![Page 1: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/1.jpg)
Sacramento Regional County Sanitation District
EchoWater Project Contractor Open House
January 14, 2014
Vick Kyotani – Program Manager
![Page 2: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/2.jpg)
Sacramento Regional County Sanitation District
Agenda • Welcome, Introductions and Purpose of the Meeting (Ruben) • Overview of EchoWater Project (Vick) • Project Details (Rob)
• Project Descriptions • Schedules/Costs (tabular form)
• Overall Site (Jill) • Plant Access and Security • Project Features • Construction Workforce
• Project Interfaces (Dan) • Procurement Alternatives (Pervaiz) • 3-D Design (Bob) • Contractor Input
![Page 3: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/3.jpg)
Sacramento Regional County Sanitation District
Overview
![Page 4: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/4.jpg)
Sacramento Regional County Sanitation District
Plant Layout for the Future
• Planning for build-out conditions (350 MGD ADWF) • EchoWater Project design is for 181 MGD ADWF • Reserve Areas for the Solids Processing Facilities • Minimize use of the Bufferlands Areas • Plan for the South County Reuse Project
![Page 5: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/5.jpg)
Sacramento Regional County Sanitation District
SRWTP Planned Layout at Buildout
FOG Facility
Dwight Road Extension
Future Secondary Clarifiers
BNR
Future Digesters
Future Primary Clarifiers
Future BNR
Filters
Future Disinfection
Filter Influent Pumping Station (FIPS)
Future Filters
Reserve for Heavy Equipment Maintenance, Bufferlands Storage, and Other Uses
Harvest Crew Building
Future FIPS
ESB-C
ESB-D
Future ESB-F
Primary Effluent Pumping Station
Future Thickener
Disinfection
![Page 6: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/6.jpg)
Sacramento Regional County Sanitation District
Current Projects
• BNR Activated Sludge • Primary Effluent Pumping Station • RAS Pumping System • Flow Equalization Basins • Site Preparation (Utilities, Staging, On-site Roads) • Chemical Storage and Feed System (early conversion
to liquid disinfection) • Filtration & Filter Pump Station
![Page 7: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/7.jpg)
Sacramento Regional County Sanitation District
Current Projects (cont.) • Disinfection Contact Basin • Nitrifying Sidestream Treatment • Main Electrical Switchgear Expansion • Building Relocations (Bufferlands, Harvest Crew,
CMID, PMO and Heavy Maintenance)
![Page 8: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/8.jpg)
Sacramento Regional County Sanitation District
EchoWater Project Layout
![Page 9: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/9.jpg)
Sacramento Regional County Sanitation District
Program Schedule
![Page 10: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/10.jpg)
Sacramento Regional County Sanitation District
Project Design Procurement Status
Project RFP Release Date Contract Approved
BNR Closed January 23, 2013 Reliability Centered Design Services Closed August 14, 2013 Flow Equalization Closed August 28, 2013 New Facilities-Bufferlands, Harvest Crew, Heavy Equipment Buildings
Closed September 25, 2013
Primary Effluent Pumping Station Closed October 23, 2013 RAS Pumping System Closed November 13, 2013 Site Preparation Closed December 11, 2013 Disinfection Chemical Storage Closed December 11, 2013 Nitrifying Sidestream Treatment December 14, 2013 March 26 , 2014 (est.) Effluent Filtration TBD Filter Influent Pumping Station TBD Disinfection Contact Basin TBD CO Tanks Conversion TBD
![Page 11: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/11.jpg)
Sacramento Regional County Sanitation District
Construction
• 12 Design Projects (may combine and add projects) • Project Construction Values: from $4 M to $420 M • Total Estimated Construction Cost: $1.12 B (escalated to
construction mid-points)
![Page 12: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/12.jpg)
Sacramento Regional County Sanitation District
Period of Intense Construction
![Page 13: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/13.jpg)
Sacramento Regional County Sanitation District
Projects Details
![Page 14: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/14.jpg)
EchoWater Project
• OCIP • PMIS (web-based) • Stringent P6 Scheduling
Requirements • Materials Testing
– Onsite District Lab – Supplement where
necessary
![Page 15: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/15.jpg)
Sacramento Regional County Sanitation District
Flow Equalization Project • Additional 80 MG Storage • Two Pumping Stations –
Washdown water supply and groundwater control
• Concrete Lining • Washdown System • Large Fill/Drain Piping • BNR Mass Excavation • Construction cost ~
$129 M
Flow Equalization Project
ESB-D
ESB-B
ESB-A
BNR/PEPS
![Page 16: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/16.jpg)
Sacramento Regional County Sanitation District
Flow Equalization Basins
• Design complete Dec 2014 • Contractor NTP March 2015
![Page 17: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/17.jpg)
Sacramento Regional County Sanitation District
Biological Nutrient Removal Facility
![Page 18: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/18.jpg)
Sacramento Regional County Sanitation District
Biological Nutrient Removal
• Project includes PEPS • Design Complete ~
August 2015 • Contractor NTP ~
February 2016
![Page 19: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/19.jpg)
Sacramento Regional County Sanitation District
Primary Effluent PS • Constructed with BNR • 330 MGD capacity • Primary effluent (PE) channel • Two enclosed wet wells • Electrical building • Relocate dual 72-inch PE
diversion lines • New 84-inch final effluent
diversion • Odor control facilities • Construction cost~$42 M
![Page 20: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/20.jpg)
Sacramento Regional County Sanitation District
Primary Effluent PS
![Page 21: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/21.jpg)
Sacramento Regional County Sanitation District
Site Preparation Project Features • Contractor/CM Complexes • Internal Plant Roadways • Utilities and Process Piping
Installations and Relocations • Security Access Facility • SRWTP Site Cleanup • Grit Landfill Removal • Building Demolition • Utility Abandonment Construction Costs: $40M Design complete Nov. 2014 Contractor NTP Feb. 2015
![Page 22: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/22.jpg)
Sacramento Regional County Sanitation District
Return Activated Sludge Pumping • Replace 48 RAS pumps to
meet the BNR’s higher head requirements.
• Rehabilitate pump cans and RAS piping
• Design Complete ~ February 2016
• Contractor NTP ~ July 2016
• Project Cost $29.3M
![Page 23: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/23.jpg)
Sacramento Regional County Sanitation District
Filter Influent PS / Filtration • 330 MGD capacity • FIPS pumps to three Granular Media
Filter Batteries • Backwash Equalization and
Treatment Facilities • Chemical Feed Systems • Tertiary Control Building • Construction cost ~ $323 M • Design complete ~
February 2017 • Contractor NTP ~
TBD
![Page 24: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/24.jpg)
Sacramento Regional County Sanitation District
Filter Section
![Page 25: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/25.jpg)
Sacramento Regional County Sanitation District
Nitrifying Sidestream Treatment (NST) • Facility Treats SSB overflow
and BRF return • Nitrifying Sequencing Batch
Reactor • NST Influent and Effluent
Pumping • Lime Addition • Construction cost ~ $28.5 M • Design Complete ~ July 2015 • Contractor NTP ~ December
2015
![Page 26: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/26.jpg)
Sacramento Regional County Sanitation District
Disinfection Chemical Storage Project
• Convert gaseous to liquid chlorination/dechlorination
• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities
• Construction cost ~ $30 million
• Design Complete ~ January 2015
• Contractor NTP ~ May 2015
![Page 27: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/27.jpg)
Sacramento Regional County Sanitation District
Disinfection Chemical Storage
![Page 28: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/28.jpg)
Sacramento Regional County Sanitation District
Disinfection Contact Basin Project • Project includes; contact basin with canopy cover, access walkways and control
gates, and connection to the effluent observation structure (EOS) • Possible construction of third effluent conduit • Construction cost ~ $90 million • Design Complete ~ May 2019 • Contractor NTP ~ September 2019
![Page 29: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/29.jpg)
Sacramento Regional County Sanitation District
Building Relocations
• Harvest Crew and Bufferlands Staff Buildings to be Relocated • Design Complete ~ May 2014 • Contractor NTP ~ July 2014 • Construction Cost ~ $8.8 M
![Page 30: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/30.jpg)
Sacramento Regional County Sanitation District
Overall Site
![Page 31: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/31.jpg)
Sacramento Regional County Sanitation District
Plant Access and Security
• Dwight Road • New Security Facility • Existing Construction
Access – Sims Road
![Page 32: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/32.jpg)
Sacramento Regional County Sanitation District
Project Features
• Contractor/CM Field Office Complex
• Contractor Laydown • Excavations, Hauling
– Scraper Route Provisions
• Onsite Traffic
![Page 33: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/33.jpg)
Sacramento Regional County Sanitation District
Construction Workforce
• Forecasted Peak Construction Workforce
• Concurrent Projects • Contractor Site Access,
Parking, Deliveries
![Page 34: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/34.jpg)
Sacramento Regional County Sanitation District
Project Interfaces
![Page 35: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/35.jpg)
Sacramento Regional County Sanitation District
• Operating Plant – Construction Traffic vs.
Operations Traffic
• Access Requests – Impact to Operations
• Interconnecting Projects – Schedules impact other
contracts – Commissioning phasing
![Page 36: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/36.jpg)
Sacramento Regional County Sanitation District
Major Equipment Procurement Alternatives
![Page 37: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/37.jpg)
Sacramento Regional County Sanitation District
Best Value Selection For Major Equipment Procurements
• Procure equipment based on their long-term costs • In most cases, lowest bid cost selection will apply • For equipment with significant variations in
operational costs, alternative procurement options will be considered
![Page 38: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/38.jpg)
Sacramento Regional County Sanitation District
Alternative Procurement Options
• Bids based on present worth analyses by Contractor • Bids based on equipment pre-selected by the District • Bids based on pre-purchased equipment by the
District • Bids based on pre-purchased equipment
subsequently assigned to the contractor
![Page 39: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/39.jpg)
Sacramento Regional County Sanitation District
3-D Design (BIM)
![Page 40: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/40.jpg)
Sacramento Regional County Sanitation District
Objectives of 3-D Design • Allow stakeholders to visualize finished facilities (layouts,
access, etc.) during design development. • Utilize clash detection to identify and eliminate conflicts
both within and between projects. • Efficiently manage large volume of asset data, including
tag numbers, asset parameters, and maintenance data. • Manage changes to contract documents during
construction and commissioning phases.
![Page 41: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/41.jpg)
Sacramento Regional County Sanitation District
Potential Contractors’ Use of 3-D Design Documents
• 3-D model files may be made available during bid phase, with disclaimer.
• BIM files may be available for 4-D (schedule) and 5-D (cost) management.
• Responsibility for maintaining model files to reflect changes, and “as-built” conditions, during construction TBD.
• Use of asset database for submittals (shop drawings, O&M information, etc.) TBD.
![Page 42: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/42.jpg)
Sacramento Regional County Sanitation District
Contact Information
• Web site: http://www.srcsd.com/business-opportunities.php • PMO CM Lead:
– Dave Conover EchoWater Project Program Management Office [email protected]
![Page 43: EchoWater Project - Regional San...• Project includes: bulk chemical storage, chemical building with day tanks and feed pumps, control systems, and piping and injection facilities](https://reader034.vdocuments.site/reader034/viewer/2022052104/603f0983efde6272d50165cf/html5/thumbnails/43.jpg)
Sacramento Regional County Sanitation District
Contractor Input