ecoraee resumen ingleslife-ecoraee.eu/en/files/e4presentationoftheecoraeeproject.pdf · 1. control...
TRANSCRIPT
Pag. 2
Pag. 3
Pag. 4
Pag. 5
Pag. 6
Pag. 7
Pag. 8
Pag. 9
Point of contact with the EC-Life Unit Technical
coordina-on Ac-ve-‐Financial coordina-on
Strategic decisions
Project supervision
Project director UVIGO-‐Interna-onal project office
Environmental Law Dept.
Applied Economics
Dept.
Electrical Enginnering
dept
Computer Engineering
dept.
Mechanical Engineering
dept.
Environmental Office Rector´s Office
Technical desing
Project monitoring
Con-ngency plan
Management Commitee
Management Unit
Pag. 10
Ini$al phase: 1. Review of project and 1. Diagram of objec7ves Detailed Assessment exis7ng documenta7on Plan
2. Diagram of effects2. Iden7fica7on of obje7ves and
expected effect, as well as of 3. Diagram of stakeholdersthe par7es involved in theproject (Stakenholders)
3. Defini7on of realisa7on,result and impact indicators
4. Prepara7on of an AssessmentPlan
Intermediate phase: 6. Data gathering 1. Control panel Intermediate AssessmentPlan
Balance of work carried out 7. Informa7on processing 2. Execu7on ques7onnaire
8. Analysis of the informa7on 3. Reports from the Panel of Experts and Discussion Groups
9. Iden7fica7on of possibleanomalies
Final phase: 10. Data gathering and 1. Control panel Final Assessment Planconsolida7on
2. Execu7on ques7onnaire11. Exploita7on of the informa7on
findings 3. Beneficiary and/or collabora7ng 12. Data analysis body ques7onnaires
13. Presenta7on of conclusions 4. Reports from the Panel of and recommenda7ons Experts and Discussion Groups
(Ac7vity C1)
Ending balanceiden7fica7on of
Instruments DeliverablesPhases Approach
Planning of AssessmentStrategy
Pag. 11