eere powerpoint 97-2004 template: green version · pdf filemud no lube mud with lube •...

16
1 | US DOE Geothermal Office eere.energy.gov Public Service of Colorado Ponnequin Wind Farm Geothermal Technologies Office 2015 Peer Review High Temperature 300ºC Directional Drilling System Kamalesh Chatterjee EE0002782 Baker Hughes Track 3 EGS1 - High Temp Tools, Drilling Systems Project Officer: Bill Vandermeer Total Project Funding: $ 5 M May 11, 2015 This presentation does not contain any proprietary confidential, or otherwise restricted information.

Upload: hathien

Post on 11-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

1 | US DOE Geothermal Office eere.energy.gov

Public Service of Colorado Ponnequin Wind Farm

Geothermal Technologies Office 2015 Peer Review

High Temperature 300ºC Directional Drilling

System

Kamalesh Chatterjee

EE0002782

Baker Hughes

Track 3 EGS1 - High Temp Tools, Drilling Systems

Project Officer: Bill Vandermeer

Total Project Funding: $ 5 M

May 11, 2015

This presentation does not contain any proprietary

confidential, or otherwise restricted information.

Page 2: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

2 | US DOE Geothermal Office eere.energy.gov

Relevance/Impact of Research

• Commercial DDS tools are functional up to 175ºC/200ºC

• Aligned with GTO R & D goals

Directional Drilling of EGS wells at high temperature.

Drilling cost a significant part of total budget in geothermal wells.

Conventional rotary drilling not practical for directional wells.

A Directional Drilling System

(DDS, EE0002782) and directional

Measurement-While-Drilling

system (MWD, EE0005505) for

geothermal applications will

operate in hard rock at depths as

great as 10,000 meters and

temperatures as high as 300ºC.

Page 3: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

3 | US DOE Geothermal Office eere.energy.gov

Proposed system concept

Drill Bit

Tricone (hard) and Kymera

hybrid (interbedded) matched to

motor and fluid requirements

Directional Motor

Metal to metal Positive

Displacement Motor (PDM),5/6

lobe 150 rpm, 4000 ft lb torque

Drilling Fluid / Equipment

300ºC stable, lubricant for metal

to metal motor operation

Page 4: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

4 | US DOE Geothermal Office eere.energy.gov

Innovations in drill bit

Cutting structure for EGS lithologies

300ºC mechanical face seals

300ºC bearing grease

300ºC metal bellows grease pressure compensator

Kymera bit

Page 5: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

5 | US DOE Geothermal Office eere.energy.gov

Fluid tests

300ºC Drilling Fluid

• Thermally stable drilling fluid aging @ 300ºC

• Lubricant / Wear reduction –Increase motor run time

• Block on ring wear test Mud No Lube Mud With Lube

• Test fluids with abrasive particles for

metal-metal motor coating tests

Page 6: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

6 | US DOE Geothermal Office eere.energy.gov

Innovations in motor

Drill Bit Sub Flex Shaft Power Section

Flex shaft engineered

for fatigue resistance

300ºC flow diverter seals

High capacity diamond thrust bearings

for high weight on bit hard rock drilling

• Metal-metal rotor stator

• Wear resistant coating

Challenges - Manufacturing

Coating

Assembly

Page 7: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

7 | US DOE Geothermal Office eere.energy.gov

Coating of the metal to metal motor

Stator coating – diffusion process

Gas Nitriding + K12 seal

Rotor coating - Tungsten Carbide

Tested coatings with coupons

4 ¾ motors for performance testing

6 ¾ motors are DOE deliverables

Testing:

• Hardness testing

• Slurry abrasion testing

• Measure wear through surface

profilometry

• Aging

• Pitting corrosion potential

• Fluid erosion test

Stator and rotor design and machining at Celle, Germany

Page 8: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

8 | US DOE Geothermal Office eere.energy.gov

Challenges: machining and assembly

Tolerance = 0.5 mm

Page 9: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

9 | US DOE Geothermal Office eere.energy.gov

High temperature test stand

Cooling

Unit

Main Frame

Test Vessel with

Motor Inside

Pressurization

System

Mechanical

Seal

Heating

Unit

Rotation

Module

Mechanical

Seal Support

System

Control

Room

Page 10: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

10 | US DOE Geothermal Office eere.energy.gov

Flow loop test of metal to metal motor

0

2000

4000

6000

8000

10000

12000

0

20

40

60

80

100

120

140

160

0 10 20 30 40 50 60

To

rqu

e [

Nm

]

Sp

ee

d [

1/m

in]

Diff. Press. w/o no-load [bar]

n_1000

n_1500

n_2000

n_2500

n_3000

T_1000

T_1500

T_2000

T_2500

T_3000

T_theor

0

20

40

60

80

100

0 10 20 30 40 50 60

eta

[%

]

Diff. Press. [bar]

1000 [l/min]

1500 [l/min]

2000 [l/min]

2500 [l/min]

3000 [l/min]

Elastomer motors

Torque : 4000 ft lb = 5423 N m was achieved at approx. 30 bar = 435 psi

Scope for efficiency improvement: Tighter tolerance, increased pressure

Page 11: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

11 | US DOE Geothermal Office eere.energy.gov

BETA test - drilling in experimental well

System drilled 180 ft in

hard granite 15-25

ft/hour

Build-up-rate

6º/100ft

Dog-leg-severity

7.2º/100ft

Metal to metal motor is

used to drill a

directional well in

granite – first in

industry

Page 12: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

12 | US DOE Geothermal Office eere.energy.gov

Wear of rotor after drilling test

Special screens are necessary at the surface

Page 13: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

13 | US DOE Geothermal Office eere.energy.gov

• All project tasks close to completion except the field trial.

Tools are ready for field trail scheduled for July.

• The directional drilling system (metal to metal motor) has

been used to drill a directional well in granite – first in

industry.

• System drilled 180 ft in hard granite 15-25 ft/hour

• Build-up-rate 6º/100ft, dog-leg-severity 7.2º/100ft

• Flow loop test of motor completed, efficiencies

compared, drill bit simulator test completed

• High temperature test stand to compare motor

parameters is operational. Tests have been conducted

and results being analyzed.

Accomplishments - I

Page 14: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

14 | US DOE Geothermal Office eere.energy.gov

Accomplishments - II

Original Planned

Milestone/ Technical

Accomplishment

Actual Milestone/Technical

Accomplishment

Date

Completed

Phase 1 Concept System concepts created Q2 2011

Phase 2 Design Designs created for Tricone and Kymera

hybrid bits, metal-metal motor, drilling

fluid with lubricant additive

Q3 2013

Phase 3 Manufacture 2 tools ready for field trial, 3rd in assembly Q4 2014

Phase 4 Testing Flow loop test of motor April 2014

Simulator test of drill bit Q2 2014

BETA test April 2014

Motor test stand Q2 2015

Field test Q3 2015

2014 Geothermal Energy Association (GEA) Honors award for

Technological Achievement (August 5, 2014)

Page 15: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

15 | US DOE Geothermal Office eere.energy.gov

Future Directions

• Complete assembly of the 3rd tool (two are complete)

• Conduct the field test at as high a temp as possible

• Follow up on the patent/invention disclosures and publications

• Complete the final project report

Milestone or Go/No-Go Status & Expected Completion Date

Field test 7/31/2015

Project end Sept 2015

Page 16: EERE PowerPoint 97-2004 Template: Green Version · PDF fileMud No Lube Mud With Lube • Test fluids with abrasive particles for ... • Slurry abrasion testing ... Mechanical Seal

16 | US DOE Geothermal Office eere.energy.gov

• Successful completion of a High Temperature 300ºC

Directional Drilling System.

• 300ºC drill bits without elastomers tested in BETA

• Metal to metal motor (without elastomers) is used to drill

a directional well in granite – first in industry

• 300ºC fluid with lubricant ready for field test.

• Flow loop test demonstrated efficiency ~30%

• High temperature test stand complete, ready to compare

metal to metal motors with conventional ones

• 2 tools ready for field trial, expected in Q3 2015

Mandatory Summary Slide