E E L LE E C C T T R R I I C C A A L L T T R R A AC C T T I I O O N N D D I I S S T T R R I I B B U U T T I I O O N N - - R R A A T T L L A AM M - - D D I I V V I I S S I I O ON N . . Ratlam TRD Department came into existence on 26th June 1985 with the electrification of Godhra – Limkheda section. The first Electric Locomotive hauled Goods Train was introduced on Godhra – Ratlam section of the division on 29th Nov. 1986. The first Electric Passenger train was introduced in 1987 when 20 UP Dehradun Express hauled by power number 20491 was flagged off on 6th Dec 1986. The first Electric passenger carrying train which came in DN direction was 25 DN on the same day. 1st Feb 1988 is a date to be remembered the most as on this day the Bombay-Delhi route was completed and 20 UP was flagged off.. Electrification work is on progress, section of Ujjain – Indore section (79.23 RKM), Maksi-Dewas section (35.31 RKM) electrified on 30.03.12, 03.12.12 respectively. The most recent sections Indore - Dr. Ambedkar Nagar (20.97 RKM) has been electrified on 31.03.17. Electrification work in Ratlam – Fatehabad Chandrawatiganj - Laxmibai Nagar section (127.51 TKM), Ratlam – Nimach – Chanderiya section (239.16 TKM), Shambhupura – Chittaurhgarh double line section (57.78 TKM), Mathela – Khandwa bypass - Nimarkheri section (55.84 TKM) and Doubling of Gambhiri Bridge (1.83 TKM) have been completed and CRS authorizations have been accorded for all these newly electrified sections. Presently Ratlam TRD department looks after 946.214 electrified Route Kms which are fed by 25 KV traction supply from 13 different Traction Substations (TSS). These has been drawing electric power supply for hauling passenger and goods trains on electric traction in Madhya Pradesh and Gujarat State area from RGPPL & JIPTL for TSS of MP w.e.f. 22.01.16 & for Gujrat is being procured from RGPPL (w.e.f Jan. 16) under open access scheme.

Upload: others

Post on 23-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

EEELLLEEECCCTTTRRRIIICCCAAALLL TTTRRRAAACCCTTTIIIOOONNN DDDIIISSSTTTRRRIIIBBBUUUTTTIIIOOONNN---RRRAAATTTLLLAAAMMM---DDDIIIVVVIIISSSIIIOOONNN...

Ratlam TRD Department came into existence on 26th June 1985 with the electrification of

Godhra – Limkheda section. The first Electric Locomotive hauled Goods Train was introduced on

Godhra – Ratlam section of the division on 29th Nov. 1986. The first Electric Passenger train was

introduced in 1987 when 20 UP Dehradun Express hauled by power number 20491 was flagged off

on 6th Dec 1986. The first Electric passenger carrying train which came in DN direction was 25 DN

on the same day. 1st Feb 1988 is a date to be remembered the most as on this day the Bombay-Delhi

route was completed and 20 UP was flagged off..

Electrification work is on progress, section of Ujjain – Indore section (79.23 RKM),

Maksi-Dewas section (35.31 RKM) electrified on 30.03.12, 03.12.12 respectively. The most recent

sections Indore - Dr. Ambedkar Nagar (20.97 RKM) has been electrified on 31.03.17.

Electrification work in Ratlam – Fatehabad Chandrawatiganj - Laxmibai Nagar section

(127.51 TKM), Ratlam – Nimach – Chanderiya section (239.16 TKM), Shambhupura –

Chittaurhgarh double line section (57.78 TKM), Mathela – Khandwa bypass - Nimarkheri

section (55.84 TKM) and Doubling of Gambhiri Bridge (1.83 TKM) have been completed and

CRS authorizations have been accorded for all these newly electrified sections.

Presently Ratlam TRD department looks after 946.214 electrified Route Kms which are fed by

25 KV traction supply from 13 different Traction Substations (TSS). These has been drawing

electric power supply for hauling passenger and goods trains on electric traction in Madhya Pradesh

and Gujarat State area from RGPPL & JIPTL for TSS of MP w.e.f. 22.01.16 & for Gujrat is being

procured from RGPPL (w.e.f Jan. 16) under open access scheme.

Page 2: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification
Page 3: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

CADRE POSITION

Sr. No. Description Sanctioned Available Vacancy

1 Supervisor 70 59 11

2 Artisan 255 217 38

3 Group 'D' 220 135 85

Total 545 411 134

Page 4: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

3. ASSETS

1.

Electrified Track Kilometers 1826.47 TKM

(Including newly electrified)

2.

Electrified Route Kilometers 946.21 RKM

(Including newly electrified)

3. Traction Sub Station 13 Nos.

4. Sectioning and Paralleling Posts 16 Nos.

5. Sub Sectioning and Paralleling Posts 52 Nos.

6. OHE Depots 15 Nos.

7. PSI Depots 13 Nos.

8. Tower Wagons 14 Nos.

i) 8- Wheeler 05 Nos.

ii) 4- Wheeler Mark-IV 03 Nos.

iii) 4- Wheeler Mark-III 02 Nos.

iv) 4- Wheeler Mark-II 04 Nos.

4. SECTION WISE ELECTRIFICATION

S/N

Section

RKM

Year of

Electrification

1. Godhara – Ratlam 183 1985-86

2. Ratlam – Nagda 44 1986-87

3. Nagda – Bhopal 238 1990-92

4. Doubling Work UJN-BPL 56.81 2007-2012

5. Indore-Dewas-Ujjain 79.23 30.03.12

6. Dewas- Maksi 36.04 03.12.12

7. Indore-Dr. Ambedkar Nagar 20.97 31.03.17

8. Ratlam-LaxmibaiNagar 112.06 29.07.19

9. Ratlam-Chanderiya including

Shambhupura Chittaurgarh doubling

198.039 22.09.20

10. Nimarkheri-Khandwa bypass-Mathela 46.185 04.08.20

5. PERFORMANCE

(a) PUNCTUALITY

Sr. No.

2018-19 2019-20 2020-21

till date

No. of Incidences

NIL

01

NIL

No. of trains

NIL

01

NIL

Page 5: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

(b) ENERGY DATA

S/N.

Item 2018-19 2019-20 2020-21

Till Nov.-20

1. Energy consumed

(Crore Units) 41.39 40.35 12.68

2.

Amount paid (Crore) 210.08 208.52 88.47

5.

Average Unit Cost 5.08 5.17 6.97

6. STATUS OF MAINTENANCE WORK

S

N

Description

Target

Cumm.

Progress

upto 30.11.20

Prog. in %

AOH

1.

Tower wagon checking (in TKM) 1344.35 768.96

57.20%

2.

Turnout checking (in Nos.) 400 235

58.75%

3.

Cross over checking (MN LN) 104 60.58

58.25%

4.

Cross over checking (other than MN LN) 151 86

56.95%

5.

Cantilever checking AOH (in TKM) 1010.65 768.96

76.09%

6.

Regulating equipment AOH (in Nos.) 2057 1255

61.01%

7.

Isolator checking 369 250

67.75%

8.

Bond checking (in TKM) 1340.9 1340.9

100%

9.

Earthing check 501 501

100%

POH

1.

Cantilever (in TKM) 335 110.39

32.95%

2.

Regulating equipment (in Nos.) 602 183

30.40%

Page 6: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

8. Achievements of TRD Ratlam:-

i. Electrification of Diesel Shed Track, Ratlam:-The Electrification work of diesel shed, Ratlam

amounting to 3.97 Crore was sanctioned in the material modification of RE work. HQ decided to

maintain WAG-5 class locomotives at Diesel Shed, Ratlam to improve mobility therefore contemplating

at the exigency and necessity, electrification of 2.12 TKM from Ratlam station to Diesel shed has been

carried out departmentally by TRD department of Ratlam Division. The scope of this departmental work

involved cutting & pollarding of 154 nos. trees, casting of 42 nos. foundations, loading, unloading,

erection & grouting of 36 nos. masts, 39 nos. cantilevers and 08 nos. terminations. Despite of heavy

rainfall during the foundation work, daily planning was devised and the electrification work was

completed within record time of 29 days and OHE was commissioned on 29.08.19.

ii. Replacement of bridges and provision of LHS: 23 nos. bridges have been replaced and 06 nos.

LHS have been made in Ratlam division in current financial year. Also the work of 57 nos. LHS is

under progress. TRD deptt. has imparted ample facilitation during bridge & LHS works by

deploying sufficient manpower for OHE slewing, restoration and bonding works and all the works

were completed within minimum time.

iii. Shifting of portal to facilitate the provision of new lift at Ratlam Station:One no. N-type

portal of RTM passenger yard loc. 654/41-42 was dismantled and shifted to facilitate the provision

of lift at PF no. 5 of Ratlam station. The foundation, erection, load shifting & dismantling work

were done departmentally by TRD deptt.

Page 7: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

iv. Utilization of waste porcelain housing of interrupters at Rail Udyaan, Ratlam: 05 nos. lamp-

posts have been made by using waste porcelain housing of interrupters and provided near PF No.4

at newly developed Rail Udyaan, Ratlam. These lamp posts are being used to lighten up and

beautify the greenery during night hours by improving the aesthetics of garden.

v. Electrification of Dewas Bank Note Press Railway Siding :- Electrification of Dewas Bank

Note Press Railway Siding having 2.2 TKM has been completed by TRD department and siding

was charged with 25 KV AC on 16.03.2019. Earlier rake placement was being done with the help

of Diesel Locomotives which had to be brought at Dewas either from UJN or INDB. Now after

electrification of BNP siding, placements of rakes are being done by Electric Locomotive without

any extra crew and Loco.

vi. Provision of Availability Based Tariff meter at TSS: The work for providing ABT meters in 08

nos. TSS of MP state have been completed by TRD deptt. The scope of work covered provision

of 0.2S Class of accuracy metering CT and PTs with structures & check meters at all the TSS of

MP.

Page 8: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

vii. Provision of traction energy management server:- In order to facilitate accurate forecasting &

scheduling of traction energy under open access regime and provide necessary data to SLDC as

per regulations, traction energy management server is being provided at RCC, Ratlam. A modified

RTU complying the requirements of new EMS has been provided at DHD/TSS on dt. 07.10.19.

viii. Removal of operational constraint from RTM yard, NAD yard & BPCL siding/MGG:

• 01 no. operating constraint was removed at Nagda yard by providing 180mtrs OHE on dead end

no. 2, which will ease and reduce time in shunting of locos while runround.

• 01 no. operating constraint removed at RTM platform no.02, line no. 11 by providing modified

cantilever arrangement on dead end, which will permit dead end to place AC locomotive.

• 01 no. operating constraint removed at BPCL siding of MGG yard by providing 9.60 mtrs OHE

from Gantry, which will ease placement of rake without guard wagon.

• Modification in existing sectioning arrangement of MGG has been done to ease the movement

of goods trains in line no. 1 & 2. Earlier elementary section of both the goods line was common

so in case of loading & unloading both lines are affected due to power block. Now after suitable

modification, entering & leaving of trains has been eased.

ix. Augmentation of Traction Transformers capacity by replacing 12.5 MVA to 30 MVA

transformers at Mohammadkhera and Sehore TSS of Ratlam division : -

12.5 MVA capacity traction transformers have been replaced & augmented by 30 MVA capacity

transformers at Mohammadkhera & Sehore TSS in Nagda-Bhopal section. TR-17 & TR-18 of

Sehore TSS and TR-15 & TR-16 of Mohammadkhera TSS.

Page 9: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

x. 132 KV BUSHING REPLACEMENT:- 04 nos. 132 KV Bushings of traction transformers (21.6

MVA) have been departmentally replaced at Naikheri, Dahod & Nagda substation.

xi. PROVISION OF MODIFIED BENT STEADY ARM-28 nos. bent steady arm of cantilever

assembly on GDA-NAD section have been replaced by modified steady arm with drop bracket to

suit 160 KMPH speed leaving no further scope.

xii. PROVISION OF BURRIED RAIL AND EXTRA EARTHING AT SP/SSPS : - Buried rail and

extra earthing have been provided at all SWS to improve earthing system as per RDSO SMI no.

TI/MI/0032 rev-1 Dated 01.04.2014system.

Page 10: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

xiii. REPLACEMENT OF LOW CAPACITY ISOLATORS :- Division has replaced all the 52 nos.

low capacity (850Amp) isolators of mainline by higher capacity (1600 Amp).

xiv. REPLACEMENT OF ‘G’ JUMPER 105 SQMM BY 160 SQMM : -

Division has replaced all 345 nos. G jumpers of 105 sq.mm. by 160sqmm in heavy loaded area

(Between TSS and First SSPs) to improve system reliability.

xv. REMOVAL OF CONVENTIONAL OVERLAP TYPE NEUTRAL SECTION :-

Existing eight nos. conventional overlap type neutral sections at Limkheda, Meghnagar,

Morwani & Khachrod of Rajdhani route have been removed to suit the train operations @

160 KMPH speed.

Page 11: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

xvi. REPLACEMENT OF RUSTY CANTILEVER :-

96 nos. rusty cantilevers assembly have been replaced by new.

9. INNOVATIONS OF TRD RTM :--

(i) Online Thermo vision camera :-

For Detection & monitoring of hot spot defects of OHE with the help of On Line Thermo vision

Camera. This system can be mounted on the roof of Locomotive or Tower Wagon for detecting

Hot-spots.

(ii) Provision of Voltage sensing Device in Tower Wagon. :-

To ensure extra safety during the power block, we have developed a voltage sensing device to sense

OHE. By providing this, staff may confirm before providing discharge rod on OHE by watching this

voltage sensing device indication in tower wagon whenever OHE is ''ON or OFF''

ROOF MOUNTED

ONLINE

THERMO -VISION

CAMERA

Page 12: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

(iii) Provision of Voltage Sensing Device in Traction substation :-

In traction substation there is no potential transformer provided in EHV (132 KV) side. In case

of failure of 132 KV supply and subsequent restoration, there is no indication of the supply

restoration unless the transformer is energized and the staff on manning duty ensures physical

humming of the transformer. To overcome this problem, the sensing device has been developed

to monitor the availability of the primary supply by the traction power controller at control center

away from the substation. Voltage sensing device can be interfaced with remote control units of

SCADA system. This facilitates the power controller to take definite prompt action in the event

of failure of 132 KV power supply. The system developed is inexpensive and requires minimum

maintenance.

(iv) Provision of contact less sensing device in lieu of potential transformer for indication purpose

at switching post :-

At UJN/SSP an induction based device has been provided in lieu of PT for catenary indication on

trial basis. As such the cost of potential transformer is saved approximate Rs. 75 thousands per AT

by provision of this arrangement.

10 ASSISTANCE REQUIRED :

Electrification work of RTM- FTD-LMNR (115.6 RKM, 146 TKM) & RTM-NMH-COR-

CNA (197 RKM, 239.16 TKM) is ongoing at fast pace. Creation of two posts of ADEE/TRD is

essentially required at Indore and Chittaurgarh to oversee the RTM-LMNR-DADN and RTM-

CNA sections respectively.

Page 13: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

ELECTRIFICATION BY CORE :

Sr.No. Section TKM Year of Energisation

1. RTM-FTD-LMNR

(Gr. 227) 140 2019-20

2. RTM-NMH-CNA

(Gr. 214) 239.16 2019-20

Page 14: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Page 1 of 3

GOOD WORKS DONE IN 21 DAYS

(TRACTION DISTRIBUTION, RATLAM DIVISION)

• SANITIZATION OF TOWER WAGONS-

OHE maintenance tower cars of TRD unit have been thoroughly cleaned duly

maintaining social distancing and completely sanitized with sprayer from top to bottom

in order to ensure safety of staff from COVID-19 virus.

Page 15: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Page 2 of 3

• SPECIAL DRIVE REGARDING PRECAUTIONS AGAINST COVID-19-

All 413 staff of TRD, Ratlam jurisdictions have been counseled by their respective

section Incharge. During counseling following points were explained to staff so as to

assure safety of staff and their families from COVID-19 virus at workplace and home:

1. Tips for often washing of hands were given and right way of hand wash was

explained.

2. Face masks were distributed to staff and they have been instructed to strictly

wear face masks.

3. It was instructed that nobody will get in touch with sick people.

4. One must always cover while coughing or sneezing.

5. If anyone is having difficulty in breathing/sore throat/high fever/dry cough then

this is the symptom of COVID-19. Such person shall immediately isolate himself

and inform nearest medical facility without fail.

Page 16: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Page 3 of 3

• GUIDELINES REGARDING IMPROVING IMMUNITY-

All TRD staff have been advised to go through the guidelines issued by “Ministry of

Ayush” in connection with “Immunity boosting measures for self care from COVID-19”

and follow the same for family members as well as per individual’s convenience.

• USING AAROGYA SETU APPLICATION-

All TRD staff have installed, registered & started using “Aarogya Setu App” and ensured

usage of this App on mobile phones of their family members as well. Self assessment

tests are being done by staff on this App. Social distancing is being strictly followed as

mentioned in the application. Staff have been instructed to go through and follow DOs

and DON’Ts mentioned in this App. We have also asked other people to use this App.

• ENSURING FITMENT OF OHE DURING LOCKDOWN-

During lockdown, movement of passenger train has been stopped but essential service

are still ON. Railways is also playing an important role in to & fro movement of goods and

parcels. In order to ensure uninterrupted movement of essential train services, TRD

deptt planned to launch a special drive duly maintaining social distancing with minimal

staff. We have done inspections of following assets to ensure reliability:

1. Liveline checking of OHE in GDA-BPL & UJN-DADN sections.

2. Footpatrolling of each station yard and section – 1344.35 TKM (Every fortnight)

3. Trimming of trees to minimize falling of trees on OHE

4. Removal of bird nests to avoid CB tripping & supply failure

5. Battery health of all 55 TRD TSS, SP & SSPs checked by our staff.

Page 17: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

1. Reliability Action Plan (OHE)

Page 18: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Sr.No. Item Description Holding Prog. TDC Remark

1 Relocation of critically implanted OHE masts 79 Nos. 23 Nos. 31.12.20Work stopped due to lockdown

2 Straightening of leaned OHE masts 30 Nos. - 31.03.21Work proposed in Law Book 2020-21

3 Removal of off load OHE masts 36 Nos. - 31.08.20TDC Subject to opening of lockdown on 03.05.2020

4 Replacement of rusty cantilevers120 Nos.

- 31.10.20TDC Subject to opening of lockdown on 03.05.2021

5Replacement of SS wire rope of Manufacturing Batch 2006 and before

Work completed

6Provision of Anti falling arrangement of 3 pulley ATD

Work completed

7Replacement of corroded anti-creep wire

Work completed

8Replacement of isolator of low capacity (800A) by 1600 A

Work completed

9Provision neutral section at insulated overlap of TSS

3 Nos. - - Not feasible due to gradient

Page 19: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Sr.No Item Description Holding Prog. TDC Remark

10Provision of false contact wire under FOBs & ROBs

Work completed

11Provision of anti-monkey devices at 495designated location in monkey prone areas

Work completed

12Provision of 596 nail guard/bird scare device to avoid crow fault

Work completed

13Replacement of 84 nos. 105 sq.mm. jumperby 160 sq.mm. jumper at cross feedergantry at FP/SP/SSP

Work completed

14Replacement of 345 nos. 'G' jumper 105 sq.mm. by 160 sq.mm.jumper in heavily loaded area (between TSS and first SSP)

Work completed

15Replacement of 130 nos. Aluminium cross feeder with 150 sq.mm. copper cross feeder as per RDSO TI/IN/0008

Work completed

16

Provision of 53 nos. 160 sq.mm. jumper with bolted type arrangement and antifalling arrangement of main line isolator.

Work completed

Page 20: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Sr No Item Description Hold. Prog. TDC Remark

17Securing of structure bonds at 108 Railway platforms of Ratlam division

Work completed

18Provision of structure bond on both leg of portal at 291 stations

Work completed

19Modification in 2520 structure bond as per HQ TC no. 106

Work completed

20Provision of 1242 insulated PVC sleeve on rail/structure bond crossing signal rail

Work completed

21Provision of 1242 insulated PVC sleeve on rail/structure bond crossing signal rail

None of earth pit is due for reconditioning

22Shifting of 180 nos. 'G' jumpers to overlap region at turn-out and cross-over

Work completed

23 Correction of tilted equalising plate Being ensured & attended (if any) during maintenance

24Remote operation of siren in OHE depot from TPC room

Work completed

25Provision of illumination in TW top working platform

Work completed

26Replacement of cross type OHE at cross-over by O/L type

Cross type OHE does not exist in our jurisdiction

Page 21: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Sr No Item Description Hold. Prog. TDC Remark

27Replacement of 0.8 mtr. steady arm with 1.0 mtr. steady arm on main line

Work completed

28Replacement of bent steady arm with BFB steady arm on GDA-NAD route

Work completed

29Replacement of overlap type NS by PTFE Neutral section

Work completed

30Identification and correction of drop arm at station having implantation less than 1.85 mtr.

No such correction required

31Improvement of disturbed contact wire profile with gradient of 3 mm/mtr. and relative gradient of 1.5 mm/mtr.

Work completed

32Modification of OHE for removal of PSR on girder bridge

Currently NO PSR due to OHE

Page 22: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

2. Reliability Action Plan (PSI)

Page 23: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Sr.No Item Description Hold. Prog. TDC Remark

1Earth resistance > 10 ohms need reconditioning at TSS/SP/SSP

No such earthing pit exists

2Provision of 87 buried rail & earthing atSP/SSP

Work completed

3Upgradation of protection system to suit parallel operation of Transformers

Already upgraded

4Provision of LBB features to feeder protection modules as per HQ TC no.74

Already provided

5Provision of forced cooling for 4transformers

Work completed

6Provision of 302 insulating pad and surge monitors to LAs as per RDSO modification

Work completed

7Provision of 286 Disconnector assembly to LAs at switching posts (RDSO SMI No.TI/MI/0048)

Work completed

Page 24: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Sr.No Item Description Hold. Prog. TDC Remark

8Repair of defective Capacitor Tripping Device

No such CTD exists for repair

9Repair of rusted transformer and attending leakage

No such transformer exists

10 Repair of defective capacitor banks No defective capacitor bank exists

11Replacement of 03 nos. BHEL make vacuum type interrupter of problematic batch (Year 2008 & 2009)

Work completed

12Replacement of 17 nos. battery sets having completed codal life

Work completed

13 POH of Power transformersAs per new guidelines issued by RDSO, no

transformer due for POH

14 Upkeep of tower wagonsBeing ensured on full pace. All tower wagons

working satisfactorily

Page 25: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

3. Reliability Action Plan

Progress of ongoing works in Ratlam Division

Page 26: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Year PB/LB/MLB Name of Work TDC Remark

2019-20 Umbrella

Godhra-Bhopal Section: Replacement of various interrupters and circuit breakers

having completed their codal life.31.03.21

Detailed estimate has been sanctioned by competent authority.

Tender floated.

2019-20 Law book

Godhra-Bhopal Section: Replacement of relay and control panels at Ratlam,

Naikheri and Maksi TSS.31.12.20

Control panels will be replaced by 31.07.2020. Cabling will be done by

31.12.2020. Financial booking of 70% amt will be done by

31.07.2020.

2019-20 Law book

Godhra-Nagda Section: Replacement of rusty cantilever assemblies and provision

of retro-reflective number plates on Rajdhani route.

31.12.20

Number plates on Rajdhani route will be replaced by 30.06.2020. 130 Cantilevers and 52 sets anti-creep

wire will be replaced by 31.12.2020. 70% financial booking

will be done by 31.07.2020.

2019-20 Umbrella

Godhra-Bhopal Section: Modification to overhead powerline crossing

(11KV & 33KV).31.12.20

Material procurement will be completed within 15 days after

lockdown ends. Work will be completed prior Dec 2020

subjected to charging & fitment of underground crossings by SEB.

11KV-05 nos., 33KV- 19nos.

Page 27: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Year PB/LB/MLB Name of Work TDC Remark

2017-18 MLB

Godhra-Bhopal Section: Provision of separate earthing for lightening arrestors

in various TSS, SP & SSP of Ratlamdivision.

30.06.20Out of 162 electrodes, 152

electrodes have been provided.

2018-19 Law bookRatlam division: Relocation of masts

approaching critical implantation.31.12.20

Work in jurisdiction of BMI completed. Work stopped due to lockdown. Locations in RTM-UJN

section to be attended. (Total location = 79, out of which 23

attended)

2018-19 Law book

Ratlam division: Replacement of potential transformers, current

transformers and lightening arrestors having completed their codal life.

-Work completed and final bill

passed.

Page 28: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Failure Analysis of TRD, Ratlam Division

(Five Years )

(i.e. from 01.01.2015 to 30.04.2020)

Page 29: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Total no. of failures / 1000 TKm of TRD jurisdiction

In 2015 – 1.54

In 2016 – Nil

In 2017 – 1.47

In 2018 – 0.74

In 2019 – 5.15

In 2020 (upto 26.04.2020) – NIL

Total w.e.f. Jan 2015 to 26.04.2020 - 9.64 (In 5 Years)

Page 30: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Total no. of failures in TRD jurisdiction

In 2015 – 02 (Punctuality case – 02)

In 2016 – Nil (Punctuality case – Nil)

In 2017 – 02 (Punctuality case – 01)

In 2018 – 01 (Punctuality case – Nil)

In 2019 – 08 (Punctuality case – 01)

In 2020 (upto 26.04.2020) – NIL (Punctuality case – Nil)

Total w.e.f. Jan 2017 to 26.04.2020 - 13 (Punctuality case – 03)

Page 31: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

SN Failure item Year 2019 Year 2018 Year 2017 Year 2016 Year 2015

1 Tower wagon 1 1 1 Nil 1

2 Potential transformer 2 Nil Nil Nil Nil

3 Auxiliary transformer 1 Nil Nil Nil Nil

4 Lightening Arrestor 1 Nil Nil Nil Nil

5 Current Transformer 1 Nil Nil Nil Nil

6Large span wire ending

cone1 Nil Nil Nil Nil

7 Reactor 1 Nil Nil Nil Nil

8 OHE parting Nil Nil 1 1 2

9 Insulators 32 30 26 35 42

10 Traction transformer Nil Nil Nil Nil Nil

11 SCADA Nil Nil Nil Nil Nil

Page 32: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 07.02.2020

Asset failed: Mark III, 4Wh Tower wagon

Section: Piplod – Sant Road

Depot Jurisdiction: Piplod

Cause of failure: Coolant leaking from radiator under frame of engine

Remedial measure opted: Special drive was launched to get radiators of alltower wagons checked for rust and fitment.

Page 33: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 02.11.2019

Asset failed: Potential transformer

Location: Sehore TSS

Depot Jurisdiction: Sehore

Cause of failure: 132KV line indication PT got burst & burnt due to internalearth fault

Remedial measure opted: Investigation of PT winding was done and it wasconcluded that internal earth fault occurred due to material failure. Specialdrive was launched to check all HV PTs of traction sub-stations thoroughly.

Page 34: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 21.09.2019

Asset failed: Potential transformer

Location: Sehore TSS

Depot Jurisdiction: Sehore

Cause of failure: Heavy lightening

Page 35: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 19.09.2019

Asset failed: Auxiliary transformer

Location: LC-109 (Phanda – Bakniya Bhaunri section)

Depot Jurisdiction: Sehore

Cause of failure: Heavy lightening

Page 36: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 06.08.2019

Asset failed: Lightening arrestor

Location: Bajrangarh SSP

Depot Jurisdiction: Bamnia

Cause of failure: Base insulator of lightening arrestor got flashed andpermanently earthed

Remedial measure opted: LA was sent to RDSO to identify the reason forpermanent earth. It was concluded to be a material failure of base insulator.Technical circular was issued by Division to check all LAs and surge monitorsfor fitment.

Page 37: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 01.05.2019

Asset failed: 2400 KVAr series reactor

Location: Sehore TSS

Depot Jurisdiction: Sehore

Cause of failure: Material failure

Remedial measure opted: Special drive launched to check all capacitor seriesreactors at traction sub-stations.

Page 38: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 27.04.2019

Asset failed: Current transformer

Location: Bamnia TSS

Depot Jurisdiction: Bamnia

Cause of failure: Primary winding of current transformer earthed

Remedial measure opted: Special drive was launched for checking currenttransformers of all switching posts and traction sub-stations.

Page 39: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 22.04.2019

Asset failed: Large span wire ending cone

Location: 48/24 (Naikheri – Shipra bridge section)

Depot Jurisdiction: Ujjain

Cause of failure: Large span wire slipped off from ending cone

Remedial measure opted: Large span wire ending cones of division are beingchecked by tower wagon on annual basis.

Page 40: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 27.02.2018

Asset failed: Mark II, 4Wh Tower wagon

Location: 74/34-36 (Laxmibainagar M/L)

Depot Jurisdiction: Laxmibainagar

Cause of failure: Tower wagon derailed due to breakage of leading drivingaxle from inside gear box

Page 41: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 04.11.2017

Asset failed: Contact wire

Location: 655/06-08 (RTM/FP to RTM-P)

Depot Jurisdiction: Ratlam

Cause of failure: Material failure

Page 42: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 03.05.2017

Asset failed: DETC 8Wh Tower wagon

Location: Khachrod - Runkhera

Depot Jurisdiction: Ratlam

Cause of failure: Traction alternator of TW-1876 got open circuit due to looseconnection with LCC card

Page 43: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 04.08.2015

Asset failed: Mark IV 4Wh Tower wagon

Location: Laxminainagar - Mangaliyagaon

Depot Jurisdiction: Laxmibainagar

Cause of failure: Propeller shaft of tower wagon got disconnected from ADGBstud bolt of ADGB housing & found broken in investigation.

Remedial measure opted: Special drive launched to check ADGB housings &propeller shafts of all 4Wh tower wagons.

Page 44: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Date of failure : 10.06.2015

Asset failed: Contact wire

Location: Maksi – Ranayla Jasmiyan

Depot Jurisdiction: Maksi

Cause of failure: Bad weather and heavy lightening

Page 45: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Depot-wise Log Sheet for Failure of 25kV Composite &

Porcelain Insulators leading to Disruption of Power

supply or Break down of OHE

From : Jan 2017 to Feb 2020

Page 46: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

SUMMARY OF INSULATOR FAILURE FROM JAN. 2017 TO 26.04.2020

Sr.No. Depot Jurisdiction Year No. of Insulator failed Reason

1 Piplod - NIL

Electrocution of birds/Heavy

rain/Lightening/Pollution deposition

2 Dahod

2017 6

2018 4

2019 6

2020 (upto 26.04.2020) NIL

3 Ratlam

2017 8

2018 10

2019 8

2020 (upto 26.04.2020) NIL

4 Nagda

2017 3

2018 7

2019 3

2020 (upto 26.04.2020) NIL

5 Ujjain

2017 NIL

2018 NIL

2019 1

2020 (upto 26.04.2020) NIL

6 Maksi - NIL

Page 47: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Sr.No. Depot Jurisdiction Year No. of Insulator failed Reason

7 Shujalpur

2017 1

Electrocution of birds/Heavy

rain/Lightening

2018 NIL

2019 NIL

2020 (upto 26.04.2020) NIL

8 Sehore

2017 2

2018 3

2019 6

2020 (upto 26.04.2020) NIL

9 Dewas

2017 1

2018 3

2019 4

2020 (upto 26.04.2020) NIL

10 Laxmibainagar

2017 4

2018 3

2019 4

2020 (upto 26.04.2020) NIL

Page 48: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Rly. Div. Depot Loc. No.

Type of Loaction

(Poll./ Non Poll. /

Vandalism)

Whether Porcelain or Composite

Type of Insulator

(ST/BT/9T/ Post/

Operating/ Sectioning

)

Creepage Distance

(850/1050/ 1600 mm

CD)

Make of Insulator

Month & Year

of Manufa

cture

Year of Erection

Date of Failure

Wheather Condition

(Clear/ Foggy/

Stormy/ Rainy)

Nature of Failure (Flashed/ Flashed & Broken/ Puncture/ Tracking along the surface/ Flasded &

Cap pulledout/ Core Broken/ Cap

Broken/ Any other reason)

Apparent Cause of Failure

[Electrocution/Short Circuit/Panto

entanglement/Tree falling/Mast

hitting/Pollutant deposition/Shed or Sheath tear/Poor

bonding/Any other reason (to be specified)]

WR RTMPiplod NIL

WR RTM

Dahod

527/34 Non polluted Porcelain BT 850 NGK 1983 1985 14.01.17 Clear Flashed Electrocution

WR RTM538/36 Non polluted Porcelain 9T 850 NGK 1983 1985 15.04.17 Clear Flashed Electrocution

WR RTM527/38 Non polluted Porcelain BT 850 NGK 1983 1985 27.06.17 Clear Flashed Electrocution

WR RTM533/20 Non polluted Composite ST 1050 Deccan 2016 2016 28.06.17 Rainy Flashed Heavy rain

WR RTM529/01 Non polluted Porcelain BT 850 NGK 1983 1985 08.07.17 Clear Flashed Electrocution

WR RTM533/19 Non polluted Porcelain BT 850 NGK 1983 1985 08.08.17 Rainy Flashed Heavy rain

WR RTM545/14 Non polluted Composite ST 1050 Deccan 2011 2013 13.10.17 Clear Flashed Electrocution

WR RTM527/29 Non polluted Porcelain BT 850 NGK 1983 1985 20.02.18 Clear Flashed Electrocution

WR RTM542/01 Non polluted Porcelain BT 850 NGK 1983 1985 18.06.18 Clear Flashed Electrocution

WR RTM557/9 Non polluted Composite 9T 1050 GIL 2013 2014 25.06.18 Clear Flashed Electrocution

WR RTM574/9 Non polluted Composite BT 1050 Deccan 2011 2012 24.09.18 Rainy Flashed Heavy rain

WR RTMMGN/2021 Non polluted Porcelain BT 850 NGK 1983 1985 25.02.19 Clear Flashed Electrocution

WR RTM529/19 Non polluted Porcelain ST 850 SIL 1985 1986 27.03.19 Clear Flashed Electrocution

WR RTM535/32 Non polluted Porcelain ST 850 SIL 1982 1985 07.05.19 Clear Flashed Electrocution

WR RTM552/6 Non polluted Composite ST 1050 Deccan 2012 2013 09.08.19 Rainy Flashed Heavy rain

WR RTM534/28 Non polluted Porcelain BT 850 NGK 1983 1985 12.08.19 Rainy Flashed Heavy rain

WR RTM528/3 Non polluted Porcelain BT 850 NGK 1983 1985 06.09.19 Clear Flashed Electrocution

Page 49: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Railway Division Depot Location No.

Type of Loaction

(Poll./ Non Poll. /

Vandalism)

Whether Porcelain or Composite

Type of Insulator

(ST/BT/9T/ Post/

Operating/ Sectioning)

Creepage Distance

(850/1050/ 1600 mm

CD)

Make of Insulator

Month & Year of

Manufacture

Year of Erection

Date of Failure

Wheather Condition

(Clear/ Foggy/

Stormy/ Rainy)

Nature of Failure (Flashed/ Flashed & Broken/ Puncture/ Tracking along the

surface/ Flasded & Cap pulledout/ Core

Broken/ Cap Broken/ Any other reason)

Apparent Cause of Failure [Electrocution/Short

Circuit/Panto entanglement/Tree

falling/Mast hitting/Pollutant

deposition/Shed or Sheath tear/Poor bonding/Any

other reason (to be specified)]

WR RTM

Ratlam

655/04 Non polluted Porcelain ST 850 IEC 02/2019 2019 16.09.19 Clear Flashed Electrocution

WR RTM 655/04 Non polluted Porcelain ST 850 IEC 06/2019 2019 16.09.19 Clear Flashed Electrocution

WR RTM RTM/1290 Non polluted Porcelain BT 850 IEC 05/2019 2019 01.10.19 Clear Flashed Electrocution

WR RTM 627/22 Non polluted Porcelain ST 850 IEC 06/2018 2019 04.11.19 Clear Flashed Electrocution

WR RTM RTM/1451 Non polluted Composite ST 1050 GIL 06/2015 2017 13.01.18 Clear Flashed Electrocution

WR RTM 626/11 Non polluted Composite ST 1050 GIL 1982 1983 13.01.18 Clear Flashed Electrocution

WR RTM 626/9 Non polluted Composite ST 1050 GIL 1982 1983 13.01.18 Clear Flashed Electrocution

WR RTM RTM/3132 Non polluted Porcelain BT 1050 MIL 01/2016 2017 17.02.18 Clear Flashed Electrocution

WR RTM RTM/3117 Non polluted Porcelain BT 1050 MIL 07/2015 2017 17.02.18 Clear Flashed Electrocution

WR RTM 655/6 Non polluted Porcelain BT 850 NGK 01/2016 2017 17.02.18 Clear Flashed Electrocution

WR RTM RTM/3110 Non polluted Porcelain BT 850 IEC 05/2016 2017 20.02.18 Clear Flashed Electrocution

WR RTM RTM/3106 Non polluted Porcelain BT 850 IEC 11/2016 2017 06.03.18 Clear Flashed Electrocution

WR RTM 655/14 Non polluted Composite BT 1050 TG 1982 1983 20.06.18 Rainy Flashed Heavy rain

WR RTM RTM/2005 Non polluted Porcelain BT 1050 MIL 05/2016 2017 23.08.18 Clear Flashed Electrocution

WR RTM 679/26 Non polluted Porcelain BT 850 BHEL 05/2006 2017 22.01.19 Clear Flashed Electrocution

WR RTM RTM/1238 Non polluted Porcelain ST 850 IEC 11/2007 2017 31.01.19 Clear Flashed Electrocution

WR RTM 654/6A Non polluted Porcelain ST 850 NGK 1982 1983 31.01.19 Clear Flashed Electrocution

WR RTM 653/39 Non polluted Porcelain ST 850 NGK 1982 1983 25.07.19 Clear Flashed Electrocution

WR RTM RTM/3106 Non polluted Porcelain ST 1050 MIL 1982 1983 11.03.17 Clear Flashed Electrocution

WR RTM RTM/2018 Non polluted Porcelain ST 850 SIL 05/1984 1986 12.04.17 Clear Flashed Electrocution

WR RTM 675/13 Non polluted Composite BT 1050 TG-2 05/2016 2017 12.06.17 Rainy Flashed Heavy rain

WR RTM 654/14 Non polluted Porcelain ST 1050 TG-2 09/2015 2016 03.07.17 Clear Flashed Electrocution

WR RTM 635/18 Non polluted Porcelain BT 850 NGK 05/2016 2017 03.07.17 Clear Flashed Electrocution

WR RTM RTM/2012 Non polluted Porcelain ST 850 BHEL 07/2015 2016 17.12.17 Clear Flashed Electrocution

WR RTM RTM/2003 Non polluted Porcelain BT 1050 MIL 05/2016 2017 25.12.17 Clear Flashed Electrocution

WR RTM RTM/3106 Non polluted Porcelain BT 1050 MIL 05/2016 2017 25.12.17 Clear Flashed Electrocution

WR RTM

Nagda

02/13 Polluted Composite BT 1050 Decasil 2012 2012 27.06.17 Clear Flashed Pollution deposition

WR RTM 694/22 Polluted Composite BT 1050 GIL 2012 2013 29.08.17 Rainy Puncture Lightening

WR RTM 11/11 Non polluted Porcelain BT 850 BHEL 1983 1990 17.11.17 Clear Flashed Monkey electrocution

WR RTM 10/21 Non polluted Porcelain ST 850 BHEL - 1990 01.01.18 Foggy Flashed Monkey electrocution

WR RTM GS/46 Polluted Porcelain ST 1050 IEC 2007 2014 24.01.18 Foggy Flashed Pollution deposition

WR RTM GS/48 Polluted Porcelain ST 1050 IEC 2007 2014 25.01.18 Foggy Flashed Pollution deposition

WR RTM GS/49 Polluted Porcelain ST 1050 IEC 2007 2014 08.02.18 Clear Flashed Pollution deposition

WR RTM GS/49 Polluted Porcelain BT 1050 MIL 2007 2014 08.02.18 Clear Flashed Pollution deposition

WR RTM 17/27 (L-3) Non polluted Porcelain BT 850 SIL 1984 1990 29.10.18 Clear Flashed Monkey electrocution

WR RTM 17/27 (L-4) Non polluted Porcelain ST 850 JSI 1984 1990 01.11.18 Clear Flashed Monkey electrocution

WR RTM 17/28 (L-1) Non polluted Porcelain ST 850 JSI 1984 1990 17.10.19 Clear Flashed Monkey electrocution

WR RTM 17/28 (L-2) Non polluted Porcelain ST 850 JSI 1984 1990 17.10.19 Clear Flashed Monkey electrocution

WR RTM Ujjain 42/12 Non polluted Composite ST 1050 Deccan 09/14 2015 21.08.19 Clear Flashed & Punctured Material failure

WR RTM Maksi NIL

Page 50: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Railway Division Depot Location No.

Type of Loaction

(Poll./ Non Poll. /

Vandalism)

Whether Porcelain or Composite

Type of Insulator

(ST/BT/9T/ Post/

Operating/ Sectioning)

Creepage Distance

(850/1050/ 1600 mm

CD)

Make of Insulator

Month & Year of

Manufacture

Year of Erection

Date of Failure

Wheather Condition

(Clear/ Foggy/

Stormy/ Rainy)

Nature of Failure (Flashed/ Flashed & Broken/ Puncture/ Tracking along the

surface/ Flasded & Cap pulledout/ Core

Broken/ Cap Broken/ Any other reason)

Apparent Cause of Failure [Electrocution/Short

Circuit/Panto entanglement/Tree

falling/Mast hitting/Pollutant

deposition/Shed or Sheath tear/Poor bonding/Any

other reason (to be specified)]

WR RTM Shujalpur 163/14 Vandalism Composite BT 1050 ABI Sep-2012 2013 21.09.17 Rainy Puncture Heavy rain & lightening

WR RTM

Sehore

184/16 Non polluted Composite BT 1050 GIL 03/2011 2012 14.09.19 Clear Flashed Electrocution

WR RTM 207/24 Non polluted Porcelain ST 1050 MIL 12/2006 2008 19.06.19 Rainy Flashed Lightening

WR RTM 193/12 Non polluted Porcelain ST 850 MIL 09/1994 1995 01.08.17 Rainy Flashed Electrocution

WR RTM 199/3 Non polluted Porcelain 9T 850 GIL 07/1988 2008 18.10.17 Clear Flashed Electrocution

WR RTM 210/28 Non polluted Porcelain ST 1050 IEC 08/2008 2008 12.07.18 Rainy Flashed Lightening

WR RTM 199/23 Non polluted Porcelain ST 1050 JSI 11/2007 2008 14.07.18 Rainy Flashed Electrocution

WR RTM 219/12 Non polluted Porcelain ST 850 IEC 04/2003 2005 05.10.18 Clear Flashed Electrocution

WR RTM 201/7 Non polluted Composite BT 1050 Goldstone 07/2008 2009 07.02.19 Clear Flashed Short Circuit

WR RTM 201/7 Non polluted Composite ST 1050 Deccan 02/2012 2013 07.02.19 Clear Flashed Short Circuit

WR RTM 201/19 Non polluted Composite BT 1050 Deccan 02/2012 2013 16.08.19 Rainy Flashed Electrocution

WR RTM 201/2 Non polluted Composite ST 1050 Deccan 05/2011 2012 01.07.19 Rainy Flashed Heavy rain

WR RTM 200/4 Non polluted Porcelain BT 1050 MIL 04/2007 2008 10.08.19 Rainy Flashed Electrocution

WR RTM

Dewas

27/1 Non polluted Porcelain BT 1050 ABI 2008 2011 12.06.17 Rainy Flashed Bird Electrocution

WR RTM 17/30 Non polluted Porcelain ST 1050 MIL 2008 2012 07.04.18 Clear Flashed Bird Electrocution

WR RTM 54/15 Non polluted Porcelain ST 1050 MIL 2008 2012 11.07.18 Rainy Flashed Bird Electrocution

WR RTM MGG/1065 Polluted Composite BT 1050 MCPL 2008 2012 19.07.18 Rainy Flashed Bird Electrocution

WR RTM MGG/1008 Polluted Composite 9T 1050 Deccan 2008 2012 21.05.19 Clear Flashed Bird Electrocution

WR RTM 35/23 Non polluted Porcelain BT 1050 ISI 2008 2011 14.06.19 Rainy Flashed Bird Electrocution

WR RTM 60/25 Non polluted Porcelain ST 1050 MIL 2008 2012 27.09.19 Clear Flashed Bird Electrocution

WR RTM DWX/1101 Non polluted Porcelain BT 1050 IEC 2008 2012 31.10.19 Clear 2 Disc broken Stone pelting by outsiders

WR RTM

Laxmibainagar

65/7 Non polluted Composite ST 1050 MCPL 2008 2012 19.05.17 Clear Flashed Electrocution

WR RTM IND/1005 Non polluted Composite BT 1050 MCPL 2008 2012 31.08.17 Rainy Flashed Heavy rain

WR RTM 73/33 Non polluted Porcelain ST 1050 MIL 08/08 2012 03.10.17 Clear Flashed Electrocution

WR RTM 68/17 Non polluted Porcelain BT 1050 MIL 06/08 2012 30.12.17 Clear Flashed Electrocution

WR RTM 500/26 Non polluted Porcelain ST 1050 IEC 05/16 2017 27.07.18 Rainy Flashed Heavy rain

WR RTM 494/31 Non polluted Porcelain BT 1050 IEC 05/16 2017 28.07.18 Rainy Flashed Electrocution

WR RTM 503/20 Non polluted Porcelain BT 1050 IEC 05/16 2017 28.11.18 Clear Flashed Electrocution

WR RTM 503/14 Non polluted Porcelain BT 1050 IEC 05/16 2017 28.05.19 Clear Flashed Electrocution

WR RTM 504/28 Non polluted Porcelain 9T 1050 IEC 03/16 2017 31.07.19 Rainy Flashed Heavy rain

WR RTM 76/3 Non polluted Composite 9T 1050 Deccan 2008 2012 07.12.19 Clear Flashed Electrocution

WR RTM LMNR/1053 Non polluted Composite ST 1050 Deccan 2008 2012 12.12.19 Clear Flashed Electrocution

Page 51: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Measures opted by TRD Ratlam

to minimize failures

Page 52: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Special drive was launched to check all lightening arrestors ofdivision with surge monitors. TC was also issued in this concern.

Special drive was launched for checking large span wire endingcones by binocular to avoid breakdown due to slipping off OHE.

Drive has been launched to check vulnerable & old trees to cutthem off so as to prevent them falling on OHE.

Special drive was launched for thorough examination of underframe of all tower wagons regarding attention to rust andtightness.

Page 53: EELLEECCTTRRIICCAALL T TTRRRA AACCCTTI IIOOONNN D … · 2020. 12. 17. · Electrification work is on progress, section of Ujjain – Indore section ... S/N Section RKM Year of Electrification

Catenary wires inside catenary suspension brackets are beingchecked after loosing and opening the suspension bracket so as toassure “no breakage of strands”.

Loco roof checking and pantograph inspection are being jointlydone to assure pantograph fitness.

Fortnight checking & requisite cleaning of insulators are beingensured in polluted zone.

Fitness of bonding and earthing system is being ensured in time.

Special drive was launched for checking the earth resistance &fitment of all earth electrodes of OHE & PSI installations.