The first industrial site in the worldmanufacturing of building Ecomaterials.

Factory Noyal Pontivy FRANCE

Page 2: Easy Eco Build Manufacturing Process

On 10,000 sq.meters, the production’s space and products storage occupies 2000 sq. meters, the workshop and reserve 600 sq. meters and offices 600 sq. meters.

Page 3: Easy Eco Build Manufacturing Process

TheEASYCHANVRE system components are made with natural raw materials: lime, hemp shive, untreated pine wood.The drying process is natural.The production generates no pollution (air, water) or waste (recycling agricultural).

These environmentally materials come from renewable raw materials, storing CO2 (Wood and Hemp).

The manufacturing system consumes very little power

Energy in KWh for 1 sq.meter of wall

Page 4: Easy Eco Build Manufacturing Process

The transport of raw materials is automated under the control of post mixer. The assays are run by computer sensors..

The supply of the mold is made by a carpet for even distribution in the mold.

The mold is also assisted by computer-controlled. The blocks are routed out of the mold on a conveyor slats for maximum ventilation

Page 5: Easy Eco Build Manufacturing Process

The blocks are stored in racks with a lift system developed to avoid weakening the products.The drying process is natural and lasts for 12-20 days before palletizing.

Page 6: Easy Eco Build Manufacturing Process

Drying Rack Routing the little pallets to the mold Stokage racks of products

Entry storage racks Exit storage racks

Page 7: Easy Eco Build Manufacturing Process
Page 8: Easy Eco Build Manufacturing Process

Hemp is stored in bales outside.

Then it is poured into a silo moving floor to be carried by bucket elevator inside the factory.

It arrives by conveyor to the mixer

Page 9: Easy Eco Build Manufacturing Process

The lime is stored outdoors.

Slaked Lime silo

Tank for water coolingagitated tanks extinction

Stirred tank manufacturingpulp lime

Storage tank "buffer"pulp lime

Page 10: Easy Eco Build Manufacturing Process

The wood frame custom sized and connectors pre-installed in factory.

Metal fittings (caps for lintels, fasteners) are delivred with the wood frame.

Page 11: Easy Eco Build Manufacturing Process
Page 12: Easy Eco Build Manufacturing Process

Poids : 18 kg

60cm

45mm

7cm

17cm

17cm

17cm 30cm

30cm

Corner Block Standard Bloc

60cm45mm

7cm

17cm

30cm

30cm

30cm

12,5cm

60cmFloor slabs

Partition slabs

Poids : 10 kg

30cm

12,5cm

60cm

Page 13: Easy Eco Build Manufacturing Process

Lintel

Posts

Floor joists

Page 14: Easy Eco Build Manufacturing Process

Compacity Porosity Coefficient of thermal conductivity anhydrous Thermal resistance of a wall (anhydrous)Coefficient of thermal transmissionThermal resistance of a wall (normal) Coefficient of acoustic absorptionFire resistanceFreeze/Thaw resistance

54%46%0,08W/m.°C3,75m².°C

0,11W/m.°C2,72m².°C/W0,80

M0 - M1

20 cycles

Page 15: Easy Eco Build Manufacturing Process
Page 16: Easy Eco Build Manufacturing Process

« Houses that breathe » Thermal regulation (saving heating and air conditioning) Comfort and health for the occupants (no moisture no mold) Excellent soundproofing

« Building sites clean » Light products and without toxicity No non-recyclable waste Easy installation