Our Project Title On:
Effect of work study & time study on production and quality.
Southeast University
![Page 2: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/2.jpg)
Name : MAZADUL HASAN SHESHIRID: 2010000400008Batch: 13th Batch (Session 2009-2013)Department: Wet Processing Technology Email: [email protected]: www. Textilelab.blogspot.com Southeast UniversityDepartment of Textile Engineering
PREPARED BY ©right
![Page 3: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/3.jpg)
Objectives of project work:
To implement of work study charts to obtain maximum utilization of the resources( Man, Machine & Materials) and to optimize workplace by changing. The plant layout & workstation, using the process charts.
Southeast University
![Page 4: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/4.jpg)
Role of industrial engineering department in apparel industry:
Importance of industrial engineering (IE) tools that can be used to improve upon the productivity of their factories and thus enhance the profits. Very few companies have been operating with a full fledged industrial engineering department and even those which boast of as an industrial engineering department(IED) in their factories are not allowing freedom and scope to function to its full capabilities. The role of IED is important for the garments
industry for the following two reasons:It’s highly labor –intensive industry. Effective planning is emerging as one of the key factors for the garments manufacturing industry.
Southeast University
![Page 5: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/5.jpg)
Garments manufacturing diagram:
Fabric from stores
Cutting section
Sewing section
Finishing section
Finished garments to warehouse
Southeast University
![Page 6: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/6.jpg)
Topics covered during the project work:
• Plant layout & workstation design.• work study & time study concepts on production and quality.
Southeast University
![Page 7: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/7.jpg)
Workstation Design:
Workstation Design are described below-
1. Space requirements.
2. Consideration of the space requirement for the movement of material handling equipment.
3. Easy access to safety stops in case of emergency.
4. Easy access to machine for inspection and lubrication, maintenance and repair.
5. Space between one machine to another machine.
6. Appropriate ventilation, lighting & safety.
Southeast University
![Page 8: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/8.jpg)
Cutting Section
Southeast University
![Page 9: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/9.jpg)
Southeast University
![Page 10: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/10.jpg)
Work Study
Method Study Work Measurement
What is work study?
Work study is mainly concerned with the examination of human work.There are two parts of work study:
Southeast University
![Page 11: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/11.jpg)
• To eliminate wastage of time and labor.• To reduce fatigue and boredom of work by avoiding unnecessary
movements.• To find a best way of doing a job.• To have more utilization of materials, machines and workers.• To improve the design of work place layout.• To standardize the method, obtained after conducting the motion
study.• To train the individual operator in its practice as per standardized
methods.
Why work study?Southeast University
![Page 12: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/12.jpg)
• Set target• Manpower allocation• Calculate efficiency• Production planning and control• Determine cost• Incentive schemes
Why Work Measurement is Important?
Southeast University
![Page 13: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/13.jpg)
Work Measurement Techniques
Time Study: Directly observing an operator.
Pre-Determined Motion Time Study System: Analyzing the motions used to carry out the activity.
Analysis of Past Records: Using previous records/ Studies available in the factory.
Southeast University
![Page 14: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/14.jpg)
Time Study
To determine the time it should take for a qualified worker to perform a specific task using a specified method by directly observing an operator.
Southeast University
![Page 15: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/15.jpg)
Time Study Sheet of IE Department:Southeast University
![Page 16: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/16.jpg)
Observed time X
1. Compute the basic time
Basic Time =
2. Compute the standard minute value
SMV = Basic Time + Allowance
Standard rating
How it Works?
Observed rating
Southeast University
![Page 17: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/17.jpg)
GSD layout of IE:Southeast University
![Page 18: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/18.jpg)
SL Operation Observed time Standard time
1 Seam right shoulder 15” 10”
2 Bind neck 16” 10”
3 Seam left shoulder 14” 11”
4 Bind sleeve openings 14” 12”
5 Seam sleeves 14” 12”
6 Attach sleeves 36” 30”
7 Cut & fold label 7” 4”
8 Attach label 16” 12”
9 Bartack shoulder & neck 10” 6”
10 Hem bottom 16” 12”
Total time 158” 119”
Practically process following in the sewing floor:
List of processes to produce T-shirts:
Southeast University
![Page 19: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/19.jpg)
SI Operator Process Observed time Rating Basic time Allowance time Standard time
1 Rahima Stay sewing 9” 80% 7.2” 20% 8.6”
2 Nazma Collar
fitting
3” 75% 2.25” 20% 2.7”
3 Moyna Collar
sewing
30’ 85% 25.5” 20% 30.6”
Time measurement table:
Southeast University
![Page 20: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/20.jpg)
For this process operation is 2, but making time taking around 10 min.seam joining uneven, seam, broken stitch, puckering needle hole and down grade quality etc defects are coming more which clearly indicate that garment piece handling by the operator are not proper, they need to trained how to handle the fabric or the proper method of stitching the garment.
Practically process following in the sewing floor:
Southeast University
![Page 21: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/21.jpg)
Southeast University
![Page 22: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/22.jpg)
In this case, we need to follow PDCA process improvement chart which can give us a solution.
PDCA
Figure : The Shewhart Cycle is a fundamental idea for continuous process improvement.
Southeast University
![Page 23: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/23.jpg)
Benefits of TQM: The benefits of TQM can be classified into the following two categories:1. Customer satisfaction oriented benefits.2. Economic improvements oriented benefits. 1. Customer satisfaction oriented benefits: The benefits under this category are listed below:(a) Improvement in product quality.(b) Improvement in product design.(c) Improvement in production flow.(d) Improvement in employee morale and quality consciousness.(e) Improvement of product service.(f) Improvement in market place acceptance. 2. Economic improvements oriented benefits: The benefits under this category are as follows: (a) Reductions in operating costs.(b) Reductions in operating losses.(c) Reductions in field service costs.(d) Reductions in liability exposure.
![Page 24: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/24.jpg)
Time Study Exercise
Process Name = Side Seam
Observed Time = 35.27 SecObserved Rating = 92%Allowance = 25%
Basic Time = (35.27 X 0.92) Sec= 32.45 Sec
SMV = 32.45 + (32.45 X 0.25) Sec= 40.56 Sec
Capacity = (3600 ÷ 40.56) Pcs/ Hour= 88 Pcs/ Hour
![Page 25: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/25.jpg)
Some suggestions:
![Page 26: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/26.jpg)
Existing Proposed
Operation are not arranged in sequence,
Intersection of material flows occur.
Material movement is more.
Material handling is more.
Operation are arranged in sequence,
Intersection of material flows avoided.
Material movement is minimized.
Material handling is minimized.
Southeast University
![Page 27: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/27.jpg)
Conclusion
WITH THE APPLICATION OF WORK STUDY CHARTS IN APPAREL MANUFACTURING, THE EFFECTIVE UTILIZATION OF RESOURCES ( MAN, MATERIAL & MACHINES) CAN BE ACHIEVED.
THE COST INVOLVED IN USING THESE CHARTS ARE VERY MINIMUM AND A SOLUTION CAN BE DERIVED IN A SHORT PERIOD OF TIME.
Southeast University
![Page 28: Effect of work study & time study on production and quality](https://reader034.vdocuments.site/reader034/viewer/2022042518/554a187eb4c90507558b5328/html5/thumbnails/28.jpg)
THANKS EVERYBODY