Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng , FS Eng. 30 January 2017 1 66 th Canadian Chemical Engineering Conference October 18 th , 2016

Upload: lamtram

Post on 30-Jan-2018

236 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Effective PSSR in Management of Change for Existing Plants

Presented by Sam Sanati, P.Eng , FS Eng.

30 January 2017 1

66th Canadian Chemical Engineering ConferenceOctober 18th, 2016

Page 2: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Pre Startup Safety Review

Last chance to confirm the objectives of change have been met and potential risks are mitigated before energize the system.

30 January 2017 2

Page 3: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Case Study: Sweetening Unit Start-up• Gasket rupture of an Exchanger

during start-up. • Causes:o Material defecto Construction/installation error (misaligned

flanges)

• Findings:o PHA did not include this scenario for start-upo Gasket and flanges were not tested before

installation30 January 2017 3

Page 4: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

When we need PSSR?

CFR 1910.119(i)The employer shall perform a pre-startup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information.

Canadian PSM Guideline : Element 3 (Capital Project Review and Design Procedure)Element 6 (Process and Equipment Integrity)Pre-startup safety reviews should be conducted before commissioning a new or modifiedprocess, replacing equipment or recommissioning mothballed equipment. The review shouldcover both equipment and operating procedures to ensure that all elements are in place andfunctional.

30 January 2017 4

Page 5: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

When we need PSSR?

CFR 1910.119(i)The employer shall perform a pre-startup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information.

Canadian PSM Guideline : Element 3 (Capital Project Review and Design Procedure)Element 6 (Process and Equipment Integrity)Pre-startup safety reviews should be conducted before commissioning a new or modifiedprocess, replacing equipment or recommissioning mothballed equipment. The review shouldcover both equipment and operating procedures to ensure that all elements are in place andfunctional.

30 January 2017 5

Page 6: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

PSSR Requirement

Check:• PSIs (e.g. P&IDs) are updated• Design intent is met• Update of Procedures and instructions• Completion of training program• Review completion of incident

investigation recommendations,• Review compliance audits ,• Review PHA recommendations

30 January 2017 6

Further Items:• Human Factors• SCE List• SCE Performance Standards• PHA Recommendations are

implemented

Page 7: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

PSSR Team

• A multidisciplinary team is selected for PSSR.

• PSSR Lead should be Competent :o Good understanding of relevant PSIso Good knowledge about what regulation requiremento Preferably, good knowledge on the subject of the

change

• Independent from the change request or process

30 January 2017 7

Page 8: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

PSSR: Have We Checked Human Factors Requirement?

30 January 2017 9

Sprinkler:- No mechanical handling is required.

- Only access to the valve is needed

Gaseous System:- Mechanical handling is required.

- Access for Replacement of cylinders

Page 9: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

MoC Risk Assessment

• Currently, What-if is a common used risk assessment method for management of change process in existing facilities.

• Concern: o What-if is not always the proper method to useo Competent facilitator is not chairing the meetingo Sometimes residual risks are not estimated

30 January 2017 10

Page 10: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

PSSR : Risk Assessment Close-out

30 January 2017 11

• 35 recommendations made by the National Transportation Safety Board

• Only six have been successfully completed

• Fourteen of the recommendations issued to the Federal Aviation Administration and its European counterpart, EASA, are marked by the NTSB as “closed-unacceptable.”

• Recommendations that got an “unacceptable” response deal with:o Pilot training, o Directions for pilots facing the loss of power in both

engines, o Equipping planes with life rafts and vests and making

it easier for passengers to use them

[Reference: globalnews.com]

US Airways Flight 1549 Incident

Page 11: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Risk Assessment Close-out

30 January 2017 12

• PSM Guideline Element 3: “Confirm that a process hazard analysis has been done and that recommendations have been resolved or implemented prior to start up”

• If a recommendation is unacceptable then ALARP demonstration and senior management approval is needed.

Page 12: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Procedure Update

30 January 2017 13

Bayer Pesticide Explosion

Page 13: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Change in Safety Critical Elements

30 January 2017 14

“The big accidents are just waiting for the little ones to get out of the way.”

Carolyn Merritt (Former CSB Chair)

• PSM Guideline Element 3: “Ensure critical equipment has been identified and incorporated into a preventative maintenance program.”

Page 14: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Update Process Safety Information

• Some of the key documents (such as P&IDs) shall be authenticated and stamped by a professional engineer.

• Ensure the updated PSI have been reviewed by all stakeholders

• Ensure all PSIs are communicated and approved by the applicable regulators.

30 January 2017 15

Page 15: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

PSSR Documentation

• Proper documentation is needed for future Investigation

30 January 2017 16

Page 16: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Summary

• Review of Human Factors requirements to ensure the mechanical change does not create an ergonomic hazard.

• Ensure a proper risk assessment method is selected and all the residual risks are reduced to an acceptable level.

• Closing out the recommendations of risk assessment study is not completed until their implementation is verified. If the recommendation is not feasible then ALARP demonstration and senior management approval is needed.

• Procedures should be updated and approved.• Change in a SCE should be highlighted in PSSR to ensure that the relevant

documents (performance standards, verification scheme, etc) have been updated.

30 January 2017 17

Page 17: Effective PSSR in Management of Change for Existing … _ PSSR .pdf · Effective PSSR in Management of Change for Existing Plants Presented by Sam Sanati, P.Eng, FS Eng. 30 January

Thank you

If you’d like to find out more visit:[email protected]

www.atkinsglobal.com

© Atkins Limited except where stated otherwise.

30 January 2017 18