    Effective Working

    Relationships

    Version A

    Revision Presentation

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    2/12

    Clerk of Works

    These are normally employed byArchitects, Local Authorities or as aconsultant.

    They ensure work is carr ied out to aspecif ication laid down by Architects.

    Once employed any variations /alterations

    from the original job specification forexample on large office buildings, would beordered by the Clerk of Works.

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    3/12

    Coordinating Different Crafts

    The responsibility for safety on site.

    Site management including coordinating the

    work of different crafts is the responsibility

    of the site manager.

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    4/12

    Quantity Surveyor

    There main responsibil i ties are:

    Measure all materials used on an installation &prepare invoices.

    Work out quantities of materials Prepare material schedules

    Generally they work closely with the estimator &

    the buyer.

    Occasionally a company plumbingrepresentative will visit the site instead of the QSto measure the amount of material installed toprepare interim invoices for stage payments

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    5/12

    Building Control Officers

    These generally work for the Local

    Authorities!

    There main Responsibil i ties are:

    Check plans & keeping Records of projects

    Carry out inspections on Foundations,

    Drainage etcSurvey potentially dangerous bui ldings

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    6/12

    Limited Company

    Most companies start as sole traders when

    they are established to protect assets they

    apply for LTD company status:

    The advantage of being a limited company

    is you get:

    tax benefits

    the owner of the company is only liable

    for a trading loss of the companies assets.

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    7/12

    Company structure

    Most companies employ a project manager or

    contracts manager to run the site.

    Main contract supervisors will organise any

    trade problems that occur day to day on the tools. Plumbing or trade supervisors will organise

    large teams of plumbers for example & sort out

    problems within there specific trade area.

    Craft operatives will carry out individual trade

    disciplines to ensure the contract finishes on time.

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    8/12

    Construction Documents

    Building plans allow craft operatives &customers to see exactly where appliances will befitted, & how large the rooms will be!

    Service layout plans are helpful to other trades aswell as plumbers as it shows where pipes will runin floors & allows e.g carpenters to makeprovisions for pipe routing.

    Site Plans are often scaled at 1:500 but generallybathroom suites would have a separatedrawing scaled to 1:10

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    9/12

    Locations of holes & notches covered

    by Building Regulations Part A

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    10/12

    Effective working

    Relationships on site Plumbing trainees should not get involved in giving the

    customers technical information on site, they shouldadvise the customers they are unsure & give thecustomer a name of someone who can help, or try to

    obtain that person. Very often trainee plumber require witness testimonies

    from the plumber supervising them for there NVQqualifications.

    Any trades man on site should seek advise from

    immediate supervisors before agreeing to remove alter orchange anything for other trades

    Plumbers should only get directly involved in disputes ifan argument breaks out between a trainee & a customer

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    11/12

    Managing Discipline on site

    If a problem arises between two parties on site the

    site manager should intervene & interview both

    parties separately to ascertain what has\

    happened & here the grievances from bothsides.

    If the situation couldnt be resolved without a

    meeting where both parties were present the

    chairman of the meeting would need to agree the

    rules of the meeting before it started to avoid

    any un-necessary confrontation!

  • 7/30/2019 Effective Working Relationships Revision Presentation Series A

    12/12

    PHASE TEST

    20 Questions

    30 Minutes

    16 correct = clear pass 14 to 15 correct = oral questions

    13 or less = re-take.

    REVISE HARD!!!!