ecoop annual meeting | 2008- 02-13 | kcs integration of observing networks (pan - eu baseline...
TRANSCRIPT
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
Objectives• Integration of existing EU-wide marine
observation systems,• harmonising flow of real time and near real
time observational data• co-ordination accessing Earth Observation
(EO) products
in order to maximise the benefit from existing national and European resources.
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
T2.1 - Network evaluation and data delivery
T2.2 - Establish a data management system to deliver real time and
near real time data in an optimal and cost-effective mode
T2.3 - Ensure proper and maximum real time delivery of remote
sensing data
T2.4 - Quality assurance
T2.5 - Establish a pan-EU data base for river run-off
T2.6 - Products and services
T2.7 - WP2 coordination (T2.0)
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
T2.1 - Network evaluation and data delivery (Giuseppe Manzella)
S2.1.1 - Provide an inventory of the data management systems used for marine regional and coastal observation systems (Aldo Drago)
D2.1.1.1 (July 2007): Central web page for accessing the
inventories (version 0).
http://www.capemalta.net/ECOOP/index.html
Manzella Giuseppe (ENEA) - AZTI-Tecnalia, BSH, CEFAS, CMRC, CNR, DMI, DMU-NERI, DNSC, ENEA, GKSS, HCMR, IEO, IFREMER, IMEDEA-CSIC, IMR, IMS-METU, IO-BAS, IOLR, MHI, MSI, OC-UCY, PdE, RIKZ, SMHI, UNI-MALTA(IOI-MOC), UNIV-GDA
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
D2.1.1.3: Report on existing observation programs fitting the ECOOP objectives
Mismatch: DoW (31.1.2008) - Progecta (31.7.2008)
We agreed to combine it with D2.1.1.2 to one report - end of July!
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
T2.2 - Establish a data management system to deliver real time and near real time data in an optimal and cost-effective mode (Declan Dunne)
Declan Dunne (CMRC) - BSH, CMRC, CNR, DMI, GKSS, IFREMER, NERC, OC-UCY, PdE, TECHWORKS, UNIV-GDA
S2.2.1 - Design and implement the ECOOP Data Management System appropriate for integrating all existing regional and coastal systems
S2.2.2 - Define the metadata-interface
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
Critically review possible ECOOP DMS options against partners’ user requirements, existing systems, INSPIRE recommendations, OGC standards, and other best practices.
D2.2.1.1 Report on existing regional centres documenting role, data types, and services.
D2.2.1.2 Delivery of a static web portal developed for ECOOPD2.2.1.3 Report on the architectural plan for building the ECOOP
DMS based on review of best practices (software patterns and design)
D2.2.2.1 Review of metadata practices at regional centresD2.2.2.2 Report on the architecture of the ECOOP metadata
catalogue system
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
ecoop.ucc.ie
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
T2.3 - Ensure proper and maximum real time delivery of remote sensing data (Rosalia Santoleri)
D2.3.1.1 Report on the design of the RT and NRT data satellite acquisition and delivery system for the TOP phase
S2.3.1 - Design the in situ and remote sensing acquisition phase
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
T2.4 - Quality assurance (Susanne Tamm, kcs)
S2.4.1 - Identify the most suitable quality assurance protocols
AZTI-Tecnalia, BSH, GKSS, IMS-METU, SMHI
D2.4.1.1 Review of the most suitable quality assurance protocols
Soetje Kai (BSH) - AZTI-Tecnalia, BSH, DMI, GKSS, IFREMER, IMS-METU, IOW, PdE, SMHI
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
T2.5 - Establish a pan-EU data base for river run-off
(Bruce Hackett)
D2.5.1.1 ECOOP River Data Catalogues (five regional) as digital spreadsheets
S2.5.1 - Assessment of existing river run-off data
Hackett Bruce (MET-NO) - AZTI-Tecnalia, BSH, MET-NO, MHI, RIKZ, SMHI
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
D2.5.2.1 ECOOP River Station Lists (five regional) as digital spreadsheets
S2.5.2 - Interfacing to ECOOP Data Management system
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
T2.6 - Products and services (Enrique A. Fanjul)
S2.6.1 - Definition and design of added value products
Alvarez Fanjul Enrique (PdE) - BSH, CLS, CMRC, HCMR, IO-BAS, MSI, PdE
D2.6.1.1 Report on designed added value products to be developed for EuroMISS (late - will be finished mid March)
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
Report on existing observation programs fitting the ECOOP objectives D2.1.1.3 Drago Aldo LATE 31.01.2008ECOOP River Station Lists (five regional) as digital spreadsheets D2.5.2.1 Hackett Bruce LATE 31.01.2008Report on designed added value products to be developed for EuroMISS D2.6.1.1 Alvarez Fanjul Enrique LATE 31.01.2008
Central web page for accessing the inventories (version 0). D2.1.1.1 Drago Aldo COMPLETED 31.07.2007Report on existing regional centres documenting role, data types, and services.D2.2.1.1 Dunne Declan COMPLETED 30.06.2007.Delivery of a static web portal developed for ECOOP D2.2.1.2 Dunne Declan COMPLETED 31.10.2007Report on the architectural plan for building the ECOOP DMS based on review of best practices (software patterns and design)D2.2.1.3 Dunne Declan COMPLETED 31.10.2007Review of metadata practices at regional centres D2.2.2.1 Dunne Declan COMPLETED 30.06.2007.Report on the architecture of the ECOOP metadata catalogue system D2.2.2.2 Dunne Declan COMPLETED 31.01.2008Report on the design of the RT and NRT data satellite acquisition and delivery system for the TOP phase D2.3.1.1 Rosalia Santoleri COMPLETED 30.11.2007Review of the most suitable quality assurance protocols D2.4.1.1 Soetje Kai COMPLETED 31.01.2008ECOOP River Data Catalogues (five regional) as digital spreadsheets D2.5.1.1 Bruce Hackett COMPLETED 31.01.2008
LATE
COMPLETED
Summary
ECOOP Annual meeting | 2008-02-13 | kcs
Integration of observing networks (pan - EU baseline system)
WP2
D2.2.2.3 (Mo15): Delivery of the ECOOP metadata catalogue system, including web-based search interface.D2.2.5.1 (Mo16): Report on the architectures of both the ECOOP DMS and EuroMISS.D2.1.1.2 (Mo18): Report on the inventories.D2.1.2.1 (Mo18): Draft report on common practices/protocols for data transfer and access.D2.1.4.1 (Mo18): Data interface for ECOOP version zero.D2.1.5.1 (Mo18): Acquisition of existing climatologies.D2.4.2.1 (Mo18): Report of the common QA-protocols to be used in the ECOOP DMS.D2.5.3.1 (Mo18): Report on interfacing river runoff data to the ECOOP Data Management System.D2.1.3.2 (Mo20): Report on data handling, transfer and delivery for the ECOOP observation system.D2.2.1.4 (Mo21): Implementation of the ECOOP Data management System - version 1.D2.2.4.1 (Mo21): Review and design of the WP 2.1 system architecture (the climatological compiling system).D2.2.4.2 (Mo21): Implement interface between climatological compiling system and the ECOOP DMS.D2.2.5.2 (Mo21): Implementation of the Interface between the ECOOP DMS and EuroMISS.D2.3.2.1 (Mo21): Near real time satellite data products for ECOOP selected zones.D2.6.2.1 (Mo24): Report of implemented real and near real time added value products for EuroMISS.D2.6.3.1 (Mo24): Report describing the best alternative for archiving large observational data sets.D2.4.3.1 (Mo29): Report of the data quality within the ECOOP Data Management System.D2.1.3.3 (Mo30): Data from ECOOP observing system.D2.2.1.5 (Mo30): Delivery of the ECOOP Data Management System - version 2.