Grid Connections: Lessons from Round One
Grid Connections: Lessons from Round One
Paul Glendinning
Operations Manager
![Page 3: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/3.jpg)
Econnect Offshore Credentials
Econnect Offshore Credentials
• Designed 7 offshore wind farms
• Research for the DTI – Medium Voltage Systems for Offshore Windfarms
• Electrical Construction Management at North Hoyle
![Page 4: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/4.jpg)
IntroductionIntroduction
• Onshore work for Offshore Projects
• Differences ?
• What are the issues ?
• Solutions
• Conclusions
![Page 5: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/5.jpg)
Onshore work for Offshore Projects
Onshore work for Offshore Projects
• Substation connections
• Either at 132kV or 33kV for the 30 to 60 turbine wind farms
• Cable connections
• Onshore Cable interconnection facility
![Page 6: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/6.jpg)
North Hoyle ProgressNorth Hoyle Progress
• Onshore works
• Offshore / Onshore Interface
![Page 7: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/7.jpg)
North Hoyle ProgressNorth Hoyle Progress
• Onshore works
• Cable Installation through the streets
![Page 8: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/8.jpg)
North Hoyle ProgressNorth Hoyle Progress
• Onshore Works
• Careful management in public areas
![Page 9: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/9.jpg)
North Hoyle ProgressNorth Hoyle Progress
• Onshore works
• Protection of cables in road
![Page 10: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/10.jpg)
North Hoyle ProgressNorth Hoyle Progress
• Onshore works
• Careful route selection around a playing field
![Page 11: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/11.jpg)
Differences ?Differences ?
• Electrical connection arrangements
• Radial versus Interconnected systems
• Cost of repairs – mobilisation of vessels
• Shore link cable environment
![Page 12: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/12.jpg)
Differences ?Differences ?
• Repair and fault finding Crew ?
![Page 13: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/13.jpg)
What are the issues ?What are the issues ?
• Switching, protection and Isolation
• Subsea cable fault repair
• Failure minimisation – maximise revenue
• Electrical losses
![Page 14: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/14.jpg)
Solutions - Switching, Protection and IsolationSolutions - Switching,
Protection and Isolation
• Increasing degrees of automation required
• Use of motorised ring switches
• Use of Fault Passage Indicators
• Reduce visits to farm
• Avoid personnel transfer to turbines
![Page 15: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/15.jpg)
Solutions - Switching, Protection and IsolationSolutions - Switching,
Protection and Isolation
Wind Turbine 1 Wind Turbine 2 Wind Turbine 3 Wind Turbine 4 Wind Turbine 5
Fault Current Fault Current
Cable Fault
FPI FPI FPI FPI
Grid Connection
![Page 16: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/16.jpg)
Solutions - Subsea cable fault repair
Solutions - Subsea cable fault repair
• Use of Time Domain Reflectometers or search coil
• Cable on shore link may be tens of meters away from original burial position
• Burial methods require careful analysis
![Page 17: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/17.jpg)
Solutions - Failure minimisation
Solutions - Failure minimisation
• Cost of single cable fault in 60 MW wind farm is £650K
• Use of standby power from Offshore diesel equipment
• Use of interconnected electrical systems
![Page 18: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/18.jpg)
Solutions - Failure minimisation
Solutions - Failure minimisation
• Layout at North Hoyle
![Page 19: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/19.jpg)
Solutions - environmentSolutions - environment
• Equipment utilised must have a marinised specification
• Shore link cable requires careful analysis of burial depth and protection requirements – Geotechnical data required.
![Page 20: Econnect Ltd Independent specialists in the grid integration of renewable energy](https://reader036.vdocuments.site/reader036/viewer/2022062312/55195c01550346a5698b46fe/html5/thumbnails/20.jpg)
ConclusionsConclusions
• Onshore electrical arrangements – not valid
• The protection of the shore link cable is critical compared to inter-link cables
• Equipment utilised must be marinised• Invest in cable specification and
installation protection• Invest in Electrical topology