elect inst three phase

Upload: sarathirv6

Post on 14-Feb-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/23/2019 Elect Inst Three Phase

    1/40

    MECHANICAL & ELECTRICAL WORKS

    MEASUREMENT (SBEQ3213)Week 9 : Electrical Installations Three Phase

    Sr. Dr. Sarajul Fikri Mohamed

    Faculty of Built Environment

  • 7/23/2019 Elect Inst Three Phase

    2/40

    Cold Water InstallationsPLUMBING WORKS

    Electrical Installations

    Fire Fighting System

    MAIN COURSE COMPONENTS

    Air Conditioning Installations

    Unit/Split Package/Central

    Single Phase Three Phase

    ELECTRICAL WORKS

    MECHANICAL WORKS

    Soil & Waste Pipes/Sanitary Fittings

    Underground Drainage

  • 7/23/2019 Elect Inst Three Phase

    3/40

    1. Electrical installations: main components

    2. SMM2 measurement rules for electrical installations

    3. Taking off list for electrical installations

    4. Heading and description.

    5. Case study: CADANGAN MEMBINA DEWAN SERBAGUNA

    TAMAN KOTA JAYA, KOTA TINGGI, JOHOR

    TABLE OF CONTENT

  • 7/23/2019 Elect Inst Three Phase

    4/40

    2009 Sarajul Fikri Mohamed

    ELECTRICAL INSTALLATIONS

    AND MAIN COMPONENTS

  • 7/23/2019 Elect Inst Three Phase

    5/40

    INCOMING SERVICES

    MAIN INSTALLATION

    POWER INSTALLATION

    LIGHTING INSTALLATION

    CABLES

    ELECTRICAL APPLIANCES

    CONDUIT AND FITTING

    LIGHTNING PROTECTION SYSTEM

    TESTING

    ELECTRICAL INSTALLATIONSTHREE

    PHASE

  • 7/23/2019 Elect Inst Three Phase

    6/40

    INCOMING SERVICES

    MAIN INSTALLATION

    POWER INSTALLATION

    LIGHTING INSTALLATION

    ELECTRICAL APPLIANCES

    FINAL SUB-

    CIRCUIT

    CABLE

    CONDUIT

    LIGHTNING

    PROTECTION

    TESTING

    ELECTRICAL DISTRIBUTION IN BUILDING

  • 7/23/2019 Elect Inst Three Phase

    7/40 2009 Sarajul Fikri Mohamed

    SMM2 MEASUREMENT

    RULES

  • 7/23/2019 Elect Inst Three Phase

    8/40

    MEASUREMENT RULES

    ELECTRICAL INSTALLATION

  • 7/23/2019 Elect Inst Three Phase

    9/4029

    Clause Description

    R4-R5 Equipments and Control Gear

    R6-R8 Fittings and Accessories

    R9-R13 Conduits, trunking and cable trayR14-R17 Cabling

    R18 Final Sub-circuits

    R19 Earthing

    R20-R21 Ancillaries

    R22 Sundries

    R23-R24 Builders Work

    RELATED SMM2 CLAUSES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    10/40

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    11/40

    EQUIPMENT AND CONTROL GEAR (NO)

    R4Equipment (generator, motors)

    Control gear (isolator, switch fuses)

    Packaged item described with a manufacturers detail.

    Limiting dimension on size shall be given.

    Connecting cable ends or cable tails shall be deemed to be

    included with the item.

    Platework and supporting steelworkSection P.

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    12/40

    HEADING AND DESCRIPTION

    MAIN INSTALLATIONS1. EQUIPMENT AND CONTROL GEARItem Description Unit Qty Note

    A

    B

    Equipment and Control Gear

    415 volt metal clade main switch board, 3 phase of wall

    mounted floor standing type and including fuse swithches,

    RCCVs, copper busbar, voltmeter, ammeter, current

    transformer, light indicator, cable box and all associated

    accessories.

    TNB metre board control gear complete with cut out fuse

    holder and neutral link with facilities for termination of

    incoming supply cable for wiring connection main switch

    distribution board and fuses 60A current operated ELCB

    complete with earthing elctrode.

    No

    No

    2

    1

  • 7/23/2019 Elect Inst Three Phase

    13/40

    EQUIPMENT SUPPORTS : R5

    Equipment supports enumeratedand described (NO)

    Method of fixing given in the description with clauses R.1.5-6.

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    14/40

    MEASUREMENT RULESELECTRICAL INSTALLATION

  • 7/23/2019 Elect Inst Three Phase

    15/40

    2. Power Installation- fitting & accessories

    = socket no

    - cables m

    - conduits m

    - final sub-circuit no

    - sundries= mark holes item

    = general bonding item

    = testing item

    TAKING OFF LISTS

    DOMESTICHOUSING SINGLEPHASE

  • 7/23/2019 Elect Inst Three Phase

    16/40

    SOCKET

    POWER INSTALLATION

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    17/40

    MEASUREMENT RULESELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    18/40

    A rectangular metal made

    system that either horizontally

    or vertically fixed to wall.

    A good mechanical protection.

    Made from 18 gauge steel sheet.

    Available size:

    50mm x 50mm

    70mm x 100mm

    150mm x 75mm

    150mm x 150mm

    Equipped with bend, tee, and

    junction.

    TRUNKING

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    19/40

    Cable and trunking use for connection from main to distribution board or

    distribution board to socket.

    Size and Material.

    SMM2 Refer to clause R.15, R.9 (M)

    TRUNKING

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    20/40

    CONDUIT, TRUNKING AND CABLE TRAYS

    R12.1 Trays (m)i) type; ii) width; and iii) method of jointing

    R12.2 Stools (NO)

    i) type; and ii) size

    R12.3 Fitting (NO and EXTRA OVER )

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    21/40

    CABLE TRAY

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    22/40

    MEASUREMENT RULES

    ELECTRICAL INSTALLATION

  • 7/23/2019 Elect Inst Three Phase

    23/40

    CABLES

    R15.1Cables (m)

    measured as the net length of the conduit, trunking or tray.

    other cable measured as fix (without any allowance for sag)

    between boxes, equipment control gear, fittings, accessories etc.

    except for final sub-circuits.

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    24/40

    CABLE

    R17 Connections to public mains, making good public highway and

    other work which may only carried out by Public Undertaking

    or Local AuthorityPROVISIONAL SUM

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    25/40

    MEASUREMENT RULESELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    26/40

    3. Lighting Installation- fittings & accessories

    = switch no

    - cables m

    - conduits m

    - final sub circuit no

    - sundries= mark holes item

    = general bonding item

    = testing item

    TAKING OFF LISTS

    DOMESTICHOUSING SINGLE PHASE

  • 7/23/2019 Elect Inst Three Phase

    27/40

    MEASUREMENT RULESELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    28/40

    4. Electrical Appliances- fitting & accessories

    = Exhaust fan no

    - cables m- conduits m

    - final sub circuit no

    - sundries

    = mark holes item

    = general bonding item= testing item

    TAKING OFF LISTS

    DOMESTICHOUSING SINGLE PHASE

  • 7/23/2019 Elect Inst Three Phase

    29/40

    HEADING AND DESCRIPTION

    POWER INSTALLATIONS4. ELECTRICAL APPLIANCES (Internally)

    Item Description Unit Qty Note

    A

    B

    C

    D

    E

    Cables

    2 x 8mm2 PVC cable in concealed galvanised iron conduit come with 1 x 8mm2 PVC

    CPC

    Conduit

    25mm diameter PVC galvanised iron conduit concealed to brickwall for exhaust fan

    Fitting and Accessories

    150mm x150mm metal exhaust fan install at high level complete with support brackets,

    flexible connectors and vibration.

    1 gang 15 Amp switch outlet for exhaust fan with PVC plate box and fixed to brick wall

    Final Sub-Circuit

    Final sub-circuit fir 15A socket point for metal exhaust fan of concealed conduit cable

    installation consisting od 2 x 8mm2 single core cable drawn into galvanised iron conduit.

    m

    m

    No

    No

    No

    15

    35

    5

    5

    5

  • 7/23/2019 Elect Inst Three Phase

    30/40

    MEASUREMENT RULESELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    31/40

    EARTHING

    R19.1 Tapes for earthing(m)

    i) size;ii) type; andiii) type & spacing of saddles, cleats, clip holdfasts & the like

    R19.2 Conductor connections & junctions (NO)

    i) type; and ii) sizeR19.4 Test clamps (NO)

    i) type ii) size; and iii) method of connecting

    MEASUREMENT RULESELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    32/40

    Air Terminal

    Cooper Tape

    LIGHTING PROTECTION SYSTEMELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    33/40

    ELEMENT: ELECTRICAL SERVICES ubb/N/04

    BIL UNIT KUANTITI

    NO 16

    NO 16

    H

    M 29.00

    Brass test c lamp complete wi th screws. NO 2

    NO 2

    NO 2

    To Collection

    HARGA

    (RM)

    JUMLAH

    (RM)

    25mm x 3mm copper tape at roof including propose

    made copper or brass c lips at 1000mm internals and

    connecting to roof tapes.

    500mm High Solid Copper air termination with

    formed thread complete with bronze nut and

    appropriate thickness copper air terminal base.

    Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri

    Selangor, Petaling Jaya, Selangor.

    KETERANGAN

    Lighting Installation-Internally (All Provisional)

    (Cont'd)

    3 x 36W recessed mounted fluorescent light fitting

    with low loss ballast C/W acrylic diffuser 2 x

    1.5mm/1C PVC in concealed UPVC conduits with

    5A switch.

    300mm x 300mm x 300mm deep concrete Earth

    Electrode Chamber complete with concrete cover

    from ground level, lightweight screed to prevent

    ingres of water, 16mm solid drawn copper Earth

    Electrode, copper tape and 50mm UPVC pipe.

    3 x 36W recessed surface fluorescent light fitting

    with low loss ballast C/W acrylic diffuser 2 x

    1.5mm/1C PVC in concealed UPVC conduits with

    5A switch.

    Lightning Protection-Externally (All Provisional)

    COOPER TAPE

    ELECTRODE CHAMBER

  • 7/23/2019 Elect Inst Three Phase

    34/40

    Typical earth-electrode pit

    Earthing using cooper strip

    Earthing & Bonding

    requirement

    EARTHING INSTALLATIONELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    35/40

  • 7/23/2019 Elect Inst Three Phase

    36/40

  • 7/23/2019 Elect Inst Three Phase

    37/40

    Air Termination (NO.)

    Copper Tape Roof Conductor. (M)

    SMM2 Refer to clause R.19.6, R.22.2, R.19.

    LIGHTNING PROTECTION INSTALLATION

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    38/40

    ANCILLARIES

    R20 Loose keys, tools, spares and the like (NOseparately)

    i) type; and ii) quantity

    Rack for holding tools (NO)

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    39/40

    SUNDRIES

    R22.1 Marking the position of holes, mortice, chases & the like

    (ITEM)

    R22.2 General earth bonding & earthing (ITEM)

    R22.3 Disconnecting, setting aside & refixing equipment (ITEM)

    R22.4 Temporary operating each installation (ITEM)

    R22.5 Testing each installation (ITEM)

    R22.6 Preparing plans or diagrams of the installations (ITEM)

    MEASUREMENT RULES

    ELECTRICAL INSTALLATIONS

  • 7/23/2019 Elect Inst Three Phase

    40/40

    THANK YOUfor your kind attention