economics of manufacturing

Upload: karenshui

Post on 03-Apr-2018

328 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Economics of Manufacturing

    1/17

    TAKING ON THE BUBBLE TEA !

    Prepared by :- Karen

    - Keyon

    - Ling Yin

    - Hui Xin

    - Xanthe

    TEAM DIVERSIFY

  • 7/29/2019 Economics of Manufacturing

    2/17

    Introduction

    Objectives

    1. Reduce congestionat counter

    2. Improve workspacelayout

    PurposeTo increase the overall

    efficiency of the bubble teabusiness situated in the

    newly opened food court inNTU

  • 7/29/2019 Economics of Manufacturing

    3/17

    C

    ON

    T

    R

    OL

    Visual Control

    Objective 1 is achievedReduce customerbuying decision time thus reducing congestion

    Main menu: Showcases only 5 drinks Prices not stated

    Side menu: Size is only 1/3 that of main menu

    yet it lists the entire drinks selection

    Problems: Main menu provides 5 variety of drinks The side menu is small and only

    customer who are in front of thecounter can see the list entire list ofdrink available.

    Those customers behind could not seethe side menu and will spend timedeciding when they are at the counter

    Suggestions:

    Main Menu List more variety of drinks,including their corresponding prices.

    Side Menu Place another side menu

    Main menu Side menu

  • 7/29/2019 Economics of Manufacturing

    4/17

    C

    ON

    T

    R

    OL

    Visual Control

    Objective 1 is achievedCongestion at counter

    is reduced

    Digital counter display cannot be seen from far

    Problem: Customers have to remain near to the counter whilewaiting for the collection of their orders

    Suggestion: Install another digital counter display, as seen in the

    image above Print an estimated waiting time on the cue slip

    Bubble Tea Store

    Suggestion : Install additionaldigital counter display at thispillar to increase visibility ofdigital counter display .

    Digital

    CounterDisplay

  • 7/29/2019 Economics of Manufacturing

    5/17

  • 7/29/2019 Economics of Manufacturing

    6/17

    5STo Set In Order - Orderliness

    Most ingredients, including thosestored in the fridge, are labeled foreasy referencing

    Objective 2 is achievedWorkspace is improved.

    Some ingredients are placed far backin the store: Delays production of the bubble

    tea since items are not readilyavailable

    Suggestion: Arrange the ingredients for easy

    accessibility Store small but sufficient

    proportions of ingredients into themini fridges below the maincounter

  • 7/29/2019 Economics of Manufacturing

    7/17

    5SShine - Cleanliness Regular cleaning of used mixersand utensils

    Counters are wiped frequently

    Objective 2 is achievedWorkspace is improved.

    Used receipts placed in the productionarea:

    Presence of these used receiptscompromises the overall tidiness of thestoreSharp needle used to fasten thereceipts could be a potential workplace

    hazard that may hurt the workers.

    Needle

    Suggestion: Place used receipts in a box at the cashier

    instead

  • 7/29/2019 Economics of Manufacturing

    8/17

    Employees adhered to the standard procedures ofmaking the bubble tea Poor layout prevents a smooth work flow: Production of bubble tea involves a 5-step sequencethat the employees adhere toAll ingredients are scattered over different segmentsof the store.( See Fig. 1)

    Shitsuke Sustain

    5SSeiketsu - Standardization

    5S

    Suggestion: All necessary ingredients could be placed on a

    single workbench for easy accessibility

    Good sustainability in the cleanliness andquality of food produced

    Objective 2 is achieved

    Workspace is improved.

    2 4

    3

    1

    Fig. 1: Current workspace layout

    5

  • 7/29/2019 Economics of Manufacturing

    9/17

    77 Waste - Motion

    Objective 2 is achievedWorkspace is improved.

    Some ingredients are placed far backin the frozen food corner: leads to unnecessary walking (See

    Fig.2 ) during preparation ofbeverages

    Suggestion: Arrange ingredients for easy reach

    Ingredients can be moved to minifridge located much nearer to theactual workbench

    wastes

    Fig. 2: Current workspace layout

  • 7/29/2019 Economics of Manufacturing

    10/17

  • 7/29/2019 Economics of Manufacturing

    11/17

    77 Waste - Waiting

    Objectives 1 & 2 are achievedCongestion at counter is improved.

    Workspace is improved.

    Ingredients are not readily availablewhen needed

    Poor store layout leads tounnecessary motion. (See Fig. 4 )

    Poor visibility of digital counter display

    No proper queue space

    wastes

    Suggestion: Modify the store layout to facilitate proper work

    flow Cue slips should indicate estimated waiting

    time so customers will not crowd around thestore thereby minimizing congestion problems.

    Fig. 4: Current workspace layout

  • 7/29/2019 Economics of Manufacturing

    12/17

  • 7/29/2019 Economics of Manufacturing

    13/17

    Key ThoughtsKey Observation Key Thoughts & Proposed Action

    Main menu

    Displays only 5 drinks

    Drinks prices absent

    Side menu

    1/3 the size of the main menu

    Lists complete selection of drinks

    Main menu

    Should provide entire list of drinks available

    Side menu

    Include another side menu

    These will accelerate consumers buying decision-making process &simultaneously minimize congestion issues.

    Limited visibility of the digitalcounter display leads tocongested queues.

    Install another digital counter display

    Include the estimated waiting time on the cue slips.

    Congestion problems addressed as customers need not stand nearthe store till their order is ready for collection.

    Cleanliness and tidiness of storewere well maintained, reflectinggood business ethics

    However, used receipts werefastened with sharp needle &placed at work bench,compromising stores tidiness and

    staff safety

    Workers are constantly producing high quality andconsistent work, indicating effective management by thesupervisors.

    Used receipts should be placed in a box at the cashierinstead

    Tidiness of store is enhanced and work hazard is eliminated for the

    safety of all workers

  • 7/29/2019 Economics of Manufacturing

    14/17

    Key ThoughtsKey Observation Key Thoughts & Proposed Action

    Poor workspace layout that

    leads to unnecessary motion.

    Ingredients are usually out of

    reach impeding smooth work

    flow

    Many ingredients are placed

    at the back of the store.

    1. Take small portions of the ingredients and store

    them in the mini fridge located right next toactual work bench.

    2. Modify the store layout:

    By moving the entire production to the back

    storage area helps to facilitate movement.

    This will help create a smoother work flow and

    increase production efficiency.

    This rearrangement may involve high costs but an

    improved workspace layout will substantially reduce

    production and customer waiting time which in turn

    increase revenue earned ultimately.

    6

    5

    4

    3

    2

    1 6

    5

    4

    3 2

    1

    Before After

  • 7/29/2019 Economics of Manufacturing

    15/17

    THE END

    Special Thanks To:

    Professor Michael Tay

    The NEW WORLD @ NTU

    III Causal Analysis:

  • 7/29/2019 Economics of Manufacturing

    16/17

    Problem Solving Theme:

    I.Background / Problem Statement:

    On average, customers have to wait for about 7-10minutes before their drink is served.

    The production process is not orderly refine, thus, resulting in ergonomics issues.

    There is no proper queue line for customers, making it difficult for customers to differentiate the

    order and collection line.

    Potential customers may be deterred from ordering upon seeing the long queue.

    II. Target/Goal:

    To reduce the waiting time of the customers to 3 minutes per drink.

    III. Causal Analysis:

    Man Machine

    Method Material

    Insufficient knowledge

    to operate the

    machine.

    Inexperienc

    e workers.

    Employees are too task-oriented;

    they do not cross over the

    boundary, upon completion of

    their job.

    No customer service standard.

    There is

    only one

    sealer.

    Inappropriate layout.

    Inappropriate

    storage of

    ingredients.

    Congestion at the

    waiting area.

    Long

    W

    aiting

    time

    IV. C ountermeasures

    Problem(s) Countermeasures

    Inexperience workers. Send the employees for training.

    Insufficient knowledge to operate the

    machine.

    Employees are too task-oriented; they

    do not cross over the boundary, upon

    completion of their job.

    Organize teambuilding activities.

    No customer service standard. Set standards for customers making the purchase:

    a) Service

    b) Drinks ordering

    c) Drinks collection

    There is only one sealer. Introduce additional sealers to promote efficiency.Congestion at the waiting area. Introduce Order here and Collection point signage at the counter to reduce

    confusion.

    Install an additional digital counter display in the middle of the foodcourt to

    increase the visibility of queue number.

    Include an estimated waiting time o n the queue slip.

    Inappropriate layout. Shift the production line to the back of the store to increase productivity

    efficiency.

    Inappropriate storage of ingredients. Store the ingredients in clearly labelled containers.

    V. Action Plan

    Countermeasures When (week) Who

    1 2 3 4 5 6

    Send the employees for training.

    Organize teambuilding activities.

    Set standards for customers making the

    purchase:

    a) Service

    b) Drinks ordering

    c) Drinks collection

    Introduce additional sealers to promote

    efficiency.

    Introduce Order here and Collection

    point signage at the counter to reduce

    confusion.

    Install an additional digital counter display

    in the middle of the foodcourt to increase

    the visibility of queue number.

    Include an estimated waiting time on the

    queue slip.

    Shift the production line to the back of the

    store to increase productivity efficiency.

    Store the ingredients in clearly labelled

    containers.

    What is the

    new waiting

    time?

    Under 3mins : Target met

    More than 3mins : Target

    not met Review action plan andconsider other approach.

    Retain plan.Follow Up

  • 7/29/2019 Economics of Manufacturing

    17/17

    V. Action Plan

    CountermeasuresWhen (week)

    Who1 2 3 4 5

    Send the employees for training. Employees

    Organize teambuilding activities. Manager

    Set standards for customers making the purchase:

    a) Service

    b) Drinks ordering

    c) Drinks collection

    Employees and

    manager

    Introduce additional sealers to promote efficiency. Manager

    Introduce Order here and Collection point signage

    at the counter to reduce confusion.

    Install an additional digital counter display in the

    middle of the foodcourt to increase the visibility of

    queue number.

    Include an estimated waiting time o n the queue slip.

    External contractor

    and manager

    Shift the production line to the back of the store to

    increase productivity efficiency.

    Employees and

    Manager

    Store the ingredients in clearly labelled containers. Employees

    I. Background / Problem Statement:

    On average, customers have to wait for about 7-10minutes before their drink is

    served.

    The production process is not orderly refine, thus, resulting in ergonomics

    issues.

    There is no proper queue line for customers, making it difficult for customers to

    differentiate the order and collection line.

    Potential customers may be deterred from ordering upon seeing the long

    queue.

    II. Target/Goal:To reduce the waiting time of the customers to 3 minutes per drink.

    III. Causal Analysis:

    Man Machine

    Method Material

    Insufficient knowledge

    to operate the

    machine.

    Inexperience

    workers.

    Employees are too task-oriented;

    they do not cross over the

    boundary, upon completion of

    their job.

    No customer service standard.

    There is

    only one

    sealer.

    Inappropriate layout.

    Inappropriate

    storage of

    ingredients.

    Congestion at the

    waiting area.

    Long

    Waiting

    time

    IV. CountermeasuresProblem(s) Countermeasures

    Inexperience workers.

    Send the employees for training.Insufficient knowledge to operate the

    machine.

    Employees are too task-oriented; they

    do not cross over the boundary,

    upon completion of their job.

    Organize teambuilding activities.

    No customer service standard.

    Set standards for customers making the purchase:

    a) Service

    b) Drinks ordering

    c) Drinks collection

    There is only one sealer. Introduce additional sealers to promote efficiency.

    Congestion at the waiting area.

    Introduce Order here and Collection point signage at the counter to reduce

    confusion.

    Install an additional digital counter display in the middle of the foodcourt to

    increase the visibility of queue number.

    Include an estimated waiting time on the queue slip.

    Inappropriate layout.Shift the production line to the back of the store to increase productivity

    efficiency.

    Inappropriate storage of ingredients. Store the ingredients in clearly labelled containers.

    What is the

    new waiting

    time?

    Under 3mins : Target met

    More than 3mins : Target

    not met Review action plan andconsider other approach.

    Retain plan.Follow Up

    Problem Solving Theme:

    To reduce the waiting time of the customers