Performance –Graded (PG) Performance –Graded (PG) Binders Binders P P aramount aramount P P etroleum etroleum C C orporation orporation 14700 Downey Ave 14700 Downey Ave Paramount, CA 90723 Paramount, CA 90723 Edgard Hitti Edgard Hitti Director of Asphalt Technical Services Director of Asphalt Technical Services Paramount Asphalt A subsidiary of ALON USA

Upload: california-asphalt-pavement-association

Post on 07-May-2015

206 views

Category:

Business


4 download

DESCRIPTION

Presentation by Edgard Hitti of Paramount Petroleum, "Asphalt Binder Update -- New Specification on PG-M" delivered at the CalAPA Fall Asphalt Pavement Conference Oct. 24, 2013 in Sacramento, Calif.

TRANSCRIPT

Page 1: Edgard Hitti

Performance –Graded (PG) BindersPerformance –Graded (PG) Binders

PParamount aramount PPetroleumetroleum CCorporationorporation

14700 Downey Ave14700 Downey Ave

Paramount, CA 90723Paramount, CA 90723

Edgard HittiEdgard HittiDirector of Asphalt Technical Services Director of Asphalt Technical Services

Paramount AsphaltA subsidiary of ALON USA

Page 2: Edgard Hitti

OverviewOverview How it is madeHow it is made

Then & NowThen & Now

Specifications gradingSpecifications grading

Why, When & How?Why, When & How?

How will it affect you?How will it affect you?

Q & AQ & A

Page 3: Edgard Hitti

Production Of Modified AsphaltProduction Of Modified Asphalt

H

Bases

Modifier

Grade

S

Bases

Polymer, rubbers, etc…

Page 4: Edgard Hitti

Production Of Modified AsphaltProduction Of Modified Asphalt

Very delicate Very delicate processprocess

Requires Requires computerized computerized systemsystem

Page 5: Edgard Hitti

PMA PlantPMA Plant

Page 6: Edgard Hitti

66

Page 7: Edgard Hitti

Long Term StorageLong Term Storage

Up to 2 weeksUp to 2 weeks

300-320oF

Avoid aging

& increase viscosity

Prevent

degradation

Neat asphalt

PMA

PG-M, PG-PM, PG-TR

Page 8: Edgard Hitti

Extended StorageExtended Storage

More than 3 weeksMore than 3 weeks

Neat asphalt:Neat asphalt:– no heatno heat

PMA (PG-PM, PG-TR, PG-M):PMA (PG-PM, PG-TR, PG-M):– No heatNo heat– Polymer has the tendency to over swell & Polymer has the tendency to over swell &

degradedegrade

<300oF

250-300

Page 9: Edgard Hitti

Formation Of Coked MaterialFormation Of Coked Material

Around heating coilAround heating coil Excessive heat for an extended periodExcessive heat for an extended period Loss in heat efficiencyLoss in heat efficiency Improper maintenanceImproper maintenance

– Inspection on yearly basisInspection on yearly basis

Solution:Solution:– Empty the tank and physically remove the material Empty the tank and physically remove the material

around the coils around the coils

Page 10: Edgard Hitti

Coked MaterialCoked MaterialHardened asphalt around the heating coils

Coked material

Heating oil

Asphalt

Pipe

Page 11: Edgard Hitti

Coked MaterialCoked Material

Very hard & brittle materials

Page 12: Edgard Hitti

Heating Oil LeakageHeating Oil Leakage

Minor leakage can drop viscosity from Minor leakage can drop viscosity from 2000 to 100 poise2000 to 100 poise

Monitor viscosity or heating fluidMonitor viscosity or heating fluid

Solution:Solution:– Material is transferred to another tank and Material is transferred to another tank and

re-blend to bring it back to spec.re-blend to bring it back to spec.

Page 13: Edgard Hitti

FlushingFlushing

Good practice to flush the tank after TR or Good practice to flush the tank after TR or PM project with HOT neat asphalt.PM project with HOT neat asphalt.– Attention to contaminationAttention to contamination– Tank completely emptyTank completely empty

Page 14: Edgard Hitti

Truck ContaminationTruck Contamination

Truck must be cleaned before loading Truck must be cleaned before loading different materialsdifferent materials

Some truckers use diesel oil to prevent Some truckers use diesel oil to prevent plugging of the valves plugging of the valves (BAD PRACTICE) (BAD PRACTICE)

Area filled with diesel oil

Page 15: Edgard Hitti

Penetration Grading System

Viscosity Grading System

Specification Specification SystemsSystems

Superpave PG Grading

System

Other Systems

Page 16: Edgard Hitti

Penetration SpecificationPenetration Specification

Five grades (original binder):Five grades (original binder): 40 - 5040 - 50 60 - 7060 - 70 85 - 10085 - 100 120 - 150120 - 150 200 - 300200 - 300

Page 17: Edgard Hitti

Original Binder (AC)

Aged Residue (AR)

Viscosity Viscosity Grading Grading SystemSystem

Page 18: Edgard Hitti
Page 19: Edgard Hitti

4050

6070

85100

120150

200300

Penetration Grades

AC 40

AC 20

AC 10

AC 5

AC 2.5

100

50

10

5

Vis

cosi

ty,

60C

(14

0F)

AR 16000

AR 8000

AR 4000

AR 2000

AR 1000

Page 20: Edgard Hitti

Superpave PG Grading SystemSuperpave PG Grading System

Developed in 1990s during SHRPDeveloped in 1990s during SHRP Fundamental PropertiesFundamental Properties

– Related to Pavement Performance?Related to Pavement Performance?

Binder Contributions to Binder Contributions to – Rutting, Fatigue and Thermal CrackingRutting, Fatigue and Thermal Cracking

Environmental Factors or Climate Environmental Factors or Climate In-Service & Construction TemperaturesIn-Service & Construction Temperatures Short- and Long-Term AgingShort- and Long-Term Aging

Page 21: Edgard Hitti

Superpave Asphalt Binder Superpave Asphalt Binder SpecificationSpecification

The grading system is based on Climate:In-Service Pavement Temperatures

PG XX - YY

Performance Grade

Average 7-day max pavement temperature

Min pavement temperature

Page 22: Edgard Hitti

AASHTO and ASTM requirements

And much more!!!

DSR

BBRRTFO

PAV

RV

Page 23: Edgard Hitti

CalTrans PG-GradesCalTrans PG-Grades

Page 24: Edgard Hitti

CalTrans Modified PG-GradesCalTrans Modified PG-Grades

PG 58-34PM (Open Grades & Night Paving)PG 58-34PM (Open Grades & Night Paving)

PG64-28PM (working horse for the State)PG64-28PM (working horse for the State)

PG76-22PM (Desert Area, Stiffer binder, higher PG76-22PM (Desert Area, Stiffer binder, higher traffic applications)traffic applications)

Effective Jan 01, 2007 to replace all PBA specsEffective Jan 01, 2007 to replace all PBA specs

Page 25: Edgard Hitti

ImplementationImplementation

4 unmodified PG-binders “Jan 06”4 unmodified PG-binders “Jan 06” Replace PBA specs with PG-PM “Jan 07”Replace PBA specs with PG-PM “Jan 07” Asphalt Rubber base “PG64-16 & PG58-Asphalt Rubber base “PG64-16 & PG58-

22”22” AMRL certification “Jan 07”AMRL certification “Jan 07” PG-TR Specs (Terminal Blend Specs) Jan PG-TR Specs (Terminal Blend Specs) Jan

0808

Page 26: Edgard Hitti

PG for rubberized bindersPG for rubberized binders AB 338AB 338

2007: min. 6.0 lb/ mix ton2007: min. 6.0 lb/ mix ton 2010: min. 7.5 lb / mix ton2010: min. 7.5 lb / mix ton 2013: min. 10.5 lb / mix ton2013: min. 10.5 lb / mix ton

AB513AB513 $2 for every 12 lb of crumb rubber = 1 PTE$2 for every 12 lb of crumb rubber = 1 PTE

Calrecycle requirements: Calrecycle requirements: min. 15% crumb tire derived & processed in CAmin. 15% crumb tire derived & processed in CA

PG-PM and PG-TR has been combined PG-PM and PG-TR has been combined under one spec: PG-Munder one spec: PG-M PG58-34M, PG64-28M and PG76-22MPG58-34M, PG64-28M and PG76-22M

PG76-22R – R18 for Chip SealPG76-22R – R18 for Chip Seal

Page 27: Edgard Hitti

Mix DesignsMix Designs

A change order needed for ongoing projectsA change order needed for ongoing projects– New projects will have PG-MNew projects will have PG-M

Suppliers will include temp/vis curves for Suppliers will include temp/vis curves for compaction and construction temp.compaction and construction temp.

Call your supplier for recommendationsCall your supplier for recommendations

Page 28: Edgard Hitti

UC Berkley hVS StudyUC Berkley hVS Study

Page 29: Edgard Hitti

performanceperformance

PG64-28NVTR

PG76-22NVTR

Page 30: Edgard Hitti

I-40 Report I-40 Report (Caltrans / Asphalt institute)(Caltrans / Asphalt institute)

Page 31: Edgard Hitti

PMTR-M ProjectsPMTR-M ProjectsDistrict 1 (HWY 101 – Del Norte County)District 1 (HWY 101 – Del Norte County)

Page 32: Edgard Hitti

PMTR-M ProjectsPMTR-M ProjectsDistrict 2 (hwy 44 – city of redding)District 2 (hwy 44 – city of redding)

Page 33: Edgard Hitti

PMTR-M ProjectsPMTR-M ProjectsSan Diego CountySan Diego County

Play Video

Page 34: Edgard Hitti

PMTR-M ProjectsPMTR-M ProjectsSiskiyou CountySiskiyou County

Play Video

Page 35: Edgard Hitti

TR ProjectsTR ProjectsRiversideRiverside

Page 36: Edgard Hitti

www.ParamountAsphalt.com

Paramount Asphalt

Page 37: Edgard Hitti

Questions and AnswersQuestions and Answers

Thank You!Thank You!