:00 A.M. - 8:00 P.M.

Pierce-Pepin 6 *Consult utility for current rates. Electric Cooperative

Pioneer Power P-1 Large Power Monthly demand: 6.00/KW All usage: 4.410/KW 15 KW Subject to power cost adjustment. & Light Company Service Annual Peak demand: 0.90/KW $(0.0239)/KWH, effective 8/2006.

$0.20/KW discount for customerswho maintain own transformers. Primary service discount: 1.25%. 2006 rate.

*Consult utility for current rates.

Polk-Burnett Three-Phase All usage: Up to Customer charge: $50.00/mo. Electric Cooperative Service Winter: 9.870/KWH 500 KVA Subject to cost of power adjustment. Summer: 11.330/KWH *Demand coincidental to peak

periods of the co-op.

Price Electric Commercial All demand: All usage: 5.300/KWH 50 KVA Facility charge: $55.50/mo. Cooperative With Demand Summer: 12.00/KW Large loads negotiated. 2008 rate.

Winter: 10.00/KWH * Summer: June - August

Richland Electric 30 Large All demand: 9.00/KW First 5,000 KWH: 5.600/KWH 50 KVA Facility charge: $.50/KVA/mo. Cooperative Commercial All additional: 4.400/KWH 2006 rate.

Riverland Energy Coop. Q Large Power All demand: 10.91/KW All usage: 4.470/KWH 50 KVA Facilities charge: $45.00/mo. (Formerly Trempealeau Electric Cooperative)

Rock County Medium All demand: 10.50/KW All usage: 4.700/KWH 75 KW Customer charge: $34.00/mo. Electric Commercial Subject to power cost adjustment Cooperative factor.

Large All demand: 10.50/KW All usage: 3.600/KWH 250 KW Customer charge: $100.00/mo. Commercial Time-of-day option available.

Page 72: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

71

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Scenic Rivers Commercial On-Peak: 6.00/KW First 500 KWH: 6.000/KWH 75 KVA Fixed charge: $27.00/mo, plus $0.50 Cooperative Off-Peak: 0.00/KW All additional KWH: 3.400/KWH per KVA over 75 KVA. Subject to

power cost adjustment.

St. Croix Electric Three-Phase All demand: All usage: 4.800/KWH 50 KW Service charge: $35.00/mo. plus Cooperative Summer: 7.00/KW $1.00 per each extra meter. Rate

Winter: 9.75/KW for customers who can shed theirloads On-Peak control days.2006 rate.

*Consult utility for current rates.

Superior Water EP-1 Large Current month: 6.90/KW All usage: 2.870/KWH 10 KW Customer charge: $43.00/mo. Light and Power Power Subject to power cost adjustment. Company Highest annual 1.60/KW (Formerly Allete) demand in excess of

current month:

EP-3 Large November - February 7.75/KW November - February: 500 KW Customer charge: $140.00/mo.Power March - October 7.25/KW On-Peak* 3.320/KWH Subject to power cost adjustment.Time-of-day Off-Peak: 2.100/KWH

Annual demand 1.60/KW March - October:> current month On-Peak: 2.970/KWH *Peak hours: Monday - Friday

Off-Peak: 2.100/KWH 9:00 A.M. - 9:00 P.M.

Taylor County R-9 Three-Phase All demand: 8.00/KW All usage: 5.300/KWH 25 KVA Facility charge: $45.00/mo. Electric Power Subject to fuel adjustment clause. Cooperative Service 2006 rate.

Vernon Electric Peak Alert Maximum demand: 4.00/KW First 25,000 KWH: 4.78/KWH 50 KW Facilities charge: $80.00/mo. plusRate All demand: All additional: 4.48/KWH $0.50/KVA in excess of 50 KVA.

Summer: 58.50/KW/yr Winter: 28.10/KW/yr

Wisconsin Electric Cg-1 General All usage: 11.763/KWH 40 KW Facilities charge: $0.5000/day Power Company Secondary Fuel adjustment: $0.00469/KWH

Cp 1 General On-Peak: On-Peak: 300 KW Facilities charge: $17.26027/dayPrimary Less than 12,470 volts: 10.908/KW Less than 12,470 volts 7.052/KWHTime-of-use 12,470 - 138,000 volts: 10.738/KW 12,470 - 138,000 volts 6.947/KWH On-Peak*: Monday - Friday Over 138,000 volts: 10.595/KW More than 138,000 volts 6.858/KWH 8:00 A.M. - 10:00 A.M. or

10:00 A.M. - 10: P.M.Maximum demand: Off-Peak: Less than 12,470 volts 1.023/KW Less than 12,470 volts 5.031/KWH 12,470 - 138,000 volts 1.007/KW 12,470 - 138,000 volts 4.957/KWH More than 138,000 volts 0.00/KW More than 138,000 volts 4.812/KWH

Page 73: Electric Power - United States 2008

EP - U.S.

72C

opyright © 2008 InfoM

ine USA

, Inc.

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Wisconsin Public CP Large Secondary: Secondary: 1,000 KW Customer charge per month: Service Corporation Commercial Customer demand: 1.957/KW On-Peak*** 5.699/KWH Under 6,000 volts: $322.00;

& Industrial Summer Off-Peak: 2.848/KWH 6,000 - 15,000 volts: $375.00;Service On-Peak: 10.758/KW Primary: Over 15,000 volts: $858.00.

Intermediate: 8.069/KW On-Peak: 5.547/KWH Subject to a fuel cost adjustment Off-Peak: 0.00/KW Off-Peak: 2.773/KWH ($0.01599)/KWH, effective 1/2008. Winter Transmission: On-Peak: 5.918/KW On-Peak: 5.472/KWH Discounts: Intermediate: 4.439/KW Off-Peak: 2.734/KWH Primary metering: Off-Peak: 0.00/KW 1.1% for 6 KV to15 KV, 2% for Primary: over 15 KV. Customer demand: 1.722/KW Summer Primary deliver: On-Peak: 10.484/KW $.36/KW for 6 KV to 15 KV, to Intermediate: 7.863/KW $.55/KW for over 15 KV. Off-Peak: 0.00/KW Winter On-Peak: 5.768/KW Intermediate: 4.326/KW Off-Peak: 0.00/KWTransmission Customer demand: 0.00/KW Summer On-Peak: 10.295/KW Intermediate: 7.721/KW Off-Peak: 0.00/KW Winter On-Peak: 5.663/KW Intermediate: 4.247/KW Off-Peak: 0.00/KW

*Winter: 10:00 A.M. - 12:00 P.M. Monday - Friday **Winter: 7:00 A.M. - 10:00 A.M. Monday - Friday ***Winter: 7:00 A.M. - 10:00 P.M. Monday - Friday5:00 P.M. - 8:00 P.M. Monday - Friday 12:00 P.M. - 5:00 P.M. Monday - Friday Summer: 7:00 A.M. - 11:00 P.M. Monday - Friday

8:00 P.M. - 10:00 P.M. Monday - FridaySummer: 10:00 A.M. - 4:00 P.M. Monday - Friday

Summer: 7:00 A.M. - 10:00 A.M. Monday - Friday4:00 P.M. - 11:00 P.M. Monday - Friday

Cg20 Small On-Peak: On-Peak: 6.414/KWH 100 KW Customer charge:Commercial Winter: 7.312KW Off-Peak: 3.659/KWH Single phase:$59.50/mo.& Industrial Summer: 10.670/KW Three-Phase: $113.60/mo.Service Off-Peak: 0.00/KW Discounts: Primary metering -1.1%

for 6 KV to 15 KV, 2% for over 15 KV; Primary delivery - $.36/KWfor 6 KV to 15 KV, $.55/KW for over15 KV. Subject to a fuel costadjustment ($0.01599)/KWH,effective 4/2007.

Page 74: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

73

WISCONSINSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Xcel Energy Cg-5 General Secondary: Secondary: 25 KW Customer charge: $30.00/mo.Service Summer: 10.65/mo. Summer: 5.242/KWH Subject to energy cost adjustment.

Winter: 8.65/mo. Winter: 4.742/KWH Energy charge credit for all KWH inexcess of 400 times billing demand

Primary: Primary: 2% discount $0.0007/KWH. Summer: 10.15/mo. Winter: 8.20/mo.

Cg-9 Large On-Peak: On-Peak: 200 KW Customer charge: $155.00/mo.General Secondary: Secondary: Merged with Lake Superior DistrictTime-of-day Summer: 9.20/KW/mo. Summer: 6.844/KWH Power Company, effective JanuaryService Winter: 7.20/KW/mo. Winter: 6.144/KWH 1, 1987. Subject to energy cost

adjustment. Energy charge credit forPrimary: Off-Peak: all KWH in excess of 400 times Summer: 9.02/KW/mo. Secondary: billing demand $0.007/KWH. Winter: 7.06/KW/mo. Summer: 3.906/KWH Winter: 3.906/KWH On-Peak*: Monday - FridayTransmission Transformed: 9:00 A.M. - 9:00 P.M. Summer: 8.69/KW/mo. Winter: 6.80/KW/mo. Discount:

Primary: 2.0%Transmission Untransformed: Transmission Transformed: 5.5% Summer: 8.65/KW/mo. Transmission Untransformed: 6.0% Winter: 6.77/KW/mo.

WYOMINGSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Beartooth Electric Commercial All usage: *Consult utility for current rates. Cooperative

Big Horn Rural CI Commercial All demand: 5.25/KW First 200 KWH/KW: 9.106/KWH 50 KVA Customer charge: $90.00/mo. Electric Company & Industrial Next 200 KWH/KW: 7.106/KWH plus $1.00/KVA.

All additional: 2.812/KWH

Page 75: Electric Power - United States 2008

EP - U.S.

74C

opyright © 2008 InfoM

ine USA

, Inc.

WYOMINGSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Black Hills Power GS-11 General First 5 KW: No charge First 1,000 KWH: 6.800/KWH Customer charge: $9.50/mo. & Light Company Service Next 45 KW: 4.35/KW Next 2,000 KWH: 6.450/KWH

All additional: 3.90/KW Next 12,000 KWH: 6.200/KWHAll additional: 5.890/KWH

GL-10 General On-Peak: First 50,000 KWH: 4.550/KWH 125 KVA Substation ownership discount:Service First 125 KVA: 900.00/mo. Next 950,000 KWH: 4.400/KWH $.25/KVA for transmission service;Large Next 175 KVA: 7.00/KVA All additional: 3.610/KWH $.15/KVA for primary distribution

All additional: 5.85/KVA service.Off-Peak: 1.5 x on-Peak: No charge All additional: 5.85/KVA

IC-11 Industrial On-Peak: 5.50/KVA First 2,800,000 KWH: 3.740/KWH 5,500 KVA No less than a five yearContract Off-Peak: All additional: 3.000/KWH contract required. Service 1.5 x on-Peak: 0.00/KVA No charge

All additional: 5.50/KVA

Bridger Valley LP Large Power All demand: 11.85/KW All usage: 2.7862/KWH Customer charge: $70.00/mo. Electric Association Demand must be less than

350 KVA. 2006 rate.

LPS Large Power All demand: 12.85/KW All usage: 2.7363/KWH 350 KVA Customer charge: $130.00/mo.to 2006 rate.

2,000 KVA

LP2000 Large Power All demand: 10.13/KW All usage: 2.3139/KWH 2,000 KVA Customer charge: varies2006 rate.

Carbon Power and LP Large Power All demand: 20.55/KW All usage: 3.692//KWH 50 KW Facility charge: $50.00/mo. Light, Inc. 5% discount for delivery at primary

Transformer Discounts: voltage. Minimum charge:Service Company owned Customer owned $1,173.00/mo.>30 KV -- $6.00/KW2-30 KV $4.00/KW $2.00/KW

Cheyenne Light General System Capacity Charge: All usage: Basic charge: Fuel & Power Company Service Secondary: 18.65/KW Secondary: 3.968/KWH Secondary: $16.00/mo.

Primary: 17.15/KW Primary: 3.762/KWH Primary: $230.00/mo.

Page 76: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

75

WYOMINGSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Fall River Rural 3 General Over 10 KW: 7.65/KW All usage: 4.605/KWH Customer charge: $45.00/mo. Electric Coop. Service

Garland Light C General All demand: 4.00/KW First 200 KWH/KW 7.4961/KWH 25 KVA Subject to power cost adjustment. & Power Service Next 200 KWH/KW 4.4201/KWH Facilities charge: $65.50/mo.

All additional: 2.2826/KWH 2006 rate.

High Plains Power B-3 Commercial All demand: 18.85/KW All usage: 2.6195/KWH Subject to power cost adjustment. (All districts) Large Minimum charge: $85.00/mo.

B-4 Large Power NCP demand: 2.00/KWH All usage: 2.508/KWH 1,000 KW Facilities charge: $225.00/mo.Transmission Subject to power cost adjustment.Level Service MCP demand: 18.60/KWH Schedule for transmission voltage

delivery.

B-1 Large Power All demand: 5.75/KW First 150 WH/KW: 11.480/KWH 45 KVA Facilities charge: $85.00/mo. B-2 Three-Phase Distribution All additional: 3.310/KWH

Secondary Service

High West LP Large Power 12.32/KW First 50 KWH/KW: 8.517/KWH 375 KVA 5% demand discount for delivery Energy, Inc. Next 100 KWH/KW: 5.804/KWH at primary voltage if customer owns

Next 100 KWH/KW: 4.546/KWH and maintains transformers. FacilityAll additional: 4.061/KWH charge: $26.00/mo. Rate includes all

adjustments. 2008 rate.

Lower Valley Power C-2 Large Power All demand: 6.480/KW All usage: 3.271/KWH 20 KW Minimum charge: $10.00/mo. and Light Service

Montana-Dakota 39 Large General All demand: 6.00/KW First 2,000 KWH: 7.792/KWH 50 KW 5% discount for delivery at primary Utilities Company Electric Service Next 8,000 KWH: 4.842/KWH voltage. Base rate $16.00/mo.

All additional: 3.792/KWH Subject to a power supply costadjustment of $(0.00355)/KWH,effective 4/2007.

Page 77: Electric Power - United States 2008

EP - U.S.

76C

opyright © 2008 InfoM

ine USA

, Inc.

WYOMINGSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Niobrara Electric LP Large Power All demand: 20.20/KW All usage: 4.071/KWH 50 KVA 7% discount for delivery at primary Association Service voltage. Facilities charge:

$237.00/mo. Special contracts forinterruptible power available.

Pacific Power 25 General All demand: Secondary: Basic charge: and Light Company Service Secondary 11.57/KW First 1,000 KWH 4.839/KWH Secondary delivery: $16.50/mo.

Primary 11.20/KW Next 8,000 KWH: 2.789/KWH Primary delivery: $19.50/mo.(Rocky Mountain Power) All additional: 1.709/KWH

Primary:First 40,000 KWH 4.691/KWHNext 8,000 KWH: 2.699/KWHAll additional: 1.649/KWH

48T Large Power On-Peak: 10.96/KW All usage: 0.547/KWH 1,000 KW Basic charge: $3,605.00/mo.Service-Transmission 1% discount for primary metering.Voltage Delivery discounts: $.30/KW for

primary $.60/KW for transmission.

On-Peak*: Monday - Friday7:00 A.M. - 11:00 P.M.

Powder River LP Large Power First 50 KW: 2.65/KW First 200 KWH/KW: 3.987/KWH 50 KVA Basic charge: $75.00/mo. Energy Corporation All additional: 5.35/KW All additional: 1.987/KWH Discount for delivery at primary Western Division voltage. $0.40/KVA of contract

capacity. (Formerly, Sheridan-Johnson Rural Electric Assn.)

LPT Large Power Basic demand: 0.95/KW All usage: 1.587/KWH 1,000 KW Basic charge: $600.00/mo.Transmission Wholesale demand: 6.77/KW Available only at 69 KV or greaterLevel for coal mining and processing.

Shoshone River Power Sold to Pacific Power & Light Co.

Wheatland Rural LP Large Power All demand: 22.56/KW First 50,000 KWH: 5.310/KWH 50 KVA Any loads over 1,000 KVA are Electric Association All additional: 3.210/KWH negotiable. Facilities charge:

$60.00/mo. 2008 rate.

Page 78: Electric Power - United States 2008

EP - U.S.

Copyright ©

2008 InfoMine U

SA, Inc.

77

WYOMINGSched Schedule Minimum

Power Company No. Name Demand Charge (dollars) Energy Charge (cents) Demand Remarks

Wyrulec Company GS-3 General Service All usage: 10.430/KWH 50 KVA Basic charge: $42.00/mo.Three-Phase Special rates available for service

over 350 KVA.

LP-TS Large Power All demand: All usage: 2.690/KWH 350 KVA Basic charge: $600.00/mo.Service Retail demand: 1.93/KW Available only to customers who Transmission Generation: 20.54/KW own their substations.

Yampa Valley Large Power All demand: No charge All usage: 6.691/KWH 50 KVA Consumer charge: $50.00/mo. Service Primary

Page 79: Electric Power - United States 2008

Estimator's Guide to Industrial Power Rates - 2008 (U.S. Dollars/KWH)

Billing Demand (kW) and Consumption (MWh)

75 KW 1,000 KW 50,000 KW

15 MWh 30 MWh 50 MWh 200 MWh 400 MWh 650 MWh 15000 MWh 25000 MWh 32500 MWh

Alabama Alabama Power Company 0.115 0.097 0.088 0.087 0.070 0.062 0.075 0.064 0.060

ArizonaArizona Public Service Company 0.123 0.081 0.064 0.101 0.070 0.058 0.094 0.071 0.064Tucson Electric Power Company 0.094 0.069 0.059 0.094 0.069 0.059 0.077 0.064 0.059

ArkansasEmpire District Electric Company 0.075 0.059 0.051 0.072 0.057 0.050 0.060 0.048 0.044Entergy Arkansas, Inc 0.079 0.067 0.056 0.079 0.059 0.049 0.063 0.052 0.046OG&E Electric Services 0.069 0.053 0.046 0.054 0.044 0.040 0.047 0.042 0.040Southwestern Electric Power Company 0.050 0.039 0.035 0.050 0.039 0.035 0.041 0.036 0.034

CaliforniaPacific Gas & Electric Company 0.125 0.109 0.103 0.117 0.096 0.088 0.072 0.069 0.067PacifiCorp 0.104 0.098 0.096 0.078 0.069 0.066 0.071 0.066 0.065San Diego Gas & Electric Company 0.160 0.123 0.109 0.156 0.122 0.108 0.098 0.094 0.092Southern California Edison 0.126 0.102 0.092 0.127 0.103 0.094 0.072 0.068 0.067

ColoradoAquila Networks-WPE (formerly UtiliCorp) 0.110 0.071 0.056 0.107 0.070 0.056 0.077 0.059 0.052Public Service Company of Colorado 0.106 0.067 0.051 0.097 0.062 0.049 0.073 0.055 0.049

ConnecticutConnecticut Light & Power Company 0.185 0.155 0.141 0.175 0.151 0.142 0.156 0.145 0.140United Illuminating Company 0.206 0.182 0.172 0.180 0.164 0.157 0.168 0.160 0.157

DelawareDelmarva Power 0.137 0.103 0.089 0.131 0.093 0.079 0.116 0.098 0.092

District of ColumbiaPotomac Electric Power Company 0.170 0.159 0.155 0.158 0.147 0.142 0.151 0.144 0.142

FloridaFlorida Power & Light Company 0.110 0.092 0.085 0.112 0.091 0.081 0.072 0.068 0.066Gulf Power Company 0.095 0.080 0.074 0.102 0.079 0.070 0.086 0.074 0.064Progress Energy Florida 0.098 0.088 0.079 0.095 0.086 0.078 0.089 0.079 0.078Tampa Electric Company 0.114 0.094 0.086 0.112 0.092 0.085 0.098 0.088 0.084

GeorgiaGeorgia Power Company 0.127 0.087 0.069 0.127 0.088 0.071 0.086 0.070 0.064

HawaiiHawaii Electric Light Company 0.375 0.342 0.324 0.372 0.338 0.317 0.350 0.326 0.316Hawaiian Electric Company 0.236 0.211 0.196 0.232 0.209 0.196 0.216 0.199 0.193Maui Electric Company (Lanai) 0.417 0.394 0.372 0.409 0.379 0.360 0.387 0.368 0.359Maui Electric Company (Maui) 0.352 0.329 0.307 0.347 0.316 0.297 0.325 0.305 0.296Maui Electric Company (Molokai) 0.424 0.378 0.352 0.387 0.363 0.324 0.370 0.342 0.323

IdahoAvista Corp. 0.073 0.062 0.058 0.067 0.057 0.052 0.047 0.043 0.041Idaho Power Company 0.048 0.038 0.035 0.047 0.036 0.031 PacifiCorp 0.069 0.053 0.044 0.070 0.051 0.043 0.050 0.042 0.040

IllinoisAmerenCILCO - Unbundled 0.085 0.082 0.081 AmerenCIPS (unbundled rates) 0.077 0.073 0.071 AmerenIP (unbundled) 0.082 0.078 0.076 Commonwealth Edison Company - Unbundled 0.101 0.089 0.084 0.137 0.115 0.109 MidAmerican Energy 0.062 0.050 0.041 0.055 0.042 0.037 0.040 0.034 0.031

Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.

Copyright @2008 InfoMine, USA, Inc.

EP-US 79

Page 80: Electric Power - United States 2008

Estimator's Guide to Industrial Power Rates - 2008 (U.S. Dollars/KWH)

Billing Demand (kW) and Consumption (MWh)

75 KW 1,000 KW 50,000 KW

15 MWh 30 MWh 50 MWh 200 MWh 400 MWh 650 MWh 15000 MWh 25000 MWh 32500 MWh

IndianaAEP (Indiana Michigan Power) 0.073 0.062 0.057 0.081 0.058 0.044 0.057 0.047 0.040Duke Energy Indiana 0.076 0.063 0.050 0.071 0.060 0.048 0.060 0.049 0.044Indianapolis Power & Light Company 0.093 0.064 0.052 0.086 0.057 0.045 0.063 0.049 0.044Northern Indiana Public Service Company 0.118 0.094 0.085 0.110 0.086 0.076 0.086 0.075 0.071Southern Indiana Gas & Electric Company 0.097 0.086 0.073 0.097 0.071 0.062 0.073 0.062 0.058

IowaInterstate Power & Light (North Zone 0.082 0.054 0.043 0.077 0.051 0.042 0.054 0.043 0.039Interstate Power & Light (Northeast Zone 0.073 0.050 0.041 0.069 0.048 0.040 0.052 0.042 0.038Interstate Power & Light (South Zone 0.072 0.050 0.042 0.070 0.049 0.042 0.053 0.043 0.040MidAmerican Energy - East System 0.081 0.057 0.047 0.071 0.052 0.045 0.051 0.041 0.038MidAmerican Energy-North System 0.055 0.045 0.035 0.048 0.038 0.031 0.041 0.034 0.031MidAmerican Energy-South System 0.071 0.055 0.041 0.062 0.045 0.035 0.051 0.040 0.035

KansasEmpire District Electric Company 0.104 0.079 0.066 0.090 0.069 0.061 0.059 0.054 0.052Kansas City Power & Light Company 0.077 0.055 0.044 0.072 0.061 0.048 0.059 0.047 0.043Westar Energy-KGE 0.063 0.053 0.049 0.070 0.047 0.038 0.054 0.042 0.038Westar Energy-KPL 0.055 0.047 0.044 0.071 0.048 0.040 0.056 0.044 0.040

KentuckyAEP (Kentucky Power Rate Area) 0.079 0.069 0.065 0.081 0.052 0.040 0.052 0.038 0.033Duke Energy Kentucky 0.094 0.071 0.059 0.102 0.072 0.060 0.062 0.053 0.050Kentucky Utilities Company 0.084 0.064 0.055 0.081 0.062 0.055 0.065 0.056 0.053Louisville Gas & Electric Company 0.086 0.058 0.046 0.080 0.054 0.045 0.059 0.047 0.043

LouisianaCLECO Power LLC 0.121 0.099 0.091 0.120 0.099 0.091 0.095 0.084 0.080Entergy Gulf States, Inc 0.104 0.091 0.085 0.099 0.087 0.082 0.083 0.075 0.072Entergy Louisiana, Inc 0.099 0.087 0.076 0.080 0.066 0.064 0.068 0.066 0.059Entergy New Orleans, Inc 0.106 0.093 0.083 0.103 0.087 0.079 0.091 0.082 0.079Southwestern Electric Power Company 0.066 0.053 0.048 0.066 0.053 0.047 0.050 0.043 0.041

MaineMaine Public Service Company 0.204 0.167 0.152 0.195 0.163 0.151

MarylandDelmarva Power 0.133 0.123 0.119 0.113 0.099 0.094 0.088 0.083 0.081Potomac Edison Company 0.124 0.088 0.069 0.096 0.087 0.083 0.080 0.077 0.077Potomac Electric Power (Montgomery County 0.130 0.126 0.124 0.114 0.111 0.110 0.111 0.109 0.109Potomac Electric Power (Prince George's County) 0.117 0.113 0.111 0.101 0.098 0.097 0.098 0.097 0.096

MassachusettsBoston Edison Company 0.195 0.168 0.157 0.193 0.157 0.143 0.168 0.149 0.143Cambridge Electric Company 0.189 0.159 0.147 0.165 0.142 0.133 0.151 0.138 0.134Commonwealth Electric Company 0.181 0.168 0.163 0.178 0.157 0.150 0.162 0.152 0.148Fitchburg Gas & Electric Light Company 0.190 0.168 0.159 0.173 0.162 0.158Massachusetts Electric Company 0.159 0.144 0.137 0.151 0.141 0.137 0.144 0.138 0.136Western Massachusetts Electric Company 0.171 0.148 0.138 0.175 0.150 0.140 0.138 0.133 0.131

MichiganAEP (Indiana Michigan Power St. Jos. Rate Area 0.083 0.076 0.073 0.087 0.056 0.045 0.054 0.042 0.038AEP (Indiana Michigan Power, Three Rivers Rate 0.079 0.068 0.064 0.073 0.059 0.051 0.051 0.044 0.039Consumers Energy 0.105 0.078 0.067 0.099 0.075 0.065 0.083 0.070 0.065Detroit Edison Company 0.107 0.092 0.074 0.107 0.084 0.069 0.087 0.069 0.060Edison Sault Electric Company 0.100 0.097 0.088 0.099 0.090 0.083 Northern States Power Company (WI) 0.092 0.073 0.065 0.092 0.073 0.066 0.076 0.066 0.061Upper Peninsula Power Company 0.163 0.119 0.102 0.124 0.103 0.095 0.105 0.090 0.085We Energies (formerly Wisconsin Electric) 0.104 0.088 0.073 0.102 0.075 0.064 0.082 0.068 0.063Wisconsin Public Service Corporation 0.091 0.093 0.074 0.105 0.076 0.065 0.084 0.069 0.064

Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.

Copyright @2008 InfoMine, USA, Inc.

EP-US 80

Page 81: Electric Power - United States 2008

Estimator's Guide to Industrial Power Rates - 2008 (U.S. Dollars/KWH)

Billing Demand (kW) and Consumption (MWh)

75 KW 1,000 KW 50,000 KW

15 MWh 30 MWh 50 MWh 200 MWh 400 MWh 650 MWh 15000 MWh 25000 MWh 32500 MWh

MinnesotaInterstate Power & Light 0.072 0.062 0.053 0.077 0.058 0.051 0.064 0.054 0.051Minnesota Power Company 0.083 0.072 0.067 0.078 0.061 0.055 0.073 0.055 0.048Northern States Power Company (MN) 0.088 0.071 0.061 0.087 0.071 0.061 0.076 0.066 0.061Otter Tail Power Company 0.095 0.071 0.061 0.086 0.067 0.059 0.073 0.062 0.058

MississippiEntergy Mississippi, Inc. 0.107 0.091 0.085 0.084 0.075 0.065 0.072 0.063 0.060Mississippi Power Company 0.110 0.088 0.080 0.106 0.084 0.073 0.085 0.075 0.070

MissouriAmerenUE 0.057 0.048 0.040 0.049 0.041 0.035 0.043 0.034 0.031Aquila Networks-L&P (formerly UtiliCorp) 0.059 0.048 0.043 0.057 0.042 0.037 0.045 0.039 0.037Aquila Networks-MPS (formerly UtiliCorp) 0.065 0.054 0.049 0.052 0.044 0.040 0.047 0.042 0.040Empire District Electric Company 0.079 0.062 0.055 0.076 0.061 0.055 0.066 0.052 0.046Kansas City Power & Light Company 0.080 0.058 0.047 0.080 0.058 0.045 0.055 0.044 0.039

MontanaMontana-Dakota Utilites Company 0.070 0.055 0.049 0.068 0.054 0.048 0.058 0.051 0.048NorthWestern Energy (formerly Montana Power) 0.107 0.085 0.076 0.085 0.070 0.065 0.067 0.063 0.061

NevadaNevada Power Company 0.097 0.092 0.089 0.091 0.082 0.078 0.084 0.079 0.078Sierra Pacific Power Company 0.133 0.113 0.105 0.139 0.110 0.100 0.118 0.104 0.099

New HampshireGranite State Electric Company 0.140 0.129 0.125 0.137 0.127 0.124 0.130 0.125 0.123Public Service Company of New Hampshire 0.148 0.126 0.117 0.135 0.118 0.111 0.124 0.115 0.111Unitil Energy Systems, Inc 0.183 0.159 0.150 0.167 0.154 0.150

New JerseyAtlantic Electric 0.150 0.131 0.123 0.096 0.087 0.083 0.089 0.084 0.083Jersey Central Power & Light Company 0.152 0.137 0.131 Public Service Electric & Gas Company 0.132 0.118 0.112 0.138 0.118 0.111 0.118 0.108 0.105Rockland Electric Company 0.151 0.138 0.132 0.150 0.134 0.125 0.170 0.155 0.150

New MexicoEl Paso Electric Company 0.138 0.095 0.073 0.156 0.096 0.073 0.114 0.082 0.071Public Service Company of New Mexico 0.094 0.070 0.059 0.088 0.060 0.050 0.059 0.049 0.047Southwestern Public Service Company 0.097 0.077 0.067 0.093 0.073 0.064 0.071 0.063 0.060

New YorkCentral Hudson Gas & Electric Corporation 0.099 0.083 0.077 0.134 0.116 0.109 0.105 0.102 0.101Consolidated Edison Company of New York 0.236 0.192 0.175 0.236 0.192 0.175 0.214 0.188 0.179LIPA 0.162 0.149 0.144 0.155 0.144 0.140 0.144 0.140 0.138National Grid (Niagara Mohawk Power Corporation) 0.173 0.145 0.135 0.194 0.151 0.132 0.121 0.110 0.106New York State Electric & Gas Corporation 0.127 0.114 0.097 0.115 0.106 0.103 0.095 0.092 0.092Orange & Rockland Utilities, Inc. 0.162 0.146 0.132 0.138 0.125 0.119 0.117 0.112 0.110Rochester Gas & Electric Corporation 0.149 0.121 0.107 0.127 0.102 0.092 0.094 0.083 0.080

North CarolinaDominion North Carolina Power 0.071 0.063 0.054 0.078 0.062 0.051 0.071 0.056 0.051Duke Energy Carolinas 0.066 0.055 0.044 0.063 0.053 0.040 0.050 0.040 0.037Progress Energy Carolinas, Inc 0.089 0.065 0.057 0.107 0.078 0.062 0.085 0.071 0.061

North DakotaMontana-Dakota Utilities Company 0.087 0.065 0.057 0.085 0.064 0.056 0.071 0.060 0.056Northern States Power Company (MN) 0.076 0.060 0.051 0.075 0.060 0.051 0.065 0.055 0.051Otter Tail Power Company 0.096 0.074 0.062 0.086 0.069 0.060 0.067 0.058 0.055

Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.

Copyright @2008 InfoMine, USA, Inc.

EP-US 81

Page 82: Electric Power - United States 2008

Estimator's Guide to Industrial Power Rates - 2008 (U.S. Dollars/KWH)

Billing Demand (kW) and Consumption (MWh)

75 KW 1,000 KW 50,000 KW

15 MWh 30 MWh 50 MWh 200 MWh 400 MWh 650 MWh 15000 MWh 25000 MWh 32500 MWh

OhioAEP (Columbus Southern Power Rate Area) 0.104 0.076 0.060 0.097 0.069 0.056 0.055 0.045 0.041AEP (Ohio Power Rate Area) 0.077 0.064 0.050 0.071 0.061 0.048 0.054 0.041 0.036Cleveland Electric Illuminating Company 0.142 0.106 0.092 0.136 0.095 0.075 0.107 0.077 0.064Dayton Power & Light Company 0.116 0.077 0.062 0.104 0.067 0.053 0.075 0.057 0.050Duke Energy Ohio 0.124 0.082 0.063 0.122 0.082 0.064 0.081 0.062 0.056Ohio Edison Company 0.151 0.092 0.066 0.155 0.095 0.068 0.102 0.072 0.061Toledo Edison Company 0.142 0.105 0.088 0.154 0.103 0.077 0.129 0.089 0.074

OklahomaEmpire District Electric Company 0.099 0.082 0.073 0.089 0.075 0.070 0.071 0.066 0.065OG&E Electric Services 0.073 0.058 0.052 0.064 0.052 0.048 0.045 0.041 0.040Public Service Company of Oklahoma 0.073 0.068 0.061 0.073 0.060 0.055 0.057 0.052 0.050

OregonIdaho Power Company 0.058 0.046 0.041 0.049 0.037 0.032 PacifiCorp 0.074 0.062 0.057 0.060 0.049 0.045 0.047 0.043 0.041Portland General Electric Company 0.092 0.078 0.073 0.086 0.074 0.069 0.067 0.064 0.063

PennsylvaniaDuquesne Light Company 0.129 0.100 0.088 0.119 0.097 0.088 0.080 0.077 0.076Metropolitan Edison Company 0.104 0.078 0.068 0.089 0.071 0.064 0.075 0.065 0.062PECO Energy 0.175 0.110 0.079 0.157 0.102 0.074 0.124 0.087 0.074Pennsylvania Electric Company 0.097 0.071 0.060 0.079 0.062 0.055 0.068 0.057 0.054Pennsylvania Power Company 0.098 0.093 0.091 0.098 0.093 0.091 0.089 0.089 0.089Pike County Light & Power Company 0.166 0.157 0.154 0.159 0.146 0.141 0.150 0.144 0.141PPL Utilities Corp. 0.111 0.082 0.069 0.103 0.074 0.061 0.078 0.064 0.058UGI Utilities, Inc. 0.141 0.119 0.109 0.137 0.118 0.109 0.117 0.108 0.105West Penn Power Company 0.078 0.069 0.065 0.074 0.059 0.053 0.060 0.047 0.042

Rhode IslandNarragansett Electric Company 0.141 0.128 0.123 0.132 0.124 0.121 0.119 0.114 0.113

South CarolinaDuke Energy Carolinas 0.074 0.054 0.042 0.068 0.052 0.042 0.052 0.041 0.038Progress Energy Carolinas, Inc 0.090 0.067 0.058 0.102 0.074 0.060 0.077 0.064 0.057South Carolina Electric & Gas Company 0.094 0.087 0.067 0.091 0.069 0.056 0.076 0.059 0.054

South DakotaBlack Hills Power 0.100 0.079 0.066 0.083 0.065 0.057 0.058 0.049 0.046MidAmerican Energy 0.063 0.050 0.039 0.063 0.046 0.036 0.052 0.041 0.036Montana-Dakota Utilities Company 0.081 0.065 0.059 0.075 0.062 0.058 0.066 0.060 0.057Northern States Power Company (MN) 0.078 0.062 0.054 0.077 0.062 0.054 0.067 0.058 0.054Northwestern Energy (formerly Northwestern Public 0.105 0.071 0.056 0.084 0.061 0.048 0.067 0.054 0.048Otter Tail Power Company 0.085 0.066 0.054 0.072 0.059 0.051 0.063 0.054 0.050

TennesseeAEP (Kingsport Power Rate Area) 0.074 0.055 0.048 0.056 0.045 0.041 0.048 0.038 0.034

TexasEl Paso Electric Company 0.144 0.105 0.085 0.156 0.105 0.079 0.084 0.065 0.058Entergy Gulf States, Inc 0.104 0.093 0.089 0.098 0.086 0.079 0.084 0.074 0.071Southwestern Electric Power Company 0.059 0.046 0.040 0.059 0.046 0.041 0.046 0.040 0.038Southwestern Public Service Company 0.084 0.064 0.056 0.078 0.060 0.054 0.056 0.050 0.048

UtahPacifiCorp 0.087 0.057 0.045 0.082 0.055 0.044 0.050 0.039 0.035

VermontCentral Vermont Public Service Corporation 0.158 0.110 0.090 0.137 0.095 0.079 0.088 0.073 0.068Green Mountain Power Company 0.144 0.108 0.094 0.139 0.106 0.093 0.117 0.099 0.092

Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.

Copyright @2008 InfoMine, USA, Inc.

EP-US 82

Page 83: Electric Power - United States 2008

Estimator's Guide to Industrial Power Rates - 2008 (U.S. Dollars/KWH)

Billing Demand (kW) and Consumption (MWh)

75 KW 1,000 KW 50,000 KW

15 MWh 30 MWh 50 MWh 200 MWh 400 MWh 650 MWh 15000 MWh 25000 MWh 32500 MWh

VirginiaAEP (Appalachian Power Rate Area) 0.073 0.054 0.043 0.065 0.050 0.041 0.049 0.039 0.036Delmarva Power 0.115 0.097 0.090 0.112 0.096 0.090 0.094 0.087 0.084Dominion Virginia Power 0.089 0.065 0.050 0.090 0.058 0.046 0.068 0.051 0.045Old Dominion Power Company 0.072 0.060 0.055 0.073 0.060 0.054 Potomac Edison Company 0.067 0.054 0.046 0.065 0.050 0.042 0.051 0.041 0.038

WashingtonAvista Corp. 0.087 0.076 0.072 0.081 0.071 0.067 0.055 0.050 0.049PacifiCorp 0.067 0.056 0.052 0.069 0.051 0.044 0.052 0.044 0.042Puget Sound Energy 0.101 0.086 0.078 0.099 0.079 0.067 0.062 0.057 0.055

West VirginiaAEP (Appalachian Power Rate Area) 0.065 0.054 0.043 0.059 0.049 0.039 0.047 0.037 0.033AEP (Wheeling Power Rate Area) 0.065 0.054 0.043 0.059 0.049 0.039 0.047 0.037 0.033Monongahela Power Company 0.075 0.055 0.047 0.072 0.053 0.042 0.051 0.040 0.037Potomac Edison Company 0.075 0.055 0.047 0.072 0.053 0.042 0.051 0.040 0.037

WisconsinMadison Gas & Electric Company 0.121 0.093 0.082 0.114 0.086 0.075 0.095 0.076 0.042Northern States Power Company (WI) 0.086 0.065 0.056 0.084 0.063 0.056 0.064 0.054 0.050Northwestern Wisconsin Electric Company 0.121 0.101 0.093 0.112 0.093 0.085 0.099 0.089 0.085Superior Water, Light & Power Company 0.073 0.054 0.047 0.078 0.058 0.050 0.058 0.047 0.043We Energies (formerly Wisconsin Electric) 0.109 0.083 0.071 0.101 0.072 0.061 0.081 0.067 0.061Wisconsin Public Service Corporation 0.094 0.071 0.060 0.086 0.063 0.054 0.069 0.057 0.053WP&L 0.101 0.101 0.100 0.105 0.070 0.061 0.076 0.062 0.057

WyomingBlack Hills Power 0.083 0.071 0.063 0.080 0.062 0.055 0.053 0.044 0.041Cheyenne Light, Fuel & Power Company 0.136 0.085 0.064 0.122 0.078 0.060 0.081 0.061 0.054Montana-Dakota Utilities Company 0.075 0.054 0.046 0.064 0.049 0.043 0.053 0.045 0.043PacifiCorp 0.090 0.061 0.049 0.100 0.059 0.044 0.054 0.040 0.035

CANADA

British ColumbiaBritish Columbia Hydro and Power Authority 0.081 0.057 0.048 0.066 0.050 0.044 0.045 0.038 0.036

ManitobaManitoba Hydro 0.079 0.054 0.043 0.075 0.050 0.041 0.041 0.034 0.031

New BrunswickNew Brunswick Power 0.116 0.085 0.072 0.107 0.075 0.063 0.086 0.069 0.063

Nova ScotiaNova Scotia Power, Inc 0.112 0.087 0.076 0.111 0.083 0.072 0.091 0.077 0.072

QuebecHydro-Quebec 0.108 0.078 0.064 0.108 0.070 0.054 0.060 0.047 0.043

Adapted from Typical Bills and Rates Report - Winter 2008. Published by Edison Electric Institute.

Copyright @2008 InfoMine, USA, Inc.

EP-US 83