ecp 11-0512d schneider ce6 with vip 300 relay test...

17
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11- 0512d Version: 4.0 Date: 04/12/2015 SCHNEIDER CE6 WITH VIP 300 RELAY TEST FORM Substation Name Substation Number Voltage Switchgear Switchboard Number Manufacturer Schneider Serial Number Type CE6 Protection CTs CT Ratio (400/1 or 800/1) Relay Serial Number Setting Range (x2 or x4) Protection Settings (specified by planner/designer) Overcurrent Settings Earth Fault Settings Setting Current Setting Current Curve Curve Time Multiplier Time Multiplier Highset Setting Current Highset (or SEF) Setting Current Highset Time Highset (or SEF) Time Preliminary Checks () Visual inspection satisfactory (no visible signs of damage etc) Earthing satisfactory SF6 gas pressure satisfactory Functional/Interlock Checks () Open and close circuit-breaker Earth switches cannot be operated when service selected Circuit-breaker cannot be operated when earth selected

Upload: doandung

Post on 23-Apr-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

THIS

IS A

N U

NC

ON

TRO

LLED

DO

CU

MEN

T, T

HE

REA

DER

MU

ST C

ON

FIR

M IT

S VA

LID

ITY

BEF

OR

E U

SE

Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

SCHNEIDER CE6 WITH VIP 300 RELAY TEST FORM

Substation Name

Substation Number

Voltage

Switchgear

Switchboard Number Manufacturer Schneider

Serial Number Type CE6

Protection CTs

CT Ratio (400/1 or 800/1)

Relay

Serial Number Setting Range (x2 or x4)

Protection Settings (specified by planner/designer)

Overcurrent Settings Earth Fault Settings

Setting Current Setting Current

Curve Curve

Time Multiplier Time Multiplier

Highset Setting Current Highset (or SEF) Setting Current

Highset Time Highset (or SEF) Time

Preliminary Checks ()

Visual inspection satisfactory (no visible signs of damage etc)

Earthing satisfactory

SF6 gas pressure satisfactory

Functional/Interlock Checks ()

Open and close circuit-breaker

Earth switches cannot be operated when service selected

Circuit-breaker cannot be operated when earth selected

Open and close earth switches

Test access cannot be opened when circuit-breaker in On and Off position

Test access can be opened when earth switch closed

Circuit-breaker cannot be operated when test access open

Page 2: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

Switchgear Continuity Test

Circuit-breaker Terminals Under Test Continuity Circuit-

breaker Terminals Under Test Continuity

Closed L1 - L1 Earthed L1 - E

L2 - L2 L2 - E

L3 - L3 L3 - E

HV Insulation Tests using Test Voltage from using Test Voltage from ECS 11-0006

Circuit-breaker Terminals Voltage (kV)

Duration (min)

IR (M)

Under Test Earthed

Closed L1 L2, L3

Closed L2 L1, L3

Closed L3 L1, L2

Open L1, L2, L3 L1, L2, L3

Protection CTs Insulation Resistance using 1kV Test Voltage

Disconnect CT wiring from relay C11, C31, C51, C71 ()

Remove CT wiring earth link C70 - C90 ()

Measure the insulation resistance C70 - Earth M

Replace CT wiring earth link C70 - C90 ()

Protection CTs Loop Continuity(from CT wiring terminal block)

Measure L1 CT continuity C11 - C70

Measure L3 CT continuity C31 - C70

Measure L3 CT continuity C51 - C70

Dual Ratio Protection CTs

For switchgear with dual ratio protection CTs select the appropriate ratio (see appendix A.4) to give the required protection settings and record CT ratio on the front of the form

()

CT Ratio Terminal Block Connections

400/1C112 - 2C132 - 6C152 - 10

()

800/1C112 - 3C132 - 7C152 - 11

()

© UK Power Networks 2016 All rights reserved 2 of 6

Page 3: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

Relay CT Connections

Reconnect the CT wiring to the relay - use the x2 range unless the required setting current is greater than that available within the range (Appendix A.5) and record the range on the front of the form

Range Relay Connections 200/1 CTs 400/1 CTs 800/1 CTs

x2

C11 - 8C31 - 6C51 - 4C71 - 2&9

20-100A 40-200A 80-400A ()

x4

C11 - 7C31 - 5C51 - 3C71 - 1&9

40-200A 80-400A 160A-800A ()

Ensure the reversible scale label matches the CT ratio and selected range ()

Measure the earth resistance between the relay case and the switchgear earth

Test Protection Settings

Apply the following temporary settings to the relay (refer to Appendix A for guidance) ()

Overcurrent Settings Earth Fault Settings

Is 72A or 80A* Ios 60A or 64A*

I> curve SI Io> curve SI

DT only 3 DT only 3

t> 0.6 x10 to> 0.6 x10

I>> off Io>> off

t>> 0.03 to>> 0.03

* Available setting will depend on the CT ratio and the range being used. Note: It is not possible to carryout the pickup test below for 800/1 CTs on the x4 range.

Relay Operation - Primary Injection Test

Increase current until the LED starts to flash and record the current value. Reset the relay and, if necessary, close the circuit breaker before each test

Overcurrent Pickup Test

CB Conductors Under Test

Short Conductors

Is Setting Calculated Pickup Current (Is + 20%)

Actual Pickup Current

Closed L1 - L2 L1, L2, L3 72/80A 87/96A A

Closed L2 - L3 L1, L2, L3 72/80A 87/96A A

Earth Fault Pickup Test

CB Conductors Under Test Ios Setting Calculated Pickup Current (Ios + 20%)

Actual Pickup Current

Closed L1 - L1 60/64A 72/77A A

Closed L2 - L2 60/64A 72/77A A

Closed L3 - L3 60/64A 72/77A A

© UK Power Networks 2016 All rights reserved 3 of 6

Page 4: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

In-service Protection Settings

Apply the in-service protection settings as specified by the planner/designer to the relay and record them below – refer to Appendix A for guidance ()

Overcurrent Settings Earth Fault Settings

Is Ios

I> curve Io> curve

DT only DT only

t> Select from table on relay

to> Select from table on relayx10 / x1 x10 / x1

I>> (Highset Current ÷Is) Io>> (Highset Current ÷Is)

t>> to>>

Table A - Calculate Injection Currents Overcurrent Setting Earth Fault Setting

CT Ratio

Primary Setting Current (Is) (Ios)

Secondary Setting Current (Primary Setting Current ÷ CT Ratio)

2 x Secondary Setting Current

5 x Secondary Setting Current

I>> or Io>> x Secondary Setting Current (highset)*

DT x Secondary Setting Current (SEF)*

Table B - Calculate Operating Times Overcurrent Setting Earth Fault Setting

Curve (I>) (Io>)

Time Setting on relay

(if x10 is selected multiply t> or to> setting by 10)

(t>) (to>)

(t>>) (to>>)

Tripping time at 2 x secondary current

Curve SI (t> or to> x 3.38) +0.09s s s

Curve VI (t> or to> x 9) + 0.09s s s

Curve EI (t> or to> x 33) + 0.09s s s

Tripping time at 5 x secondary current

Curve SI (t> or to> x 1.44) + 0.09s s s

Curve VI (t> or to> x 2.25) + 0.09s s s

Curve EI (t> or to> x 4.1) + 0.09s s s

Tripping time at I>> or Io>> or DT x Secondary Setting Current

Highset/Instantaneous t>> or to>> + 0.09s s s

SEF* to> + 0.09s s

* Only calculate highset, instantaneous or SEF settings if used.

© UK Power Networks 2016 All rights reserved 4 of 6

Page 5: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

Relay Operation - Secondary Injection Test

Connect timer circuit to auxiliary contacts 64 and 65 (contact closed when CB open) ()

Overcurrent Test

SettingCalculated Injection Current(from table A)

Calculated Operating Time (from table B)

Actual Operating Times

C11 - C31 C31 - C51 C51 - C11

2x A s s s s

5x A s s s s

Instantaneous A s s s s

Earth Fault Test

SettingCalculated Injection Current(from table A)

Calculated Operating Time (from table B)

Actual Operating Times

C11 - C70 C31 - C70 C51 - C70

2x A s s s s

5x A s s s s

Instantaneous A s s s s

SEF* A s s s s

* The trip current may have to be increased to operate the circuit breaker if the current is below the minimum operating current.

© UK Power Networks 2016 All rights reserved 5 of 6

Page 6: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

Final Checks ()

Check correct CT and interposing CT ratios selected

Check correct ratio labels have been fitted

Check correct protection settings applied

Check relay reset

Reconnect umbilical cable to RTU (if fitted)

Asset data form completed

Test Equipment

Make/Type Serial Number Calibration Date

Certification ()

All tests have been completed satisfactorily

Comments

Commissioning Engineer Signature Date

The completed test form shall be left on-site in a plastic wallet and in secure location. A copy of the completed test shall be sent to the relevant ART mailbox.

© UK Power Networks 2016 All rights reserved 6 of 6

Page 7: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

Appendix A – Vip 300

A.1 Introduction

The Vip 300 is a self-powered three phase overcurrent and earth fault protection relay. Protection settings are displayed on the relay front panel (see section A.2) along with manual reset and trip flags.

The CTs are connected to one of two sets of inputs to the relay, to give two different setting current ranges. It is important to ensure that the correct scale label (see section A.3) is in place (either x4 or x2) depending on the inputs and the CT ratio used.

Settings are applied by adjusting the dial selectors to the correct location using a screwdriver. Care should be taken when applying the time settings as the Vip 300 does not use the time multiplier as the time input for IDMT curves (t> or to>). Instead the table on the top right of the front panel should be used to convert the required time multiplier to the Vip 300 setting depending on the IDMT characteristic being applied. For definite time settings (DT, I>>, Io>>) the dials give the relay operating time.

For example, to apply the following typical settings to a Vip 300 relay with 400/1 CTs:

OC 200A VI 0.1TM SEF 32A DT 3s

Looking at the range cards for 400/1 CTs it can be seen that the x2 range provides the option for a phase overcurrent setting (Is) of 200A and an earth fault setting current (Ios) of 32A, the x2 range inputs should be used.

Applying the overcurrent setting:

1. Is should be set to 200.2. I> curve selection should be set to VI.3. t> should be set to 0.3 with a multiplier of x1 (from the table provided this corresponds to

a time multiplier of 0.1).4. As no high set overcurrent is required, I>> should be set to OFF.5. As no high set overcurrent is required, t>> should be set to 0.03.

Applying the earth fault setting:

1. Ios should be set to 32.2. Ios> curve selection should be set to DT.3. DT should be set to 1.4. t> should be set to 0.3 with a multiplier of x105. As no high set earth fault is required, Io>> should be set to OFF.6. As no high set earth fault is required, to>> should be set to 0.03.

© UK Power Networks 2016 All rights reserved 1

Page 8: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

A.2 Front Panel

VIP 300

VAP6 test plug

EI,VI,SI

DT

RI

DT only

11.2

1.51.8 2.1

2.42.7

3

( x Is)

x 10

x 1

t >>

0.030.05

0.10.2 0.4

0.60.9

1.5(s)

DT

RI

SIVI EI

off

curve selection

I>phase

overcurrent

I>

trip

sensors:800/1 4509169A0VIP 300LH range: x2

34

69 12

1520

( x Is)

I>>

off

DT only

1

1.21.5

1.8 2.12.42.7

3

( x Ios)

x 10

x 1

200

816

3248

64 96 128160

240280

320(A)

Ios

Io>

trip

minimum operatingphase current: 80A

earth fault

0.90.03

0.050.1

0.2 0.40.6

1.5(s)

to >>

reset

34

69 12

1520

( x Ios)

Io>>

off

VIP300Settings

Equivalent TimeMultiplier

t>, to> SI VI EI0.05 x1 0.02 0.03 0.060.07 x1 0.02 0.05 0.090.1 x1 0.03 0.07 0.120.15 x1 0.05 0.1 0.190.2 x1 0.07 0.13 0.250.3 x1 0.1 0.2 0.370.4 x1 0.13 0.27 0.50.05 x10 0.17 0.33 0.620.6 x1 0.2 0.4 0.740.07 x10 0.24 0.47 0.870.1 x10 0.34 0.67 1.240.15 x10 0.5 1 1.860.2 x10 0.67 1.33 2.480.3 x10 1.01 2 3.710.4 x10 1.35 2.67 4.950.6 x10 2.02 4 7.43

Warning

not timemultiplier

see table

Warning

not timemultiplier

see table

288

8096

120144

168192 224256

320360

400(A)

Is

0.40.05

0.070.1

0.15 0.20.3

0.6(s)

to >

DT

RI

SIVI EI

off

curve selection

Io>

t >

0.050.07

0.10.15 0.2

0.3

0.40.6

(s)

A.3 Scale Labels

Reversible scale label for Ringmaster fitted with

200/1CTs

Reversible scale label for Ringmaster fitted with

400/1CTs

Reversible scale label for Ringmaster fitted with

800/1CTs

© UK Power Networks 2016 All rights reserved 2

Page 9: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

A.4 Dual Ratio CT Connections

Note: The orientation of the connections may vary depending on the vintage of the switchgear.

A.5 Relay CT Connections

© UK Power Networks 2016 All rights reserved 3

400/1 Ratio

800/1 Ratio

Page 10: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

This page is intentionally left blank.

© UK Power Networks 2016 All rights reserved 4

Page 11: ECP 11-0512d Schneider CE6 with Vip 300 Relay Test …library.ukpowernetworks.co.uk/library/asset/ba07703d-ba... · Web viewL2 - L2 L2 - E L3 - L3 L3 - E HV Insulation Tests using

Schneider CE6 with Vip 300 Relay Test Form Document Number: ECP 11-0512d

Version: 4.0

Date: 04/12/2015

Appendix B – Schematic Diagram

© UK Power Networks 2016 All rights reserved 1