![Page 1: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/1.jpg)
November 6, 2014
East Link Extension
South Bellevue Completion of Design Open House
![Page 2: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/2.jpg)
Tonight’s agenda • 5-7 p.m. – Open house
– Meet the team
– View design plans
• 5:30 – Presentation
– Welcome and introductions (Luke Lamon)
– City of Bellevue introduction (Kate March)
– East Link overview (Paul Cornish)
– Station design (John Walser)
– STart (Barbara Luecke)
– Questions and comments
• 6:00 – Return to open house
• 7:00 - Close
![Page 3: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/3.jpg)
City of Bellevue
Light Rail Permitting Citizen’s Advisory Committee Purview:
• Station design
• Park & rides
• Landscaping
• Accessory structures
• Noise walls
• Tunnel portals
• Public art
![Page 4: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/4.jpg)
City of Bellevue
1) Permitting & Inspection
• Requires Sound Transit and other utility companies to meet our city codes
2) Maintenance of Traffic
• Works with Sound Transit to develop a plan to keep vehicles moving
3) General Coordination
• Partners with Sound Transit and utility companies to facilitate a smooth construction process
City’s Role During East Link Construction
![Page 5: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/5.jpg)
Link light rail system
• 16 miles of light rail with 13 stations
currently in service
• University Link & South 200th Link under
construction; open 2016
• ST2 Plan funded extensions to Overlake,
South King County, and Lynnwood
• 50+ mile system
![Page 6: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/6.jpg)
East Link overview
Length: 14 miles
Ride times:
• Mercer Island to UW: 20 min.
• S. Bellevue to Intl. District: 14 min.
• Overlake Transit Center to
Bellevue Transit Center: 10 min.
Rider projection: 50,000 daily by
2030
Budget: $2.8 billion (2010 $)
Start of Service: Targeted 2023
![Page 7: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/7.jpg)
East Link timeline & recent progress
Completion of
design
Early construction
planning underway
South Bellevue
Design &
Mitigation Permit
submitted
![Page 8: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/8.jpg)
South Bellevue Segment overview
• Serves South Bellevue with an elevated, at-grade
and trench alignment along Bellevue Way SE and
112th Ave SE
• Approximately 4,500 daily boardings (2030)
• One station in this segment:
South Bellevue: Located at current South
Bellevue Park-and-Ride lot. Includes
approximately 1,500 parking stalls.
• Southbound HOV lane on Bellevue Way
from the South Bellevue Station to I-90
![Page 9: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/9.jpg)
South Bellevue Station construction
Starting in 2016, the South Bellevue park-and-ride
will become an active construction zone and no
longer accessible to the public.
• The South Bellevue park-and-ride will serve as the construction
hub for building the light rail station, track, and 1,500-stall parking
garage and staging equipment.
• Sound Transit is working to identify alternate options for park-
and-ride users, including directing riders to underused park-and-
rides, leasing parking space from community churches, and
potentially constructing new parking spaces off-site.
![Page 10: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/10.jpg)
Keeping you moving
Goals:
• Maintain 2-lanes of peak directional traffic on
Bellevue Way
• Minimize cut-through traffic in
neighborhoods
• Minimize overall impacts of utility work; 10
scenarios considered by Sound Transit and
City of Bellevue
![Page 11: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/11.jpg)
What we’ve heard
Noise • Operational noise analysis complete, proposed wall
locations and heights currently under review by City of
Bellevue.
Tree Preservation • Tree inventory complete, preservation and
replacement plan presented to CAC
Construction • Contractor on-board in 2016 with additional schedule
detail
• Coordination: City of Bellevue, WSDOT, KC Metro
![Page 12: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/12.jpg)
2015 early construction activity
Advance utility relocations • Work expected to take place mid-2015
• Utility owners relocate their infrastructure
prior to Sound Transit construction
• Puget Sound Energy (electric)
Installation of 2 new poles at SE 30th,
east and west sides of Bellevue Way
Installation of 1 new pole at the wye,
east of Bellevue Way
• Heavy civil construction, including utility
undergrounding and relocation, to begin 2016
Work look-ahead for S. Bellevue
![Page 13: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/13.jpg)
Overview of typical impacts: • Temporary utility service disruptions
• Traffic circulation
• Blocked off work areas
• Noise, vibration, dust and debris
• Storage of work materials and equipment
Sound Transit 24/7 construction hotline:
888-298-2395
Utility relocations – Overview of impacts
![Page 14: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/14.jpg)
Station Design Overview
South Bellevue Station
![Page 15: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/15.jpg)
Landscape plan
![Page 16: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/16.jpg)
Overall site sections
![Page 17: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/17.jpg)
Context-Boardwalks
![Page 18: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/18.jpg)
Landscape plan
![Page 19: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/19.jpg)
1 2 3
4
5
6
![Page 20: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/20.jpg)
South entry
![Page 21: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/21.jpg)
South entry
![Page 22: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/22.jpg)
North entry
![Page 23: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/23.jpg)
South parking entry
![Page 24: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/24.jpg)
North entry & bus platform
![Page 25: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/25.jpg)
North entry & bus platform
![Page 26: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/26.jpg)
Platform view to south
![Page 27: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/27.jpg)
STart
Sound Transit’s Integrated Art Program
![Page 28: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/28.jpg)
Katy Stone- past projects
![Page 29: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/29.jpg)
Katy Stone- past projects
![Page 30: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/30.jpg)
Katy Stone- garage facade inspiration
![Page 31: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/31.jpg)
Katy Stone- garage facade
![Page 32: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/32.jpg)
Katy Stone- art sited for prime platform viewing
![Page 33: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/33.jpg)
Katy Stone- garage facade
![Page 34: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/34.jpg)
Katy Stone- garage facade
![Page 35: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/35.jpg)
Katy Stone- perforated screen inspiration
![Page 36: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/36.jpg)
Katy Stone- perforated screen study
![Page 37: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/37.jpg)
Katy Stone- perforated garage screen
![Page 38: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/38.jpg)
Vicki Scuri- past projects
![Page 39: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/39.jpg)
Site inspiration
![Page 40: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/40.jpg)
Vicki Scuri- station column inspiration and pattern
![Page 41: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/41.jpg)
Platform columns before
![Page 42: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/42.jpg)
Platform columns after
![Page 43: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/43.jpg)
Vicki Scuri- station column closeup
![Page 44: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/44.jpg)
Vicki Scuri- station platform column wrap
![Page 45: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/45.jpg)
Vicki Scuri- acoustic panel inspiration
![Page 46: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/46.jpg)
Vicki Scuri- acoustic panel patterns
![Page 47: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/47.jpg)
Acoustic panel- before
![Page 48: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/48.jpg)
Acoustic panel- after
![Page 49: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/49.jpg)
Vicki Scuri- acoustic panel patterns 5 designs create 100s of feet of patterns
![Page 50: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/50.jpg)
What’s next?
Select station names
Hire contractors
Secure permits
Continue community
outreach
![Page 51: East Link Extension South Bellevue Completion of Design ... · hub for building the light rail station, track, and 1,500-stall parking garage and staging equipment. • Sound Transit](https://reader035.vdocuments.site/reader035/viewer/2022071020/5fd47b8c0ae6416c131786d7/html5/thumbnails/51.jpg)