ECB Easy Connect ion Box

Installations- und bedienungsanleitung DE

Manual de instalación y uso ES

Manuel d’installation et d’utilisation FR

Installation and operating manual GB

Manuale di installazione e uso IT

Page 2: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind
Page 3: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

3ECB - Ref.: IOMSUNXXXX08-GB 03

EN

GL

ISH

1. REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

1.1. CONVENTIONS USED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

1.2. ABBREVIATIONS AND ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

1.3. SAFETY INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1.4. QUALIFIED PERSONNEL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

2. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2.1. GENERAL DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2.2. ELECTRICAL DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

2.3. DIMENSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

3. INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

3.1. MECHANICAL INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

3.2. ELECTRICAL INSTALLATION (ECB3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

3.3. ELECTRICAL INSTALLATION (ECB6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

4. MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

4.1. REGULAR INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

4.2. SPD REPLACEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

5. TECHNICAL SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

CONTENTS

Page 4: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

4 ECB - Ref.: IOMSUNXXXX08-GB 03

The packaging guarantees stability for the equipment during all transport and handling procedures. Carry the packaged unit as

close as possible to the installation site.

When handling the unit on inclined surfaces (even where the incline is minimal), use equipment fitted with suitable

locking devices in order to prevent serious accidents.

1.1. CONVENTIONS USED

The following conventions are used in this guide.

CAUTION: RISK OF ELECTRIC SHOCK

Before beginning any installation procedures make sure you are wearing suitable safety equipment.

IMPORTANT!

These notes contain information you need to be aware of but are not as serious as a caution or warning.

1.2. ABBREVIATIONS AND ACRONYMS

AC: Alternating current

AC (Im): Maximum current AC

AC (Un): Rated voltage AC

DC: Direct current

DC (Im): Maximum current DC

DC (Un): Rated voltage DC

H: Height

W: Width

D: Depth

Ui: Rated insulation voltage

ECB3: Easy Connection Box 3 kW

ECB6: Easy Connection Box 6 kW

1. REQUIREMENTS

Page 5: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

5

EN

GL

ISH

ECB - Ref.: IOMSUNXXXX08-GB 03

1. REQUIREMENTS

1.3. SAFETY INSTRUCTIONS

• Read this instruction manual before commissioning the equipment.

• The photovoltaic panels constantly supply a very high DC power level and the DC switch only cuts off connection with the inverter.

Never touch live parts powered by the photovoltaic panels, as doing so could cause serious injury due to electric shock.

• The device must only be accessed by authorised personnel.

• Unauthorised opening of the device or incorrect maintenance work may cause serious personal injury, fatal accidents or serious

material damage.

• All repair procedures must only be carried out by qualified personnel.

• All repair procedures must only be carried out using original spare parts.

• Original spare parts can be purchased from SOCOMEC customer service.

• Check the protective devices regularly.

• Only use fuses of the correct size.

• For plug-in photovoltaic connectors, the same brand of male and female connectors must be used.

• Making any changes to the ECB panel without obtaining prior consent from SOCOMEC is strictly prohibited.

Clean the ECB with a damp cloth and water or neutral soap.

1.4. QUALIFIED PERSONNEL

Personnel must be familiar with installation, assembly, commissioning and device operation procedures, and must be aware of

potential hazards.

Personnel must possess the required qualifications to carry out commissioning and maintenance procedures.

More specifically these qualifications include:

• Mechanical installation of the device: professional installer with basic electrical skills

• Electrical installation of the device: professional electricians

• Commissioning of the device: professional electricians.

Page 6: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

6 ECB - Ref.: IOMSUNXXXX08-GB 03

2.1-1 Operating principle of a photovoltaic system

2.1-2

2. INTRODUCTION

2.1. GENERAL DESCRIPTION

The ECB (Easy Connection Box) can be used to switch off and isolate the power supply (AC or DC) in the event of non-routine

maintenance or photovoltaic inverter replacement.

11

Solar panels

ECB 3 kW ECB 6 kW

Inverter Electricity network

Page 7: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

7ECB - Ref.: IOMSUNXXXX08-GB 03

EN

GL

ISH

2.2. ELECTRICAL DIAGRAM

There are two versions of ECB: ECB 3 kW to connect to only one 3 kW Inverter (fig 2.2-1) and ECB 6 kW to connect to two 3 kW

Inverters (fig 2.2-2). The ECB has one or two (depending on the model) DC switches to cut off the photovoltaic panels of the inverter,

which can also be handled while charged. Type 2 surge protection devices (SPD) are fitted downstream of the switch, in a classic

Y configuration.

The AC section has one or two (depending on the model) magnetothermal circuit breakers to which a 30 mA type A differential switch

(optional) can also be connected. The AC section is protected by type 2 SPD fitted with protection fuses.

The ECB connection panel is categorised as Class 2, therefore the earth wire is connected directly to the dischargers.

SPD intervention can be ‘monitored’ by the photovoltaic inverter, by connecting the relevant cable (supplied) to the inverter interface

circuit board (please refer to the inverter instruction manual).

When the ECB6 version is installed SPD intervention must only be ‘monitored’ only on one inverter.

2.2-1

FROM THE PANELSwith DC connectors

DC INPUT BREAKER25 A 600 V

SPD DCSURGYSG51800V

TO THE INVERTER GND

FROM THE INVERTER

AC OUTPUT BREAKER16 A 500 V CURVE C

DIFF. 30 mA TYPE A

FUSE16 A gG

SPD ACSURGYSD40

TO THE MAINSwith AC connector

SURGYS AC/DC

N.O.APD AC

N.O.APD DC

PROTECTIONS

N.B.: the differential linked to Q3 is optional.

N.B.: the differentials linked to Q3 and Q4 are optional.

2. INTRODUCTION

2.2-2

From the panelswith DC connectors

Q1

+ -

+ -

F N F N

Q2 Q3 Q4DC INPUTBREAKER25 A 600 V

SPD1 DCSURGYSG51800 V

SPD1 DCSURGYSG51800 V

SPD2 DCSURGYSG51800 V

SPD ACSURGYSD40

TO THE MAINSwith AC connector

GND

DIFF. 30 mA TYPE A DIFF. 30 mA TYPE A

N.O.SPD1 DC

N.O.SPD2 DC

N.O.SPD AC

DC INPUTBREAKER25 A 600 V

AC OUTPUT BREAKER16 A 500 V CURVE C

AC OUTPUT BREAKER16 A 500 V CURVE C

From the panelswith DC connectors

From the inverter 1

TO THE INVERTER 1 TO THE INVERTER 2

From the inverter 2

+ -

+ -

Q1 Q3

Page 8: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

8 ECB - Ref.: IOMSUNXXXX08-GB 03

2.3-1

2.3. DIMENSIONS

205350

1000

SPD

SEE INSTALLATION INSTRUCTIONS BEFORE CONNECTING TO THE SUPPLY

SPD

SEE INSTALLATION INSTRUCTIONS BEFORE CONNECTING TO THE SUPPLY

Front view 1

1 Dimensions in mm

Side view 1

View from below ECB6

View from below ECB3View from above

2. INTRODUCTION

Page 9: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

9ECB - Ref.: IOMSUNXXXX08-GB 03

EN

GL

ISH

3. INSTALLATION

3.1. MECHANICAL INSTALLATION

The equipment is designed for both indoor and outdoor operation.

WARNING!

Assemble it vertically or at a maximum angle of 45°. Be careful, as in this case a drop in performance (derating) may

occur due to the deterioration of heat dispersal.

The support points used to secure the panel must be sufficiently flat.

3.1-1: Remove the ECB from the packaging.

3.1-2: Remove the board fixing screws from the bracket.

3.1-3: Fasten the bracket supplied directly to the wall using two wall plugs, and to the inverter bracket using two nuts. To fix the ECB

on the wall in lateral position use the four holes.

3.1-1

Quick start guide

INSTALLATION AND

OPERATING MANUAL

3.1-2

3.1-3

Page 10: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

10 ECB - Ref.: IOMSUNXXXX08-GB 0310 ECB - Ref.: IOMSUNXXXX08-GB 03

Strip the Red and Black wires coming from panels and attach them to the relevant DC connectors. Connect the AC plug to the

power supply cable coming from mains (connectors and plug supplied).

3.1-4: Fix the ECB to the bracket using the four screws supplied (two on each side).

3.1-5: Remove the two anchoring screws from the mobile part of the bracket.

3.1-6: Rotate the ECB to connect the wires to the inverter.

3.1-4 3.1-5

3. INSTALLATION

3.1-6

Page 11: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

11

EN

GL

ISH

ECB - Ref.: IOMSUNXXXX08-GB 03

3. INSTALLATION

3.2-1

SPD

SEE INSTALLATION INSTRUCTIONS BEFORE CONNECTING TO THE SUPPLY

3.2. ELECTRICAL INSTALLATION (ECB3)

CAUTION: RISK OF ELECTRIC SHOCK

Before beginning any installation procedures, make sure you are wearing suitable safety equipment.

• Make sure the DC cut-off switch and the AC magnetothermal circuit breaker are set to OFF.

• Check that there is no AC mains power in the cable at the panel power socket installation point.

• Connect the AC mains power cable to the single-phase plug (Phase + Neutral + earth) supplied with the inverter and then plug it into input 8.

• Connect the wires coming from the photovoltaic system to inputs 1 and 2 (the DC connectors are supplied with the inverter).

• Connect the wires at output 3 and 4 to the DC input of the inverter, taking care to run them behind the ECB.

• Connect the wire at output 7 to the AC input of the inverter, taking care to run it behind the ECB.

• Connect the SPD monitoring contacts at output 6 to the inverter (please refer to the inverter manual for connection details).

• Connect the earth wire at output 5 of the ECB, to the earth bar in the inverter.

• After making all the electrical connections, rotate the board till it is vertical and secure the mobile part using the two screws.

• Position and secure the two red protective elements.

1 3 5

2 4 6 7 8

Page 12: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

12 ECB - Ref.: IOMSUNXXXX08-GB 0312 ECB - Ref.: IOMSUNXXXX08-GB 03

3. INSTALLATION

3.2-2

3.2-4

click

3.2-3

2

3 4 7 5 6

18

Page 13: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

13ECB - Ref.: IOMSUNXXXX08-GB 03

EN

GL

ISH

3.3. ELECTRICAL INSTALLATION (ECB6)

CAUTION: RISK OF ELECTRIC SHOCK

Before beginning any installation procedures, make sure you are wearing suitable safety equipment.

• Make sure the DC cut-off switch and the AC magnetothermal circuit breaker are set to OFF.

• Check that there is no AC mains power in the cable at the panel power socket installation point.

• Connect the AC mains power cable to the single-phase plug (Phase + Neutral + earth) supplied with the inverter and then plug it

into input 8.

• Connect the wires coming from the photovoltaic system to inputs 1 and 2 for string 1 and to input 9 and 10 for string 2 (the DC

connectors are supplied with the inverter).

• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the

inverter 2, taking care to run them behind the ECB.

• Connect the wire at output 7 to the AC input of the inverter 1 and the wire at output 13 to the AC input of the inverter 2, taking

care to run it behind the ECB.

• Connect the SPD monitoring contacts at output 6 to the inverter 1 or 2 (please refer to the inverter manual for connection details).

• Connect the earth wire at output 5 of the ECB, to the earth bar in the inverter.

• After making all the electrical connections, rotate the board till it is vertical and secure the mobile part using the two screws.

• Position and secure the two red protective elements.

3. INSTALLATION

3.3-1

SPD

SEE INSTALLATION INSTRUCTIONS BEFORE CONNECTING TO THE SUPPLY

2 10 4

1 9 3 11 5 13

12 6 7 8

Page 14: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

14 ECB - Ref.: IOMSUNXXXX08-GB 0314 ECB - Ref.: IOMSUNXXXX08-GB 03

3.3-2 3.3-3

3

1

3.3-5

click

3.3-4

3. INSTALLATION

2

10

1

98

3 4 7 5 6

11 12 13

Page 15: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

15

EN

GL

ISH

ECB - Ref.: IOMSUNXXXX08-GB 03

4. MAINTENANCE

CAUTION: RISK OF ELECTRIC SHOCK

Before beginning any installation procedures, make sure you are wearing suitable safety equipment.

4.1. REGULAR INSPECTIONS

The following should be checked on a regular basis (at least once a year):

• Condition of wires.

• Condition of the panel.

• Condition of connections.

• Condition of fuses.

• Condition of switches (test differential switch intervention, if fitted).

• Condition of Surgys overvoltage SPD (end of service life indicators: green = ok; red = faulty)

4.2. SPD REPLACEMENT

If the dischargers need to be replaced, proceed as follows:

• Make sure that the ECB is completely disconnected (switches set to OFF and all AC/DC wires disconnected)

• Remove the clear plastic cover protecting the SPD

• Remove and replace the damaged SPD

• Replace any blown fuses (AC section only)

• Reposition the clear plastic cover

• Connect all AC/DC wires

• Set the DC switch to ON

• Set the AC magnetothermal circuit breaker to ON

Reference code for the Surgys SPD G51 PV 800 V REM 49822511

Reference code for the Surgys SPD D40 MD 320 V REM 49821426

Reference code for fuses 10 x 38 16 A gG 60120016

Page 16: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind

16 ECB - Ref.: IOMSUNXXXX08-GB 0316 ECB - Ref.: IOMSUNXXXX08-GB 03

5. TECHNICAL SPECIFICATIONS

Models ECB3 ECB6

Rated voltage DC (Un) 600 V 600 V

Maximum current DC (lm) 13 A 26 A 13+13 A

Rated voltage AC (Un) 230 V 230 V

Maximum current AC (lm) 16 A 32 A 16+16 A

Rated insulation voltage (Ui) 800 V 800 V

Earthing system Class II Class II

Compliance with standard EN 61439-2 EN 61439-2

Operating temperature -20÷60 °C -20÷60 °C

Protection rating IP65 IP65

Dimensions (unit) (W x D x H) 350 x 560 x 230 mm 350 x 560 x 230 mm

Weight (net) 13,5 kg 13,5 Kg 14,5 kg

Rated impulse voltage Class II Class II

Dimensions ECB with Inverter (W x D x H) 350 x 205 x 1000 mm 350 x 205 x 1000 mm

Page 17: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind
Page 18: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind
Page 19: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind
Page 20: ECB...• Connect the wires at outputs 3 and 4 to the DC input of the inverter 1 and the wires at output 11 and 12 to the DC input of the inverter 2, taking care to run them behind