Summary of Preliminary Phase 1 Assumptions, Findings, and Recommendations Eisenhower East Small Area Plan 2019 Update March 27, 2019 Mixed-Use, Transit Oriented Development - Area is served by two Metro Stations and Amtrak/VRE - Trips to and from destinations can easily be made by non-auto means Multimodal Transportation Improvements Planned by City - Complete Streets - Vision Zero - Transportation Master Plan - Bicycle and Pedestrian Master Plan - Smart Mobility Mode split (also called mode share) is the percentage of travelers using a particular type (or mode) of transportation when traveling Auto Transit Walk Bike Land Use Proximity to Metro/Type Auto Transit Bike Walk Adjacent to Metro 30% 55% 5% 10% <1/4 Mile to Metro 35% 50% 5% 10% >1/4 Mile and <1/2 Mile 40% 45% 5% 10% Adjacent to Metro 30% 60% 5% 5% <1/4 Mile to Metro 35% 55% 5% 5% >1/4 Mile and <1/2 Mile 40% 50% 5% 5% Neighborhood Serving Retail 10% 10% 5% 75% Destination Retail 50% 10% 5% 35% Grocery Store 65% 5% 5% 25% Hotel All 20% 55% 1% 24% Retail Residential Office 1) Increase in density and changes in uses will have a manageable impact on the surrounding transportation network, assuming recommendations and mitigation measures are implemented ( Preliminary Mitigations are shown on accompanying board ) 2) Phase 2 of analysis will further refine and verify preliminary mitigations Findings from Preliminary Phase 1 Analysis 1) Complete Grid of Streets 2) Standardization of Signals 3) Study Feasibility of Implementing Increased Bus Service 4) Provide Parking Ratios to Encourage Non-Auto Use 5) Implement Transportation Demand Management (TDM) Plans 6) Improved Bicycle Infrastructure 7) Implement Transportation Technologies Recommendations from Preliminary Phase 1 Analysis Mode Splits Assumed in Preliminary Phase 1 Study - Based data collected at comparable sites in Northern Virginia (including Eisenhower East) and Washington DC, Census data, and WMATA Ridership Survey Factors Considered in Preliminary Phase 1 Analysis Changes in Transportation since 2003 Plan was Approved - Parking Standards for New Developments - Capital Bikeshare - Transportation Network Companies (TNCs) Uber, Lyft, Via, etc. - Car-Sharing Zipcar, Maven, Car2Go, Free2Move, etc. - Dockless Mobility Lime, Lyft, Jump, Bird, Bolt, etc. Travel Assumptions used in Preliminary Phase 1 Analysis

Upload: others

Post on 09-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EE Transit Study Prelim Phase 1 Analysis 03 27 19 · Ramp to WB I-495 Ramp from WB I-495 Ramp from WB I-495 Ramp to EB I-495 49 42 8 9 50 28 Study Area Project Boundary # Study Intersection

Summary of Preliminary Phase 1 Assumptions, Findings, and RecommendationsEisenhower East Small Area Plan 2019 Update March 27, 2019

• Mixed-Use, Transit Oriented Development

- Area is served by two Metro Stations and Amtrak/VRE

- Trips to and from destinations can easily be made by non-auto means

• Multimodal Transportation Improvements Planned by City

- Complete Streets

- Vision Zero

- Transportation Master Plan

- Bicycle and Pedestrian Master Plan

- Smart Mobility

Mode split (also called mode share) is the

percentage of travelers using a particular type (or

mode) of transportation when traveling

Auto

Transit

Walk

Bike

Land Use Proximity to Metro/Type Auto Transit Bike Walk

Adjacent to Metro 30% 55% 5% 10%

<1/4 Mile to Metro 35% 50% 5% 10%

>1/4 Mile and <1/2 Mile 40% 45% 5% 10%

Adjacent to Metro 30% 60% 5% 5%

<1/4 Mile to Metro 35% 55% 5% 5%

>1/4 Mile and <1/2 Mile 40% 50% 5% 5%

Neighborhood Serving Retail 10% 10% 5% 75%

Destination Retail 50% 10% 5% 35%

Grocery Store 65% 5% 5% 25%

Hotel All 20% 55% 1% 24%

Retail

Residential

Office

1) Increase in density and changes in uses will have a manageable impact on the

surrounding transportation network, assuming recommendations and mitigation measures

are implemented (Preliminary Mitigations are shown on accompanying board)

2) Phase 2 of analysis will further refine and verify preliminary mitigations

Findings from Preliminary Phase 1 Analysis

1) Complete Grid of Streets

2) Standardization of Signals

3) Study Feasibility of Implementing Increased Bus Service

4) Provide Parking Ratios to Encourage Non-Auto Use

5) Implement Transportation Demand Management (TDM) Plans

6) Improved Bicycle Infrastructure

7) Implement Transportation Technologies

Recommendations from Preliminary Phase 1 Analysis

• Mode Splits Assumed in Preliminary Phase 1 Study

- Based data collected at comparable sites in Northern Virginia (including Eisenhower East) and Washington

DC, Census data, and WMATA Ridership Survey

Factors Considered in Preliminary Phase 1 Analysis

• Changes in Transportation since 2003 Plan was Approved

- Parking Standards for New Developments

- Capital Bikeshare

- Transportation Network Companies (TNCs)

Uber, Lyft, Via, etc.

- Car-Sharing

Zipcar, Maven, Car2Go, Free2Move, etc.

- Dockless Mobility

Lime, Lyft, Jump, Bird, Bolt, etc.

Travel Assumptions used in Preliminary Phase 1 Analysis

Page 2: EE Transit Study Prelim Phase 1 Analysis 03 27 19 · Ramp to WB I-495 Ramp from WB I-495 Ramp from WB I-495 Ramp to EB I-495 49 42 8 9 50 28 Study Area Project Boundary # Study Intersection

12

4

3

5

67

10

1112

1314 15

16 17

18

1920

21

32

35

33

36

37

38

39

40

22

31

2324 25 26

2729 30

41

44

45

46

48

34

43

47Ramp from EB I-495

Ramp to WB I-495

Ramp from WB I-495

Ramp from WB I-495

Ramp to EB I-495

49

42

8

9

50

28

Study Area

Project Boundary

# Study Intersection (Phase 1)

Area of Simulation (Phase 2)

NOT TO SCALENOT TO SCALE

Study Area Intersections: Phase 1 and Phase 2 Analysis Study AreasEisenhower East Small Area Plan 2019 Update March 27, 2019

Page 3: EE Transit Study Prelim Phase 1 Analysis 03 27 19 · Ramp to WB I-495 Ramp from WB I-495 Ramp from WB I-495 Ramp to EB I-495 49 42 8 9 50 28 Study Area Project Boundary # Study Intersection

Summary of Preliminary Phase 1 Results and MitigationsEisenhower East Small Area Plan 2019 Update March 27, 2019

10

21

35

36

39

23

2627

29 30

46

34

28

2

4

3

6

1314 15

16 17

18

38

7

5

12

3732

33

20

1

11

19

22

40

41

45

24

Preliminary Mitigation*

Signal Timing/Phasing/Restriping#

Additional Capacity (Curbwork)#

New Signal#

No Mitigation Required

*Preliminary mitigations from the Phase 1 analysis are

system-wide improvements that are needed to maintain levels

of service similar to 2003 plan/development program;

mitigations require verification in Phase 2 of analysis

50

NOT TO SCALENOT TO SCALE

25

#

4331

- Added 3rd southbound lane

- New signal

- Added 2nd westbound lane

- New signal

- New Signal

- Added 3rd northbound lane

50