CBB1052 ENGINEERING
GRAPHICS
PROCESS FLOW DIAGRAM (PFD)
& PROCESS AND INSTRUMENTATION
DIAGRAM (P&ID)
![Page 2: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/2.jpg)
OBJECTIVES
At the end of this lecture, students should be able
to:
Explain what is PFD and P&ID
Construct PFD given a process statement or from
block diagram
Understand and apply general draughting rules
![Page 3: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/3.jpg)
PROCESS FLOW DIAGRAM
In the process flow diagram (PFD), processes
and/or process plants are shown as graphical
symbols, interconnected by flow lines.
The graphical symbols represent equipment and
the lines represent flows of mass or energy or
energy carriers.
![Page 4: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/4.jpg)
PROCESS FLOW DIAGRAM
The process flow diagram should consist of the
following basic information:
• symbols of process equipment
• denomination of the equipment
• route and direction of the incoming and
outgoing material, energy and/or carrier flows
• denomination of flows of incoming and outgoing
materials, energy and/or carriers
• operating conditions (T and P)
![Page 5: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/5.jpg)
PROCESS FLOW DIAGRAM
Source: EN ISO 10628:2001
![Page 6: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/6.jpg)
PROCESS FLOW DIAGRAM
The process flow diagram may also contains:
• denomination of flow directions and flow rates
of process fluids between the process steps
• essential valves in the logical process position
with respect to their function
• functional demands for process measurement
and control at essential points
![Page 7: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/7.jpg)
PROCESS FLOW DIAGRAM
(continued):
• supplementary operating conditions ( , )
• denomination of equipment and characteristic
data of equipment
• denomination of drives (e.g., gears, conveyors,
belts, chains, cranes) and their characteristics
• elevation of platforms and approximate
relative vertical position of equipment.
![Page 8: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/8.jpg)
PROCESS FLOW DIAGRAM
Source: EN ISO 10628:2001
![Page 9: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/9.jpg)
PROCESS AND INSTRUMENTATION DIAGRAM
(P&ID)
• The piping and instrumentation diagram (P&ID) is
drawn based on the process flow diagram (PFD).
• The P&ID represents the technical realization of a
process by means of graphical symbols for equipment and
piping together with graphical symbols for process
measurement and control functions.
![Page 10: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/10.jpg)
The piping and instrument diagram should consist of the following
basic information:
• function or type of equipment, including drives,
conveyors as well as installed spares
• identification number of equipment
• characteristic data of equipment
• indication of nominal diameter, pressure rating,
material and type of piping
PROCESS AND INSTRUMENTATION DIAGRAM
(P&ID)
![Page 11: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/11.jpg)
PROCESS AND INSTRUMENTATION DIAGRAM
(P&ID)
Basic information (continued):
• details of equipment, piping, valves and fittings,
thermal insulation
• process measurement and control functions with
identification number
• characteristic data of drives, given in separate lists if
necessary
![Page 12: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/12.jpg)
![Page 13: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/13.jpg)
PROCESS AND INSTRUMENTATION DIAGRAM
(P&ID)
The piping and instrumentation diagram may also contains:
• denomination of flow rates or amounts of energy or energy
carriers
• route and direction of flow of energy or carriers
• type of essential primary elements and sensors
• essential construction materials for equipment
• elevation of platforms and approximate relative vertical
position of equipment
• reference designation for valves and fittings
• denomination of equipment
![Page 14: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/14.jpg)
![Page 15: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/15.jpg)
EQUIPMENT FUNCTION CODE BASED ON
PTS
![Page 16: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/16.jpg)
EQUIPMENT FUNCTION CODE BASED ON
PTS
![Page 17: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/17.jpg)
![Page 18: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/18.jpg)
![Page 19: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/19.jpg)
![Page 20: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/20.jpg)
![Page 21: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/21.jpg)
GENERAL DRAUGHTING RULES ACCORDING
TO BRITISH STANDARD
Dimensions
Should reflect the actual relative dimensions with
respect to scale and elevation (exclude valves,
pumps and measurement unit)
Location
Devices to be expected at the uttermost level of the
plant shall appear at the top of the drawing
Those devices at the lowest level are expected to be
shown at the bottom of the drawing
Logical position
![Page 22: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/22.jpg)
GENERAL DRAUGHTING RULES ACCORDING
TO BRITISH STANDARD (CONT.)
Line Widths 1 mm for main flow lines
0.5 mm for Graphical symbols of the equipment, except valves, fittings,
and piping accessories
Energy carrier lines and auxiliary system
Subsidiary flow lines
Rectangular frames for illustrating unit operations
0.25 mm for Graphical symbols of valves, fittings and piping accessories
Symbol for process measurement and control functions, control and data transmission lines
Reference lines
Other auxiliary lines,
![Page 23: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/23.jpg)
Flow Direction
Flow direction shall start from left to right or top to bottom
Line Spacing
Line should not be spaced less than twice the width of the lines
Line spacing (parallel lines) > 10 mm is highly desirable
Arrows
For better understanding, arrow may be located at the inlet of the equipment and upstream of pipe branches
GENERAL DRAUGHTING RULES ACCORDING
TO BRITISH STANDARD (CONT.)
![Page 24: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/24.jpg)
GENERAL DRAUGHTING RULES ACCORDING
TO BRITISH STANDARD (CONT.)
Lines Connection
![Page 25: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/25.jpg)
GENERAL DRAUGHTING RULES ACCORDING
TO BRITISH STANDARD (CONT.)
Auxiliary system lines
Lines shall be shown as dashed lines with the
indication of the direction of flow and reference to
type of the energy carrier
Lettering
Height of letters shall be 5 mm for reference
designations of major equipment
2.5 mm for other inscriptions
![Page 26: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/26.jpg)
INSTRUMENT NOMENCLATURE
![Page 27: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/27.jpg)
SUMMARY
PFD
P&ID
General Draughting Rules
![Page 28: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/28.jpg)
![Page 29: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/29.jpg)
EXERCISE
Draw the process flow diagram of the cumene
manufacturing process according to the
draughting standards outlined in BS.
Use the given block diagram to assist you
![Page 30: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/30.jpg)
BLOCK DIAGRAM FOR CUMENE
MANUFACTURING PROCESS
![Page 31: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/31.jpg)
![Page 32: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/32.jpg)
![Page 33: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/33.jpg)
![Page 34: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/34.jpg)
![Page 35: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/35.jpg)
![Page 36: Ed_lec09 Chapter 9_pfd Pid (1)](https://reader031.vdocuments.site/reader031/viewer/2022020314/577ccf351a28ab9e788f28fa/html5/thumbnails/36.jpg)