elc eng-001-patel nikung kumar mohanlal
TRANSCRIPT
-
7/28/2019 Elc Eng-001-Patel Nikung Kumar Mohanlal
1/6
Nikunj PatelEmail: [email protected]: 09225132090, 09879242880
Experience Summary:
I am MBA withBachelor of Engineering (B.E.) Electricals with 10 + years ofexperience and strengths in:
Production/testing and commissioning
Generators, Transformer Motors, PCC, MCC Maintenance
Physical, Internal Inspection and Testing of transformer
Management and Scheduling of Load
Work of HT Connections and Agriculture connections
Planning and layout of HT/LT network.
Load survey work management thereof.
Skills:General skills
- Managing External Resources & dealing with contractors- Managing Vendors- Managing high value contracts- Sound technical knowledge of the field- Loyal to work and company
Computer Skills- Operating computers of Microsoft Operating Systems- MS Office covering Word, Power Point and Excel for generating reports and
documents.- Have worked on Data Structure and Programming language of C, C++.-
Experience Summary:
Duration
( From To)
Name of Organization Designation Work Profile
At Present:-
6.12.2010
TILL TODAY
TORRENT POWER LTD.
SURAT
ASSISTANT
MNAGER
TECHNO
COMMERCIAL
02.06.2004
2.12.2010
PGVCL (GEB)- TMS,
ALDC(ABT)
DEPUTY ENGINEER TECHNO
COMMERCIAL
18.10.2002
30.5.2004
RUBY MACONS LTD-
VAPI
MAINTANENCE
ENGINEER
MAINTENANCE &
TROUBLE
SHOOTING
1-3.2000
30.6.2002
ASHOK
TRANSFORMERS (P)
LTD- UDHNA
PRODUCTION &
TESTONG ENGR
TESTING & PRODUCTION
OF POWER & DIST
XMERS
1 of 6
mailto:[email protected]:[email protected] -
7/28/2019 Elc Eng-001-Patel Nikung Kumar Mohanlal
2/6
Experience Description
After completing my Engineering, I have got opportunities to server fewcompanies with different responsibilities. Following is my experiences in detail,
1. 1st Mar 2000 to 30th June 2002 as Production/Testing &commissioning EngineerAt: Ashok Transformers Pvt Ltd.UdhnaDuration: 2 years 4 monthsScope of Work:
Company is engaged in Manufacturing of Power and Distributiontransformers of Capacity from 63 KVA to 20 MVA of 11KV to 132KV.
My job is to check the Quality of the transformer and Testing oftransformer and also maintenance.
I commissioned Transformer at Porbandar (10MVA/66KV), Mehsana(10MVA/66KV), and Bardoli (15MVA/66KV). I visited ERDA for type test (Short Circuit Withstand) of Distribution
Xmer on behalf of company. Here I worked on CT, PT and also having knowledge of Relay Testing at
Sub Stations. I also commissioned OVEN (Vacuum, Oil) at this company and
maintenance of same.
2. 29th Aug 2002 to 4th Oct 2002 as Maintenance EngineerAt:Jayesh Electricals, a contractor of SMC South ZONE, SuratDuration: 2 monthsScope of Work:
Survey work and carry out system up gradation for power savingpurpose and maintenance of street light and Light Masts
3. 18th Oct 2002 to 30th May 2004 as Maintenance EngineerAt: Ruby Macons Ltd. GIDC, VapiDuration: 1 year 7 monthsScope of Work:
Company is a large producer of Craft Paper for packaging (40,000tons/anum) of various qualities.
Here I have to look after Power Control Panels, Motor Control panels of
various Capacity and Maintenance of Motors and Transformer. Work of Maintenance and Trouble shooting in A/c Variable Drives (ABB
ACS) DC Variable drives (Control Technique/ABB-DCS). I also look after 1.2 MW-415 V-50 Hz Steam Turbine Generator (Back
Pressure Turbine), 2500 KW-415 V-50 vHz Diesel Generator and wehave to regularly maintain them and trouble shooting for Synchronisingpanel, AVR and control panels.
I also worked On Project (Planning/Erection/Commissioning) of a newFurnace Oil Based Generator (HYUNDAI) of 1.7 MW-415 V-50 Hz and itsPCC and Synchronizing Panel maintenance there after.
More Over this I also looked after TATA-Honeywell Measure System
(Quality Control System). Here I also worked with PLC for pneumatic valves on Paper Machine.
2 of 6
-
7/28/2019 Elc Eng-001-Patel Nikung Kumar Mohanlal
3/6
Here I have also learned Men-Power management, Cost cuttingmanagement maintaining Quality and reducing down times formaintenance work.
4. 2nd June 2004 to 27th July 2008 as Junior Engineer (TMS)- PGVCLAt: Paschim Gujarat Vij Co. Ltd. (Div Office Una - Junagadh)Duration: 4 years 1 monthScope of Work: Transformer maintenance work and Physical, Internal Inspection and
Testing oftransformer.
Here my duties are of maintenance of transformers (More then 2900),and fail transformer replacement work.
I have to carry out Physical & Internal Inspection and Testing oftransformer at various repairing agencies and also look for Inspectionalong with Executive engineer.
Here we have to maintain the records of various agencies and tomaintain the records of each and every transformer of our division.
More over this I also do the Installation Checking work in Agriculture,Residential, Commercial and Industrial connection.
I also have to do activities of Meter Testing Laboratory and Remotemetering system ofL&T and SEMS.
5. 27th July 2008 to 29th Dec 2009 as Junior Engineer (Shift Incharge)- PGVCLAt: Paschim Gujarat Vij Co. Ltd. (Load Management Unit of PGVCL at 400
KV- ALDC- Jetpur)Duration: 1 year 5 months
Scope of Work:
Load Management- Forecasting and Scheduling Work of Saurastra Kuchchh Region of PGVCL.
Here we do work of Real Time System Monitoring of Western Region(area under WRLDC) on SCADA system.
Here I am working in shift duty for Management of Power Position inSaurastra and Kachchh region.
Here we do activities Power Forecasting and Power Scheduling andPower Purchasing work for PGVCL and manage Drawl depending onFrequency.
We process out Schedules/ Whiling of various Privet Captive and MotivePower Generating units under Saurastra- Kuchchh region.
Here we have to work on scheduling based on UI rate.
Here I cleared Professional exam of PGVCL regarding Electricity act-2003, AMR, E-urja with Distinction.
6. 29th Dec 2009 to 06th Dec 2010 as In charge Deputy Engineer-PGVCL
At: Paschim Gujarat Vij Co. Ltd. (Mahuva Division Office)Duration: 1 Year (approx).
3 of 6
-
7/28/2019 Elc Eng-001-Patel Nikung Kumar Mohanlal
4/6
Scope of Work:
Here I have to Work for Releasing HT Connections as per GERC normsand related work of HT connections.
Here I also have to work for AMR (Automatic Meter Reading) andRemote metering system of SEMS and L&T meters.
Work related to Agriculture connection as per Govt. of Gujaratguidelines.
To monitor HT/ LT network developing and strengthening andmaintenance work of the same, for area under Mahuva Division-(Including Coastal Area Development Scheme).
To Develop and Future Planning of 66 KV Sub stations to over come the
Demand Growth of the area under control
To maintain 66 KV S/s including 11 KV panels of feeders supplying thearea.
To Execute and monitor work ofHVDS scheme for Ag feeders as well asin Mahuva City area.
I also have to get executed works involving T&D and AT&C lossreduction activities.
I have to work and monitor on e-urja modules designed for PGVCL byTCS.
I look after work of Divisional Stores and Vendor Management IncludingMaterial purchase and Line Maintenance contracts.
Man Power Management of Three Junior Engineers, Five Sub divisionofficers and Store Officer including Seven store Junior Assistants andsubordinates.
7. 6th Dec 2010 to 23rd Aug- 2011 as Assistant Manager Torrent
Power Ltd.At: Surat (HVCC)Duration: Continue..Scope of Work:
Plan and sequence the activities related to Erection, Operation, and Maintenance
& Testing of various electrical network equipments.
Preventive, Corrective & Routine maintenance of LV Lines & Sub-Stations.
Assisting in all types of fault finding i.e. LV line, Transformers, Feeders etc.
Commitment to maintaining the highest standards of service quality in all aspects
at Transmission and Distribution levels as per Electricity Rules-1956 and Act-
2003.
Active involvement in Various Section distribution network like Tariff, Metering,
Billing etc.
Doing needful action to minimize Power theft, % L.T voltage regulation, T&D
losses.
To assist in improving electrical distribution network performance and reliability.
4 of 6
-
7/28/2019 Elc Eng-001-Patel Nikung Kumar Mohanlal
5/6
Utility site survey and system study report preparation.
Identification of utility requirements based on techno-commercial approach with
the reliability & cost benefit analysis.
Monitoring of work progress of various activities as per schedule in coordinationwith various departments, updating of the latest status and ensure on time
completion of the work.
Coordinate resolution of issues through the use of change management .
Ability to successfully interface with executive, customer and Higher Authorities.
Liaison with the contractors and statutory authorities.
Recently we are working on new System implementation of SAP.
I have carried out Technical and Commercial survey work for Proposed
Distribution Franchisee by Madhya Pradesh at for Ujjain District and carried
out the viability of the franchisee if taken .
8. 23rd August -2011...continued- as Assistant Manager -Torrent Power Ltd.
At : Bhivandi
Scope of Work: HT Switching Operations, Network Department
Here I have to look after HT network upgradation work and to curtail
Technical Line losses along with maintaining high standards for power
Reliability.
Planning of HT cabling work to reduce existing Overhead network with best
of network schemes to provide reliable Power supply to our customers.
Also manage vendors and line contractors and to look after new line
execution work.
Taking care of Admin and Operations of 4 nos of Switching stations, and
switching operations with 4 nos of 220/22 KV S/s.
Planning of Capacitor bank, Reactors and its commissioning.
On site Trouble shooting for 22 KV ABB make RMUs, Circuit Breakers,
Autoreclosers , sectionalizers.
Liasoning with MSETCL / Nagar Palika and MERC officials also with Public
when required.
Education
5 of 6
-
7/28/2019 Elc Eng-001-Patel Nikung Kumar Mohanlal
6/6
MBA from ISBM- Ahmedabad/ Mumbai (Distance learning) in March-2010 withspecialization in Maintenance Management.
B. E. Electricals from LDCE Ahmedabad of Gujarat University in Jan-2000 withfirst class (60%)
H. S. C. from GSEB in Mar-1995 with distinction (70.6%)
S. S. C. from GSEB in Mar-1993 with distinction (78%)
Presentation:
Energy Conservation & Conventional Energy Sources
Project Work:
GBPS-Utran (GSECL) 135 MW Combine Cycle Power Plant - Surat.
Other Activities
Playing Synthesizer, Singing, Photography, Travelling
Personal DetailsName: Nikunj Patel
DOB: 29th March 1978
Address: 1) A-34, Balaji Krupa Society, Near Palanpur Jakatnaka, Rander Road,
Surat- 395009.
2) C/O Mohanbhai R. Patel, Soni Street, At. Po. ORMA, Ta. Olpad, SURAT
Marital Status: Married
Contact No: Personal-9737049596, 9925230112 Home- 9879242880,
Email: [email protected], [email protected]
Current CTC : Rs.5.4 Lacks/ annum. (Indian Rupees)
Expected CTC: Negotiable.
Notice Period: Three Month.
Contacts: 9225132090, 9879242880, 08446615310
6 of 6
mailto:[email protected]:[email protected]:[email protected]:[email protected]