What is EPTP ? EPTP is a Project consists of 21 components
– Substations and its Interconnections –for the 500 & 220kV Egyptian transmission network.
The Project sub-components are independent and geographically dispersed.
The priority of the components is in line with the comprehensive Power Transmission Network Master plan
The project can be categorised into [3] main components.
Egyptian Power Transmission Project
Project Components Component Description
C [1]: Investments to reinforce the Egyptian National Grid & enabling Saudi Arabia Interconnection
C [2]: Investments to evacuate power from wind farms planned in the Red Sea
C [3]: Investments to Strengthen the Egyptian Grid along North Sinai to interconnect with Gaza Strip
European Development Partners [EDPs]
World Bank [WB]
Egyptian Electricity Transmission Company [EETC]
Egyptian Electricity Sector
Egyptian Electricity Holding Company
[EEHC] [7]
Production Companies
[9] Distribution Companies
Egyptian Electricity Transmission
Company [EETC]
No. Financier Share Eq. MEUR
1 EDPs EUR380 million 380
2 WB USD220 million 170
3 EETC EGP1,821 million 232
Total 782
N Financing Institution MEUR
1 European Investment Bank [EIB] 260
2 Agence Française de Développement [AFD] 50
3 Kreditanstalt für Wiederaufbau [KfW] 50
4 Neighbourhood Investment Facility [NIF] [G] 20
Total 380
No. Financing Institution MUSD Eq.
MEUR
1 International Bank for Reconstruction and Development [IBRD]
70 54
2 Clean Technology Fund [CTF] 150 116
Total 220 170
No. Sub-Project
1 3x500MVA, 500/220kV, Bader GIS Substation
2 2X500MVA, 500/220kV, 6th of October GIS Substation,
3 3x125MVA, 220/66kV, Manshiat Nasser GIS Substation
4 2x125MVA, 220/66kV ,Abu-Ghaleb GIS Substation
5 Total3x125MVA, 220/66kV,Ashmoon GIS Substation
No. Sub-Project
6 3x125MVA, 220/66kV,Sohag East AIS Substation
7 Tibbeen Substation Ext. (500MVA, transformer + bays)
8 12x 125+ 10x 175MVA, 220/66kV power transformers
9 Saudi- Egyptian Interconnection
Under final approval from EDPs
No. Sub-Project
1 1x500MVA, 500/220kV, Suez Gulf GIS Substation
2 Samalaut Substation Ext. (500MVA, transformer + bays)
No. Sub-Project
1 2x125MVA, 220/66kV, Massaed AIS Substation
Consultants Short Term Technical Advisor
Local Consultant
Long Term Technical Advisor
EPS
Where are we now?
3x 500MVA, 500/220kV Badr GIS Substation
PACKAGE [A] 500 & 220kV GIS Equipments + Civil Works
Contractor:
Date of signing: November 12, 2012
3x 500MVA, 500/220kV Badr GIS Substation
PACKAGE [B] 10x167MVA, 500/220kV
Auto Transformers Contractor: Korea
Date of signing: December 13, 2012
3x 125MVA, 220/66kV Ashmoon GIS Substation
PACKAGE [A] 220kV GIS Equipments
+ Civil Works Contractor:
Date of signing: July 1, 2012
3x125MVA, 220/66kV Ashmoon GIS Substation
PACKAGE [B] 3x125MVA, 220/66kV
Power Transformers Contractor: Bulgaria
Date of signing: March 26, 2012
2x 125MVA, 220/66kV Abu-Ghaleb GIS Substation
PACKAGE [A] 220kV GIS Equipments
+ Civil Works Contractor: Egypt
Date of signing: June 26, 2012
2x125MVA, 220/66kV Abu-Ghaleb GIS Substation
PACKAGE [B] 2x125MVA, 220/66kV
Power Transformers Contractor: Bulgaria
Date of signing: March 26, 2012
220kV, 4-Circuits, UGC Giza North/ Abu-Ghaleb
4x 2.5km
1200mm2 XLPE
Turn-Key Job Contractor: Egyptian Chinese Company
Date of signing: September 5, 2012