ECM Treatment Plant Weekly Inspection Chec Project: Kallang Whampoa - C50A Location: S/N Item Report of Checking 1 Outer part of the tank free from crack or leakage 2 The inlet pipe in good condition 3 The outlet pipe free from damage or chockage 4 The optimum chemical level found in the Flocculent (left side)tank 5 The optimum checmial level found in the Coagulant(right side) tank 6 Clean water tap is open and the clean water flows inside 7 Ladder is in good condition 8 Guard rail free of damage and in good in condition 9 Hinged acess in good condition 10 Main switch control panel is ON 11 Chemical mixer switch is ON 12 Chemical dosing pump is working 13 Emergency switch is working 14 Discharge water outlet is in good condition 15 No excessive noise generated from the machine 16 Equipment and machinery properly maintained(record checked) 17 Sedimantation removal is maintained Inspected by: Reviewed b _________________________ __________ EHS Personnel (ECO) PM / Site Date:_____________________ Date:_____ * P = Satisfactory/Yes x = Unsatisfactory/No NA = not applicable

Upload: 88san

Post on 20-Oct-2015

159 views

Category:

Documents


17 download

DESCRIPTION

ECM Daily Checklist

TRANSCRIPT

Page 1: ECM Daily Checklist by ECO

ECM Treatment Plant Weekly Inspection Checklist

Project: Kallang Whampoa - C50A Location: Bendemeer road

S/N Item Report of RemarksChecking

1 Outer part of the tank free from crack or leakage

2 The inlet pipe in good condition

3 The outlet pipe free from damage or chockage

4 The optimum chemical level found in the Flocculent (left side)tank

5 The optimum checmial level found in the Coagulant(right side) tank

6 Clean water tap is open and the clean water flows inside

7 Ladder is in good condition

8 Guard rail free of damage and in good in condition

9 Hinged acess in good condition

10 Main switch control panel is ON

11 Chemical mixer switch is ON

12 Chemical dosing pump is working

13 Emergency switch is working

14 Discharge water outlet is in good condition

15 No excessive noise generated from the machine

16 Equipment and machinery properly maintained(record checked)

17 Sedimantation removal is maintained

Inspected by: Reviewed by:

_________________________ __________________________

EHS Personnel (ECO) PM / Site Manger

Date:_____________________ Date:______________

* P = Satisfactory/Yes x = Unsatisfactory/No NA = not applicable