eDOS Workgroup

Pilots – Kickoff Teleconference

October 2, 2012

Page 2: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

Meeting Etiquette

• Remember: If you are not speaking keep your phone on mute• Do not put your phone on hold – if you need to take a call, hang up

and dial in again when finished with your other call • This meeting, like all of our meetings, is being recorded

– Another reason to keep your phone on mute when not speaking!

• Feel free to use the “Chat” or “Q&A” feature for questions or comments

• Please announce your name each time prior to making comments or suggestions during the Q&A portion of the meeting

NOTE: This meeting is being recorded and will be posted on the eDOS wiki page after the

meeting

NOTE: This meeting is being recorded and will be posted on the eDOS wiki page after the

meeting

From S&I Framework to Participants:Hi everyone: remember to keep your phone on mute

2

Page 3: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

Agenda

• eDOS Pilot Projects Schedule• eDOS Pilots – Engagement Plan• LRI – LOI - eDOS Pilots Coordination Meetings• Next Steps

3

Page 4: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

The eDOS project is a component of the Lab Order Interface (LOI) Initiative

Page 5: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

Lab Order Interface (LOI) Initiative

Page 6: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS Engagement Plan

• Introduction• Pilot Site Criteria• Pilot Site Selection• Coordination Meetings• Project Outcomes• Out-of-Scope Assumptions

Page 7: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS Engagement Plan

• Introduction• The eDOS work group is seeking laboratories, sites, and their

appropriate vendors, willing to pilot the eDOS HL7 Implementation Guide in a production environment.

• There is minimal value in recruiting participants who can only commit to evaluating the content of the eDOS IG itself as an academic exercise.

• The value to the pilot project is for participating sites that have the capability to work with their vendor(s) to implement the appropriate messaging profiles and actually update their database with the information received via the interface.

Page 8: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS Engagement Plan

• Pilot Site Criteria• Four or more sites, one or more of each with the following criteria:

– eDOS integrated with both LRI and LOI– eDOS integrated with LOI– eDOS integrated with an ordering environment not LOI– eDOS from laboratory to laboratory (under consideration)

• Should we include laboratory to laboratory as a pilot? We do not have a formal use case to support this nor is lab to lab within the stated scope of the piloted Implementation Guide.

Page 9: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS Engagement Plan• Pilot Site Selection• Approach the top 3 laboratories in the US. Ask each to participate

along with their preferred vendor• Work with each of the following laboratories in determining their

preferred EHR vendor and target site; reach out to preferred vendors, sites, and encourage/recruit to participate– BioReference Laboratories– LabCorp– Quest Diagnostics

• Work with each of the following interoperability partners in determining their preferred Lab vendor and EHR vendor– Mayo– Kaiser Permanente

Page 10: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS Engagement Plan

• Coordination Meetings• All sites and vendors participating in any eDOS pilot project are

required to attend regularly scheduled pilot coordination meetings. The initial meetings will occur bi-weekly as pilot projects are kicked-off. As pilot projects progress, the meeting schedule will be re-evaluated on an as-needed basis. The next meeting is scheduled for Tuesday, October 16th, 2012, 2-3pm ET.

Page 11: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS Engagement Plan

• Project Outcomes• Verification of the veracity of the eDOS specification itself and the

assertion that adoption will gain implementers efficiencies and, therefore, cost savings.

• A change control list of edits/enhancements produced by the pilot projects

• Initial evaluation of changes will be done by the eDOS work group, determined to be errata (technical corrections) or edits/enhancements for the normative IG

Page 12: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS Engagement Plan• Out-of-Scope Assumptions• The eDOS pilot project will not handle the issue of the appropriateness of test

codes within laboratory processing.– Providers ordering lab diagnostic testing frequently do not include method

and sometimes even specimen isn’t appropriate on an order. Additionally, the nature (speed) at which the test must be performed can change the ordering code as well. In short, documenting critical information necessary to place each order is not-in-scope for this pilot project.

– For performing lab work, the entire detail of LOINC is available and appropriate for documenting results from a lab-specific perspective

– The lab may perform a different test than was ordered.– For an EHR receiving lab results, the lab codes are frequently too specific.

EHR systems would like to graph and ‘trend’ lab results where possible and appropriate.

• While the data fields which hold the common elements need to be synchronized, the actual value sets do not (with the exception of the test codes themselves, of course)

Page 13: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

eDOS – Pilot Signup

• Join the Work Group– URL: http://

wiki.siframework.org/Getting+Started+as+a+Participant• Contact a Work Group Lead

– Patrick E. Loyd; [email protected]– Freida Hall; [email protected]

• Will have each site fill out a form which details logistics– Lab Vendor/Product– EHR Vendor/Product

Page 14: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

TimelineDate(s) Task

September 18, 2012 Pilots Coordination Kickoff

September-October 2012 Recruiting

September 2012 – March 2013 (original dates) Pilot

May 2013 Normative Ballot of updated Implementation Guide

May-June 2013 Ballot Reconciliation

September 2013 - January 2014 Re-ballot (if needed)

No later than February, 2014 Publication of Normative Implementation Guide

Page 15: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

Q&A

Page 16: EDOS Workgroup Pilots – Kickoff Teleconference October 2, 2012

Next Steps

• Sign up as a Pilot (Process TBD)• The eDOS Pilot Kickoff meeting will be held on September 18 from

2:00 – 3:00 PM ET

16